pc3
S
77
W W W W W W
W
S S S S
W
S
W
S
S
S
S
S
C:\Users\Nassir\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\WAS9HVT3\CD.dwg, 7/27/2013 12:29:25 PM, DWG To PDF.pc3
W W W W W W
W
S S S S S
W
W
S
S
S
S
77
C:\Users\Nassir\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\WAS9HVT3\CD.dwg, 7/27/2013 12:29:55 PM, DWG To PDF.pc3
C:\Users\Nassir\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\WAS9HVT3\CD.dwg, 7/27/2013 12:30:18 PM, DWG To PDF.pc3
PROPOSED THREE STORY MIXED USE BUILDING
01
ICC/ANSI A117.1-2003
Heritage Madison Architecture, LLC
F:\Dwg\0-2013-JOBS\13118-499Hmltn-Dn\CD-140325\ARCHITECTURAL\PLOT\A-101.dwg, 5/2/2014 11:52:20 AM, DWG To PDF.pc3
01
FT'G./FOUNDATION PLAN (CONSTRUCTION)
01
SECOND FLOOR PLAN (CONSTRUCTION)
02
REFLECTED CEILING PLAN @ CORRIDOR
Heritage Madison Architecture, LLC
F:\Dwg\0-2013-JOBS\13118-499Hmltn-Dn\CD-140325\ARCHITECTURAL\PLOT\A-104.dwg, 5/2/2014 11:52:24 AM, DWG To PDF.pc3
03
THIRD FLOOR PLAN (CONSTRUCTION)
01
ATTIC PLAN (CONSTRUCTION)
01
ROOF PLAN (CONSTRUCTION)
ELEVATION DETAIL
05
Heritage Madison Architecture, LLC
STAIR #1 FIRST FLR.
01
STAIR #3 FIRST FLR.
03
01
ELEVATOR DETAILS
Heritage Madison Architecture, LLC
F:\Dwg\0-2013-JOBS\13118-499Hmltn-Dn\CD-140325\ARCHITECTURAL\PLOT\A-411.dwg, 5/2/2014 11:52:31 AM, DWG To PDF.pc3
01
ELEVATOR DETAILS
Heritage Madison Architecture, LLC
F:\Dwg\0-2013-JOBS\13118-499Hmltn-Dn\CD-140325\ARCHITECTURAL\PLOT\A-501.dwg, 5/2/2014 11:52:34 AM, DWG To PDF.pc3
01
WALL SECTION
02
WALL SECTION
Heritage Madison Architecture, LLC
F:\Dwg\0-2013-JOBS\13118-499Hmltn-Dn\CD-140325\ARCHITECTURAL\PLOT\A-502.dwg, 5/2/2014 11:52:36 AM, DWG To PDF.pc3
01
WALL SECTION
02
WALL SECTION
DETAIL @ SUMP PUMP PIT (TYP.) DETAIL @ RAMP CONC. SLAB JOINTS (TYP.)
09 DTL @ DOOR HEAD & SILL 13 18
10
Heritage Madison Architecture, LLC
DOOR TYPES
01
WINDOW ELEVATIONS
02
8x8 TRANSFER
24x24 DUCT (TYP ALL
LOUVER W/ CONFINED ROOMS) 1" GAS
FILTER (TYP)
6x20 AC-8 6x20
AC-5 4x10 AC-9
LOUVER LOUVER
LOUVER
(150) (150)
4x10 (50) 4x10
LOUVER LOUVER
(50) (50)
4x10 AC-6 AC-7
LOUVER 4" EXHAUST
1" DOOR
4x10 (50) TO ROOF 4x10
UNDERCUT (TYP
LOUVER FROM EACH LOUVER
FOR BATHROOMS
(50) AC-4 DRYER WITH IN (50)
ALL UNITS BOTTOM WALL
SUPPLY, TOP CONNECTION
RETURN, FLEX KIT (TYP)
6x20
CONNECTIONS, 1" 3X14 DUCT
F:\Dwg\0-2013-JOBS\13118-499Hmltn-Dn\CD-140325\CONSULTANT\MEP\IN\140418\MEP 20140415.dwg, 5/2/2014 12:14:07 PM, DWG To PDF.pc3
LOUVER
CONDENSATE DRAIN FROM BELOW
6x20 (200) 6x20
TO DRAINAGE, 1" REGISTERS AT CLG
LOUVER GAS TO HWH & AC, LOUVER
(150) 3" FLUE AND (150)
6x20 COMBUSTION AIR 6x20 6x20
6x20
LOUVER TO ROOF, FLEX LOUVER LOUVER
LOUVER
(200) CONNECTIONS (150) (200)
(200)
PANEL T2
02
LINE DIAGRAM
2) ALL WATERLINES BELOW THE FLOOR UP TO 3/4" SHALL BE TYPE 'L' SOFT DRAWN COPPER TUBING WITH NO JOINTS,
WHERE BENDS ARE REQUIRED A TUBING BENDER SHALL BE USED; ALL WATERLINES BELOW THE FLOOR 1" OR GREATER
SHALL BE TYPE 'L' HARD DRAWN COPPER TUBING WITH WROUGHT COPPER OR CAST BRASS FITTINGS. JOINTS SHALL BE
PROPERLY REAMED TO FULL BORE, CLEANED, FLUXED AND SWEAT SOLDERED USING 'LEAD FREE' FLUX AND SOLDER.
3) ALL WATERLINES ABOVE THE FLOOR SHALL BE TYPE 'L' HARD DRAWN COPPER TUBING WITH WROUGHT COPPER OR
CAST BRASS FITTINGS. JOINTS SHALL BE PROPERLY REAMED TO FULL BORE, CLEANED, FLUXED AND SWEAT SOLDERED
USING 'LEAD FREE' FLUX AND SOLDER.
4) COPPER TUBING SHALL BE SUPPORTED AT EACH FIXTURE AND AT INTERVALS NOT EXCEEDING 4'-0" FOR VERTICAL
PIPING AND AT INTERVALS NOT EXCEEDING 6'-0" FOR HORIZONTAL PIPING.
5) ALL WATERLINES BELOW BUILDING, IN EXTERIOR WALLS, OR IN CAVITY ADJACENT TO EXTERIOR WALLS SHALL BE
INSULATED WITH ARMORFLEX PIPE INSULATION HAVING A MINIMUM WALL THICKNESS OF ONE HALF INCH. WATERLINES SHALL
NOT BE INSTALLED IN OUTSIDE WALLS UNLESS SPECIFICALLY APPROVED BASED ON GEOGRAPHIC LOCATION OF
BUILDING.
6) COPPER WATERLINES PASSING THROUGH WALLS AND FLOORS SHALL BE PROTECTED AGAINST CORROSION WITH
SLEEVES OF SUITABLE MATERIAL. PROPERLY SIZED ESCUTCHEON PLATES SHALL BE INSTALLED AT POINT OF FLOOR
AND WALL PENETRATIONS.
7) DRAIN, WASTE, AND VENT PIPING SHALL BE SCHEDULE 40 D.W.V. PVC, CONFORMING TO ASTM D2665 & D3311, U.S.
FEDERAL SPECIFICATION L-P-302-B, AND ANSI A119.1 & A119.2. ALL JOINTS SHALL BE PROPERLY REAMED TO FULL BORE,
CLEANED, PRIMED, AND SOLVENT WELDED. DRAIN, WASTE, AND VENT PIPING SHALL BE SUPPORTED AT EACH FIXTURE
AND AT BASE OF VENT STACKS. VERTICAL PIPING SHALL SUPPORTED AT SUFFICIENTLY CLOSE INTERVALS AS TO KEEP IT
IN ALIGNMENT AND TO PREVENT SAGGING. HORIZONTAL PIPING SHALL BE SUPPORTED AT SUFFICIENTLY CLOSE INTERVALS
AS TO KEEP IT IN ALIGNMENT AND TO PREVENT SAGGING, BUT NOT LESS THAN 4'-6" INTERVALS. PROVIDE CAST IRON
OR FIRE INSULATION WHERE EXPOSED TO PLENUM.
8) ALL FLOOR DRAINS, FLOOR SINKS AND HUB DRAINS SHALL HAVE PROPERLY INSTALLED TRAP PRIMING DEVICE.
9) ALL HOSE THREADED CONNECTIONS SHALL HAVE PROPERLY INSTALLED VACUUM BREAKERS.
10) VENT EXTENSIONS THROUGH THE ROOF SHALL BE A MINIMUM OF 3 INCHES IN DIAMETER, WHERE NECESSARY TO
INCREASE THE SIZE OF THE VENT PIPE, SUCH INCREASE SHALL BE A MINIMUM OF 12 INCHES BELOW THE ROOF LINE. VENTS
SHALL TERMINATE A MINIMUM OF 12 INCHES ABOVE THE ROOF LINE, WHEN NECESSARY (DUE TO SHIPPING HEIGHT
FIRST FLOOR PLUMBING PLAN SECOND FLOOR PLUMBING PLAN LIMITATIONS) PROVIDE VENT TERMINAL EXTENSIONS TO BE INSTALLED AT JOB-SITE.
1 2 11) TRAPS BELOW THE FLOOR THAT CANNOT BE HELD ABOVE BOTTOM OF BASEFRAME, SHALL BE DRY FITTED, PROPERLY
NUMBERED, LABELED, AND SHIPPED WITH BUILDING TO BE INSTALLED AT JOBSITE.
12) PROVIDE PVC PRIMER AND PVC CEMENT OF SUFFICIENT QUANTITY TO INSTALL TRAPS AND VENT EXTENSIONS.
13) TESTING : ROUGH-IN TESTING DRAIN, WASTE, AND VENT SYSTEM SHALL BE TESTED BY CLOSING OFF ALL OPENINGS
EXCEPT VENT TERMINATIONS AT ROOF LINE, FILL ALL HORIZONTAL AND VERTICAL PIPING WITH WATER AND CHECK FOR
LEAKS. ANY LEAKS SHALL BE REPAIRED AND TEST REPEATED. POTABLE WATERLINES SHALL BE TESTED WITH A SINGLE
CHARGE OF AIR AT 100psi, PRESSURE SHALL HOLD FOR A PERIOD OF THIRTY MINUTES WITHOUT ANY LOSS. ANY LEAKS
SHALL BE REPAIRED AND TEST REPEATED. AFTER OBTAINING SUCCESSFUL TESTS G.C. SHALL CALL FOR INSPECTION AND
APPROVAL PRIOR TO ANY PLUMBING BEING CONCEALED. FINAL TEST OF WATER SUPPLY SYSTEM AFTER FIXTURES ARE
SET, WATER PIPING SHALL BE TESTED WITH A SINGLE CHARGE OF AIR AT 50psi, PRESSURE SHALL HOLD FOR A PERIOD
OF THIRTY MINUTES WITHOUT ANY LOSS. ANY LEAKS SHALL BE REPAIRED AND TEST REPEATED. AFTER OBTAINING
SUCCESSFUL TEST, CALL FOR FINAL INSPECTION AND OPERATION TEST.
F:\Dwg\0-2013-JOBS\13118-499Hmltn-Dn\CD-140325\CONSULTANT\MEP\IN\140418\MEP 20140415.dwg, 5/2/2014 12:14:20 PM, DWG To PDF.pc3
DIRECTION
OF FLOW
FLOOR CLEANOUT DETAIL HOT WATER HEATER (STORES) SEWER CONNECTION DETAIL PIPE PENETRATION THRU FLR.
01 02 03 04
RISER DIAGRAMS
1