Anda di halaman 1dari 18

HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE

TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

COMPANY: CHEVRON TEXACO NIGERIA LIMITED

CONTRACTOR: HYUNDAI HEAVY INDUSTRIES

SUBCONTRACTOR: INERGEY ENGINEERING AND


CONSTRUCTION CO. LTD.

TENDER NO:

WECO JOB NO: 003-004

BALLAST PLAN AND CALCULATION

FOR
ESCRAVOS GAS PLANT EGP - 3
PIPE RACKS AND MUDULES FABRICATION,
MODULARIZATION AND INSTALLATION
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

Rev Date Author Endorsed Endorsed Purpose of Issue


No by by
WECO Customer

0 25 FEB UHM For Bid Document


2003
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

1.0 INTRODUCTION

This document presents results of tidal variations monitored at Aker


Base for a Period of two weeks, and a preliminary ballasting
calculations to show compatibility of bardge/quary at two extreme
conditions: the low water tide and the high water tide. Calculations
are based on the Loadout Arrangement Block Diagram provided by
the transportation and Installation Contractor.
Detailed calculations will be provided after the Transportation and
installation contractor has provided AFC loadout and sea fastening
and barge drawings.
It is assumed that the cargo barge Tide Mar 254 ( 250’x72’x16’ )will
be used.

2.0 TIDAL VARIATIONS AT AKER BASE

A tide gauge has been established on October 16,1999 at the quay


of Aker base and regular readings are taken every day for a period
of two weeks. Details of the readings are hereby attached
(Appendix 1). All readings are above LLW.
It has been observed 11/2 to 2 hours of relatively steady tide(+/-
10cm).
This would be the ideal period for the loadout operation.

The Aker Base quay elevation is 3.58 above LLw. At the highest
tide the water level was about 2.32m above LLW, therefore 1.26m
below quay level. At the lowest tide the water level was at LLw
(0.0m), therefore 3.58m below quay level.

The two main water levels studies (low and high water) are
llustrated in figure 2.1 and 2.2.

3.0 HYDROGRAPHIC SURVEY (SOUNDING) OF AKER BASE


HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

In order to ascertain the compatibility of the depth of Aker base


Jetty/Barge maximum draft, hydrographic survey map has been made
available, the results of the survey show an average depth of 7.0m below
LLW, which is more than enough to accommodate the Cargo Barge which
maximum draft is 3.87m.
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

3.0 Cargo Barge Dimensions and Ballast Tanks Arrangement

3.1 Barge Dimensions

Length overall 250.0 ft 76.20m

Beam 72.0 ft 21.20m

Depth 16.0 ft 4.88m

Light draft 2.20 ft 0.67m

Maximum draft 12.6 ft 3.87m

Freeboard 3.35 ft 1.02m

Light displacement 2610 kips 945.6 tonnes

Displacement @ design 5,710.0lt 5,801.36 t


draft

Deadweight 4,780.0lt 4,856.40 t

Deck Space 230 x 68 ft 70.1 x 20.7m

Deck Strength 1,500.lb/ft2 7.30 t/m2

3.2 Ballasting Tanks Arrangement

To achieve the required ballasting, all tanks have been assigned


explicit purposes.
These assignments are illustrated in figure 3.1.It is assumed that all
thanks will have at least 2.5% or about 5 inches of water in them
(this accounts for mud or excess water pumps cannot remove).
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

4.0 Parabe Quarters Ballasting at Phrase 0


5.0
The ballasting at phase 0 takes place after the loading by crane of piles
(P1, P2, P3) and the bridge, it aims at leveling the main deck of the cargo
barge with the quay. We will consider therefore the two extreme cases the
low tide and the high tide.

4.10 Piles, Bridge, Lightship data


The piles, Bridge and lightship data have been estimated
approximately based on the loadout block diagram provided by the
transportation and installation contractor.

Item Weight (kips) X (ft) Y (ft)


Lightship 2610 0.0 0.0
P.Q piles 501.52 -54.8 -7.71
P.Q Bridge 39.6 -73.0 22.5
Note: Coordinates are in reference to mid-ship

Using a geometrical analogy, it was established that the waterline length


at the design draft is 243 ft.
The mass displacement of the barge when loaded with the pipes and the
bridge is 3,151.12 kips (1,141.71 tonnes). This correspond to a volume
displacement of 1,114 m3, using seawater density of 1.025 t/m 3.
For this given load, we resort once more to the geometrical analogy to
determine the waterline length, LWLa and the corresponding draft.

Llw =63.58m(208.6 ft) d1 = 1.03m (3.38 ft)

We can now estimate the excess height and the corresponding volume of
water to ballast so that the deck of the badge with the quay. We shall
therefore consider separately the low and high tide scenario.

4.2 Low Tide

42.1 Levelling of barge with quay

At the lowest tide the water level is 3.58m below quay level,
knowing the depth of the barge H, and the draft d 1,we can obtain
the excess height h 1, as:
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

h1= H-d1- 3.58 = 4.88 – 1.03 – 3.58 = 0.27m


h1 = 0,27m (0.89ft)

To align the deck with the quay we need to pump into the barge a
certain volume of water such that the dreft of the barge will be:

d2 = d1 + h1 = 1.03 + 0.27 = 1.30m (4.27ft)

With the corresponding waterline length L w12 =64.47m (211.52ft) we


can now obtain the volume displacement both at d 1 and d2 drafts.
The displacement at d1 is 1 = 1,399.13m3
The displacement at d2 is 2 = 1,777.59m3
The required volume of water to pump into the barge is obtained as

V1 =1 -2 = 1,777.59 – 1,399.13 = 378.46m3

V1 =378.46m3 = 13,365.19ft3 (855.4 kips)

4.2.2 Heel and Trim correction

The loading of the piles and the bridge will generate trim and heel
that must be corrected before the loading of the jacket.

4.2.2.1 Trim correction

We can see from the Weight calculation that the longitudinal Center
of Gravity (XCG) has shifted by 9.64ft towards the stern,this must
be corrected.

a. Determination of the moment to change trim (MCT)

MCT =( x GML ) / Lpp

Where  : the mass displacement (kips)


GML : Longitudinal Metacentric height (ft)
L pp : Length between perpendiculars (ft)

MCT = ( 3151.12 x 1493 .4) /246.5

= 19090.8 kips / ft

b. Determination of the total trim

Total trim =  (LCG – LCB ) x   / MCT


= ( -9. 64 X 3151.12 )/ 19090.8
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

= -1.59 FT
There is a trim of 1.59 ft by the stern. To eliminate it, we need to
pump a certain amount of water into the control tank (1c) located at
the bow.
a. Determination of the amount of water to transfer to tank 1c

w = (GGi x W)( GGi – d)

where GGi : the trimming lever (ft)


w : weight (amount of water ) to add. (kips)
W : Mass displacement (kips)
D : trimming distance (ft)

W = (-9.64 x 3151.12)/(-9.64 – 64)


= 412 kips  6437 ft3
To correct the trim we need:

V2 = 6,437 ft3

4.2.2.1 Heel correction

We can see from the weight calculations that the transverse center
of Gravity (YCG) has shifted by 0.94ft towards the starboard, this
must be corrected.

a. Determination of the moment to change heel (MCH)

MCH = ( x GMT )/L pp

Where  : mass displacement (kips)


GMT : Transvers Metacentric height (ft)
B : Beam (ft)

MCH = (3,151.12 X 123.9 )/72


= 5,422.55 KIPS/FT

b. determination of the total Heel

Heel =  (TCG – TCB ) x  MCH


= ( -0.94 x 3,151.12 )/5,422.55
= -0.55ft

There is a heel of 0.55ft by the starboard side.


To eliminate it, we need to pump certain amount of water into the heel
control tank (3p) located at the port side.
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

b. Determination of the amount of water to transfer to tank


3p
W = ( GGi x W )/(GGi – d )

Where GGi : heeling lever (ft)


w : weight (amount of water) to add
W : mass displacement (kips)
d : heeling distance

w = (- 0.94 x 3, 151.12)/(-0.94 – 27) = 106 kips  1,656 ft3

To correct the heel we need:

V3 = 1656 ft3

4.3 High Tide Scenario

4.3.1 Draft control


At the highest tide, the water level is 1.26m below quay level,
knowing the depth of the barge H, and the draft d 1, we can obtain
the excess height h1 as:

h1 = H – d1 – 1.26 = 4.88 – 1.03 – 1.26 = 2.59m

h1 = 2.59m

To align the deck elevation of the barge with the quay, we need to
pump the barge a certain amount of water such that the draft of
the barge will be:

d2 = d1 + h1 = 1.03 + 2.59 =3.62m

d2 =3.62m with the corresponding waterline length L w12 = 72.10m


we can now obtain the volume displacement both at d 1 and d2
drafts.
This displacement at d1 is 1 =1,399.13m3
The displacement at d2 is 2 =5,255.82m3

The required volume of water to pump into the barge to achieve the
draft d2 is obtained as:

V1 = 2 -1 =5,255.82 –1,399.13 =3,856.69m3


V1 = 3,856.69m3 =136,197.72ft3
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

4.3.2 Heel and Trim Correction


The correction of the trim and heel remains the same as in the case
of low tide scenario.

Ballast Data Weight Calculations


% Weigh KG Wt*KG XCG YCG ZC MY (Kip Mx (Kip Mz (Kip
Capacity
used t (Ft) (Ft) G – Ft) –Fit) -Ft)
(Kips) % (Kip) (Ft) (Kip – (Ft)
Ft)
2610.0 9.10 23751. 0.00 0.00 9.10 0.00 0.00 23751.0
0 00 0
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 - 0.00
27483.
30
501.52 18.0 9027.3 -54.80 -7.71 18.0 - - 9027.36
0 6 0 3866.7 2890.8
2 0
39.60 18.0 712.80 -73.00 22.50 18.0 891.00 712.80
0 0
3151.1 10.6 33491. -9.64 -0.94 10.6 - - 33491.1
2 3 16 3 2975.7 30374. 6
2 10
655.36 2.50 16.38 0.20 3.28 80.00 28.00 0.20 458.64 1310.4 3.28
0
1638.40 27.50 451.10 2.20 992.42 8.00 0.00 2.20 0.00 3688.0 992.42
0
655.36 2.50 16.38 0.20 3.28 80.00 -28.00 0.20 -458.64 1310.4 3.28
0
655.36 2.50 16.38 0.20 3.28 40.00 28.00 0.20 458.64 655.20 3.28
1638.40 2.50 40.96 0.20 8.19 40.00 0.00 0.20 0.00 1638.4 8.19
0
655.36 2.50 16.38 0.20 3.28 40.00 -28.00 0.20 -458.64 655.20 3.28
655.36 16.20 106.30 1.30 138.19 0.00 28.00 1.30 2976.4 0.00 138.19
0
1638.40 18.20 299.00 1.46 436.54 0.00 0.00 1.46 0.00 0.00 436.54
655.36 2.50 16.38 1.20 3.28 0.00 -28.00 0.20 -458.64 0.00 3.28
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

655.36 2.50 16.38 0.20 3.28 -40.00 28.00 0.20 458.64 -655.20 3.28

1638.40 2.50 40.96 0.20 8.19 -40.00 0.00 0.20 0.00 - 8.19
1638.4
0
655.36 2.50 16.38 0.20 3.28 -40.00 -28.00 0.20 -458.64 -655.20 3.28
655.36 2.50 16.38 0.20 3.28 -80.00 28.00 0.20 458.64 - 3.28
1310.4
0
1638.40 2.50 40.96 0.20 8.19 -80.00 0.00 0.20 0.00 - 8.19
3276.8
0
655.36 2.50 16.38 0.20 3.28 -80.00 0.00 0.20 0.00 1310.4 3.28
0
196.61 2.50 4.92 0.20 0.98 - 28.00 0.20 137.76 -541.20 0.98
110.0
0
491.52 2.50 12.29 0.20 2.46 - 0.00 0.20 0.00 - 2.46
110.0 1351.9
0 0
196.61 2.50 4.92 0.20 0.98 - -28.00 0.20 -137.76 -541.20 0.98
110.0
0
Subtotal 1148.8 1.42 1625.. 26.44 25.59 1.42 2976.4 30376. 1625.64
3 64 0 90
Total 4299.9 8.17 35116. 0.00 0.00 8.17 0.68 2.80 35116.8
5 80 0
Inergy Jacket Barge 250’ x 72’ x 16’
Tank Volume Perm. Ballast
Number Ft3
% Capacity
Weight (Kips)
1p 10240 100 655.36
1c 25600 100 1638.40
1s 10240 100 655.36
2p 10240 100 655.36
2c 25600 100 1638.40
2s 10240 100 655.36
3p 25600 100 655.36
3c 10240 100 1638.40
3s 25600 100 655.36
4p 10240 100 655.36
4c 25600 100 1638.40
4s 10240 100 655.36
5p 10240 100 655.36
5c 25600 100 1638.40
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

5s 10240 100 655.36


6p 3072 100 196.61
6c 7680 100 491.52
6s 3072 100 196.61

WECO Jacket Barge 250’ x 16’


Loadout –Phase 0 (high Water
Ballasting Data Weight Calculations
Capacit
%Used Weight KG Wt*KG XCG YCG ZCG My (kip – Mx (kip – Mz (kip –
y
(Ft) (Ft) (Ft) Ft) Ft) Ft)
(Kips) % (Kips) (Ft) (Kips-f t)
2610.00 9.10 23751.00 0.00 0.00 9.10 0.00 0.00 23751.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
-
501.52 18.00 9027.3 -54.80 -7.71 18.00 -27483.30 9027.36
38666.72
39.60 18.00 712.80 -73.00 22.50 18.00 891.0 -2890.80 712.80
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

3151.12 10.63 33491.16 -9.64 -0.94 10.63 -2975.72 -30374.10 33491.16


655.36 2.50 16.38 0.20 3.28 80.00 28.00 0.20 458.64 1310.40 3.28
1638.40 85.00 1393.10 6.80 9473.08 80.00 0.00 6.80 0.00 111448.00 9473.08
-
655.36 2.50 16.38 0.20 3.28 80.00 0.20 -458.64 1310.40 3.28
28.00
655.36 70.00 458.75 5.60 2569.00 40.00 28.00 5.60 12845.00 18350.00 2569.00
1638.40 70.00 1146.88 5.60 6422.53 40.00 0.00 5.60 0.00 45875.20 6422.53
- -
655.36 70.00 458.75 5.60 2569.00 40.00 5.60 18350.00 2569.00
28.00 12845.00
655.36 73.50 482.10 5.90 2844.39 0.00 28.00 5.90 13498.80 0.00 2844.39
1638.40 50.00 817.00 3.99 3259.83 0.00 0.00 3.99 0.00 0.00 3259.83
- -
655.36 60.00 3.99 4.80 1882.56 0.00 4.80 0.00 1882.56
28.00 10981.60
655.36 70.00 4.80 5.60 2569.00 -40.00 28.00 5.60 12845.00 18350.00 2569.00
1638.40 70.00 5.60 5.60 64222.53 -40.00 0.00 5.60 0.00 -45875.20 6422.53
- -
655.36 70.00 5.60 5.60 2569.00 -40.00 5.60 -18350.00 2569.00
28.00 12845.00
655.36 2.50 0.20 0.20 3.28 -80.00 28.00 0.20 458.64 1310.40
1638.40 60.00 4.80 4.80 4718.40 -80.00 0.00 4.80 0.00 -78640.00 4718.40
655.36 2.50 0.20 0.20 3.28 -80.00 0.00 0.20 0.00 -1310.40 3.28
-
196.61 2.50 0.20 0.20 0.98 28.00 0.20 137.76 -541.20 0.98
110.00
-
491.52 2.50 0.20 0.20 2.46 0.00 0.20 0.00 -1351.90 2.46
110.00
- -
196.61 2.50 0.20 0.20 0.98 0.20 -137.76 -541.20 0. 98
110.00 28.00
Subtotal 8283.81 5.47 45316.85 3.67 0.36 5.47 2975.84 3037.70 445316.85
Total 11434.93 6.89 78808.01 0.00 0.00 6.89 0.12 -0.40 78808.01

Tank Capacity

Tank Volume Perm.


HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

Number Ft3 % Ballast


Capacity
Weight (Kips)
1p 10240 100 655.36
1c 25600 100 1638.40
1s 10240 100 655.36
2p 10240 100 655.36
2c 25600 100 1638.40
2s 10240 100 655.36
3p 10240 100 655.36
3c 25600 100 1638.40
3s 10240 100 655.36
4p 10240 100 655.36
4c 25600 100 1638.40
4s 10240 100 655.36
5p 10240 100 655.36
5c 25600 100 1638.40
5s 10240 100 655.36
6p 3072 100 196.61
6c 7680 100 491.52
6s 3072 100 196.61
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

CAPACITY AND DIMENTIONS OF BALLAST TANKS

S/NO TANK FUNCTION LENGTH LENGTH BREADTH BREADTH DEPTH CAPACITY CAPACITY
(ft) (m) (ft) (ft) (m) Volume (ft3) Weight ((kips)

1 1C Trim control 40.00 12.20 40.00 12.20 16.00 25600.00 1638.40


(bow)
2 2P Draft control 40.00 12.00 16.00 4.88 16.00 10240.00 1638.40
(tidal variation)
3 2C Draft control 40.00 12.20 40.00 12.20 16.00 25600.00 655.36
(tidal variation)
4 2S Draft control 40.00 12.20 16.00 4.88 16.00 10240.00 1638.40
(tidal variation )
5 3P Heel control 40.00 12.20 16.00 4.88 16.00 10240.00 655.36
(port)
6 3C Draft control 40.00 12.20 40.00 12.20 16.00 25600.00 655.36
(primary)
7 3S Heel control 40.00 12.20 16.00 4.88 16.00 10240.00 1638.40
(starboard )
8 4P Draft control 40.00 12.20 16.00 4.88 16.00 10240.00 655.36
(tidal variation)
9 4C Draft control 40.00 12.20 40.00 12.20 16.00 25600.00 1638.40
(tidal variation
10 4S Draft control 40.00 12.20 16.00 4.88 16.00 10240.00 655.36
(tidal variation)
11 5C Trim control 40.00 12.20 40.00 12.20 16.00 25600.00 1638.40
(stern)
12 1P Unused tank 40.00 12.20 16.00 4.88 16.00 10240.00 655.36
13 1S Unused tank 40.00 12.20 16.00 4.88 16.00 10240.00 655.36
HHI – CHEVRONTEXACO ESCRAVOS GAS PROJECT PHASSE 3 ONSHORE
TENDER DOCUMENT BALLASTING PLAN AND CALCULATION

14 5P Unused tank 40.00 12.20 16.00 4.88 16.00 10240.00 655.36


15 5S Unused tank 40.00 12.20 16.00 4.88 16.00 10240.00 655.36
16 6P Unused tank 25.00 7.62 16.00 4.88 - 3072.00 196.61
17 6C Unused tank 25.00 7.62 40.00 12.20 - 7680.00 491.52
18 6S Unused tank 25.00 7.62 16.00 12.20 - 30772.00 196.61

NOTE:
Tank 3c is the primary draft control tank.Tanks 1c and 5c will be used for trim control.
Tanks 3p and 3s will be used to heel angle correction.
Tanks 2p,2c,2s,4p,4c and 4s will be used to control draft due to tidal variation.

Anda mungkin juga menyukai