Contract No.

: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

APPENDIX- III.5
CURRICULUM VITAE (CV) FOR PROPOSED KEY STAFF OF THE GROUP
Position Title and No.
Name of Firm SYSTRA (Insert
Photograph)
Name of Expert
Date of Birth
Years with the Firm
Country of Citizenship/
Residence
Education
S.No. Degree(s)/Diploma(s) College/University Dates
Attended
1. xxx XXX XXX
Additional Training:
 XXX
 XXX

Detailed Tasks to be assigned:


Chief Structures Expert – Underground and Elevated will review and approve the preliminary and final
designs of viaduct and underground structures. Review and approve detailed designs and ‘Good for
Construction’ drawings prepared by DDC. Review and approval to modifications in approved plans,
drawings and methodology that may be necessitated to change in field conditions during construction.
Review and approval of designs and drawings of temporary works during construction of the project.
Review and approval of “As build drawings”.
Key Qualifications:
XXX
XXX
XXX

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Employment record:

Period Employing organization and your Title of Position Location of


title/position. Held Assignment
Contact info for references for last 7 years
Apr 2013 Employing organization: SYSTRA MVA Lead Design Mumbai / Chennai
to Consulting (India) Pvt. Ltd. Checker/ Team and Lucknow/
Till Date Lead for cut and Kolkata/ Delhi/
Title Held: Principal Engineer cover and Stations/ India
Team Leader for
Employer references: Stations/ Heading
Name: Mr. Nishith Gupta the Team of
Position: Technical Director - Structural
Underground Works Engineers/
Tel: +91-129-668 5600 Independent
Email: ngupta@systra.com Engineer
Sep 2006 Employing organization: Vayam Team Leader Delhi, Mumbai,
to Technologies Uttarakhandand
Mar 2013 Punjab
Title Held: General Manager / Dy. General
Manager / Sr. Project Manager

Employer references:
Name:
Position:
Tel: +
Jun 1992 Employing organization: Consulting Structural Engineer New Delhi, Jaipur,
to Engineering Services (India) Pvt. Ltd. Yemen, Bangalore,
Sep 2006 Nagpur, Gujarat,
Title Held: Project Manager / Senior Cochin, Orissa,
Engineer / Engineer / Assistant Engineer Maharashtra, J&K,
Andhra Pradesh,
Kerala and
Hyderabad

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:
1. Name of Assignment or Project: Mumbai Metro Line 3 Contract UGC-04 - Design and Construction
of UG Section (Relevant Project)
Year: Jan 2017 to Till Date (1 Year 10 Month)
Location: Mumbai
Client: CEC-ITD CEM-TPL JV, TATA Projects
Main Project Features: Including three Underground Stations at Siddhi Vinayak, Dadar and Shitla Devi
temple and associated tunnel
Position Held: Lead Design Checker
Activities Performed:
 Reviewing the DDC design
 Managing different disciplines for review

2. Name of Assignment or Project: Lucknow MRTS Phase – 1 Project (CCS Airport to Munsipulia)
(Relevant Project)
Year: May 2016 to Till Date (2 Year 6 Month)
Location: Lucknow
Client: LMRC
Main Project Features: Four Underground Stations CCS Airport, Hussaingunj, Hazratgunj, Sachivalya
Position Held: Team Lead for cut and cover and Stations (Similar Position)
Activities Performed:
 Heading the team of structural engineer for reviewing underground stations.
 Co-ordination with other disciplines, client, contractor and DDC for finalisation of design and drawings
for timely completion of project.
 Providing support to Construction teams, Contractors at site
 Interfacing with Client teams

3. Name of Assignment or Project: Detail Design of Underground Stations at Howrah Maidan with Cross
Over, Howrah with Subway, New Mahakaran with Provision of Retrieval/launching shaft, vent shaft
and Associated Tunnels with Cross Passages till East End of New Mahakaran Station Including Design
Co-Ordination as per Interfacing Requirement. (Relevant Project)
Year: Jan 2016 to Till Date (2 Year 10 Month)
Location: Kolkata
Client: AFCONS
Main Project Features: Three Underground Stations
Position Held: Team Leader for Stations (Similar Position)
Activities Performed: Heading the team of structural engineers for finalization detail design of
Underground Stations, getting Approval from GC, Resolving Site Issues

4. Name of Assignment or Project: Chennai Metro Rail Project, Phase-1 Extension (Detailed Design for
Section from Washermenpet To Wimco Nagar) (Relevant Project)
Year: Oct 2015 to Till Date (3 Year 1 Month)
Location: Chennai

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:

Client: CMLR
Main Project Features: Two underground stations, cut and cover and tunnel
Position held: Team Lead for cut and cover and Stations (Similar Position)
Activities Performed: Heading the team of Structural engineers for finalization detail design of
Underground Stations

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:

5. Name of Assignment or Project: Mumbai Metro Rail Project Line-3 Pretender (Relevant Project)
Year: Jan 2015 to May 2015 (5 Month)
Location: Mumbai
Client: L&T
Main Project Features: ML-3 is a 33.5 KMs long underground corridor running along Colaba-Bandra-
SEEPZ. Length of the corridor is marked with 27 key stations out of which 26 will be underground and 1
at grade
Position held: Heading the Team of Structural Engineers (Similar Position)
Activities Performed:
 Heading the team of Structural engineers
 Co-ordinating with other disciplines (Architecture and MEP) for finalization and Tender preparations
for 14 underground stations
 Interfacing with Client teams

6. Name of Assignment or Project: Delhi Metro Rail Project, CC-07 (Relevant Project)
Year: Oct 2013 to Mar 2016 (2 Year 6 Month)
Location: Delhi
Client: DMRC, Delhi
Main Project Features: Design & Construction of Underground Stations at Lal Quila, Kashmere Gate and
associated Tunnels
Position Held: Heading the Team of Structural Engineers (Similar Position)
Activities Performed:
 Heading the team of structural engineer for reviewing underground stations.
 Co-ordination with other disciplines, client, contractor and DDC for finalisation of design and drawings
for timely completion of project.
 Providing support to Construction teams, Contractors at site
 Interfacing with Client teams

7. Name of Assignment or Project: Detailed Design Consultancy for Delhi Metro Line 7 Project (Relevant
Project)
Year: Apr 2013 to Dec 2017 (4 Year 9 Month)
Location: Delhi
Client: DMRC, Delhi
Main Project Features: The Delhi Metro Line 7 is a 58km long out having 26 Elevated (38KM) stations
and 12 underground (20KM) stations
Position Held: Heading the Team of Structural Engineers (Similar Position)
Activities Performed:
 Heading the team of structural engineer for reviewing the stations.
 Co-ordination with other disciplines, client, contractor and DDC for finalisation of design and drawings
for timely completion of project.

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:
8. Name of Assignment or Project: Detailed Design Consultancy for Badarpur Faridabad Line 6 Project
(Relevant Project)
Year: Jun 2013 to Nov 2013 (6 Month)
Location: Delhi
Client: DMRC, Delhi
Main Project Features: Elevated Viaduct, the Project has 13 km Long Elevated viaduct with Full Span U
Girder / PSC I Girder Superstructure with 16m to 36m straight / curved span on RCC / PSC Substructure
supported on 1.0mm to 1.2 m dia. Pile Foundation.
Position Held: Independent Engineer (Similar Position)
Activities Performed: Independent superstructure check internally

9. Name of Assignment or Project: Detailed Design Consultancy Services for Project Mandi House to
Central Secretariat of DMRC under Package - CC01 of Phase – III (Relevant Project)
Year: Feb 2012 to Mar 2013 (1 Year 2 Month)
Location: Delhi
Client: DMRC, Delhi
Main Project Features: UG Tunnelling between Central Sectt. And Mani House Station
Position Held: Team Leader (Similar Position)
Activities Performed:
 Heading the team of structural engineer for detailed design of all different levels of slabs.
 Co-ordination with other disciplines (architecture, MEP), client, contractor and proof checkers for
finalisation of design and drawings for timely completion of project.
 Providing support to Construction teams, Contractors at site
 Interfacing with Client teams

10. Name of Assignment or Project: Underground MRTS Corridor of DMRC Airport Metro Express Line-
C1. (Relevant Project)
Year: Jul 2008 to Aug 2010 (2 Year 2 Month)
Location: Delhi
Client: DMRC, Delhi
Main Project Features: Preparation of Preliminary Planning and Detailed Design from CH. 0.00 to CH. 3.80
Long Underground Corridors with Double Track Including Underground Tunnel & Underground Stations
Position Held: Team Leader (Similar Position)
Activities Performed:
 Heading the team of structural engineer for Designing and producing drawings for underground cut
& cover tunnel
 Interaction and co-ordination with site
 Issuing Construction Reference Drawings
 Issuing Working Drawings
 Getting approval from the Proof Consultants.

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:
11. Name of Assignment or Project: Underground MRTS Corridor of DMRC Airport Metro Express Line-
C3. (Relevant Project)
Year: Mar 2008 to Jun 2009 (1 Year 4 Month)
Location: Delhi
Client: DMRC, Delhi
Main Project Features: Consultancy Services Provided for the Preparation of Preliminary Planning &
Detailed Design from CH. 13600 to CH. 17300 Long Underground Corridors with Double Track Including
Underground Tunnel & Underground Stations.
Position Held: Team Leader (Similar Position)
Activities Performed:
 Providing Preliminary Design for underground cut and cover tunnel & station building
 Providing Detailed Design for underground cut and cover tunnel & station building
 Interaction and co-ordination with site for site problems

12. Name of Assignment or Project: MRTS Corridor of DMRC in Delhi. (Relevant Project)
Year: Oct 2009 to Nov 2011 (2 Year 4 Month)
Location: Delhi
Client: DMRC, Delhi
Main Project Features: Preparation of Detailed Design of AMEL-C7 Underground CH. 219380 to CH.
229120 - Dwarka Tunnel by Cut & Cover Method
Position Held: Team Leader (Similar Position)
Activities Performed:
 Heading the team of structural engineer for Designing and producing drawings for underground cut
& cover tunnel and Dwarka 21 station;
 Interaction and co-ordination with site;
 Issuing Construction, Reference and working Drawings;
 Getting approval from the Proof Consultants

13. Name of Assignment or Project: Double Track Metro Rails Versova Andheri Ghat Kopar MRTS
Elevated Corridor at Mumbai (Relevant Project)
Year: Aug 2009 to Jan 2012 (2 Year 6 Month)
Location: Mumbai
Client: Mumbai Metro Rail Corporation
Main Project Features: Review of Design & Drawings Including the Independent Design Check for 12.0
Km Elevated Corridor
Position Held: Team Leader (Similar Position)
Activities Performed:
 Heading the team of structural engineer for reviewing the design and drawings
 Carrying independent checks for typical structures and stations

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:
14. Name of Assignment or Project:
 Tender Design Consulting Services for DMRC: Contract No. CC-07, Contract No. CC-20, Contract No.
CC-34, Contract No. CC-04 & Contract No. CC-05 (Relevant Project)
 Six Stations (Kanhaiya Nagar, Lawrence Road, Kohat Enclave, Pitampura, Rohini East, Rohini West)
on Trinagar-Rithala Section, DMRC - Phase 1 (Relevant Project)
 Jaipur Metro - Phase 1 (Relevant Project)
Year: Dec 2010 to Jan 2013 (2 Year 2 Month)
Location: Delhi
Client: DMRC, Delhi
Main Project Features: Tender Design Consulting Services for DMRC
Position Held: Team Leader (Similar Position)
Activities Performed:
 Heading the team of Structural engineers
 Co-ordinating with other disciplines for finalization of Tender preparations

15. Name of Assignment or Project: Preparation of Detailed Design for Four Laning of Muzaffarpur-
Haridwar Section from Km. 131.000 to Km. 211.000 of NH-58, In the State of up and Uttarakhand
Under NHDP Phase III as BOT (Toll) on DBFOT Pattern
Year: Mar 2011 to Jan 2013
Location: Uttarakhand
Client: ERA INFRA
Main Project Features: Four Laning of Muzaffarpur-Haridwar Section from 80 Km. of NH-58
Position Held: Team Leader
Activities Performed: Preparing and issuing Detailed design and drawings for
bridges/ROB’S/Underpasses at different chainages.

16. Name of Assignment or Project: Preparation of Detailed Design for Four Laning of Haridwar -
Dehradun Section from Km. 211.000 to Km 218.00 of NH-58 & Km 165.00 to Km. 196.825 of NH-72
in the State of Uttarakhand Under NHDP PHASE III as bot (Toll) on DBFOT Pattern
Year: Mar 2011 to Jan 2013
Location: Uttarakhand
Client: ERA INFRA
Main Project Features: Four Laning of Haridwar - Dehradun Section 7.00 Km of NH-58 & 31.825 Km
Position Held: Team Leader
Activities Performed: Detailed design and drawings for bridges/ROB’S/Underpasses at different
chainages.

17. Name of Assignment or Project: Preparation of Detailed Design of 3.5 Km Long Four Lane Elevated
Road Corridor Along G.T. Road at Amritsar, Punjab.
Year: Nov 2006 to Sep 2008
Location: Punjab
Client: Gammon India

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:
Main Project Features: 3.5 Km Long Four Lane Elevated Road Corridor Along G.T. Road
Position Held: Team Leader
Activities Performed: Detailed design and drawings for Elevated Corridor, Solving Site Problems during
execution.

18. Name of Assignment or Project: Preparation of Detailed Design of 1.0 Km Long Two/Three Lane
Elevated Road Corridor Link to Golden Temple at Amritsar, Punjab.
Year: Nov 2006 to Nov 2008
Location: Punjab
Client: Gammon India
Main Project Features: 1.0 Km Long Two/Three Lane Elevated Road Corridor Link
Position Held: Team Leader
Activities Performed: Detailed design and drawings for Elevated Corridor, Solving Site Problems during
execution

19. Name of Assignment or Project: Jaipur Mahwa Road Project, BOT


Year: May 2005 to Sep 2006
Location: Jaipur
Client: NHAI
Main Project Features: BOT Project
Position Held: Bridge and Structural Expert
Activities Performed:
 Responsible for review of design and drawings of different structures (i.e. culverts, minor bridges &
major bridges) at different chainages in Jaipur Mahwa Road.
 Responsible for solving the site problems during execution of the project.

20. Name of Assignment or Project: Suqrah Mukkalah Road Project, Repubic of Yemen
Year: May 2004 to Jul 2004
Location: Yemen
Client: Republic of Yemen
Main Project Features: WB Funded
Position Held: Structural Engineer
Activities Performed: Design/drawing of all structures and widening details of different minor/major
bridges at different chainages in the road

21. Name of Assignment or Project: Flyover at Mico Layout Junction, Bangalore


Year: Dec 2003 to Apr 2005
Location: Bangalore
Client: UPSBC
Main Project Features: The superstructure consists of PSC box girder, PSC beams (Segmental
construction for PSC box girder resting on pile foundation
Position Held: Structural Engineer

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:
Activities Performed: Responsible for fixing span arrangements, detailed design of PSC box girders in
curved & straight substructure, pile foundation, subway & working drawings for the same checking the
design and drawing for temporary structure responsibility also include approval from department.

22. Name of Assignment or Project: Flyover at GT66 - Road No. 66 Intersection & NH24 Bypass, New
Delhi
Year: Jun 2002 to Nov 2003
Location: New Delhi
Client: AFCONS
Main Project Features: 616m long flyover at GT 66 having 10m overall width and 515 m long flyover at
NH24 bypass having 2 X 17.5m overall width with 2 x 14.0m carriageway width. The superstructure
consist of continuous P.S.C beam of span 28.0m and continuous PSC box girder of span of 50m. The
substructure consists of solid R.C.C. circular piers on pile foundations. and construction of pedestrian
subway at GT66
Position Held: Structural Engineer
Activities Performed: Responsible for fixing span arrangements, detailed design of PSC beam, pile
foundation, subway & working drawings for the same checking the design and drawing for temporary
structure responsibility also include approval from department.

23. Name of Assignment or Project: Flyover at Ring Road Junction & Sakkardara Junction, Nagpur
Year: 2003 to 2004
Location: Nagpur
Client: UPBSE
Main Project Features: Flyover
Position Held: Structural Engineer
Activities Performed:
 Fixing span arrangements, detailed design of PSC beam, substructure and open foundation
 Preparation of working drawings for same and site visit during execution

24. Name of Assignment or Project: Construction Supervision of 4-Laning of Surat-Manor Tollway


Project, (ADB Funded) (Km 239.4 to Km 439, Length 175.6 Km)
Year: Dec 2000 to Dec 2001
Location: Gujarat
Client: National Highways Authority of India
Main Project Features: Details of some major bridges and flyovers are as follows:
 Damanganga Bridge: Span arrangement 4 @ 38.4m c/c + 3@ 38m c/c (continuous in 4 spans and 3
spans respectively) total length 266.80m.
 Par River Bridge: T-beam girder PSC continuous with 3 spans each having a length of 27.55m. Total
length: 9 spans @ 27.550m = 249.00
 Velparva Bridge: Single span PSC box, 1 @ 43.74m c/c.

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:
 Vapi Flyover: Central three span continuous PSC box (34.6m + 44.1m + 30.45 m on eastern
carriageway) followed by viaduct spans with 8@20.4m (Total) at each end (Continuous with 4 spans
each in two units).
Position Held: Structural Engineer
Activities Performed:
 As Bridge/Structural Engineer, design of bridges, in 3 packages i.e. 42 nos. bridges (span varying
between 10-52m, length varying between 10-275m) on NH 8 (180 km) based on confirmatory subsoil
data modified the foundations, and substructures.
 Review of all drawings of superstructure.

25. Name of Assignment or Project: Vypeen Bridge Cochin


Year: 2001 to 2003
Location: Cochin
Client: AFCONS
Main Project Features: Bridge Project
Position Held: Structural Engineer
Activities Performed:
 Fixing span arrangement, detailed design of precast PSC box girder, pile foundation and box culvert
 Preparation of working drawing for same and site visit during execution.
 Checking of design and drawings for temporary structure.
 Getting the approval from department.
 Special Anticorrosive treatment have been given to structures and reinforcement as bridge is in costal
region.

26. Name of Assignment or Project: Ashram Flyover, New Delhi


Year: Dec 2000 to Nov 2001
Location: New Delhi
Client: AFCONS
Main Project Features: 516.5 m long flyover having 2 X 10.25m overall width with 2 x 9.25m carriageway
width. The superstructure consist of P.S.C box girder span of 40.0 m and precast post-tensioned beams
of 26.0 m span with deck continuity. The substructure consists of solid R.C.C. piers on pile foundations.
Position Held: Structural Engineer
Activities Performed:
 Carrying out detailed design of superstructure and foundation
 Preparation of working drawings
 Preparation of maintenance manual.

27. Name of Assignment or Project: Flyover at Nitin Casting at Mumbai


Year: 1999 to 2000
Location: Mumbai
Client: AFCONS

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:
Main Project Features: Flyover Project
Position Held: Structural Engineer
Activities Performed:
 Carrying out detailed design of superstructure and foundation
 Preparation of working drawings
 Preparation of maintenance manual.

28. Name of Assignment or Project: Bridge Over River Mahanadi, Near Boudh, Orissa
Year: Aug 1998 to May 1999
Location: Orissa
Client: UPSBC
Main Project Features: 1857.4 m long Bridge having 11.1 m overall width with 7.5 m carriageway and
1.5 m footpath on either side. The superstructure consists of post tensioned PSC beams. The
substructure consist of RCC solid circular piers resting on open foundation.
Position Held: Structural Engineer
Activities Performed:
 Carrying out detailed design of superstructure, Substructure and foundation
 Preparation of working drawings.
 Visit the site during construction of bridge.
 Checking of design and drawings for temporary structure.
 Responsibility also includes getting the approval from department

29. Name of Assignment or Project: Flyover Near Golden Dyes at Mumbai


Year: 1998
Location: Mumbai
Client: UPSBC
Main Project Features: Flyover Project
Position Held: Structural Engineer
Activities Performed:
 Carrying out detailed design of superstructure and foundation
 Preparation of working drawings
 Preparation of maintenance manual.

30. Name of Assignment or Project: Mahim Bridge, Mumbai


Year: Feb 1997 to Jul 1998
Location: Mumbai
Client: MSRDC
Main Project Features: 600m long Bridge having 8.25m overall width with 7.6m carriageway width
running parallel to old Mahim. The ramp is having 10m width with 9.0m carriagway. The superstructure
consist of P.S.C. curved box girders spans varying from 30m to 50m.The substructure consists of solid
R.C.C. piers on open foundations.

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:
Position Held: Structural Engineer
Activities Performed:
 Detailed design of PSC superstructure span (straight & curve) and foundation
 Preparation of working drawings for same
 Preparation of maintenance manual.
 Checking of design and drawings for temporary structure.
 Responsibility also includes getting the approval from department

31. Name of Assignment or Project: Road Over Bridge for Vashi Link, Mumbai
Year: 1996 to 1998
Location: Mumbai
Client: CIDCO
Main Project Features: Continuous pretensioned girder & Curved RCC box girders of Bridge
Position Held: Structural Engineer
Activities Performed:
 Carrying out detailed design of superstructure (i.e. Continuous pretensioned girder) & curved RCC box
girders and substructure and foundation
 Preparation of working drawings for the same.

32. Name of Assignment or Project: Rajapuri Creek Bridge, Maharashtra


Year: 1996 to 1997
Location: Maharashtra
Client: UPSBC
Main Project Features: RCC box superstructure, counterfort type abutments, box type returns of Bridge
Position Held: Structural Engineer
Activities Performed:
 Preparation of tender documents,
 Preparation of detailed design and working drawings of RCC box superstructure, counterfort type
abutments, box type returns etc.
 The responsibility also included getting the approval from the department.
 Special anti corrosive treatment have been provided to structure and reinforcement as bridge is in
coastal region.

33. Name of Assignment or Project: Bridge Over Aik Nallah from R. S. Pura To Arnia, Jammu & Kashmir
Year: 1996 to 1998
Location: Jammu & Kashmir
Client: JKPCC
Main Project Features: Voided slab resting on Well Foundations
Position Held: Structural Engineer
Activities Performed:
 Preparation of detailed design of superstructure (i.e. Voided slab) resting on well foundations

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:
 Preparation of working drawings for the same.

34. Name of Assignment or Project: Andhra Pradesh State Highway Project


Year: Mar 1996 to Aug 1997
Location: Andhra Pradesh
Client: SMEC & PWD Andhra Pradesh
Main Project Features: Minor Bridges
Position Held: Structural Engineer
Activities Performed:
 Detailed design of Minor Bridges at different chainages
 Preparation of working drawings for the same.

35. Name of Assignment or Project: Thane Creek Bridge Airoli at Mumbai


Year: Apr 1994 to Jun 1995
Location: Mumbai
Client: AFCONS
Main Project Features: 50m PSC precast box girder, 40m cast in situ box girder
Position Held: Structural Engineer
Activities Performed:
 Preparation of detailed design of superstructures, (i.e. 50m PSC precast box girder, 40m cast in situ
box girder)
 Design of foundations including counterfort type abutments etc.
 Preparation of working drawings for the same.
 Special anti-corrosive treatment have been taken to structures and reinforcement as bridge is in costal
region.

36. Name of Assignment or Project: Construction of Rob at Km 21/3 in Kakinada Rajanagaram Road,
Andhra Pradesh
Year: 1994 to 1995
Location: Andhra Pradesh
Client: PWD
Main Project Features: Detailed Design of Superstructure (I.E. Solid Slabs), Substructure and Open
Foundation
Position Held: Structural Engineer
Activities Performed:
 Preparation of Detailed Design of Superstructure (I.E. Solid Slabs), Substructure and Open Foundation
 Preparation of Working Drawings for the Same
 Detailed Rate Analysis

37. Name of Assignment or Project: Turbhe Junction Flyover


Year: 1992 to 1993

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:
Location: Maharashtra
Client: Govt. of Maharashtra, PWD
Main Project Features: RCC & PSC straight and curved box girder of spans varying from 20.0 to 40m
Position Held: Structural Engineer
Activities Performed:
 Preparation of detailed design of RCC & PSC straight and curved box girder of spans varying from 20.0
to 40m
 Preparation of working drawings for the same

38. Name of Assignment or Project:


Year:
Location:
Client:
Main Project Features:
Position Held:
Activities Performed:

39. Name of Assignment or Project:


Year:
Location:
Client:
Main Project Features:
Position Held:
Activities Performed:

40. Name of Assignment or Project:


Year:
Location:
Client:
Main Project Features:
Position Held:
Activities Performed:

41. Name of Assignment or Project:


Year:
Location:
Client:
Main Project Features:
Position Held:
Activities Performed:

42. Name of Assignment or Project: Year:

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Work Undertaken That Best Illustrates Capability to Handle the ‘Detailed Task to be Assigned’:
Location:
Client:
Main Project Features
Position Held:
Activities Performed:

43. Name of Assignment or Project:


Year:
Location:
Client:
Main Project Features:
Activities Performed:
 .

APPENDIX III.5: CURRICULUM VITAE


Contract No.: MMRDA/MMRP/L-5&9/GC-01
Appointment of General Consultant for Mumbai Metro Line 5 (Thane-
Bhiwandi-Kalyan) & Line 9 (Andheri (E) to CSIA and Dahisar (E) to Mira
MUMBAI METROPOLITAN REGION Bhayandar) of Mumbai Metro Rail Project of MMRDA
DEVELOPMENT AUTHORITY TECHNICAL PROPOSAL

Language Skills:
Languages Read Write Speak
English
Hindi
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my
qualifications, and my experience.

Date:
Name of Expert Signature {day/month/year}

Date:
Name of Authorized Signature {day/month/year}
Representative of the Consultant
(The same who signs the Proposal)

APPENDIX III.5: CURRICULUM VITAE