Rab BTG Kapeh Revisi
Rab BTG Kapeh Revisi
37.35
Analisa terbaru dicek la 0.0268
kode analisa
18.675
0.0535
33,491,989
Rp 33,491,989.13
4,374,124
4,374,124
1,786,215 50
1,786,215
19
4,160,000
56,096,466 26.6666666667
Rp 20,679,462.60
Anl.Alat Berat
Nagari IV Koto Mudiak Kec. Batang Kapeh
PERHITUNGAN BIAYA DAN OPERASIONAL ALAT
II. Biaya Tidak Langsung (Indirec Cost) = 15 % x (E) (F) Rp. 78,875.40
III. Keuntungan
I. Upah
0.0210 Pekerja @Rp. 70,000.00 Rp. 1,470.00
0.0051 Mandor @Rp. 95,000.00 Rp. 484.50
Jumlah Rp. 1,954.50
II. Peralatan
0.0420 jam Excavator @Rp. 665,000.00 Rp. 27,930.00
- Alat Bantu @Rp. Ls Rp. 800.00
Jumlah Rp. 28,730.00
I. Upah
0.0110 Pekerja @Rp. 70,000.00 Rp. 770.00
0.0030 Mandor @Rp. 95,000.00 Rp. 285.00
Jumlah Rp. 1,055.00
II. Peralatan
0.0313 jam Excavator @Rp. 665,000.00 Rp. 20,814.50
- Alat Bantu @Rp. Ls Rp. 800.00
Jumlah Rp. 21,614.50
#REF!
#REF!
#REF!
#REF!
JADWAL PELAKSANAAN PEKERJAAN (TIME SCHEDULE)
Kegiatan : Penunjang kegiatan DAK Bidang Perikanan Budi daya
Pekerjaan : Perencanaan ( DED ) Pembuatan Kolam baru
Lokasi : Nagari IV Koto Mudiak Kec. Batang Kapeh
1 Pek. Galian kolam 23,560,326.21 14.47 2.41 2.41 2.41 2.41 2.41 2.41
60 %
2 Pek. Pembuatan tanggul 27,429,528.26 16.85 2.81 2.81 2.81 2.81 2.81 2.81
3 Pek. Pas batu kali saluran air pembuang 33,491,989.13 20.57 4.11 4.11 4.11 4.11 4.11 50 %
4 Pembuatan kolam panen 1,776,632.55 1.09 0.55 0.49
40 %
5 Pek. Saluran air pembuang 1,207,250.00 0.74 0.19 0.19 0.19 0.19
PEK. PELENGKAP DAN LAIN LAIN
30 %
1 Pek. bak penampung 200x200x100 4,374,124.21 2.69 0.90 0.90 0.90
2 Pek. bak kontrol 40x40 1,786,214.50 1.10 0.37 0.34 0.34 20 %
3 Pengadaan dan Pemasangan Pipa PVC Ø 4 inci 10,820,348.00 6.64 1.33 1.33 1.33 1.33 1.33
10 %
4 Pengadaan dan Pemasangan Pipa PVC Ø 3 inci 33,743,600.00 20.72 4.14 4.14 4.14 4.14 4.14
5 Pengadaan Assesoris pipa PVC 4,160,000 2.55 0.51 0.51 0.51 0.51 0.51 0%
Ir. Azizar
Team Leader
HITUNGAN VOLUME
Kegiatan : Penunjang kegiatan DAK Bidang Perikanan Budi
Pekerjaan : Perencanaan ( DED ) Pembuatan Kolam baru
Lokasi : Batang Kapeh
No URAIAN VOLUME Satuan Catatan
I PEKERJAAN PERMULAAN
1 Papan proyek 1 Unit Uraian ada di analisa papan proyek
2 Pemasangan patok pengukuran dan baowplank
Jumlah Kolam 12 Buah 12
Patok dipasang setiap sudut kolam per sudut 5 Meter 20
Jumlah panjang baowplank 240 Meter
3 Pembuatan direksiket lapa 3 x 6 Meter
Jenis bangunan bedeng penyimpanan barang
45.00
3.06 M³
HITUNGAN VOLUME
150
120
saluram air keluar
270
PEKERJAAN PARALON
7 12
dia 4 mm Saluran dari bak penampung 130 + 40 + 30 200
dia 3 mm paralon untuk air buangan 12 x 6 72
6 11
paralon untuk air masuk 7x2 14
5 1 10
0
4 9
25 25
200
BAK PENAMPUNG 200X200x100
Item kegiatan Volume Harga satuan Jumlah
● Dinding Pas batu 3 583,995.50 1,751,987
● Pondasi Pas batu 2 583,995.50 1,167,991
100 ● Lantai beton 0.4 1,053,910.00 421,564
● Pasir uruk 0.4 100,000.00 40,000
● Plesteran 10.8 51,664.14 557,973
● Galian 7.2 60,362.50 434,610
BIAYA 1 UNIT BAK PENAMPUNG 4,374,124
40
50
HITUNGAN VOLUME
20
20 SALURAN PEMBUANG
50
ITEM KEGIATAN VOL Harga Sat. JUMLAH
● Dinding Pas batu 0.10 583,995.50 58,399.55
● Pondasi Pas batu 0.09 583,995.50 52,559.60
40
● Lantai beton 0.03 1,053,910.00 31,617.30
● Pasir uruk 0.03 100000 3,000.00
● Plesteran 1.20 51,664.14 61,996.97
30 ● Galian 1.00 60,362.50 60,362.50
● BIAYA PER METER ###
30 3 30
0
59.20
57.60
77.92
70.52
77.40
73.96
92.88
64.68 TANAH ASLI
50.16
60.06
60.06
47.39 TIMBUNAN
791.82 418.15
12,830,754.36
120 0
Galian
2,50
1.00
20.00
2
2
0.2 116,799
0.09 52,560
0.04 907
0.03
1.2
3,000
51,664
BAK KONTROL
0.24 14,487
239,417
/
HARGA BAHAN BANGUNAN DAN UPAH KERJA
J UPAH KERJA
1 Kepala Tukang Hari 100,000
2 Mandor Hari 95,000
3 Tukang Batu Hari 90,000
4 Tukang Kayu Hari 90,000
5 Tukang Pipa Hari 90,000
6 Operator jam 12,500
7 Pembantu Operator Hari 90,000
Juru ukur Hari 150,000
HARGA BAHAN BANGUNAN DAN UPAH KERJA
30,000
40,000
di padang trasport
424,000.00 106,000 14,000.00
256,000.00 64,000 14,000.00
156,000.00 39,000 14,000.00
ANALISA HARGA SATUAN
1 2 3 4 5 6
Bahan
Tenaga
Pekerja 0.0150 OH 70,000.00 1,050.00
Mandor 0.0200 OH 95,000.00 1,900.00
Alat
Alat Bantu
Jumlah 2,950.00
Over Head & Profit (10%) 295.00
TOTAL 3,245.00
ANALISA HARGA SATUAN
1 2 3 4 5 6
Bahan
Kayu 5/7 0.0025 M3 ### 5,750.00
Papan 0.0042 M3 ### 9,660.00
Paku biasa 0.2000 kg 16,000.00 3,200.00
Tenaga -
Tukang Kayu 0.0200 OH 90,000.00 1,800.00
Pekerja 0.0600 OH 70,000.00 4,200.00
Kepala Tukang 0.0020 OH 100,000.00 200.00
Mandor 0.0060 OH 95,000.00 570.00
Juru Ukur 0.0200 OH 150,000.00 3,000.00
Pembantu juru ukur 0.0200 OH 90,000.00 1,800.00
Alat
Water pass 0.0040 Hari 150,000.00 600.00
Jumlah 30,780.00
Over Head & Profit (10%) 3,078.00
TOTAL 33,858.00
ANALISA HARGA SATUAN
1 2 3 4 5 6
Bahan
Tenaga
Pekerja 0.7500 OH 70,000.00 52,500.00
Mandor 0.0250 OH 95,000.00 2,375.00
Alat
Alat Bantu
Jumlah 54,875.00
Over Head & Profit (10%) 5,487.50
TOTAL 60,362.50
ANALISA HARGA SATUAN
1 2 3 4 5 6
Bahan
Tenaga
Pekerja 1.5000 OH 70,000.00 105,000.00
Mandor 0.0600 OH 95,000.00 5,700.00
Alat
Alat Bantu
Jumlah 110,700.00
Over Head & Profit (10%) 11,070.00
TOTAL 121,770.00
ANALISA HARGA SATUAN
1 2 3 4 5 6
Bahan
Batu Kali 1.2000 M3 85,000.00 102,000.00
Semen Portland 3.2600 zak 63,000.00 205,380.00
Pasir Pasang 0.5200 M3 70,000.00 36,400.00
Tenaga
Pekerja 1.5000 OH 70,000.00 105,000.00
Tukang Batu 0.7500 OH 90,000.00 67,500.00
Kepala Tukang 0.0750 OH 100,000.00 7,500.00
Mandor 0.0750 OH 95,000.00 7,125.00
Alat bantu
Alat bantu
Jumlah 530,905.00
Over Head & Profit (10%) 53,090.50
TOTAL 583,995.50
ANALISA HARGA SATUAN
1 2 3 4 5 6
Bahan
Tanah Urug 1.2000 M3 79,000.00 94,800.00
Tenaga
Pekerja 0.3000 OH 70,000.00 21,000.00
Mandor 0.0100 OH 95,000.00 950.00
Alat
Alat Bantu
Jumlah 116,750.00
Over Head & Profit (10%) 11,675.00
TOTAL 128,425.00
ANALISA HARGA SATUAN
1 2 3 4 5 6
Bahan
Semen Portland 0.1248 zak 63,000.00 7,862.40
Pasir Pasangan 0.0240 m3 70,000.00 1,680.00
Tenaga
Pekerja 0.3000 OH 70,000.00 21,000.00
Tukang Batu 0.1500 OH 90,000.00 13,500.00
Kepala Tukang 0.0150 OH 100,000.00 1,500.00
Mandor 0.0150 OH 95,000.00 1,425.00
Alat
Jumlah 46,967.40
Over Head & Profit (10%) 4,696.74
TOTAL 51,664.14
ANALISA HARGA SATUAN
1 2 3 4 5 6
Jumlah
Over Head & Profit (10%)
TOTAL
ANALISA HARGA SATUAN
1 2 3 4 5 6
Bahan
Pipa PVC 4" 1.2000 M1 78,000.00 93,600.00
Perlengkapan 1.0000 Ls 23,400.00 28,080.00
Tenaga
Pekerja 0.0810 OH 70,000.00 5,670.00
Tukang Pipa 0.1350 OH 90,000.00 12,150.00
Kepala Tukang 0.1350 OH 100,000.00 13,500.00
Mandor 0.0040 OH 95,000.00 380.00
Alat
Jumlah 153,380.00
Over Head & Profit (10%) 15,338.00
TOTAL 168,718.00
ANALISA HARGA SATUAN
1 2 3 4 5 6
Bahan
Pipa PVC dia 3 " 1.2000 M1 53,000.00 63,600.00
Perlengkapan 1.0000 Ls 15,900.00 19,080.00
Tenaga
Pekerja 0.0810 OH 70,000.00 5,670.00
Tukang Pipa 0.1350 OH 90,000.00 12,150.00
Kepala Tukang 0.1350 OH 100,000.00 13,500.00
Mandor 0.0040 OH 95,000.00 380.00
Jumlah 114,380.00
Over Head & Profit (10%) 11,438.00
TOTAL 125,818.00
ANALISA HARGA SATUAN
1 2 3 4 5 6
Bahan
Kerikil 0.820 m3 100,000.00 82,000.00
Pasir Pasangan 0.540 m3 70,000.00 37,800.00
Semen 4.600 zak 63,000.00 289,800.00
Tenaga
Pekerja 6.000 OH 70,000.00 420,000.00
Mandor 0.300 OH 95,000.00 28,500.00
Tukang 1.000 OH 90,000.00 90,000.00
Kepala Tukang 0.100 OH 100,000.00 10,000.00
Alat
Jumlah 958,100.00
Over Head & Profit (10%) 95,810.00
TOTAL ###
ENGINEER ESTIMATE (EE)
HARGA SATUAN PEKERJAAN BIDANG KECIPTAKARYAAN TA 201
DINAS PEKERJAAN UMUM
KABUPATEN PESISIR SELATAN
Kode
URAIAN PEKERJAAN SAT HARGA SATUAN
Anal
PEK. PERMULAAN
Papan proyek ls
Pemasangan patok pengukuran dan baowplank M'
Pembuatan direksiket lapangan M2
Pekerjaan pembersihan lapangan M2
Mobilisasi dan Demobilisasi ls
0 ls
M3 121,770.00
M3 97,102.50
KET
sisir Selatan
Kegiatan : Penunjang kegiatan DAK Bidang Perikanan Budi daya
Pekerjaan : Perencanaan ( DED ) Pembuatan Kolam baru
Lokasi : Nagari IV Koto Mudiak Kec. Batang Kapeh
Jenis Pekerja : Papan proyek
Satuan pembayaran : Unit
1 2 3 4 5 6
Bahan
Printing merk kegiatan 1.0000 M 50,000.00 50,000.00
Kayu 5/7 3.0000 Btg 35,000.00 105,000.00
Papan 0.0500 M3 2,300,000.00 115,000.00
Paku 0.1000 Kg 16,000.00 1,600.00
Tenaga
Pekerja 1.0000 OH 70,000.00 70,000.00
Mandor 0.0500 OH 95,000.00 4,750.00
Alat
Alat Bantu
Jumlah 346,350.00
Over Head & Profit (10%) 34,635.00
TOTAL 380,985.00
Jenis Pekerja : Pembuatan 1 M2 Bedeng kerja
Satuan pembayaran : M2
1 2 3 4 5 6
Bahan
Dolken kayu dia 1.25 btg 10,000.00 12,500.00
Kayu 0.1880 M3 2,300,000.00 432,400.00
Paku biasa 0.3300 kg 16,000.00 5,280.00
Semene Portland 0.3600 zak 65,000.00 23,400.00
Koral beton 0.0500 M3 125,000.00 6,250.00
Seng gelombang 1.5000 lbr 45,000.00 67,500.00
Plywood 4mm 1.3500 lbr 68,000.00 91,800.00
Tenaga
Pekerja 1.0000 OH 60,000.00 60,000.00
Tukang kayu 2.0000 OH 90,000.00 180,000.00
Kep Tukang kayu 0.2000 OH 100,000.00 20,000.00
Mandor 0.0500 OH 90,000.00 4,500.00
Alat
Alat Bantu
Jumlah 903,630.00
Over Head & Profit (10%) 90,363.00
TOTAL 993,993.00
1 2 3 4 5 6
Bahan
Tenaga
Pekerja 0.2000 OH 70,000.00 14,000.00
Mandor 0.0200 OH 95,000.00 1,900.00
Alat
Chainsaw 0.1000 Hari 50,000.00 5,000.00
Jumlah 20,900.00
Over Head & Profit (10%) 2,090.00
TOTAL 22,990.00
ah Harga
40
ah Harga
Semen Portland
264,500.00
ah Harga
DATA KOLAM
07 Kolam panen
1x1x0,3
06 11
Bak Kontrol
0,4x0,4x0,4 Pipa penguras
CURREN PVC Ø3 inci
04 09
02
I
SUNGA
01 LAY
OUT
JALAN RAYA JEMBATAN
500
1
120
2
PENAMPANG
TANGGUL
Volume
timbunan
tanggul ( M³ )
126.00
99.00
106.43
106.43
106.43
106.43
118.25
72.60
72.60
72.60
72.60
92.40
1,151.75
1,209.98
58.22
1,786,605.01