Anda di halaman 1dari 6

TABLE: Auto Seismic - User Coefficient

LoadPat Dir PercentEcc EccOverride UserZ C K WeightUsed BaseShear


Text Text Unitless Yes/No Yes/No Unitless Unitless Kgf Kgf
SX X 0.05 No No 0.25 1 5.39 0.54
SY X 0.05 No No 0.25 1 5.39 0.54

1.3475
1.3475
TABLE: Program Control
ProgramName Version ProgLevel LicenseNum LicenseOS LicenseSC LicenseHT
Text Text Text Text Text Text Text
SAP2000 20.2.0 Ultimate 3010*1B6TD9PQ7EQAPAW Yes Yes No
CurrUnits SteelCode ConcCode AlumCode ColdCode RegenHinge
Text Text Text Text Text Text
Kgf, m, C AISC 360-10 ACI 318-14 AA-ASD 2000 AISI-ASD96 Yes
REQUERIMIENTO DE MATERIALES

CERCO PERIMETICO (ZONA 01)

MATERIALES P/CONSTRUCCION

BLOQUETA UND 389.00


CEMENTO BLS 61.00
ARENA GRUESA M3 4.02
PIEDRA 1/2" M3 3.90
ACERO 1/2" VAR. 19.00
ACERO 6mm VAR. 33.00
ENCOFRADO M2 36.00
ALAMBRE N° 4 KG 20

MAQUINARIA P/DEMOLICION

RETROEXCAVADORA UND 1.00


CAMION BOLQUETA UND 2.00

HERRAMIENTAS MANUALES P/CERCO

PALA UND 5.00


PICO UND 5.00
BARRETA UND 3.00
CARRETILLA UND 3.00
MARTILLO (BOSH) UND 2.00
REQUERIMIENTO DE MATERIALES

MURO DE CONTENCION (ZONA 01)

MATERIALES P/CONSTRUCCION

CEMENTO BLS 86.00


ARENA GRUESA M3 4.66
PIEDRA 1/2" M3 5.10
ACERO 1/2" VAR. 75.00
ENCOFRADO M2 35.00
TECNOPOR 1/2" M2 35.00
ALAMBRE N° 4 KG 20

EQUIPO P/DEMOLICION

MARTILLO (BOSH) UND 2.00

HERRAMIENTAS MANUALES P/CERCO

PALA UND 5.00


PICO UND 5.00
BARRETA UND 3.00
CARRETILLA UND 3.00
REQUERIMIENTO DE MATERIALES

LOSA NITRATO (ZONA 01)

MATERIALES P/CONSTRUCCION

CEMENTO BLS
ARENA GRUESA M3
ENCOFRADO M3

EQUIPO P/LIMPIEZA

CISTERNA UND 2.00

HERRAMIENTAS MANUALES P/CERCO

ESCOBA UND 5.00


UND 5.00
UND 3.00
UND 3.00

Anda mungkin juga menyukai