STANDARD SPECIFICATION
ENGINEERS No.
INDIA LIMITED FOR CONCRETE LINING IN
6-65-0049 Rev. 4
IA Govt of India Undertaking)
CANALS
Page 1 of 6
fe-itr
STANDARD SPECIFICATION
FOR
CONCRETE LINING IN CANALS
RA'L—
i ji 0ir
JAN
4 06.07.18 REAFFIRMED & ISSUED AS STD. SPEC. LP
SRIVASTAVA TRIVEDI
3 24.09.13 REVISED AND ISSUED AS STD. SPEC. RBT RKS RBB DM
Standards Standards
Rev. Committee Bureau
Prepared Checked
No
Date Purpose
by by
Convenor Chairman
Approved by
Abbreviations:
c/ c Center to Center
CM Centimeters
IS Indian Standard
Mtn Millimeter
CONTENTS
1.0 SCOPE 4
4.0 MATERIALS 4
7.0 CURING 4
10.0 ACCEPTANCE/TESTING 5
11.0 PAYMENT 5
1.0 SCOPE
4.0 MATERIALS
7.1 Subsequent to laying and finishing of concrete lining and after a period of 24 to 36 hours, the
linings shall be cured for at least 28 days.
7.2 On the bed curing may be done by constructing 15.0 cm. deep earthen bunds across the bed so
that a small depth of water will stand on the bed. Curing of side slopes and coping shall be done
by wet jute lining or by using sprinkler.
8.1.1 Contraction joints shall be provided at 4.5 m c/c transversely along the length of canal and
junction with bed concrete and berm side along the length of canal, or at places shown in the
drg. or as directed by the Engineer-in-Charge.
8.1.2 When lining is cast in panels, transverse and longitudinal grooves shall be provided at locations
as per clause no. 8.1.1.
8.1.3 In situ sleepers in case of bed and precast in case of sides shall be provided under the joints. The
sleeper shall be 15mm wide and 7.5mm deep. The sleepers shall be placed centrally below the
joint. Concrete used for sleepers shall be of the same grade as for lining.
8.1.4 Filler
The grooves in canal lining shall be filled with mastic filler as per IS: 5256. The grooves shall be
clean and free from foreign substances where mastic filler is applied. Grooves shall not be
filled while it is raining or while there is free water in the grooves. The grooves shall be filled as
soon as the concrete has become sufficiently stiff to prevent appreciable distortion of groove and
damage to the concrete.
8.2.1 Expansion Joints shall be provided and constructed at places shown in the drawing and as
directed by the Engineer-in-charge.
8.2.3 The Joints shall be thoroughly cleaned of all dirt, organic matter, dust, etc. The Joints then shall
be filled with bitumen mix filler as specified in the item except for 25mm depth at top. The top
25mm of the joints shall be filled with approved hot applied sealing compound conforming to
IS: 5256.
Steps shall be provided and constructed at places shown in the drawing and as directed by
Engineer-in-charge.
Steps wherever required, shall be constructed, as specified in relevant item.
10.0 ACCEPTANCE/TESTING
On completion of the work, the canal shall be filled with water upto maximum water level.
Level of water shall be recorded for a period of 3 days at an interval of 24 hr. The average water
loss shall not be more than 0.60 m 3/sec. per million square meter of wetted perimeter. Any
defect noted or pointed out by the Engineer-in-charge shall be rectified by contractor at his own
cost to the satisfaction of Engineer-in-charge.
11.0 PAYMENT
11.1 Concrete
Payment for plain cement concrete shall be made on cubic meter basis of the actual finished
work done or as per approved construction drawings, which ever is less and shall be inclusive of
all labour, materials, curing etc. complete. The rates shall be deemed to include complete cost of
taking and testing concrete cubes and carrying out any other tests as per specifications and as
directed by Engineer-in-Charge.
11.5 The above payment clauses are not applicable in case of LSTK Jobs