for
Rev. 0
PREPARED BY
Simone Palmieri
Project Engineer
This document is confidential and is the property on WellDynamics International Ltd. It may not be copied, reproduced or disclosed in any form without the
written consent of WellDynamics. WellDynamics intends to protect this confidential document under the copyright laws as unpublished work, or in the event of
inadvertent or deliberate publication as a published work of WellDynamics. Copyright 2001 by WellDynamics
Page 1 of 6 16/05/2003
Belayim 112-86 SmartWell® Completion Sleeve Movement Record Sheet
8 N/A X
Sleeves Movement Record during Stack-up Test before moving to Well Site
(through 11,000 ft Flat-pack)
Client ENI-Agip / Petrobel Well No. Belayim 112-86
Date 15/07/03 Test Location Halliburton base in Cairo
Client Engineer None WellDynamics Simone Palmieri
Sheet number 5 Engineer
10 D-04 X