Anda di halaman 1dari 28

Bill of Quantity

Harga Satuan (Rp)


Jasa
NO ITEM ALAT SPESIFIKASI SAT
Alat Pengiriman

Fluke 52 II Dual Probe Digital


1 1 8,690,000
Thermometer
2 KENIS Pyranometer 3116500 1 4,490,000
Spesifikasi :

Digital Solar Power Meter Sun Light


3 1 1,050,000
Radiation Measuring Testing Specification:

Model: SM206
Resolution: 0.1W/m², 0.1Btu/(ft²-h)

Range Error: ±10W/m² (±3Btu/(ft²-h) or ±5% of measured value


Temperature Error: ±0.38W/m²/℃ ±0.12Btu/(ft²-h)/℃
deviation at 25°C
Display: 3-3/4 LCD display, maximum 3999
Overload Display: "OL"
Shift: <±3% /year
Measurement Range: 0.1-399.9W/m², 1-3999W/m², 0.1-
399.9Btu/(ft²-h), 1-3999Btu/(ft²-h)
Sampling Time: 0.25 seconds/time
Operating Temperature and Humidity: 0~50 ℃, <80%RH
Storage Temperature and Humidity: -10~60 ℃, <70%RH
Battery: 9V battery (NOT included)

14,230,000
Total Harga (Rp)
KET
TOTAL 20%

8,690,000
- -
4,490,000

1,050,000
14,230,000
Specifications :
Dual use for non-contact &amp; Contact testing on your needs. Have 4 di

Specifications :
Dual use for non-contact &amp; Contact testing on y
Have 4 different connecting head used for contact m
Wide measuring type : can test rotational speed (RP
High Resolution ratio and 5-digit backlight LCD displa
All 30 data storage : 10 maximum / minimum / insta
Wide measuring range : non-contact way --2 to 9999
testing on your needs. Have 4 different connecting head used for contact measuring. Wide measuring type : can test rotational speed (RPM

ntact &amp; Contact testing on your needs.


necting head used for contact measuring.
e : can test rotational speed (RPM), counter rotating (REV), Frequency(Hz), surface speed(m/minute; inch/min; feet/min; yard/min; and len
o and 5-digit backlight LCD display.
10 maximum / minimum / instantaneous measuring data.
ge : non-contact way --2 to 99999RPM; Contact way --2 to 20000
: can test rotational speed (RPM), counter rotating (REV), Frequency(Hz), surface speed(m/minute; inch/min; feet/min; yard/min; and leng

min; feet/min; yard/min; and length(meter, inch, feet, yard).


min; feet/min; yard/min; and length(meter, inch, feet, yard). High Resolution ratio and 5-digit backlight LCD display. All 30 data storage : 10 m
display. All 30 data storage : 10 maximum / minimum / instantaneous measuring data. Wide measuring range : non-contact way --2 to 9999
nge : non-contact way --2 to 99999RPM; Contact way --2 to 20000
RENCANA ANGGARAN BIAYA
PENGADAAN DAN PEMASANGAN SIPIL SUPPORT SKKL
SS#4 PEKERJAAN RENOVASI GEDUNG KEDOYA

NO URAIAN PEKERJAAN Spesifikasi


RENOVASI TELKOM AKSES
I. PEKERJAAN PERSIAPAN
1 Survey lapangan
2 Mobilisasi dan Demobilisasi
3 Bongkar Dinding, partisi & Lantai Keramik / Raisedfloor Existing

II. RENOVASI RUANG KERJA TELKOM AKSES


1 Sipil Arsitektur
- Pas. Sloof & Ring Balk 15/20 cm
- Pas. Kolom Praktis 15/15 cm
- Pas. Dinding Bata Ringan Hebel
- Pas. Plester + Acian
- Pas. Dinding kaca 8 mm + Frame almn
- Pas. Sticker Kaca Sanblas
- Pas. Kaca Tempered uk. 10 mm.
- Pas. Pintu Kaca Tempered uk. 10 mm
- Pas. Handle pintu, Ex. Cissa
- Pas. Floor Hinge Dorma BTS- 84
- Pas. Engsel Pintu kaca Dorma
- Pas. Kunci pintu kaca
- Pas. Kusen + Daun Kaca aluminium+ Kunci + Door Closser dan Engsel)
- Pas. Partisi ( kerangka aluminium+ kaca bening uk. 5 mm + Sanblast)
- Pas. Daun jendela aluminium+ engsel + hendle +Sanblast.
2 Lantai & Plafond
- Pas. Keramik lantai Uk. 60 x60 cm Roman
- Pas. Keramik plint lantai uk. 10 x 60 cm.
- Pas. Plafond Gypsum 9 mm + Rangka Hollow
- Pasang list plafon
3 Elektrikal
- Pas. Panel SSDP Kap 63 Amper, 3 Phase lengkap
- Pas. Kabel Tupur uk. 4x 32mm
- Pas. Instalasi Titik Listrik (NYM 3 x 2,5 & 2 x 1,5 mm)
- Pas. Lampu TL 2 x 18 Watt
- Pas. Stop Kontak @ 4 Lb
- Pas. Saklar
- Bongkar Pasang AC Existing
4 Finishing
- Pengecatan tembok interior mowilex W- 1502
- Pengecatan plafon Vinylex no. 300

III. PEKERJAAN AKHIR


1 Pembersihan akhir
2 Buang Puing Ex. Pekerjaan & Sampah/Puing

PERBAIKAN/ RENOVASI RUANG KERJA Ka. AP


I PEKERJAAN PERSIAPAN
1 Survey lapangan
2 Mobilisasi dan Demobilisasi
3 Bongkar Dinding, partisi & Lantai Existing Existing

II Pekerjaan SIPIL dan ME


1 Pekerjaan Ruang kerja
a Pekerjaan Partisi, Jendela dan Pintu;
- Perapihan Tembok Bekas Bobokan
- Pas. Kusen + Daun Kaca aluminium+ Kunci + Door Closser dan Engsel)
- Pas. Partisi ( kerangka aluminium+ kaca bening uk. 5 mm + Sanblast)
- Pas. Sticker Kaca Sanblas
- Pas. Kaca Tempered uk. 10 mm.
- Pas. Pintu Kaca Tempered uk. 12 mm
- Pas. Handle pintu, Ex. Cissa
- Pas. Floor Hinge Dorma BTS- 84
- Pas. Engsel Pintu kaca Dorma
- Pas. Kunci pintu kaca
- Pas. Daun jendela aluminium+ engsel + hendle +Sanblast.
b Pekerjaan lantai dan Pengecatan;
- Pas. Keramik lantai Uk. 60 x60 cm Roman teras
- Pas. Keramik plint lantai uk. 10 x 60 cm.
- Pengecatan tembok exterior dan interior mowilex W- 1502
- Pengecatan plafon Vinylex no. 300
c Pekerjaan ME;
- Pas. Instalasi Titik Listrik NYM 2 x 1,5 mm & 3 x 2,5 mm
- Pas. Lampu TKI TL 2 x 18 Watt
- Pas. Stop Kontak Ex. Brocco Planno E154 (White Pearl)
- Bongkar Pasang AC Existing
- Pas. Instalasi telpon

III. PEKERJAAN AKHIR


1 Pembersihan akhir
2 Buang Puing Ex. Pekerjaan & Sampah/Puing

PEKERJAAN PEMINDAHAN PERANGKAT & ALAT KERJA EXISTING


A. PEKERJAAN PERSIAPAN
1 Mobilisasi Alat & Tenaga Kerja
2 Survey & Pengukuran Lokasi

B. PEMINDAHAN MEUBELAIR DARI MERUYA KE STO KEDOYA & PALMERAH


1 Bongkar pasang dan pemindahan Meubelair Exsisting
Meja kerja,Workstation,cabinet & lain2
Kursi kerja

C. MEKANIKAL & ELEKTRIKAL


1 Bongkar Pasang Instalasi Titik Listrik Kabel 3 x 2,5 mm & 2 x 1,5 mm, Ex. Eterna
- Kabel Listrik 3 x 2,5 mm & 2 x 1,5 mm, Ex. Eterna
- Pipa Konduit, Klem Kabel, Isolasi, Tee & Inbow Dust
2 Pas. Stop Kontak Isi 4 Lb, Ex. Uticon
3 Bongkar pasang cctv
4 Pasang instalasi kabel LAN & Telfon
5 Pas. Instalasi Kabel TV + Antenna

D. PEKERJAAN AKHIR
1 Pembersihan Akhir Site
2 Buang Puing Ex. Pekerjaan & Sampah Keluar Lokasi

PEKERJAAN PEMBUATAN BANGUNAN TOILET


I PEKERJAAN PERSIAPAN
1 Survey lapangan
2 Mobilisasi dan Demobilisasi

II. BANGUNAN TOILET & KAMAR BILAS Uk. 760 x 400 cm


1 Struktur & Pondasi
- Galian Tanah Pondasi
- Pas. Pondasi Setempat Uk. 40 x 40 x 25 cm
- Pas. Rollag Bata
- Pas. Sloof Beton Uk. 20 x 25 cm
- Pas. Kolom Praktis Uk. 10 x 10 cm
- Pas. Ring Balk Uk. 10 x 15 cm
2 Sipil Arsitektur
- Pas. Dinding Hebel
- Pas. Plester + Aci
- Pas. Plafond GRC 4 mm + Rangka Hollow
- Pas. List plafon , Fin. Cat
- Pas. Partisi PVC T = 200 cm (Termasuk Dgn Pintu-Lengkap)
- Pas. Keramik dinding uk, 30x 60 cm, Roman - T = 280 cm
- Pas. Keramik Lantai uk. 30 x 30 cm, Roman
- Pas. Keramik Lantai uk. 30 x 30 cm, Roman (Teras)
- Pas. Kusen Almn. + Daun Pintu Kayu (Single Swing) - Lengkap
- Pengecatan Dinding & Plafond, Ex. Vinylex
3 Rencana Atap
- Pas. Rangka Atap Baja Ringan
- Pas. Penutup atap Alderon
- Pas. List plang GRC uk. 9 mm+ cat
4 Rencana Peninggian Elevasi permukaan 25 cm
- Pengurugan Dgn Tanah/Puing t = 20 cm (Padat)
- Pengurugan Dgn Pasir Urug/Pasang t = 5 cm (Padat)
- Pemadatan Tanah Mekanis 3 Layer (Sewa Stamper + Operator)
- Pas. Rollag Bata (Teras) T = 30 cm

5 Sanitasi & Plumbing


a. Pas. Closet Duduk Ex. TOTO, Type C704L/SW784JP (lengkap)
b. Jet Washer Ex. TOTO, Type TX403SB
c. Urinal Ex. TOTO, Type UW930JM (Lengkap)
d. Urinal Partition Ex. TOTO ; Type A100
e. Lavatory Ex. TOTO, Type LW898CJ
f. Faucet Ex. TOTO ; Type TX115LESBR
g. Shower Head Ex. TOTO, Type TX465SEN
h. Fitting Shower Ex. TOTO
i. Pas. Floor Drain, Ex. TOTO ; Type TX1BN
j. Pas. Cermin + Frame
k. Pas. Kran Biasa, Ex. TOTO ; Type TX130L
l. Pas. Kapstok / Gantungan Baju
g. Pas. Instalasi Air Bersih & Kotor/Buang/Bekas
h. Pas. Saptictank uk, 200 x 150 x 200 cm & Resapan 100 x 100 x 50 cm
- Galian + Buang Tanah
- Pas. Bata, Plester+ aci
- Pas. Penutup Beton Cor
- Instalasi Buang & Kotor
i. Pengadaan Air Bersih
- Jasa Pengeboran, Instalasi Pipa PVC Ex. Wavin/Rucika
- Pengadaan Pompa Air JET POMP Kap. 500 Watt
- Instalasi Titik Listrik Stop Kontak
j. Pas. Torn kap. 2000 ltr (Lengkap Dgn Radar)

6 Elektrikal
a. Pas. Instalasi Titik Listrik NYM 2 x 1,5 mm & 3 x 2,5 mm
b. Pas. Downlight LED 10 Watt
c. Pas. Saklar Engkel, Ex. Brocco Planno E163 (White Pearl)
d. Pas. Exhaust Fan Setara Panasonic/National

III. PEKERJAAN AKHIR


1 Pembersihan akhir
2 Buang Puing Ex. Pekerjaan & Sampah/Puing
Harga Satuan (Rp) Volume Kontrak (Rp)
SAT
Material Jasa Kontrak DRM-1 Deviasi Material Jasa

ls 1.00 1.00 - - -
ls 1.00 1.00 - - -
ls 1.00 1.00 - - -

m3 1.44 1.44 - - -
m3 1.21 1.21 - - -
m3 5.12 5.12 - - -
m2 65.14 65.14 - - -
m2 18.00 18.00 - - -
m2 8.00 8.00 - - -
m2 2.00 2.00 - - -
m2 8.00 8.00 - - -
set 8.00 8.00 - - -
set 4.00 4.00 - - -
set 8.00 8.00 - - -
set 4.00 4.00 - - -
unit 1.00 1.00 - - -
m2 88.38 88.38 - - -
unit 14.00 14.00 - - -

m2 435.82 435.82 - - -
m' 102.00 102.00 - - -
m2 435.82 435.82 - - -
m' 210.00 210.00 - - -

unit 1.00 1.00 - - -


m' 200.00 200.00 - - -
ttk 42.00 42.00 - - -
set 30.00 30.00 - - -
bh 12.00 12.00
bh 3.00 3.00
Unit 16.00 16.00 - - -

m2 224.40 224.40 - - -
m2 435.82 435.82 - - -

m2 435.82 435.82 - - -
rit 9.00 9.00 - - -

ls 1.00 1.00 - - -
ls 1.00 1.00 - - -
ls 1.00 1.00 - - -

ls 1.00 1.00 - - -
pcs 2.00 2.00 - - -
m2 49.09 49.09 - - -
m2 4.00 4.00 - - -
m2 2.00 2.00 - - -
m2 4.00 4.00 - - -
set 2.00 2.00 - - -
pcs 2.00 2.00 - - -
pcs 4.00 4.00 - - -
pcs 2.00 2.00 - - -
pcs 14.00 14.00 - - -

m2 56.00 56.00 - - -
m' 29.00 29.00 - - -
m2 390.00 390.00 - - -
m2 245.00 245.00 - - -

ttk 26.00 26.00 - - -


set 11.00 11.00 - - -
bh 12.00 12.00 - - -
Unit 3.00 3.00 - - -
Unit 12.00 12.00 - - -

m2 245.00 245.00 - - -
rit 4.00 4.00 - - -

ls 1.00 1.00 - - -
ls 1.00 1.00 - - -

m2 187.00 187.00 - - -
ttk 143.00 143.00 - - -

bh 149.00 149.00 - - -
titik 13.00 13.00 - - -
titik 95.00 95.00 - - -
set 1.00 1.00 - - -

ls 1.00 1.00 - - -
rit 5.00 5.00 - - -

ls 1.00 1.00 - - -
ls 1.00 1.00 - - -

m3 4.86 4.86 - - -
m3 0.79 0.79 - - -
m' 36.20 36.20 - - -
m3 1.81 1.81 - - -
m3 0.56 0.56 - - -
m3 0.88 0.88 - - -

m3 12.07 12.07 - - -
m2 241.40 241.40 - - -
m2 60.76 60.76 - - -
m' 112.80 112.80 - - -
m' 13.20 13.20 - - -
m2 101.36 101.36 - - -
m2 30.40 30.40 - - -
m2 16.40 16.40 - - -
unit 4.00 4.00 - - -
m2 81.80 81.80 - - -

m2 65.10 65.10 - - -
m2 65.10 65.10 - - -
m' 33.40 33.40 - - -

m3 8.50 8.50 - - -
m3 2.13 2.13 - - -
m2 42.50 42.50 - - -
m' 15.25 15.25 - - -

unit 6.00 6.00 - - -


unit 6.00 6.00 - - -
unit 4.00 4.00 - - -
unit 3.00 3.00 - - -
unit 4.00 4.00 - - -
unit 4.00 4.00 - - -
unit 2.00 2.00 - - -
unit 2.00 2.00 - - -
bh 7.00 7.00 - - -
bh 4.00 4.00 - - -
bh 6.00 6.00 - - -
bh 8.00 8.00 - - -
m' 100.00 100.00 - - -
ls 1.00 1.00 - - -

ls 1.00 1.00 - - -

ls 1.00 1.00 - - -

ttk 22.00 22.00 - - -


bh 12.00 12.00
bh 4.00 4.00 - - -
bh 6.00 6.00 - - -

m2 30.40 30.40 - - -
rit 5.00 5.00 - - -

- -
-
Tambah (Rp) Kurang (Rp) DRM-1 (Rp)
Material Jasa Material Jasa Material Jasa

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -

- - - - - -
- - - - - -

- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -

- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -

- - - - - -

- - - - - -

- - - - - -
- - - - - -

- - - - - -
- - - - - -

- - - - - -
- - -
Deviasi (Rp)
KET
Material Jasa

- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -

- -
- -
- -
- -

- -

- -
- -

- -
- -

- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -

- -
- -
- -
- -
- -

- -
- -

- -
- -

- -
- -

- -
- -
- -
- -

- -
- -

- -
- -

- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -

- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

- -

- -

- -

- -
- -

- -
- -

- -
-

Anda mungkin juga menyukai