This weekly progress report summarizes Rodrigo Babijis' activities during his OJT at RP Alfonso Construction Services from April 22-27. During the week he completed onboarding documents, received safety orientations and site tours, viewed AutoCad plans and electrical equipment, assisted with testing lights and load schedules, read earthing layouts, and planned light orientations. He spent each day from 7 AM to 4 PM at the 60 MLD Valenzuela STP construction site, gaining exposure to the electrical and mechanical departments.
This weekly progress report summarizes Rodrigo Babijis' activities during his OJT at RP Alfonso Construction Services from April 22-27. During the week he completed onboarding documents, received safety orientations and site tours, viewed AutoCad plans and electrical equipment, assisted with testing lights and load schedules, read earthing layouts, and planned light orientations. He spent each day from 7 AM to 4 PM at the 60 MLD Valenzuela STP construction site, gaining exposure to the electrical and mechanical departments.
This weekly progress report summarizes Rodrigo Babijis' activities during his OJT at RP Alfonso Construction Services from April 22-27. During the week he completed onboarding documents, received safety orientations and site tours, viewed AutoCad plans and electrical equipment, assisted with testing lights and load schedules, read earthing layouts, and planned light orientations. He spent each day from 7 AM to 4 PM at the 60 MLD Valenzuela STP construction site, gaining exposure to the electrical and mechanical departments.
Organization/Company Name RP ALFONSO CONSTRUCTION SERVICES Supervisor’s Name ENGR. LOUZELLE MIKELLA ALBAO
Directions: Accomplish in computerized format. Submit to your assigned OJT Coordinator’s e-mail address at the end of the week.
Inclusive Day Time Time Location Activities
Dates In Out APRIL Monday -- -- PLV - Complying initial documents to start OJT. 22
APRIL Tuesday 7 AM 4 PM 60 MLD - Toolbox
23 VALENZUELA - Introduction to people and colleagues. STP- - Overall tour with Engr. Albao F.Bautista St., - Inspection of activities of Electrical and Marulas, Mechanical Department. Valenzuela City APRIL Wednesday 7 AM 4 PM 60 MLD - Safety Orientation at WABAG Office. 24 VALENZUELA - Site Visitation and introduction of works. STP- F.Bautista St., Marulas, Valenzuela City APRIL Thursday 7 AM 4 PM 60 MLD - Viewing the AutoCad files of the electrical 25 VALENZUELA plans. STP- - Cable Tray Support introduced by Sir F.Bautista St., Joseph. Marulas, - Viewed a gigantic Diesel Generator that has Valenzuela huge capacity. City APRIL Friday 7AM 4PM 60 MLD - Testing of Lights and its relays with Sir 26 VALENZUELA Edward and Sir Edison. STP- - Read Load Schedules of particular areas. F.Bautista St., - Went to Warehous to withdraw 185 mm2 bare Marulas, copper wire. Valenzuela City
APRIL Saturday 7 AM 4 PM 60 MLD - Read Overall Earthing Layout of the site.