Alternatives
EVALUATION BASED ON MULTIPLE CRITERIA
Step 1: Assess the Need for the Project. Addresses the question:
Why do it at all?
– Why do it this way? That is, has the project been demonstrated to be a
feasible one
– from an engineering perspective? What are the costs involved in the
project? Are
– there other methods or approaches that could achieve a similar result
at a lower cost
– in time and money? Should the project be included as a budget item
for implementation or deferred to a later date?
Step 3: Analyze the Impact of the Project. Addresses the
question:
– Accessibility
– Community cohesion
– Economic development
– Traffic noise
– Visual quality
– Property values
Step 3 (c): Natural Systems Effects. These refer to those impacts
of transportation projects that are related to the environment
within which the project will be located.
• Among the natural elements that may be affected are