1 2 (Rp.)
TOTAL
PPN 10%
JUMLAH TOTAL
CV/PT. ____________________
_______________________
HARGA PERKIRAAN SENDIRI (HPS)
1 2 (Rp.)
TOTAL
PPN 10%
JUMLAH TOTAL
CV/PT. ____________________
_______________________
HARGA PERKIRAAN SENDIRI (HPS)
1 2 3 4 (Rp.)
TOTAL
PPN 10%
JUMLAH TOTAL
Terbilang : Sebelas Juta Sembilan Ratus Sembilan Puluh Lima Ribu Lima Ratus Rupiah
KEPALA BIDANG PENATAAN
DINAS PUPR KABUPATEN KAR
KUASA PENGGUNA ANGGA
TOTAL HARGA
(Rp.)
6,940,000.00
6,940,000.00
694,000.00
7,634,000.00
n Ratus Sembilan Puluh Lima Ribu Lima Ratus Rupiah
KEPALA BIDANG PENATAAN RUANG
DINAS PUPR KABUPATEN KARANGASEM/
KUASA PENGGUNA ANGGARAN/PPK
1 2 3 4 (Rp.)
1 PROYEKTOR ASUS P3B Unit 1.00 10,905,000.00
- Portable LED Projector
- 800 Lumens
- WXGA (1280*800),
- Built-in 12000mAh Battery
- Short Throw
- Up to 3-hour Projection
- Power Bank
- Multimedia Player
- Auto Keystone Correction
- Wireless Connection
- Extensive Connectivity
TOTAL
PPN 10%
JUMLAH TOTAL
Terbilang : Sebelas Juta Sembilan Ratus Sembilan Puluh Lima Ribu Lima Ratus Rupiah
TOTAL HARGA
(Rp.)
10,905,000.00
10,905,000.00
1,090,500.00
11,995,500.00