DENSIDAD= 202.134
DOTACION= 95
I FILTRACION 5000
ANALISI
Tramo P.V.S Caudal Long. Diámetro Rh^2/3
No. No No (lps) m mm m
Del Al diseño
1 PV5 PV4 1.087174769 95.64 200 0.135720881
2 PV4 PV3 3.979469907 101.5 200 0.135720881
3 PV3 PV2 5.341515278 99.61 200 0.135720881
4 PV2 PV1 6.440997685 63.26 200 0.135720881
n= 0.009
ANALISIS TOPOGRAFICO CON TUBERIA PVC
Tramo P.V.S Long Elev. terreno S
Del Al Serv A. arriba A. Abajo
No. No No m m m %
1 PV5 PV4 73.23 524 520 0.156838143
2 PV4 PV3 80.92 520 519 0.147783251
3 PV3 PV2 68.69 519 518 0.200783054
4 PV2 PV1 80.14 518 516.5 0.189693329
ALCULO DE LOS CAUDALES DE DISEÑO.
Población Factor de Harmon Caudales
Acum. Calculado Utilizado Medio Máximo Infiltra. Qe
Hab. (lps) (lps) (lps) (lps)
382.925 4.031084197 3 0.336832176 1.010496528 0.076678241 0
1401.65 3.700662606 3 1.23293287 3.698798611 0.280671296 0
1881.39 3.606281504 3 1.654926389 4.964779167 0.376736111 0
2268.65 3.542586583 3 1.995571759 5.986715278 0.454282407 0
ANALISIS HIDRAULICO
A Elevación topográfica Pendientes Qll Velocidad
m2 Aguas arriba Aguas abajo % % (lps) m/s
Terr. Tub. Lleno
0.031415927 524 520 4.182350481 0.156838143 18.76203227 0.597214036
0.031415927 520 519 0.985221675 0.147783251 18.2123774 0.579717978
0.031415927 519 518 1.00391527 0.200783054 21.22841458 0.675721423
0.031415927 518 516.5 2.371166614 0.189693329 20.63384016 0.656795531
GRAFICO CON TUBERIA PVC
Elev. invert Prof. excavación Cálculo de Caída
A. arriba A. Abajo A. arriba A. Abajo CALCULADA Propuesta
m m m m m m
522.3 522.1851474 1.7 -2.18514743 0.002163711 0.03
522.1551474 522.0355612 -2.15514743 -3.03556122 0.003211518 0.03
522.0055612 521.8676433 -3.00556122 -3.86764334 0.005519431 0.03
521.8376433 521.6856231 -3.83764334 -5.18562311 0.005910972 0.03
Diseño
(lps)
1.087174769
3.979469907
5.341515278
6.440997685
Velocidad RELACIONES
m/s CAUDALES VELOCIDAD DIAMETRO
Diseño
0.412077685 0.057945469 0.69 0.244
0.502035769 0.218503593 0.866 0.369
0.658152666 0.251621018 0.974 0.47
0.681096966 0.312157002 1.037 0.547