Anda di halaman 1dari 2

REKAPITULASI BILL OF QUANTITY (BOQ)

Pekerjaan : Belanja Jasa Konsultasi Perencanaan (Planing)


Masjid
Lokasi : Jl Raya Miramareu No.99 Ds. Sirnabakti Kec. Pameungpeuk Garut

SUB JUMLAH JUMLAH


NO URAIAN PEKERJAAN HARGA HARGA
(Rp.) (Rp.)

A. PEKERJAAN PERSIAPAN -
-
PEKERJAAN LEVELING
B. PEKERJAAN TANAH DAN PONDASI -
-
PEKERJAAN MASJID
B. PEKERJAAN TANAH DAN PONDASI
B.1 PEKERJAAN TANAH -
B.2 PEKERJAAN PONDASI -
-
C. PEKERJAAN STRUKTUR BETON
C.1 PEKERJAAN STRUKTUR BETON ELEV 3.00 M -
C.2 PEKERJAAN STRUKTUR BETON ELEV 5.50 M -
C.3 PEKERJAAN STRUKTUR BETON ELEV 7.5 M -
C.4 PEKERJAAN STRUKTUR BETON ELEV 9.00 M -
C.5 PEKERJAAN STRUKTUR BETON ELEV 11.70 M -
C.6 PEKERJAAN STRUKTUR BETON ELEV 14.00 M -
C.7 PEKERJAAN STRUKTUR BETON ELEV 15.00 M -
C.8 PEKERJAAN STRUKTUR BETON ELEV 17.00 M -
-
D. PEKERJAAN DINDING
D.1 PEKERJAAN DINDING ELEVASI 3.00 M -
D.2 PEKERJAAN DINDING ELEVASI 5.50 M -
D.3 PEKERJAAN DINDING ELEVASI 7.50 M -
D.4 PEKERJAAN DINDING ELEVASI 9.00 M -
D.5 PEKERJAAN DINDING ELEVASI 11.70 M -
D.6 PEKERJAAN DINDING ELEVASI 14.00 M -
D.7 PEKERJAAN DINDING BATA ELEVASI 15.00 M -
D.8 PEKERJAAN DINDING ELEVASI 17.00 M -
-
E. PEKERJAAN PLAFOND
E.1 PEKERJAAN PLAFOND ELEVASI 3.00 M -
E.2 PEKERJAAN PLAFOND ELEVASI 5.50 M -
-
F. PEKERJAAN LANTAI DAN KUSEN
F.1 PEKERJAAN LANTAI -
F.2 PEKERJAAN KUSEN DAN ASESORIES -
-
G. PEKERJAAN PENGECATAN
G.1 PEKERJAAN PENGECATAN ELEVASI 3.00 M -
G.2 PEKERJAAN PENGECATAN ELEVASI 5.50 M -
-
H. PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR
H.1 PEKERJAAN INSTALASI AIR BERSIH -
H.2 PEKERJAAN INSTALASI AIR KOTOR -
H.3 PEKERJAAN SANITAIR -
-
I. PEKERJAAN PENGADAAN AIR BERSIH -
SUB JUMLAH JUMLAH
NO URAIAN PEKERJAAN HARGA HARGA
(Rp.) (Rp.)

-
J. PEKERJAAN INSTALASI PENERANGAN
J.1 PEKERJAAN INSTALASI PENERANGAN -
J.2 LP/PP.A -
J.3 PEKERJAAN PENANGKAP PETIR -
-
K. PEKERJAAN INSTALASI TATA SUARA
K.1 INSTALASI TATA SUARA -
K.2 INSTALASI TATA SUARA -
-
L. PEKERJAAN INSTALASI TATA UDARA
L.1 INSTALASI TATA UDARA -
-
M. PEKERJAAN SALURAN, BLOOMBAK DAN KOLAM
M.1 PEKERJAAN SALURAN -
M.2 PEKERJAAN BLOOMBAK -
M.3 PEKERJAAN KOLAM -
-
N. PEKERJAAN GROUNTANG DAN RUMAH POMPA -
-
O. PEKERJAAN SARANA DAN PRASARANA
O.1 PEKERJAAN AKSES JALAN -
O.2 PEKERJAAN PAVING BLOK -
-
P. PEKERJAAN LAIN - LAIN -
-

TOTAL Rp. -

Terbilang :
-

…..........., …...............................2019
CV. / PT. …....................................

…...............................................
Direktur / Direktris

Anda mungkin juga menyukai