Document/Drawing Title

Owner's Document No. Contractor's Document No. F09211S-T1013


Owner's Revision No. Contractor's Revision No. A
Approval Type For Approval Document Status

All conditions of the Contract apply, including but not limited to GC 3.9.2, GC 4.2, GC 18.2 and GC 21.3.

NESPAK comments SEPCOIII answer NESPAK comments SEPCOIII answer NESPAK comments SEPCOIII answer NESPAK comments
Priority Status Com Com
Date Page Subject/item Comment Name Date Answer Name Date Page Comment Name Date Answer Name Date Com N° Page Comment Name Date Answer Name Date Com N° Page Comment Name
N° N°
Contractor's Transmittal 8/9/2019 Tr-No. Rev. A
Owner's Transmittal Tr-No. Rev. A
Drawing and
SEPCO III shall check and confirm that the Allowable pile laod in tension
1 Not Approved 1 Calculation confirmed.
and compression are as per Geotechnical Report.
Report
All the loads given in the design calculations are assumed to be correct
1 2 noted.
and the authenticity of the loads is sole responsibility of the designer
These drawings shall be read in conjunction with approved architectural,
1 3 plumbing, equipment and all other relevant drawings before execution at noted.
site.

1 4 Provide the detailed calculations and backup of loads used for design. added in the section 1.5 of a calculation book.

SEPCO III / Geo-Technical Engineer shall confirm the compliance of


1 5 geotechnical parameters including the vertical and horizontal group confirmed.
efficiency factors to be used
Evaluate pile foundation for allowable settlement and report in calculation
1 6 added in the third section of a calculation book.
book.

Criteria for tolerable value of settlement shall be provided and SEPCO 3


1 7 According to the contract, the allowable settlement value is 25mm.
shall confirm its compliance according to geotechnical recommendations.

Spring values used in the piles are assued to be as per Geo-technical


1 8 confirmed.
specifications. SEPCO III shall confirm.

Page 1 de 1