GRAIN SIZE ANALYSIS OF SOIL


As per IS:2720 (Part-4)

Lab. Ref. :……………………………

Type of Material :……………………………

Location / Source:……………………………

Weight of Cumulative Wt.


IS Sieve Cumulative % of
Retained of Retained
Size Retained
(gms) (gms)

75 mm

19 mm

4.75 mm

2.00mm

425 µ

75 µ
Pan

Gravel (%): ……………… Sand (%): …………..….

Remarks: ……………………………………………………...………………………………

EPC Contractor's Representative. Authority Engin


SPV Sponsor

Nagpur-Mumbai Maharashtra State


Super Communication Road Development
Expressway Ltd. Corporation Ltd.

ed Nagpur-Mumbai Super Communication Expressway


hamarg) in the State of Maharashtra under EPC mode
: From Km 390.445 to Km 444.845
ada to Village Fatiyabad, District : Aurangabad

SIZE ANALYSIS OF SOIL


As per IS:2720 (Part-4)

Date of :…………………..

Date of :…………………..

Wt. of S :…………………..

Percentage
Remarks
of passing
Silt & Clay(%) : ………….

…………………...………………………………

Authority Engineer/Client's Representative.


EPC Contractor Authority Engineer SPV Sponsor

Yooshin Engineering Corporation JV with


Nagpur-Mumbai Super Maharashtra State
MultiMedia Consultants Pvt. Ltd. In
Megha Engineering & Infrastructures Ltd Communication Road Development
Association JS Environics Consultants Pvt.
Expressway Ltd. Corporation Ltd.
Ltd.

Construction of Access Controlled Nagpur-Mumbai Super Communication Expressway


(Maharashtra Samruddhi Mahamarg) in the State of Maharashtra under EPC mode.

Package-9 : From Km 390.445 to Km 444.845


Section:Village Bendiwada to Village Fatiyabad, District : Aurangabad
MODIFIED PROCTOR COMPACTION TEST
As Per IS:2720 (Part-8)

Lab. Ref. Date of Sampling

Location / Source 420 Date of Testing:

Type of Material No. of Blows 55

Mould Volume (W2) 2250 Mould Wt. (W1) 6020

Rammer Wt. 4.9


Sl.
TEST NO. Unit 1 2 3 4 5 6
No
1 Water Add. (%) (%) 4 6 8 10 12

2 Wt. of mould + compacted soil (W3) gm 10749 10896 11124 11092 10950

3 Wt. of compacted soil W4 = (W3-W1 gm 4729 4876 5104 5072 4930

4 Wet Density W5 = (W4/W2) gm/ cc 2.1 2.16 2.26 2.25 2.19

5 Cointainer No. 74 36 34 33 35

6 Weight of Container(W6) gm 37 39 35 39 39

7 Wt. of Container + Wet Soil (W7) gm 157 164 150 160 163

8 Wt. of Container + Dry Soil - (W8) gm 148 154 138 148 150

9 Wt. of Water W9 = (W7-W8) gm 9 10 12 12 13

10 Wt. of Dry Soil W10 = (W8-W6) gm 111 115 103 109 111
Moisture Content W11 =
11 % 8.1 8.69 11.65 11 11.71
(W9/W10)x100
12 Dry Density W12 = W5 / {1+(W11/1gm/ cc 1.942 1.987 2.024 2.027 1.96
Dry Density (g/cc)

M.D.D (g/cc) :

O.M.C (%)

Water Content (%)

Remarks: ………………………...…………………….……………………………………………………….

EPC Contractor's Representative. Authority Engineer/Client's Representative.


EPC Contractor Authority Engineer SPV Sponsor

Yooshin Engineering Corporation JV with Nagpur-Mumbai Super Maharashtra State Road


Megha Engineering &
MultiMedia Consultants Pvt. Ltd. In Association Communication Development Corporation
Infrastructures Ltd
JS Environics Consultants Pvt. Ltd. Expressway Ltd. Ltd.

Construction of Access Controlled Nagpur-Mumbai Super Communication Expressway


(Maharashtra Samruddhi Mahamarg) in the State of Maharashtra under EPC mode.

Package-9 : From Km 390.445 to Km 444.845


Section:Village Bendiwada to Village Fatiyabad, District : Aurangabad

FREE SWELL INDEX OF SOIL


As per IS 2720 ( Part- 40)

Lab Ref. : ……………………….. Date of Sampling : ……………………….

Type of Material: ……………………….. Date of Testing : ……………………….

Location / Sourc: ………………………..

TEST NUMBERS
DESCRIPTION UNIT
1 2 Average

1 Mass of dry soil passing 425 micron sieve gm

2 Volume of soil in water After 24 hrs (Vw) ml

3 Volume of soil in Kerosene after 24 hrs (Vk) ml

4 Free Swell Index = (Vw - Vk) / Vk X 100 %

Remarks : ---------------------------------------------------------------------------------

Authority Engineer/Client's
EPC Contractor's Representative. Representative.
EPC Contractor Authority Engineer SPV Sponsor

Yooshin Engineering Corporation JV with Nagpur-Mumbai Super Maharashtra State


Megha Engineering & Infrastructures Ltd. MultiMedia Consultants Pvt. Ltd. In Association JS Communication Road Development
Environics Consultants Pvt. Ltd. Expressway Ltd. Corporation Ltd.

Construction of Access Controlled Nagpur-Mumbai Super Communication Expressway


(Maharashtra Samruddhi Mahamarg) in the State of Maharashtra under EPC mode.

Package-9 : From Km 390.445 to Km 444.845


Section:Village Bendiwada to Village Fatiyabad, District : Aurangabad

ATTERBERGS LIMITS (CONE PENETRATION METHOD)


As per IS:2720 (Part-5)
Lab. Ref. :……………………. Date of Sampli:………………..

Location / Sour:……………………. Date of Testing:………………..

Type of Materia
:…………………….
LIQUID LIMIT (LL) PLASTIC LIMIT (PL)
Determination No. Unit
1 2 3 4 1 2 Average

Penetration in mm -

Container No. -

Wt. of Container (W1) gms.

Wt. of Container + wet Soil (W2) gms.

Wt. of Container + Oven Dry Soil (W3 gms.

Wt. of Water W4 = (W2-W3) gms.

Wt. of Dry Soil W5 = (W3-W1) gms.


Moisture Content W6 =
%
(W4/W5)X100
Moisture Content (%)

Determination of Liquid Limit

LL (%) =

PL (%) =

PI (%) =

Penetration in mm
Remarks: …………………………………………………………………………………………..

EPC Contractor's Representative. Authority Engineer/Client's Representative.


EPC Contractor Authority Engineer SPV Sponsor

Yooshin Engineering Corporation JV with MultiMedia Nagpur-Mumbai Super Maharashtra State


Megha Engineering & Infrastructures Ltd Consultants Pvt. Ltd. In Association JS Environics Communication Road Development
Consultants Pvt. Ltd. Expressway Ltd. Corporation Ltd.

Construction of Access Controlled Nagpur-Mumbai Super Communication Expressway


(Maharashtra Samruddhi Mahamarg) in the State of Maharashtra under EPC mode.

Package-9 : From Km 390.445 to Km 444.845


Section:Village Bendiwada to Village Fatiyabad, District : Aurangabad

ATTERBERGS LIMITS (CASAGRANDE METHOD)


As per IS:2720 (Part-5 )

Lab. Ref. :……………………. Date of Sampling :………………..

Location / Source :……………………. Date of Testing :………………..

Type of Material :…………………….


LIQUID LIMIT (LL) PLASTIC LIMIT (PL)
Determination No. Unit
1 2 3 4 1 2 Average

No. of Blows -

Container No. -

Wt. of Container (W1) gms.

Wt. of Container + wet Soil (W2) gms.

Wt. of Container + Oven Dry Soil (W3) gms.

Wt. of Water W4 = (W2-W3) gms.

Wt. of Dry Soil W5 = (W3-W1) gms.

Moisture Content W6 = (W4/W5)X100 %


% of Moisture C ontent

100

90

80 LL (%) =
70

60
PL (%) =
50

40
PI (%) =
30

20

10

0
1 1;
10 0 2 3 4 5 6; 0 7 8 9 100

No. of Blows

Remarks: …………………………………………………………………………………………..

EPC Contractor's Representative. Authority Engineer/Client's Representative.


EPC Contractor Authority Engineer SPV Sponsor

Yooshin Engineering Corporation JV with MultiMedia Nagpur-Mumbai Super Maharashtra State


Megha Engineering & Infrastructures Ltd Consultants Pvt. Ltd. In Association JS Environics Communication Road Development
Consultants Pvt. Ltd. Expressway Ltd. Corporation Ltd.

Construction of Access Controlled Nagpur-Mumbai Super Communication Expressway


(Maharashtra Samruddhi Mahamarg) in the State of Maharashtra under EPC mode.

Package-9 : From Km 390.445 to Km 444.845


Section:Village Bendiwada to Village Fatiyabad, District : Aurangabad

FIELD DENSITY TEST


BY SAND REPLACEMENT METHOD
As per IS : 2720 ( Part-28 )

RFI No. :…………………………. Source of Material :………………………….

Date :…………………………. MDD (g/cc), (Ymdd) :………………………….

Location :…………………………. OMC (%) :………………………….

Layer :…………………………. Bulk Density of sand,:…………………..(g/cc)

Sand Pouring Cylinder No.:……….. Dia.: Wt. of Sand in cone :…………………..(gm.)


1. Description Test Hole No. 1 2 3 4 5 6 7 8 9 10

A Location of Test

B Offset from C/L

C Depth of Hole, ( mm )

2. Determination of Wet Unit Weight

D Wt. of Wet Sample from Hole, ( g )

E Wt.of Sand+Cylinder before Pourin

F Wt.of Sand+Cylinder after Pouring,

G Wt of Sand in Cone, from calibrati

H Wt. of Sand in Hole, ( g ) (E-F-G)

I Volume of Sand, (cc) ( H/Ys )

Wet Density of Sample,


J
Ywet, ( g/cc) (D/I)

3. Determination of Water Content

K Container No.

L Container wt., g

M Wt.of wet Soil + Container, g ( W1)

N Wt.of Dry Soil + Container, g ( W2

Moisture Content %,
O
W = ((W1-W2)/W2)*100

P Dial Gauge Reading, ( Div )

Moisture Content ( % )
Q
from RMM Calibration chart

4. Degree of Compaction

Dry Density, (g/cc)


R
Yd = Ywet / (1 + W/100)
Degree of Compaction, ( % )
S
(( Yd/Ymdd)*100)

T Compaction Required, ( % )

Acceptance Criteria: Meanvalue > Specified value +(1.65-1.65/√n)xSDEV

Remarks : ……………………………………………………………………………………………………………………………….

EPC Contractor's Representative. Authority Engineer/Client's Representative.


EPC Contractor Authority Engineer

Yooshin Engineering Corporation JV with Mu


Megha Engineering & Infrastructures Ltd Consultants Pvt. Ltd. In Association JS Env
Consultants Pvt. Ltd.

Construction of Access Controlled Nagpur-Mumbai Super


(Maharashtra Samruddhi Mahamarg) in the State of Mah
Package-9 : From Km 390.445 to Km
Section:Village Bendiwada to Village Fatiyabad, D

CALIFORNIA BEARING RAT


As per IS 2720 (Part-16
Lab. Ref. No. :……………………………..

Type of Material :……………………………..

Location / Source: :……………………………..

Type of Compaction : Static / Dynamic

Volume of Mould (V) cc :


Before Before
Condition of Sample After Soaking
Soaking Soaking
No. of Blows

Mould No.

Wt. of Mould (W1) gms.

Wt. of wet sample + Mould (W2) gms

Wt. of wet sample W3 = (W2-W1) gm

Wet Density W4 = (W3/ V v)

Moisture Determination

Cantainer No.

Wt. of container (W5) gms.


Wt. of Wet sample + container (W6)

Wt. of Dry sample + container (W7)

Wt. of Water W8 = (W6-W7) gms.

Wt. of Dry sample W9 = (W7-W5) gm

% Moisture Content W10 = (W8/W9

Dry Density W11=((W4) / (100+W10

Proving Ring Correction Factor :

Penetration Mould No : Mould


Standard Load PR Reading Load in PR Reading
in mm
(Div) (kg) (Div)
0.0

0.5

1.0

1.5

2.0
Standard Load : 1370
2.5
kg

4.0
Standard Load : 2055
5.0
kg

7.5

10.0

12.5

Remarks: …………………………………………………………………………………………………

EPC Contractor's Representative.


uthority Engineer SPV Sponsor

ng Corporation JV with MultiMedia Nagpur-Mumbai Super Maharashtra State Road


Ltd. In Association JS Environics Communication Expressway Development Corporation
onsultants Pvt. Ltd. Ltd. Ltd.

Nagpur-Mumbai Super Communication Expressway


arg) in the State of Maharashtra under EPC mode.
om Km 390.445 to Km 444.845
to Village Fatiyabad, District : Aurangabad

BEARING RATIO (CBR)


r IS 2720 (Part-16 )
Date of Casting :…………………………

Date of Testing :…………………………

Period of Soaking :…………………………

MDD (g/cc) :…………………………

OMC (%) :…………………………


Before Brfore
After Soaking After Soaking
Soaking Soaking
Mould No : Mould No :
PR Reading Load in PR Reading Load in
(Div) (kg) (Div) (kg)

………………………………………………………………………

Authority Engineer/Client's Representative.


EPC Contractor Authority Engineer

Yooshin Engineering Corporation JV with Nagpur-


Megha Engineering & Infrastructures Ltd MultiMedia Consultants Pvt. Ltd. In Association Com
JS Environics Consultants Pvt. Ltd. Expr

Construction of Access Controlled Nagpur-Mumbai Super Communication


(Maharashtra Samruddhi Mahamarg) in the State of Maharashtra under
Package-9 : From Km 390.445 to Km 444.845
Section:Village Bendiwada to Village Fatiyabad, District : Aurang

CALIFORNIA BEARING RATIO (CBR


IS : 2720 ( Part-16 )
Type of Material: ……………………. Date of Sampling
Location / Source : ………………… Date of Testing :

40

37.5

35

32.5

30

27.5
Load (kg.)

25

22.5

20

17.5
15

12.5

10

7.5

2.5

0
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 5.5 6 6.5 7 7.5 8 8.5 9 9.5 10 10.5 11 11

Penetration (mm)

EPC Contractor's Representative. Authority E


SPV Sponsor

Nagpur-Mumbai Super Maharashtra State


Communication Road Development
Expressway Ltd. Corporation Ltd.

ur-Mumbai Super Communication Expressway


n the State of Maharashtra under EPC mode.
Km 390.445 to Km 444.845
llage Fatiyabad, District : Aurangabad

ARING RATIO (CBR)


20 ( Part-16 )
Date of Sampling : …………………
Date of Testing : ……………………
7 7.5 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15

enetration (mm)

Authority Engineer/Client's Representative.