PLANT SURVEY INFORMATION:

SECTION A-A SECTION B-B STATION PLATFORM ZERO 0.000 = 1727.000 METERS ABOVE SEA LEVEL.
ALL LEVELS SHOWN ARE RELATIVE LEVELS AND REFER TO THE STATION
CONCRETE DIMENSIONS 1 : 20 CONCRETE DIMENSIONS 1 : 20 ZERO LEVEL.

SUBSTRUCTURE AND FOUNDATIONS:


OUTER DIAMETER 107044.10 MM INNER DIAMETER 105044.10 MM OUTER DIAMETER 107044.10 MM INNER DIAMETER 105044.10 MM RING BEAM PLAN TANK 3 1 : 200 SUBSTRUCTURE:
BEFORE PLACING THE LEAN CONCRETE UNDER THE FOUNDATION,
THE CONTRACTOR MUST ENSURE THAT THE UNDER LAYING SOIL IS
HDPE LINER 1MM.
44.1 MM TANK DIAMETER 106000.00 MM 4.41 COMPACTED TO A MINIMUM PROCTOR COMPACTION DENSITY OF 97%.
TANK DIAMETER 106000.00 MM
4.41 IF THE IN-SITU CONDITIONS OF THE SOIL DO NOT MEET THEESE
HDPE LINER 1MM. 47.79 128.68 REQUIREMENTS, MEANS AND METHODS OF COMPACTIONS WILL BE
47.79 47.8

B
1"Ø CONDUIT FOR EMPLOYED TO IMPROVE THE SOIL CONDITIONS TO THE REQUIRED LEVEL.

354.5°
CLEAN WASHED SAND
CONCRETE CLEAN WASHED SAND CONCRETE LEAK DETECTION SYSTEM 1 12"Ø CONDUIT FOR
RING BEAM RING BEAM CP SYSTEM THE CONTRACTOR MUST SUBMIT HIS PROPOSALS AND METHOD
+0.30 +1727.30 STATEMENTS FOR THIS PROCEDURE TO SWCC/THE ENGINEER FOR THEIR

350°


+0.28 +1727.28 +0.30


1"Ø CONDUIT FOR
APPROVAL BEFORE THE EXECUTION OF WORK.
LEAK DETECTION SYSTEM

18°
30

30
ALL CONCRETE STRUCTURES WITH A FLOOR LEVEL BELOW PERMANENT

30
2

28
±0.00 +1727.00 ±0.00 +1727.00
C.P ANODE -0.02 C.P ANODE GRADE SHALL HAVE THE UNDERGROUND PART COMPLETELY ENCASED IN

3 PLAN I-I A TANKING MADE FROM A PREFABRICATED HEAVY DUTY WATER PROOFING

15 10

15 10
80

H 80

33
MEMBRANE OF MODIFIED BITUMEN, MINIMUM 4MM THICK AND WITH A
95

00.0°

93
1"Ø CONDUIT FOR POLYESTER NON-WOVEN FABRIC-BASE. THE TANKING ON THE SIDES

33
50

48
LEAK DETECTION SYSTEM
5


AND THE TOPS OF THE STRUCTURES SHALL BE FULLY TORCH-APPLIED

B
5
-0.50 ON A BITUMEN PRIMED SURFACE. THE PROTECTION MATERIAL SHALL

35
-0.50 1"Ø CONDUIT FOR

35
1"Ø CONDUIT FOR LEAK DETECTION SYSTEM CONTINUE TO A LEVEL NOT LESS THAN 0.2M ABOVE FINAL GRADE
10

°
LEAK DETECTION SYSTEM (STATION ELEVATION). THE TANKING UNDER THE STRUCTURE SHALL BE

10

36
31
ROAD BASE MATERIAL ROAD BASE MATERIAL LAID ON A CONCRETE BLINDING. ALL OVERLAPS SHALL BE MINIMUM 100 MM

9.5
COMPACTED TO BLINDING CONCRETE COMPACTED TO 1 12"Ø CONDUIT FOR
AND FULLY TORCH-WELDED. PROTECTION MEMBRANE FOR VERTICAL

°
BLINDING CONCRETE
(ACC. SPECIFICATION CRUSHED STONE WITH CEMENT: 100% PROCTOR DENSITY (ACC. SPECIFICATION 100% PROCTOR DENSITY CP SYSTEM
-WELL GRADED NON COHESIVE (ACC. SPECIFICATION C03, CLAUSE 5.2) (ACC. SPECIFICATION ELEMENTS SHALL BE PROVIDED.

10
C03, CLAUSE 5.2)

SEE DETAIL "2"


MATERIAL G02, CLAUSE 8.4) G02, CLAUSE 8.4)

00
-MAXIMUM GRAIN SIZE: 75mm
50 50 -MINIMUM CEMENT 50 50 50 80 CRUSHED STONE WITH CEMENT: CATHODIC PROTECTION:

.00
100 130 CONTENT: 200 kg/m3
100 130
-WELL GRADED NON COHESIVE MATERIAL
-MAXIMUM GRAIN SIZE: 75mm 19x 1 FOR CATHODIC PROTECTION DETAILS REFER TO RELEVANT DRAWINGS.

MM
-MINIMUM CEMENT
CONTENT: 200 kg/m3
°
EARTHING:

H
50

2"Ø CONDUIT FOR 1"Ø CONDUIT FOR FOR EARTHING DETAILS REFER TO RELEVANT SPECIFICATION.
CP SYSTEM 4° LEAK DETECTION SYSTEM
5
PLAN I-I 1:50 30
4° CONCRETE:
°
G CONCRETE MIXTURE MUST FOLLOW THE RESPECTIVE CONCRETE MIX

SEE DETAIL "1"


B

1"Ø CONDUIT FOR 60 DESIGN REPORTS (REFER 77-QB20-R-004).

3 297
° 14x 2
LEAK DETECTION SYSTEM
LEAN CONCRETE MIN. CEMENT CONTENT 200 kg/m3
MIN. CHARACTERISTIC STRENGTH 20 N/mm 2
CYLINDER TEST
5.622
1.311 1.50 1.50 1.311 G SULPHATE RESISTANT PORTLAND CEMENT
TYPE V ACCORDING TO ASTM C150
STRUCTURAL CONCRETE GRADE A
47 795

MINIMUM CHARACTERISTIC STRENGTH 50 MN/m 2 AT 28 DAYS


47 795

1.00

-0.02 -0.02
MINIMUM CEMENT CONTENT 350 kg/m 3
1.00

290
420 kg/m 3
47 795 4 41

° MAXIMUM CEMENT CONTENT


522 05

+0.28 +0.28
+0.30 +0.30 WATER/CEMENT RATIO 0.40%
1"Ø CONDUIT FOR 1"Ø CONDUIT FOR
72°
50

+0.28 LEAK DETECTION SYSTEM LEAK DETECTION SYSTEM CONCRETE IN CONTACT WITH SOIL OR WATER
MUST BE WATERPROOF (SEE NOTE ABOVE)
00.0°

2.759 2.759
283° TYPE OF CEMENT:
1.40 5.517 1.40 1"Ø CONDUIT FOR
PORTLAND CEMENT TYPE 1 ACCORDING TO ASTM C150
LEAK DETECTION SYSTEM
ALL UNDERGROUND CONCRETE STRUCTURES SHALL CONTAIN
B

280°
MICRO-SILICA OF 7.0% BY WEIGHT OF CEMENT.
1 12"Ø CONDUIT FOR MICROSILICA SHALL COMPLY WITH ASTM C1240 AND THE ADDITIONAL
CP SYSTEM REQUIREMENTS ACCORDING TO SPECIFICATION C07, 2.3 (SILICA FUME).

AGGREGATES:
85°
LEAK DETECTION DETAIL 1 : 20 1"Ø CONDUIT FOR
LEAK DETECTION SYSTEM
COARSE-GRAINED AGGREGATES ACCORDING TO
ASTM C33 OR BS EN 12 620

COARSE GRAINED AGGREGATES SHALL COMPLY WITH THE MIX DESIGN OF THE CONCRETE
47.79 4.41 47.79 SUPPLIER TO AVOID CONGESTION DURING VIBRATION / CASTING OF THE CONCRETE.
10 230
HDPE LINER 1MM. 270° 270.0° 90.0° 90°
GRATING COVER CLEAN WASHED SAND
1 12"Ø CONDUIT FOR FORMWORK:
CP SYSTEM 92°
SMOOTH FORMWORK FOR ALL VISIBLE SURFACES AND
1"Ø CONDUIT FOR ESPECIALLY FOR ALL WATER COVERED SURFACES
LEAK DETECTION SYSTEM 94°
ACCORDING TO SPECIFICATION C07, CLAUSE 7.2

RI
30

30

15

NG
C.P ANODE
TRIANGULAR FILLETS FOR ALL CHAMFERED CORNERS (20/20 mm)
10.365

BE
15 10

2% SLOPE

REINFORCING STEEL:
90

AM
35

TAN
35 1"Ø CONDUIT FOR
50

260° LEAK DETECTION SYSTEM REINFORCING STEEL GRADE 60 ACCORDING TO ASTM A615

DI
1"Ø CONDUIT FOR
> 420 N/mm2
_
10

DUCTILITY CLASS B fy
A

AM
K DIA
35

LEAK DETECTION SYSTEM 102°


REINFORCEMENT SHALL NOT BE LEFT EXPOSED FOR AN EXTENDED PERIOD

ET
15

BEFORE BEING CAST IN. CLEANING OF REINFORCEMENT ACCORDING TO

ER
MET
ROAD BASE MATERIAL
LEAK DETECTION PIT COMPACTED TO
A SPECIFICATION C07, CLAUSE 6.5

10
100% PROCTOR DENSITY
50 DRAIN PIPES: 1" PVC CONDUITS
50 (ACC. SPECIFICATION
CONCRETE COVER OF REINFORCING STEEL:

ER 1

50
LAID IN FORMWORK, 22 PIPES
DISTRIBUTED OVER THE G02, CLAUSE 8.4)

44
100 130 CIRCUMFERENCE OF THE RING BEAM FOUNDATION IN CONTACT WITH SOIL 70 mm

.10
SPACERS 70mm x 70mm x 70mm ACCORDING TO SPECIFICATION C07

0600
1"Ø CONDUIT FOR
CLAUSE 6.2.3

MM
° LEAK DETECTION SYSTEM
248
LEAN CONCRETE

0.00
PLAN II-II 1:50 STRUCTURAL CONCRETE

M M
REFERENCE DRAWINGS DRAWING NO.
C

BAR BENDING SCHEDULE, TANK 3 RING BEAM FOUNDATION 76-QP10-L-056


200.0°

0° REINFORCEMENT DRAWING SHEET 2/2 76-QP10-V-056


24

12
50

2"Ø CONDUIT FOR 4°

D D CP SYSTEM
449

12
1"Ø CONDUIT FOR 8°
LEAK DETECTION SYSTEM
-0.87 6 -0.87 6 0°
4 23

C
8.265 D REFERENCE DRAWING: DRAWING TITLE:

10
50 50

TYPICAL TANKING DETAIL 1:20 4

00
50 449 3.684 3.683 449 50

.00
°
0.0

E

1.0 %

22
3.323
3.772

21

13
MM


1"Ø CONDUIT FOR PLAN
II-II
6.403

LEAK DETECTION SYSTEM ENGINEER'S STICKER: CONTRACTOR'S STICKER:

-0.90 9 -0.90 9
D RP DOCUMENT
No. 76-QP10-V-056
COMMENT SHEET
No. EH-AH-D-1533
Rev. E Date 12.05.2019
30

F
STATUS A: Approved for Construction (AFC)

15
HEAVY DUTY WATERPROOFING



MEMBRANE OF MODIFIED BITUMEN, 1"Ø CONDUIT FOR B: Approved as noted (AAN)

197.

180.0°
MIN. 4MM THICK LEAK DETECTION SYSTEM C: Rejected (REJ)

F 1"Ø CONDUIT FOR


1.757

BITUMAT BITUSHIELD (PTM-04) D: For Information only (INF)


°
202

BITUMAT BITUSHIELD (PTM-04) BITUMEN PROTECTION BOARD LEAK DETECTION SYSTEM

160
2.279

C
1.00

BITUMEN PROTECTION BOARD OR EQUIVALENT


197°

°
OR EQUIVALENT

165°
1 12"Ø CONDUIT FOR

190°
CP SYSTEM
10 5

1 12"Ø CONDUIT FOR

185.5°

182°

175°
522

2X4"Ø CONDUIT FOR CP SYSTEM


180°
E

CONCRETE OVERLAY
CP SYSTEM 1"Ø CONDUIT FOR
BLINDING CONCRETE
(ACC. SPECIFICATION 2"Ø CONDUIT FOR LEAK DETECTION SYSTEM
C03, CLAUSE 5.2) 1"Ø CONDUIT FOR
CP SYSTEM
C

LEAK DETECTION SYSTEM


REV. ISSUED FOR DRAWN CHECKED APPROVED DATE
4.632 4.633

9.265 KINGDOM OF SAUDI ARABIA

SALINE WATER CONVERSION CORPORATION (SWCC)

PROJECT TITLE:

Project No.
STRATEGIC RESERVOIRS AT MAKKAH PHASE II &
SECTION C-C 1:50 SECTION D-D 1:50 SECTION E-E 1:20 SECTION F-F 1:20 20906
TAIF PHASE I

10 30 20 20 30 10 ENGINEER:
HDPE LINER 1MM.
200.0°

HEAVY DUTY WATERPROOFING HEAVY DUTY WATERPROOFING


MEMBRANE OF MODIFIED BITUMEN, MEMBRANE OF MODIFIED BITUMEN, CLEAN WASHED SAND
MIN. 4MM THICK MIN. 4MM THICK SAUDI CONSOLIDATED ENGINEERING COMPANY
+0.30 +0.30 +0.30 +0.30 +0.30 ±0.00 (KHATIB & ALAMI)
±0.00
30

20
30

30

CONTRACTOR:

30
117.6
120.9

117.6
118.5
50

-0.50 ±0.00 C.P ANODE ±0.00

20
170

170

170

170

AL-AYUNI INVESTMENT & CONTRACTING CO.


15 10

-0.909 1.0 % -0.876 -0.876 -0.876


90
90

50
52.4
49.1

52.4
51.5

-1.40 -1.40 -1.40 -1.40


60

50
-0.50 DRAWING TITLE:
35

BITUMAT BITUSHIELD (PTM-04) BITUMAT BITUSHIELD (PTM-04) BITUMAT BITUSHIELD (PTM-04) BITUMAT BITUSHIELD (PTM-04)
CONCRETE OVERLAY BLINDING CONCRETE
BITUMEN PROTECTION BOARD
OR EQUIVALENT
50 50 332.3
(ACC. SPECIFICATION
C03, CLAUSE 5.2) 44.9
BITUMEN PROTECTION BOARD
OR EQUIVALENT
BITUMEN PROTECTION BOARD
OR EQUIVALENT
CONCRETE OVERLAY
BLINDING CONCRETE
(ACC. SPECIFICATION
BITUMEN PROTECTION BOARD
OR EQUIVALENT
±0.00
SCALE
STRATEGIC RESERVOIRS AT TAIF PHASE I

90.0°
170'000 m3 POTABLE WATER STORAGE TANK
C03, CLAUSE 5.2)
44.9 368.4 368.4 44.9 2x ø 101.6mm PVC CONDUIT SCH.40
100 113.1 377.2 50 ROAD BASE MATERIAL
FOR ANODE FEEDER CABLES COMPACTED TO 2x ø 101.6mm PVC CONDUIT SCH.40 1:20/50/200
50 826.5 50 (BY CONTRACTOR) 100% PROCTOR DENSITY FOR ANODE FEEDER CABLES TANK 3, RING BEAM FOUNDATION
640.3 1x ø 50.8mm PVC CONDUIT SCH.40 (ACC. SPECIFICATION (BY CONTRACTOR)
FORMWORK DRAWING
926.5 FOR REFERENCE ELECTRODES G02, CLAUSE 8.4) 1x ø 50.8mm PVC CONDUIT SCH.40
CABLES (BY CONTRACTOR) FOR REFERENCE ELECTRODES DOCUMENT NO: SHEET REV.
CABLES (BY CONTRACTOR)
100 130
7 6 - Q P 1 0 - V - 0 5 6 1/3 0
IBG Ltd.
PLANT SURVEY INFORMATION:
STATION PLATFORM ZERO 0.000 = 1727.000 METERS ABOVE SEA LEVEL.
ALL LEVELS SHOWN ARE RELATIVE LEVELS AND REFER TO THE STATION
ZERO LEVEL.

SUBSTRUCTURE AND FOUNDATIONS:


SECTION G-G RING BEAM PLAN TANK 3 1 : 200 SUBSTRUCTURE:
BEFORE PLACING THE LEAN CONCRETE UNDER THE FOUNDATION,
CONCRETE DIMENSIONS 1 : 20 THE CONTRACTOR MUST ENSURE THAT THE UNDER LAYING SOIL IS
COMPACTED TO A MINIMUM PROCTOR COMPACTION DENSITY OF 97%.
219.7
IF THE IN-SITU CONDITIONS OF THE SOIL DO NOT MEET THEESE
RADIUS 50800.00 MM REQUIREMENTS, MEANS AND METHODS OF COMPACTIONS WILL BE
OUTER DIAMETER 107044.10 MM INNER DIAMETER 105044.10 MM

B
1"Ø CONDUIT FOR EMPLOYED TO IMPROVE THE SOIL CONDITIONS TO THE REQUIRED LEVEL.

354.5°
LEAK DETECTION SYSTEM 1 12"Ø CONDUIT FOR
CP SYSTEM THE CONTRACTOR MUST SUBMIT HIS PROPOSALS AND METHOD
44.1 MM TANK DIAMETER 106000.00 MM
STATEMENTS FOR THIS PROCEDURE TO SWCC/THE ENGINEER FOR THEIR

350°


1"Ø CONDUIT FOR
4.41 APPROVAL BEFORE THE EXECUTION OF WORK.
LEAK DETECTION SYSTEM
47.79 47.8 59.9 10 40 HDPE LINER 1MM.

18°
ALL CONCRETE STRUCTURES WITH A FLOOR LEVEL BELOW PERMANENT
CONCRETE CLEAN WASHED SAND GRADE SHALL HAVE THE UNDERGROUND PART COMPLETELY ENCASED IN
RING BEAM
3 PLAN I-I A TANKING MADE FROM A PREFABRICATED HEAVY DUTY WATER PROOFING

33
-8.388 +1718.61 2 MEMBRANE OF MODIFIED BITUMEN, MINIMUM 4MM THICK AND WITH A

00.0°
1"Ø CONDUIT FOR

H
POLYESTER NON-WOVEN FABRIC-BASE. THE TANKING ON THE SIDES

33
LEAK DETECTION SYSTEM


AND THE TOPS OF THE STRUCTURES SHALL BE FULLY TORCH-APPLIED

B
30

10.001 30
-8.688 +1718.31 2 DRAIN PIT 1"Ø CONDUIT FOR ON A BITUMEN PRIMED SURFACE. THE PROTECTION MATERIAL SHALL

60
1"Ø CONDUIT FOR LEAK DETECTION SYSTEM CONTINUE TO A LEVEL NOT LESS THAN 0.2M ABOVE FINAL GRADE

°
LEAK DETECTION SYSTEM (STATION ELEVATION). THE TANKING UNDER THE STRUCTURE SHALL BE

36
14.999
124

90

31
95

LAID ON A CONCRETE BLINDING. ALL OVERLAPS SHALL BE MINIMUM 100 MM

9.5
1 12"Ø CONDUIT FOR
50

AND FULLY TORCH-WELDED. PROTECTION MEMBRANE FOR VERTICAL

°
5

CP SYSTEM
ELEMENTS SHALL BE PROVIDED.
-9.188

10
35
C.P ANODE
SEE DETAIL "2"

00
CATHODIC PROTECTION:
10

.00
19x 1 FOR CATHODIC PROTECTION DETAILS REFER TO RELEVANT DRAWINGS.

MM
BLINDING CONCRETE CRUSHED STONE WITH
(ACC. SPECIFICATION CEMENT:
-WELL GRADED NON COHESIVE °
C03, CLAUSE 5.2)
EARTHING:

H
MATERIAL
ROAD BASE MATERIAL 50
-MAXIMUM GRAIN SIZE: 75mm
50 50 69.9 COMPACTED TO
-MINIMUM CEMENT
CONTENT: 200 kg/m3
100% PROCTOR DENSITY
2"Ø CONDUIT FOR 1"Ø CONDUIT FOR FOR EARTHING DETAILS REFER TO RELEVANT SPECIFICATION.
100 (ACC. SPECIFICATION
° LEAK DETECTION SYSTEM
G02, CLAUSE 8.4) CP SYSTEM 54
30
4° CONCRETE:
°
G CONCRETE MIXTURE MUST FOLLOW THE RESPECTIVE CONCRETE MIX

297
1"Ø CONDUIT FOR

14x 2
LEAK DETECTION SYSTEM SEE DETAIL "1" 60 DESIGN REPORTS (REFER 77-QB20-R-004).
LEAN CONCRETE MIN. CEMENT CONTENT 200 kg/m3
° MIN. CHARACTERISTIC STRENGTH 20 N/mm 2
SECTION H-H CYLINDER TEST
SULPHATE RESISTANT PORTLAND CEMENT

CONCRETE DIMENSIONS 1 : 20 G TYPE V ACCORDING TO ASTM C150


STRUCTURAL CONCRETE GRADE A
259.7 MINIMUM CHARACTERISTIC STRENGTH 50 MN/m 2 AT 28 DAYS
RADIUS 50400.00 MM
MINIMUM CEMENT CONTENT 350 kg/m 3
290
OUTER DIAMETER 107044.10 MM INNER DIAMETER 105044.10 MM ° MAXIMUM CEMENT CONTENT 420 kg/m 3
WATER/CEMENT RATIO 0.40%
1"Ø CONDUIT FOR 1"Ø CONDUIT FOR
72°
44.1 MM TANK DIAMETER 106000.00 MM LEAK DETECTION SYSTEM LEAK DETECTION SYSTEM CONCRETE IN CONTACT WITH SOIL OR WATER
MUST BE WATERPROOF (SEE NOTE ABOVE)
4.41
47.79 47.8 70 10 HDPE LINER 1MM.
283° TYPE OF CEMENT:
CONCRETE CLEAN WASHED SAND 1"Ø CONDUIT FOR
PORTLAND CEMENT TYPE 1 ACCORDING TO ASTM C150
RING BEAM LEAK DETECTION SYSTEM
-13.50 9 +1713.491 ALL UNDERGROUND CONCRETE STRUCTURES SHALL CONTAIN
280°
MICRO-SILICA OF 7.0% BY WEIGHT OF CEMENT.
1 12"Ø CONDUIT FOR MICROSILICA SHALL COMPLY WITH ASTM C1240 AND THE ADDITIONAL
30

30

CP SYSTEM REQUIREMENTS ACCORDING TO SPECIFICATION C07, 2.3 (SILICA FUME).


-13.80 9 +1713.19 1 54.9
PUMP OUT PIT
15 10

AGGREGATES:
90

90

85°
95

1"Ø CONDUIT FOR COARSE-GRAINED AGGREGATES ACCORDING TO


50

LEAK DETECTION SYSTEM ASTM C33 OR BS EN 12 620


5

-14.309 154
35

COARSE GRAINED AGGREGATES SHALL COMPLY WITH THE MIX DESIGN OF THE CONCRETE
SUPPLIER TO AVOID CONGESTION DURING VIBRATION / CASTING OF THE CONCRETE.
90°
10

270° 270.0° 90.0°

BLINDING CONCRETE
ROAD BASE MATERIAL 1 12"Ø CONDUIT FOR FORMWORK:
C.P ANODE COMPACTED TO CP SYSTEM 92°
(ACC. SPECIFICATION
100% PROCTOR DENSITY SMOOTH FORMWORK FOR ALL VISIBLE SURFACES AND
C03, CLAUSE 5.2) 1"Ø CONDUIT FOR
(ACC. SPECIFICATION
94°
ESPECIALLY FOR ALL WATER COVERED SURFACES
G02, CLAUSE 8.4) LEAK DETECTION SYSTEM ACCORDING TO SPECIFICATION C07, CLAUSE 7.2
50 50 80

RI
NG
100 134.9 154 40 TRIANGULAR FILLETS FOR ALL CHAMFERED CORNERS (20/20 mm)

BE
CRUSHED STONE WITH
CEMENT:
REINFORCING STEEL:

A
TAN
1"Ø CONDUIT FOR

M
260° LEAK DETECTION SYSTEM REINFORCING STEEL GRADE 60 ACCORDING TO ASTM A615

DI
1"Ø CONDUIT FOR
DUCTILITY CLASS B fy > 420 N/mm2
_
A

AM
K DIA
LEAK DETECTION SYSTEM 102°
REINFORCEMENT SHALL NOT BE LEFT EXPOSED FOR AN EXTENDED PERIOD

ET
BEFORE BEING CAST IN. CLEANING OF REINFORCEMENT ACCORDING TO

ER
MET
DETAIL "1" A SPECIFICATION C07, CLAUSE 6.5

10
CONCRETE COVER OF REINFORCING STEEL:

ER

50
DRAIN PIT 1 : 5

44
FOUNDATION IN CONTACT WITH SOIL 70 mm

1060

.10
SPACERS 70mm x 70mm x 70mm ACCORDING TO SPECIFICATION C07
1"Ø CONDUIT FOR
CLAUSE 6.2.3

MM
° LEAK DETECTION SYSTEM
248

00.00
LEAN CONCRETE
STRUCTURAL CONCRETE
RA

MM
DIU 130
REFERENCE DRAWINGS DRAWING NO.

S 50 BAR BENDING SCHEDULE, TANK 3 RING BEAM FOUNDATION 76-QP10-L-056


80 100 0° REINFORCEMENT DRAWING SHEET 2/2 76-QP10-V-056
0 .0 24
0M
M 12

2"Ø CONDUIT FOR
CP SYSTEM
12
1"Ø CONDUIT FOR 8°
LEAK DETECTION SYSTEM

23

C
Ø12 D REFERENCE DRAWING: DRAWING TITLE:

10
4
4

00
.00
°
0.0

E
°3
22

21

DETAIL "2"

13
MM


1"Ø CONDUIT FOR PLAN
II- II ENGINEER'S STICKER: CONTRACTOR'S STICKER:
LEAK DETECTION SYSTEM
PUMP-OUT PIT 1 : 5
73

D RP DOCUMENT
No. 76-QP10-V-056
COMMENT SHEET
No. EH-AH-D-1533
106

Rev. E Date 12.05.2019

F
STATUS A: Approved for Construction (AFC)

15

1"Ø CONDUIT FOR B: Approved as noted (AAN)


197.

180.0°
100
LEAK DETECTION SYSTEM C: Rejected (REJ)
73

F 1"Ø CONDUIT FOR D: For Information only (INF)


°

3 0
202

LEAK DETECTION SYSTEM


1

160
C

81.91
197°

°
165°
1 12"Ø CONDUIT FOR
190°

CP SYSTEM
1 12"Ø CONDUIT FOR
185.5°

182°

175°
2X4"Ø CONDUIT FOR CP SYSTEM
180°
E

CP SYSTEM 1"Ø CONDUIT FOR


2"Ø CONDUIT FOR LEAK DETECTION SYSTEM
1"Ø CONDUIT FOR
CP SYSTEM
LEAK DETECTION SYSTEM
REV. ISSUED FOR DRAWN CHECKED APPROVED DATE

0 MM KINGDOM OF SAUDI ARABIA

4 00. 0
50
50

SALINE WATER CONVERSION CORPORATION (SWCC)


I U S
R AD PROJECT TITLE:
0 6

Project No.
1

20906
STRATEGIC RESERVOIRS AT MAKKAH PHASE II &
TAIF PHASE I
50

ENGINEER:

Ø154 SAUDI CONSOLIDATED ENGINEERING COMPANY


(KHATIB & ALAMI)

CONTRACTOR:

AL-AYUNI INVESTMENT & CONTRACTING CO.

DRAWING TITLE:

SCALE
STRATEGIC RESERVOIRS AT TAIF PHASE I
170'000 m3 POTABLE WATER STORAGE TANK
1:20/50/200
TANK 3, RING BEAM FOUNDATION
FORMWORK DRAWING
DOCUMENT NO: SHEET REV.

7 6 - Q P 1 0 - V - 0 5 6 2/3 0
IBG Ltd.
<(r
BOTTOM AND TOP REINFORCEMENT 1 :50 RING BEAM PLAN TANK 3 1 : 200 PLANT SURVEY INFORMATION:
STATION PLATFORM ZERO 0.000 = 1727.000 METERS ABOVE SEA LEVEL
al
19x(D LAP LENGTHS ALL LEVELS SHOWN ARE RELATIVE LEVELS AND REFER TO THE STATION
ZERO LEVEL

-----------------
-- _::c:=......... '
- - - - ------------- - SUBSTRUCTURE AND FOUNDATIONS:

-- - --
-- "F- --:., ---
- 032 1.92 m

®u�
� � SUBSTRUCTURE:
-
-,F"""
L ' .. � PLAN 1-1
BEFORE PLACING THE LEAN CONCRETE UNDER THE FOUNDATION,

025 1.50 m
THE CONTRACTOR MUST ENSURE THAT THE UNDER LAYING SOIL IS
' COMPACTED TO A MINIMUM PROCTOR COMPACTION DENSITY OF 97%.

al

�. !<CL
,.oo 2.00
0
IF THE IN-SITU CONDITIONS OF THE SOIL DO NOT MEET THEESE
REQUIREMENTS, MEANS AND METHODS OF COMPACTIONS WILL BE

.� "' - .. -
LAPPING OF 0
N !;l � 8 LAPPING OF EMPLOYED TO IMPROVE THE SOIL CONDITIONS TO THE REQUIRED LEVEL
i " � " i;

!!-
THE BOTTOM THE BOTTOM
l st
" & "i
. � THE CONTRACTOR MUST SUBMIT HIS PROPOSALS AND METHOD
• •
•i
REINFORCEMENT o• � V 0
REINFORCEMENT
:t. ��
� �
STAGGERED �� ""
" �
s • □-
....J
r,j :il -' �
& ....1 ISi I!
STAGGERED STATEMENTS FOR THIS PROCEDURE TO SWCC/THE ENGINEER FOR THEIR

® le ( ;:: X ;::
>< ><
tl 8)
>< ><
.; APPROVAL BEFORE THE EXECUTION OF WORK.
ALL CONCRETE STRUCTURES WITH A FLOOR LEVEL BELOW PERMANENT
....... ........
m m m o,

19x CD
GRADE SHALL HAVE THE UNDERGROUND PART COMPLETELY ENCASED IN

<(r
A TANKING MADE FROM A PREFABRICATED HEAVY DUTY WATER PROOFING
MEMBRANE OF MODIFIED BITUMEN, MINIMUM 4MM THICK AND WITH A
BOTTOM AND TOP REINFORCEMENT 1 :50 POLYESTER NON-WOVEN FABRIC-BASE. THE TANKING ON THE SIDES
AND THE TOPS OF THE STRUCTURES SHALL BE FULLY TORCH-APPLIED
ON A BITUMEN PRIMED SURFACE. THE PROTECTION MATERIAL SHALL

14x@ CONTINUE TO A LEVEL NOT LESS THAN 0.2M ABOVE FINAL GRADE
(STATION ELEVATION). THE TANKING UNDER THE STRUCTURE SHALL BE
LAID ON A CONCRETE BLINDING. ALL OVERLAPS SHALL BE MINIMUM 100 MM
-------------
--
u.'-Ll I AND FULLY TORCH-WELDED. PROTECTION MEMBRANE FOR VERTICAL

---- ---
ELEMENTS SHALL BE PROVIDED.

14x@
- --i--
CATHODIC PROTECTION:
FOR CATHODIC PROTECTION DETAILS REFER TO RELEVANT DRAWINGS.

2.00
LAPPING OF LAPPING OF
EARTHING:
THE BOTTOM THE BOTTOM FOR EARTHING DETAILS REFER TO RELEVANT SPECIFICATION.
REINFORCEMENT REINFORCEMENT
STAGGERED STAGGERED
CONCRETE:
"'-
X
"'- "'-
X X X
....
"it
X
.....
s:I'
X
.... ....
"it
X
"it
LEAN CONCRETE MIN. CEMENT CONTENT 200 kg/m'
MIN. CHARACTERISTIC STRENGTH 20 N/mm 2
CYLINDER TEST

BOTTOM REINFORCEMENT 1 :50 SULPHATE RESISTANT PORTLAND CEMENT


TYPE V ACCORDING TO ASTM C150
1x@ al STRUCTURAL CONCRETE
MINIMUM CHARACTERISTIC STRENGTH
GRADE A
50 MN/m 2 AT 28 DAYS
350 kg/m 3
1.92
MINIMUM CEMENT CONTENT
MAXIMUM CEMENT CONTENT 420 kg/m 3
WATER/CEMENT RATIO 0.40%
CONCRETE IN CONTACT WITH SOIL OR WATER

--- --·- ---- MUST BE WATERPROOF (SEE NOTE ABOVE)

TYPE OF CEMENT:
PORTLAND CEMENT TYPE 1 ACCORDING TO ASTM C150
ALL UNDERGROUND CONCRETE STRUCTURES SHALL CONTAIN

�-
270.0° 90.0° MICRO-SILICA OF 7.0% BY WEIGHT OF CEMENT.
MICROSILICA SHALL COMPLY WITH ASTM C1240 AND THE ADDITIONAL
REQUIREMENTS ACCORDING TO SPECIFICATION CO?, 2.3 (SILICA FUME).

AGGREGATES:
- 0 -
• a

"'
NO
COARSE-GRAINED AGGREGATES ACCORDING TO
ASTM C33 OR BS EN 12 620

COARSE GRAINED AGGREGATES SHALL COMPLY WITH THE MIX DESIGN OF THE CONCRETE
SUPPLIER TO AVOID CONGESTION DURING VIBRATION I CASTING OF THE CONCRETE.
TOP REINFORCEMENT 1 :50 FORMWORK:
al -- SMOOTH FORMWORK FOR ALL VISIBLE SURFACES AND
1x@
t � ESPECIALLY FOR ALL WATER COVERED SURFACES
L 1.92
L
1 ACCORDING TO SPECIFICATION CO?, CLAUSE 7.2

TRIANGULAR FILLETS FOR ALL CHAMFERED CORNERS (20120 mm)

---- --- REINFORCING STEEL:


REINFORCING STEEL GRADE 60 ACCORDING TO ASTM A615
DUCTILITY CLASS B 1, ,c 420 N/mm 2
REINFORCEMENT SHALL NOT BE LEFT EXPOSED FOR AN EXTENDED PERIOD
al BEFORE BEING CAST IN. CLEANING OF REINFORCEMENT ACCORDING TO
" 0
-

!;3 �
SPECIFICATION CO?, CLAUSE 6.5

; ! � i� ! ;! �! ;! ;! CONCRETE COVER OF REINFORCING STEEL:


- ®0
,;t - r--
ISi • 1SI • & . ISi • IS: • IS . ISi •
COVVN<'?<'l a:, -st .., ,:,;,
FOUNDATION IN CONTACT WITH SOIL 70 mm
'<j-

SPACERS 70mm x 70mm x 70mm ACCORDING TO SPECIFICATION CO?


CLAUSE 6.2.3

LEAN CONCRETE
B888888888i STRUCTURAL CONCRETE

SECTION A-A 1 : 20 SECTION B-B 1 : 20

j, 0
'1
REFERENCE DRAWINGS DRAWING NO.
1114a=20

6,32
4.Layer
4e25
@ BAR BENDING SCHEDULE, TANK 3 RING BEAM FOUNDATION 76-QP10-L-056
_ _ _,_. j, 41< ,L ,-Ja �2ll 34
llJ
64 71 )-i y,,, -----+-----J;t-----c:::":L
Lai;i • fs5\ 3.Layer FORMWORK DRAWING SHEET 112 76-QP10-V-056

.
3_f;
4.Layer �

-+-• •
.... ,,,.
�-;

Inside
''" 0 ,,--.PiLAN 11-11 1
I 41!132
0
"</
1•
4,32
64 71 /,,; =:--
Outside
1•
---<p 1. •
Inside

11114a=20
SO
0
@
211132
Outside
4"32 -e- •••• • "I
Inside

11114a= 20
12
1.1.a
. yer
<> 1.
I• • •••••••,
014a=20
1.Layer
62

•• 1!114a= 20
9
1.L.ayer . . �
•••• � 1.Layer
"
020a=100 2
020a-100 "
e:? b
REFERENCE DRAWING: DRAVVING TITLE:

@ -
u/
2X41i132 2x4fl32 41!125 g

---
64 71 8
2.L.ayer <I> I<I> 2.L..ayer 2.layer
31
64 71 .��'2.l.9.yer
·�':!:':;""�- ---
-4--4--4--4 •• �,2.L..ayer
·�·'!·""'' '---- - - -
-4 ----$--4--4 1!114a=20
1.laYflr ® -- ----
ENGINEER'S STICKER: CONTRACTOR'S STICKER:

LJJ/ RP DOCUMENT
,o. 76-QP10-V-056
COMMENT SHEET
,o. I EH-AH-D-15JJ
Rev. IE Date 1 12.052019
STATUS □ A: Appl'O\led tor Construction (AFC)

i.i B: Appl'Olled as noted (MN)


□ C: Rejecled (REJ)

BOTTOM REINFORCEMENT 1 :50 TOP REINFORCEMENT 1 :50 SECTION C1-C1 1 : 20


□ D: For lnformatinn only (INF)

-"' "'- "'"' -•,-.• 8• - - "'"' -"' ® -• •


8)
1-'-F �'�'vA�'�'�·
�. E�H�-A�H-�DJ·l�SJ�l-�D�A�TE�D�l2�.o�s�.20�1�9 ----+�"�'-+- Ko -+--�'°� -+- 03.07.2019
®• "' "' ®• 8
.-
11 � �
". - ---
0 0 0 0 0
E REV. ACC. EH-AH-D-1423, DATED 09.04.2019 RB Ko Ko 12.04.2019
M M
-"'
-+

0
• "
1x •• E!

!" . '" ••II�i "a
.• ! ••
•• : � • ! �! " i!
�;,il !" ! o ---t----------�---------t-- RB ---t-- Ko ---t--,-
o.v -t- 25.03.2019

..•' .•'
REV. ACC. EH-AH-D-1313, DATED 07.03.2019
••• •• a • - •
� �
.-
N N • 0 N N N m N
Ti l
ii 1b 1b
®
t "0

!�0 !�0
. � "'
"0 "0 - 0 "0 - "0

"" • 0 a "•" "" """ �


II

""..... .5

m "ill
ii p=-•J..�cc. FH-A-1-�-·,so, l)ATF� 1J.0?.?[,13 �B l"-.02.2010
� " � "
•• •• •• •• •
' '

••
N

1x
gij<-4 N -
• • Iii, ll�lli 'X
,..... -
L LQ L IQ L

r
pc:-,_:!',(:,� FH !..H "; ()p,7·_nATFn1:,·0:,r,1Q �8 'C.'J1.2�19
LQ

� •
"• SECTION C2-C2 1 : 20
II � II �

!� � . � . o,.....r ""'
<II ...J ti! ...J <II ...J
• J . J L�.1 · .L·�1 0
�• c,; lG• c,;

(.) �
�..i.-b
� &! J,..,11 ...,.._.. .-..-�

' I 1
tg REV. ISSUED FOR CHECl<ED APPROVED

min. 1. 2 Im

-
1.92

l.---::--------ff=-_ - · ' � ·
- _LF..:..�Jr:=:�:t1r---_-t_-t-=_:=�_::-::_�-----�, ��,....._._·.,_'.·- Jt
I N· ' l•O ""I
92 �..iy -\\ 4_yJI 4.5.Lu..li
I
-
'

1 ��· =j- = - ·
� 1 --::::J::tJr
KINGDOM OF SAUDI ARABIA

• '

. . . - Tl •• •--
• . • •
'---..,.]W1 ,L..ll ½b.:.J
L..WI """'_;.JI

--
I

--;1'1:1._ �1--- --
__
--r.-�--
1

�i-f1---
•••• •••• T
I

j-+ ---
SALINE WATER CONVERSION CORPORATION {SWCC)
~ �- --
--
-- -- -��T�----
- =-
,-"- M •
- ' l+/,J, ::- ---- -rl,..... -� -J�-=
- - - ":-'F,I
L__
I ---
.I I I • I

• 2x61125a= 15� PROJECT TITLE: ��
-�-1\ �. �
i.;-.,r.:!-''\...,.......
• ":i'I ....I ti..ie.J\ .•1j

""'"""+
1 � • Inside�
u_;:,,..i:. JJ.:,,-->-
••••

.I.
- . .
1. �
••••
1 "I
{";'-.,411132

I
I• •I • I • Project No. t,,;..,.ll ,.i,
u.lU:.11 i) i)JY.l U:...,,.i,JIJ
L.-----1i;:�---- ---= ..,.._-__ __ ' ------->--1•----•----------.r-----__j I I
\:_JOutside I I I • 2x6e25a= 15
20906
STRATEGIC RESERVOIRS AT MAKKAH PHASE II &

--­
:L
• I
62025a=15 @
Q621126a= 16
r.......
,wt•• +--.p • • •I I• •I 0 TAIF PHASE I

-1 Q 461114a 20
•I outside

.,
I
V1. Layer
i-- 46 4. Layer
�1.Layer
=

•1

�L 11
ENGINEER:
16
2X7!1132a=15
Inside
28 e.20 a=15 I'I • 4711114a=20
• • • • • • • 55 820 a::15126'
4,..-J..i+ll �1),.,1�-� -½.i__p-.Jl �I .iG.....i"'-JI J..s�

I
1.Layer�
i--
2. Layer
32 (""'°J .,.,i,;,)
s11125a 15
_
= 81l25a=15
19
I
II 6,32
1. Layer • • I
•I 62 825a= 15
SAUDI CONSOLIDATED ENGINEERING COMPANY
@ln:s1de Inside
p �

7 Outside • • • 45

.• .�\
• • • (KHATIB & ALAM!)
4. Layer

r.-, r, I
25J!l2Da=15
• �
••

33 291125a=15 I
2. layer

@ 62 1120 a=15 CONTRACTOR:

··...\• 2. Layer 47 1114a=20


• I 23
@
62J!l25a=15
1. Layer "'• \
j.
• (';;;\62025a=15
\::::)4. Layer
10
1. Layer •
• • •• • • •• • • ••• ••••••
1. Layer

.::.�J\L.\lJ .;�� __,.iJ:;1-11 .i...sy,!i

t
',


N- . AL-AYUNI INVESTMENT & CONTRACTING CO.

o I

NI +
1. •
,.n,i !J,!d I
,____
S 1!125a= 15 81l25a= 15
20 OI.IUlide (.) J
Oulsid11
20 I
I
I
AL·AYUNI

1
I 81132
55fl20a=15
L,___ _ j,,-------- ---------L--e------- - ___
I 0
26 1. Layer 2. Layer I.,. .,I ,..,.
l ,__---< _.....,I DRAWING TITLE:
251l20a=15 __) 29e25a=15'
621120 a=15 2. Layer ,-,.JI c,a ¼'­
23 1.Layer
33
I
' Q81!132a= 15 2g\
2. Layer�
SCALE
STRATEGIC RESERVOIRS AT TAIF PHASE I
�2.L..ayer
28e2Da-15 .
.. 170'000 m3 POTABLE WATER STORAGE TANK
,//

@
2. Layer
2x81112511=15
1.
__,,,,,, , ,,---,,-·, �
• 1:20/50/200
TANK 3, RING BEAM FOUNDATION
_
@Inside

2x81!12511 15
=
�-...... '
1. - J 1. REINFORCEMENT DRAWING
DOCUMENT NO: SHEET REV.
18 Outside T N
N o_ 7 6 - Q P 1 0 - V - 0 5 6 3/3 0
(.) -- IBG Ltd.
D:r-awn with JDC CAD Computer System