Anda di halaman 1dari 207

Asstez Marq Lot-2 Road W

Sl. No
NT 1
NT 2
NT 3
NT 4
NT 5
NT 6

NT 7
Asstez Marq Lot-2 Road Work Executed

Non Tenderd Item


Coping Concrete including of Shutering
Water Patti for Compound Wall
Block Work with Coping
Block Work Plastering with Gurumalla Finish
compound Wall Demolosition
Tree Cutting & Root Removal

Forest Permission
ork Executed Non-Tender Iteams

Unit Qty Rate Amount


Cum 1.00 6,758.34 6,758.34
Rmt 1.00 185.00 185.00
Sqm 1.00 1,494.40 1,494.40
Sqm 1.00 482.63 482.63
Sqm 1.00 308.88 308.88
Nos 1.00 2,281.50
2,281.50
LS 125,000.00
ams

Remarks
Reach No - 02
Reach No - 02
Reach No - 02
Reach No - 02
Near Entrance
Near Entrance and
Promonde Area
Entrance Tree Cutting

permissions
S.No DESCRIPTION OF WORK UOM
1 Block Work Plastering with Gurumalla Finish at Stretch - 02 Sqm
Labours
a Mason Day
b Male Day
c Female inculing Curing Day
Required Materials
a Cement (in Kgs) Kgs
b Sand (in Cum) Cum
c Water Ltrs
d Water (for Curing), 14days Ltrs
Ne
for Tools & Plants Char
Overhead and Pr
Tota
Rate Per 100Sqm P
Rate Per 1Sqm P

2 Block Work at Stretch - 02


1 Materials
Blocks Nos
Cement Bags
Sand Cum
2 Labours
Head Mason Nos
Mason Nos
Mazdoors Nos
Female Cooli Nos
3 Contingencies T & P etc Lump Sum

Tool and Plants Charges @2% of

Add Profit and over head Cost @ 15% of


Rate Per 10Sqm Bl
Rate 1

3 Compound Wall Demolosition at Near Entrance Towadrds Main Road Sqm


Labours
JCB Hrs
Demolosition Area is Cleared from Debris
a Male Day
b Female Day
c Tractor Day
Ne
for Tools & Plants Char
Overhead and Pr
Tota
Rate Per 100Sqm Wall Dem
Rate Per 1Sqm Wall Dem

4 Tree Cutting & Root Removal at Near Entrance and Promonade Area Nos
a JCB Hrs
Consolidation Works
a Water Ltrs
Ne
for Tools & Plants Char
Overhead and Pr
Tota
Rate Per 15Tree Cutting & Root
Rate Per 1 Tree Cutting & Root

5 Coping Concrete including of Shutering at Strecth-02 Compound Wall Cum


Labours
a Mason Day
b Male Day
c Female Day
d Female (For 14 Days Curing) Day
Required Materials
a Cement (in Kgs) Kgs
b Sand (in Cum) Cum
c Aggregates (in Cum) Cum
d Water Ltrs
e Water (for Curing), 14days Ltrs
Ne
for Tools & Plants Char
Overhead and Pr
Tota
Rate Per 5Cum Coping Concrete including of S
Rate Per 1Cum Coping Concrete including of S
QTY RATE AMOUNT

13.000 900.000 11,700.000


10.000 550.000 5,500.000
12.000 450.000 5,400.000

1,436.400 8.000 11,491.200


2.993 2,116.800 6,334.524
500.000 0.250 125.000
2,800.000 0.250 700.000
Net Amount 41,250.724
for Tools & Plants Charges @2% 825.014
Overhead and Profit 15% 6,187.609
Total Amount 48,263.347
Rate Per 100Sqm Plastering 48,263.347
Rate Per 1Sqm Plastering 482.633

130.000 56.000 7,280.000


1.500 300.000 450.000
0.650 900.000 585.000

0.500 800.000 400.000


2.000 700.000 1,400.000
3.500 450.000 1,575.000
2 350 700.000
LS 350 350.000
12,740.000
ol and Plants Charges @2% of the Total 254.800
Total 12,994.800
and over head Cost @ 15% of the Total 1,949.220
Rate Per 10Sqm Block Work 14,944.020
Rate 1 per Sqm 1,494.402

6.000 900.000 5,400.000

7.000 550.000 3,850.000


7.000 450.000 3,150.000
4.000 3,500.000 14,000.000
Net Amount 26,400.000
for Tools & Plants Charges @2% 528.000
Overhead and Profit 15% 3,960.000
Total Amount 30,888.000
Rate Per 100Sqm Wall Demolosition 30,888.000
Rate Per 1Sqm Wall Demolosition 308.880

30.000 900.000 27,000.000

9,000.000 0.250 2,250.000


Net Amount 29,250.000
for Tools & Plants Charges @2% 585.000
Overhead and Profit 15% 4,387.500
Total Amount 34,222.500
te Per 15Tree Cutting & Root Removal 34,222.500
ate Per 1 Tree Cutting & Root Removal 2,281.500

4.000 900.000 3,600.000


4.000 550.000 2,200.000
4.000 450.000 1,800.000
4.000 450.000 1,800.000

852.923 8.000 6,823.385


2.369 2,116.800 5,015.188
4.738 1,270.080 6,018.225
1,000.000 0.250 250.000
5,500.000 0.250 1,375.000
Net Amount 28,881.798
for Tools & Plants Charges @2% 577.636
Overhead and Profit 15% 4,332.270
Total Amount 33,791.703
Coping Concrete including of Shutering 33,791.703
Coping Concrete including of Shutering 6,758.341
SL no Description of work Nos Length Breadth Depth
1 Materials Calculation for Plastering 1 10.000 0.025 10.000
a Wet Volume
b Dry Volume
c Cement (in Kgs)
d Sand (in Cft)

2 Materials Calculation Coping Concrete


a Wet Volume 1 250.000 0.200 0.100
b Dry Volume
c Cement (in Kgs)
d Sand (in Cft)
e Aggregates (in Cft)
Qty Remarks
2.500
3.000 3
3.990
1,436.400
105.575

5.000
7.700
852.923
83.586
167.173
RADICAL WORKS PVT LTD

Project : Assetz Marq


Bill Of Quantity for Concrete Road works

MESUREMENT SHEET
Sl. No. Particulars Unit Nos L B

READY MIX CONCRETE / CONTROLLED CONCRETE

Providing, batching, mixing, transporting through transit mixers,


pumping and laying Reinforced Cement Concrete of specified grade at
all levels and heights specified below using ordinary Portland cement
of grade 53 from approved manufacturer, M sand, 20mm and down
1 size coarse aggregates, necessary admixtures approved by Consultants
(Conplast SP 430SRV from Fosroc or equivalent), including all leads
and lifts, pumping using line pump, vibrating/ compaction, curing as
directed.. Rate to include cutting/trimming of slab edges to fix slit
drains, kerbs, saucer drains, etc.. as per drawings given or as instructed
by project manager

1.10 Slab - M25 Grade Providing, batching, mixing, transporting through Cum
transit mixers, pumping and laying Reinforced Cement Concrete

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Mechanical / power trovelling over and above item No 2.01 and


1.20 broom finishing the surface Mechanical / power trovelling over and Sqm
above item No 2.01 and broom finishing the surface

Cutting groves of 6mmX10mm size at regular interval as per


requirement including filling the same with non shrink polymer Rmt
grouting compound as approved by project manager.
1.30
Cutting groves of 6mmX10mm size at regular interval as per
requirement including filling the same with non shrink polymer
grouting compound as approved by project manager.

Providing and mixing in concrete the pigment of approved colour for


Cum
the cycle track area as per the drawing. Rate to include

1.40
Providing and mixing in concrete the pigment of approved colour for
the cycle track area as per the drawing. Rate to include

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Providing and fixing in position Pre-cast concrete kerbs of length


600mm each in straight road and 300mm to 600mm in curvature as
per drawings and architectural details.Providing and fixing in position
Pre-cast concrete kerbs of length 600mm each in straight road and
300mm to 600mm in curvature as per drawings and architectural
2 details Rate to include all leads and lifts, necessary excavation, 75mm
thk PCC in M10 concrete for fixing (as per drawing enclosed) fixing to
line and plumb, raking and flushpointing the joints with CM 1:3, curing
etc., complete(Refer drawing before quoting) of size. Rate to also
include kerbs with drainage openings of 150mm dia/square wherever
required as per details/ as instructed by engineer in - charge.

Providing and fixing in position Pre-cast concrete kerbs of length150


2.1 x 600mm Providing and fixing in position Pre-cast concrete kerbs Rmt
of length150 x 600mm

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Providing and fixing in position Pre-cast concrete kerbs of length150


2.2 x 450mm Providing and fixing in position Pre-cast concrete kerbs Rmt
of length150 x 450mm

Curve - Near Compound Wall Rmt 1.00 10.00


Total Qty

Providing and fixing in position Pre-cast concrete kerbs of length 150


2.3 x 450 mm Sleeping Kerb Providing and fixing in position Pre-cast
concrete kerbs of length150 x 450 mm Sleeping Kerb

Strecth No. -01 Rmt 1.00 65

Strecth No. -03 Rmt 1.00 74

Total Qty

Supplying, installing, testing and commissionig of R.C.C NP2 class


Hume pipe laid to the required level and grade with collars joining
Supplying, installing, testing and commissionig of R.C.C NP2 class
Hume pipe laid to the required level and grade with collars joining in
3 CM 1:3 and filling the excavated trench on sides, bottom and top
surface of pipe, cradle concrete in CC 1:2:4 for the pipe joints with all
leads and lifts, making necessary connections as required etc.,
complete.

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

150 mm Dia Supplying, installing, testing and commissionig of R.C.C


3.1 NP2 class Hume pipe 150 mm Dia Supplying, installing, testing and
commissionig of R.C.C NP2 class Hume pipe

Strecth No. -01 Rmt 1.00 10

600 mm Dia Supplying, installing, testing and commissionig of R.C.C


3.2 NP2 class Hume pipe 600 mm Dia Supplying, installing, testing and
commissionig of R.C.C NP2 class Hume pipe

In B/W sTRCH No. 1 and Strech-02 Cross Drain Continous Rmt 1.00 37

Providing & constructing RCC Built up trench of 750 wide (clear) and
depth from 600mm to 1200mm as per layout and details. Providing &
4 constructing RCC Built up trench of 750 wide (clear) and depth from
600mm to 1200mm as per layout and details.

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Shuttering for walls & top slab (MS shuttering) Shuttering for walls &
4.1 top slab (MS shuttering)

Cross Drain in front Stretch 01 & Stretch 2


Side Wall Sqm 4.00 8.85
Cross Drain at Strech No. 04
Bottam Raft Sqm 2.00 10.00

U Shape Drain (Strecth 03)


Side Wall Sqm 4.00 28.00
Side Wall Sqm 4.00 60.00
U Shape Drain (Strecth 04)
Bottam Raft Sqm 2.00 31.50
Bottam Raft Sqm 2.00 56.00

Top Slab For 'U'Shape Drain (Stretch 03) Sqm 1.00 28.00
Sqm 1.00 60.00

Sqm 1.00 28.00


Side of the Drain ( Stretch 03 )
Sqm 1.00 60.00

Sqm 8.00 1.05


Chamber cover Portion Stretch 03
Sqm 4.00 0.90

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Sqm 4.00 6.00


Impersion Portion
Sqm 8.00 0.40
Total Qty
ENTRANCE ROAD WORK FOR MARQ ENTRANCE ROAD
5 WORK FOR MARQ

Excavation in all types of soil except rocks not exceeding 1.5m depth
including dressing Excavation in all types of soil except rocks not exceeding
5.1 1.5m depth including dressingfor camber and disposing the excess earth and
spreading in layers of 200mm within the site to the required levels wherever
specified

Cross Drain at Strech No. 04 Cum 1.00 10.00 1.65


U Shape Drain (Strecth 04) Cum 1.00 31.50 1.50
U Shape Drain (Strecth 04) Cum 1.00 56.00 1.65
Hume Pipe 150 mm dia Cum 1.00 10.00 0.30
Hume Pipe 600 mm dia Cum 1.00 37.00 0.90
Road Excavation Cum
Total Qty

Providing and laying 1000 micron guage polythene paper/Polythene


sheet below Concrete Bottom slab etc. Providing and laying 1000
micron guage polythene paper/Polythene sheet below Concrete
5.2 Bottom slab etc, to the required levels, including supply, loading and
unloading,storing,tranportation,laying,sealing of junctions and
overlaps, all leads and lifts, etc.,complete

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Strecth No. -02 Sqm 1.00 70.00 8.00

Strecth No. -02 Curve Sqm 1.00 10.00 9.70

Strecth No. -03 Sqm 1.00 62.00 9.00

Total Qty
Providing and fixing in position Pre-cast concrete Saucer drain of
length 600mm each and width of 450 mm on road and 300mm to
600mm length in curvature as per drawings and architectural details.
Providing and fixing in position Pre-cast concrete Saucer drain of
length 600mm each and width of 450 mm on road and 300mm to
5.3 600mm length in curvature as per drawings and architectural details Rmt
Rate to include all leads and lifts, fixing in line to the road finish and
flushpointing the joints with CM 1:3, curing etc., complete(Refer
drawing before quoting) of size. Rate to also include drainage openings
of 150mm dia/square wherever required as per details/ as instructed
by engineerand
Providing in - fixing
charge.in position Pre-cast concrete Saucer drain at
5.4 curvature Providing and fixing in position Pre-cast concrete Saucer Rmt
drainat curvature

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Providing and fixing Pre-Cast Slit Drains of size 250 X 250 mm and
1000 mm in length as cross drain for the road at regular intervals as
per the drawing.Providing and fixing Pre-Cast Slit Drains of size 250 X
5.5 250 mm and 1000 mm in length as cross drain for the road at regular Rmt
intervals as per the drawing. Rate to include all leads and lifts, fixing in
line to the road finish and flush pointing the joints with CM 1:3, curing
etc., complete(Refer drawing before quoting).

Providing and constructing wall for foundation in size stone masonry


in CM 1:6 for line and level, Providing and constructing wall for
foundation in size stone masonry in CM 1:6 for line and level filling the
5.6 voids with boulders including curing complete as per specifications
and drawings including all leads and lifts as per the instructions of
Engineer in Charge.

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Providing and constructing Solid Cement Concrete block masonry in


cement mortar 1:6 (1 cement : 6 manufacture sand) approved
quality, set to level plumb including setting in position, curing,
etc.,Providing and constructing Solid Cement Concrete block masonry
5.7 in cement mortar 1:6 (1 cement : 6 manufacture sand) approved
quality, set to level plumb including setting in position, curing, etc.
complete with all leads and all as per specification and direction of
Engineer-in-charge.

For 200mm thick walls using (400x200x200)mm size blocks

Plastering 20mm thick with cement mortar 1:6 with sponge finish
including scaffolding, curing, etc.; Plastering 20mm thick with cement
5.8 mortar 1:6 with sponge finish including scaffolding, curing, etc.; Sqm
complete for EXTERNAL SURFACES for masonry walls as per direction
from project manager.

Compound Wall (Strecth 02)


Side of the wall Sqm 1.00 0.43

Step 01 Sqm 1.00 9.64


Sqm
Step 02 Sqm 1.00 15.30

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Step 03 Sqm 1.00 12.94

Step 04 Sqm 1.00 14.80

Step 05 Sqm 1.00 5.80

Step 06 Sqm 1.00 9.20

Step 07 Sqm 1.00 15.30

Step 08 Sqm 1.00 18.00

Plinth Beam Side Sqm 1.00 4.52

Side Of the Wall Sqm 1.00 0.43

Top of the Wall Sqm 1.00 100.09


Total Qty

Construction of RCC Inspection chambers Construction of RCC


Inspection chambers of M25 grade & size 1000 X 2000 mm and depth
up to 1000 mm (clear dimensions) with150mm thick walls and
5.9 150mm thick bottom slab including fixing of necessary concrete Nos
sleeves. Including the cost of Shuttering, excluding the cost of
Reinforcement steel which shall be measured separately etc.,
complete

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Pre-cast concrete slab of size 900 X 1000mm and 150mm thick as


drain covers at regular intervals. Pre-cast concrete slab of size 900 X
1000mm and 150mm thick as drain covers at regular intervals Cost to
5.10 inculde fixing of MS flat at edges of cover slab as frame with necessary Nos
holdfast/lugs etc.. For fixing in concrete. The MS flats shall be
measured and paid seperately in relevant item.
Grade of concrete shall be M25

Providing & fixing Rain water recharge Pits using RCC rings of size
900 mm dia and 300 mm height for a maximum depth 3 mtrs.
Providing & fixing Rain water recharge Pits using RCC rings of size 900
5.11 mm dia and 300 mm height for a maximum depth 3 mtrs. Rate to Nos
include excavation keeping required working space, packing of
boulders below 3 mtrs for min 150 mm thickness, packing of boulders
around the rings

Hard Scape Portion Nos


Total Qty
Providing & constructing RCC Built up trench of 750 wide (clear) and
6 depth from 600mm to 1200mm as per layout and details.

Providing and laying 75 mm thk PCC M10 Providing and laying 75


6.1 mm thk PCC M10
Cross Drain at Strech No. 04 Cum 1.00 10.00 1.65
U Shape Drain (Strecth 04) Cum 1.00 31.50 1.50

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

U Shape Drain (Strecth 04) Cum 1.00 56.00 1.65

Total Qty

RCC M25 grade concrete for base slab & Wall. RCC M25 grade
6.2 concrete for base slab & Wall. Rate to include making provision for
sleeves in the wall to connect cross drains from road

Cross Drain in front of Office


Side Wall Cum 2.00 8.85 0.15
U Shape Drain (Strecth 03)
Side Wall Cum 2.00 28.00 0.15
Side Wall Cum 2.00 60.00 0.15
Cross Drain at Strech No. 04
Bottam Raft Cum 1.00 10.00 1.05

U Shape Drain (Strecth 04) Cum 1.00 31.50 0.90


U Shape Drain (Strecth 04) Cum 1.00 56.00 1.05

Total Qty

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Supplying suitable approved good quality gravel Supplying


suitable approved good quality grave / Hoskote Murrum / other
approved fill materials as per specification from any source out side
the site with all leads and lifts and spreading the same in not
exceeding 300mm thick layers including watering with all leads to
obtain moisture levels of mix between 1% above and 2% below the
optimum moisture content at the time of compaction, levelling and
7.1 compacting by rolling with vibratory power rollers of 8 - 10 T capacity
over fill areas till the formation level is reached including mixing of
different fill materials if and where required, consolidating each layer
to obtian the required protector density including protecting the earth
works, cost and conveyance of fill materials,labour, charges for all tools
and plants employed and all other incidental charges such as pumping
out any accumulated water etc., all complete

Providing 50 X 50 mm slits 4 in a set at 50mm clear gap Providing 50


7.2 X 50 mm slits 4 in a set at 50mm clear gap in concrete using MS Rmt
moulds as per the drawing provided

Providing and fixing UPVC pipe of schedule 40, 160 dia Providing
7.3 and fixing UPVC pipe of schedule 40, 160 dia for connecting drains Rmt
wherver required

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Supply and filling in foundations with Approved quality Quary Dust


7.4 Supply and filling in foundations with Approved quality Quary Dust
brought from outside
Hume Pipe Bottam Filling In B/W Strech No.1 and No.2 Cum 1.00 37.00 0.90
Electrical Pipe Filling Cum 1.00 87.00 0.20
Hume Pipe Bottam Filling Bottam and Top Filling Cum 2.00 10.00 0.20
Total Qty

Providing, Fabricating and fixing in position structural steel


Providing, Fabricating and fixing in position structural steel
conforming to IS 800 as angles(150x75x8MM), Flats of size 150 X
7.5 MT
10mm for drain covers at regular intervals and wherever specified as
per drawings. Cost to include a coat of zinc chromate primer and
necessary holdfasts for fixing in concrete.

Earth filling with available earth at site in layers of 200mm to the


required levels and slope including watering & compaction Earth
filling with available earth at site in layers of 200mm to the required
7.6 levels and slope including watering & compaction with 8 to 10 T power
roller or mechanical rammer where road roller can not be employed
so as to obtain 95% relative compaction ( 5-6 times rolling)

Cross Drain in front of Office Cum 2.00 9.10 0.60


Hume Pipe Bottam Filling In B/W Strech No.1 and No.2 Cum 1.00 37.00 0.90
Strech -05 BACK FILLING Cum
Total Quantity

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Preperation of subgrade after trimming to the required cambers and


gradients, watering, compacting Preperation of subgrade after
trimming to the required cambers and gradients, watering,
compacting the same using 8-10 T vibratory power roller (5-6 Times
7.7 Sqm
rolling) to achieve required density including.( NOTE: Surface shall be
checked for CBR which shall be more than 12 failing which contractor
shall redo the subgrade as per the relavent codes and instructions
from consultants)

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Providing and laying granular sub-base of Grade - 1 consisting of


sand, moorum, crushed stone and gravel mixed in proportions as
specified below for Roads & Pavements Providing and laying
granular sub-base of Grade - 1 consisting of sand, moorum, crushed
stone and gravel mixed in proportions as specified below for Roads &
Pavements Sieve designation
% by weight passing
90mm 100
53mm 80 - 100
26.50mm 55 - 75
4.75mm 10 - 30
75 micron 00 - 10

7.8

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

7.8

for subgrade to a compacted thickness of 200mm laid in single layer


using good quality graded materials from approved source and mixed
in the specified proportion including cost and conveyance of all
materials, stacking and mixing in the specified proportion, spreading
after mixing to required camber, levelling, watering with all leads to
obtain moisture levels of mix between 1% above and 2% below the Sqm
optimum moisture content at the time of compaction and compacting
each layer with 8 - 10 tonne vibratory power roller to obtain the
required proctor density including all labour, charges for all tools and
plants employed and all other incidental charges etc. all complete as
per IRC /and MORTH specifications and as directed CBR value shall not
be less than 30 for sub base

Contractor Client
RADICAL WORKS PVT LTD

Sl. No. Particulars Unit Nos L B

Supplying, Fabricating & fixing in position reinforcement for RCC


work with high yield strength ribbed cold twisted tor steel (HSD) bar
of various diameters and grade of steel as specified below
conforming Supplying, Fabricating & fixing in position reinforcement
for RCC work with high yield strength ribbed cold twisted tor steel
(HSD) bar of various diameters and grade of steel as specified below
conforming to IS specification including cutting, providing, supplying &
bending, hoisting, fabricating and placing in position according to
drawings and binding the reinforcement with GI wire of double fold of
7.9 18 gauge and providing PVC cover blocks for placing the
reinforcements in position and for maintaining the cover specified
and/or according to relevant IS.

Drain Work
Road Work
Total Quantity

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

180.96

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

1,213.00

JMR

276.00

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

10.00 JMR
10.00

65

74
JMR
139

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

10
JMR

37
JMR

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

1.66 58.76

0.15 3.00

0.60 67.20
0.60 144.00

0.15 9.45
0.15 16.80

0.60 16.80
0.60 36.00

0.15 4.20
0.15 9.00

0.15 1.26
JMR
0.15 0.54

Contractor Client
RADICAL WORKS PVT LTD
JMR

D Qty Remarks

0.15 3.60
0.15 0.48
371.09

1.01 16.58 750 drain


1.07 50.32 600 Drain
1.22 112.27 750 Drain
0.20 0.60 JMR
2.50 83.25 near project office. JMR
4,195.48
4458.50

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

560.00

97.00

558.00

1,215.00

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

1.72 0.74

2.24 21.59 As per JMR

2.10 32.13

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

1.96 25.36

2.12 31.30

2.22 12.85

2.26 20.79

2.38 36.34

2.63 47.25

0.82 3.71

2.00 0.86

0.20 20.02
252.94

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

3.00
3.00

16.50
47.25

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

92.40

156.15

1.66 4.41

0.60 5.04
0.60 10.80

0.15 1.58

0.15 4.25
0.15 8.82

34.89

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

0.10 3.33
0.15 2.61 JMR
0.05 0.20
6.14

1.75 19.11
1.80 59.94 JMR
172.52 Qs to check
251.57 Road backfilling qty pending

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

Contractor Client
RADICAL WORKS PVT LTD

D Qty Remarks

Contractor Client
MESUREMENT SHEET
Sl. No. Particulars Unit
READY MIX CONCRETE / CONTROLLED CONCRETE

Providing, batching, mixing, transporting through transit mixers, pumping and laying
Reinforced Cement Concrete of specified grade at all levels and heights specified below
using ordinary Portland cement of grade 53 from approved manufacturer, M sand, 20mm
1 and down size coarse aggregates, necessary admixtures approved by Consultants (Conplast
SP 430SRV from Fosroc or equivalent), including all leads and lifts, pumping using line pump,
vibrating/ compaction, curing as directed.. Rate to include cutting/trimming of slab edges to
fix slit drains, kerbs, saucer drains, etc.. as per drawings given or as instructed by project
manager

Slab - M25 Grade Providing, batching, mixing, transporting through transit mixers, Cum
pumping and laying Reinforced Cement Concrete
1.10 Chamber
Paver Area Deduction
Front of Main Road Ramp Cum
Total Qty

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum
Sl. No. Particulars Unit
RA BILL-05 Cum

Total Cumulative Qty Cum

Mechanical / power trovelling over and above item No 2.01 and broom finishing the
1.20 surface Mechanical / power trovelling over and above item No 2.01 and broom finishing the Sqm
surface

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

Cutting groves of 6mmX10mm size at regular interval as per requirement including filling Rmt
the same with non shrink polymer grouting compound as approved by project manager.
1.30
Cutting groves of 6mmX10mm size at regular interval as per requirement including filling the
same with non shrink polymer grouting compound as approved by project manager.
Sl. No. Particulars Unit
S-5

Curve Portion

S-4 to S-3

S-3 to S-2
Sl. No. Particulars Unit
S-3 to S-2

S-2 to S-1 Up to Entrance

Entry portal

Total Qty
Sl. No. Particulars Unit
RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

Providing and mixing in concrete the pigment of approved colour for the cycle track area
as per the drawing. Rate to include
1.40
Providing and mixing in concrete the pigment of approved colour for the cycle track area as
per the drawing. Rate to include

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum
Sl. No. Particulars Unit
RA BILL-05 Cum

Total Cumulative Qty Cum

Providing and fixing in position Pre-cast concrete kerbs of length 600mm each in straight
road and 300mm to 600mm in curvature as per drawings and architectural
details.Providing and fixing in position Pre-cast concrete kerbs of length 600mm each in
straight road and 300mm to 600mm in curvature as per drawings and architectural details
2 Rate to include all leads and lifts, necessary excavation, 75mm thk PCC in M10 concrete for
fixing (as per drawing enclosed) fixing to line and plumb, raking and flushpointing the joints
with CM 1:3, curing etc., complete(Refer drawing before quoting) of size. Rate to also
include kerbs with drainage openings of 150mm dia/square wherever required as per
details/ as instructed by engineer in - charge.

Providing and fixing in position Pre-cast concrete kerbs of length150 x 600mm


2.1 Providing and fixing in position Pre-cast concrete kerbs of length150 x 600mm

Entry Portal Towards Main Road Rmt

Total Qty

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum
Sl. No. Particulars Unit
RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

Providing and fixing in position Pre-cast concrete kerbs of length150 x 450mm


2.2 Providing and fixing in position Pre-cast concrete kerbs of length150 x 450mm

S-01 Entrance Median Kerb Rmt

Total Qty

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum


Sl. No. Particulars Unit

Providing and fixing in position Pre-cast concrete kerbs of length 150 x 450 mm Sleeping
2.3 Kerb Providing and fixing in position Pre-cast concrete kerbs of length150 x 450 mm Sleeping
Kerb
Total Qty

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

Supplying, installing, testing and commissionig of R.C.C NP2 class Hume pipe laid to the
required level and grade with collars joining Supplying, installing, testing and
commissionig of R.C.C NP2 class Hume pipe laid to the required level and grade with collars
3 joining in CM 1:3 and filling the excavated trench on sides, bottom and top surface of pipe,
cradle concrete in CC 1:2:4 for the pipe joints with all leads and lifts, making necessary
connections as required etc., complete.
Sl. No. Particulars Unit

150 mm Dia Supplying, installing, testing and commissionig of R.C.C NP2 class Hume pipe
3.1 150 mm Dia Supplying, installing, testing and commissionig of R.C.C NP2 class Hume pipe

Total Qty

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

600 mm Dia Supplying, installing, testing and commissionig of R.C.C NP2 class Hume pipe
3.2 600 mm Dia Supplying, installing, testing and commissionig of R.C.C NP2 class Hume pipe

Piallan Side and S-05 Connecting to Drain Rmt

Total Qty
Sl. No. Particulars Unit
RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

Providing & constructing RCC Built up trench of 750 wide (clear) and depth from 600mm to
4 1200mm as per layout and details. Providing & constructing RCC Built up trench of 750 wide
(clear) and depth from 600mm to 1200mm as per layout and details.

Shuttering for walls & top slab (MS shuttering) Shuttering for walls & top slab (MS
4.1 shuttering)

Drain Slab Sacrificial Board Sqm


Sl. No. Particulars Unit
Paver cut outs at all Strechs Sqm

Drain Cover at S-03 Sqm

Total Qty

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

5 ENTRANCE ROAD WORK FOR MARQ

Excavation in all types of soil except rocks not exceeding 1.5m depth including dressing
Excavation in all types of soil except rocks not exceeding 1.5m depth including dressingfor camber
5.1 and disposing the excess earth and spreading in layers of 200mm within the site to the required
levels wherever specified
S-1 Entrance
S-1 Entrance Towards Main Road
Sl. No. Particulars Unit
Chamber Excavation Near S-05 Cum
Chamber Excavation Near S-05 Cum
Hume pipe near Pylon Cum
Swell Area @ S-01 Cum
Compound Work @ Entry Portal Cum
Electrical Cabel near Boom Barrier Cum

Provision Qty
Total Qty

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum


Sl. No. Particulars Unit

Providing and laying 1000 micron guage polythene paper/Polythene sheet below Concrete
Bottom slab etc. Providing and laying 1000 micron guage polythene paper/Polythene sheet
5.2 below Concrete Bottom slab etc, to the required levels, including supply, loading and
unloading,storing,tranportation,laying,sealing of junctions and overlaps, all leads and lifts,
etc.,complete

Total Qty
RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum


Sl. No. Particulars Unit

Providing and fixing in position Pre-cast concrete Saucer drain of length 600mm each and
width of 450 mm on road and 300mm to 600mm length in curvature as per drawings and
architectural details. Providing and fixing in position Pre-cast concrete Saucer drain of
length 600mm each and width of 450 mm on road and 300mm to 600mm length in
5.3 Rmt
curvature as per drawings and architectural details Rate to include all leads and lifts, fixing in
line to the road finish and flushpointing the joints with CM 1:3, curing etc., complete(Refer
drawing before quoting) of size. Rate to also include drainage openings of 150mm
dia/square wherever required as per details/ as instructed by engineer in - charge.

Providing and fixing in position Pre-cast concrete Saucer drain at curvature Providing and
5.4 fixing in position Pre-cast concrete Saucer drainat curvature
Rmt

Providing and fixing Pre-Cast Slit Drains of size 250 X 250 mm and 1000 mm in length as
cross drain for the road at regular intervals as per the drawing.Providing and fixing Pre-Cast
Slit Drains of size 250 X 250 mm and 1000 mm in length as cross drain for the road at regular
5.5 Rmt
intervals as per the drawing. Rate to include all leads and lifts, fixing in line to the road finish
and flush pointing the joints with CM 1:3, curing etc., complete(Refer drawing before
quoting).
Sl. No. Particulars Unit

Providing and constructing wall for foundation in size stone masonry in CM 1:6 for line and
level, Providing and constructing wall for foundation in size stone masonry in CM 1:6 for
5.6 line and level filling the voids with boulders including curing complete as per specifications
and drawings including all leads and lifts as per the instructions of Engineer in Charge.

Near Sai Lakshmi Industries Cum


Near Sai Lakshmi Industries Cum
Compound wall Cum
Cum
Provision Qty Cum

Total Qty

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum
Sl. No. Particulars Unit
Total Cumulative Qty Cum

Providing and constructing Solid Cement Concrete block masonry in cement mortar 1:6 (1
cement : 6 manufacture sand) approved quality, set to level plumb including setting in
position, curing, etc.,Providing and constructing Solid Cement Concrete block masonry in
5.7 cement mortar 1:6 (1 cement : 6 manufacture sand) approved quality, set to level plumb
including setting in position, curing, etc. complete with all leads and all as per specification
and direction of Engineer-in-charge.

For 200mm thick walls using (400x200x200)mm size blocks


Chamber Excavation Near S-05 Sqm
Chamber Excavation Near Sqm
Chamber Excavation Near Sqm
Chamber Excavation Near Sqm
Near Sai Lakshmi Industries Sqm
GATE No.-1 Near Car Parking Sqm
Compound Work @ Entry Portal Sqmt
Compound Work @ Entry Portal Sqmt
S-04 Cross Drain Chamber to Hume Pipe Sqmt
Compound Work @ j1 Point Sqmt
S-02 Near Cross Drain Sqmt
Sl. No. Particulars Unit

Provision Qty

Total Qty

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

Plastering 20mm thick with cement mortar 1:6 with sponge finish including scaffolding,
curing, etc.; Plastering 20mm thick with cement mortar 1:6 with sponge finish including
5.8 scaffolding, curing, etc.; complete for EXTERNAL SURFACES for masonry walls as per
direction from project manager.

Chamber Excavation Near S-05 Sqm


Chamber Excavation Near Sqm
Chamber Excavation Near Sqm
Sl. No. Particulars Unit
Chamber Excavation Near Sqm
Near Sai Lakshmi Industries Sqm
Top Of Block Work Sqm
Compound Work @ Entry Portal Sqmt
Compound Work @ Entry Portal Sqmt

Provision Qty
Total Qty

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

Construction of RCC Inspection chambers Construction of RCC Inspection chambers of


M25 grade & size 1000 X 2000 mm and depth up to 1000 mm (clear dimensions)
5.9 with150mm thick walls and 150mm thick bottom slab including fixing of necessary concrete
sleeves. Including the cost of Shuttering, excluding the cost of Reinforcement steel which
shall be measured separately etc., complete

Provision Qty Nos


Sl. No. Particulars Unit
Total Qty

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

Pre-cast concrete slab of size 900 X 1000mm and 150mm thick as drain covers at regular
intervals. Pre-cast concrete slab of size 900 X 1000mm and 150mm thick as drain covers at
regular intervals Cost to inculde fixing of MS flat at edges of cover slab as frame with
5.10 Nos
necessary holdfast/lugs etc.. For fixing in concrete. The MS flats shall be measured and paid
seperately in relevant item.
Grade of concrete shall be M25

Providing & fixing Rain water recharge Pits using RCC rings of size 900 mm dia and 300 mm
height for a maximum depth 3 mtrs. Providing & fixing Rain water recharge Pits using RCC
rings of size 900 mm dia and 300 mm height for a maximum depth 3 mtrs. Rate to include Nos
excavation keeping required working space, packing of boulders below 3 mtrs for min 150
mm thickness, packing of boulders around the rings
Sl. No. Particulars Unit
At Entry Portal
RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

Providing & constructing RCC Built up trench of 750 wide (clear) and depth from 600mm to
6 1200mm as per layout and details.

6.1 Providing and laying 75 mm thk PCC M10 Providing and laying 75 mm thk PCC M10

Chamber Excavation Near S-05 Sqm


Chamber Excavation Near S-06 Sqm
Near Sai Lakshmi Industries Sqm
Swell Area Sqm
Kerb Bottam Sqm
Compound Work @ Entry Portal Sqm
Sl. No. Particulars Unit
Compound Work @ Gate -1 Sqm
Swell Area near Piallan Sqm
Sqm
Provision Qty Sqm
Total Qty

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

RCC M25 grade concrete for base slab & Wall. RCC M25 grade concrete for base slab &
6.2 Wall. Rate to include making provision for sleeves in the wall to connect cross drains from
road

Near Sai Lakshmi Industries Drain Bottam Raft Cum


Sl. No. Particulars Unit
Near Sai Lakshmi Industries Drain Top Salb Cum

Near Sai Lakshmi Industries Plinth Beam Cum

S-4 to S-5 DRAIN Cum

Provision Qty

Total Qty
RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum


Sl. No. Particulars Unit

Supplying suitable approved good quality gravel Supplying suitable approved good
quality grave / Hoskote Murrum / other approved fill materials as per specification from any
source out side the site with all leads and lifts and spreading the same in not exceeding
300mm thick layers including watering with all leads to obtain moisture levels of mix
between 1% above and 2% below the optimum moisture content at the time of compaction,
7.1 levelling and compacting by rolling with vibratory power rollers of 8 - 10 T capacity over fill
areas till the formation level is reached including mixing of different fill materials if and
where required, consolidating each layer to obtian the required protector density including
protecting the earth works, cost and conveyance of fill materials,labour, charges for all tools
and plants employed and all other incidental charges such as pumping out any accumulated
water etc., all complete

At All Strech Curve Portion Cum

Total Qty
RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum
Sl. No. Particulars Unit
Total Cumulative Qty Cum

Providing 50 X 50 mm slits 4 in a set at 50mm clear gap Providing 50 X 50 mm slits 4 in a


7.2 set at 50mm clear gap in concrete using MS moulds as per the drawing provided

S-01 to S-4 Rmt


Total Qty
RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

Providing and fixing UPVC pipe of schedule 40, 160 dia Providing and fixing UPVC pipe of
7.3 schedule 40, 160 dia for connecting drains wherver required
Supply and filling in foundations with Approved quality Quary Dust Supply and filling in
7.4 foundations with Approved quality Quary Dust brought from outside
Sl. No. Particulars Unit
RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

Providing, Fabricating and fixing in position structural steel Providing, Fabricating and
fixing in position structural steel conforming to IS 800 as angles(150x75x8MM), Flats of size
7.5 150 X 10mm for drain covers at regular intervals and wherever specified as per drawings. MT
Cost to include a coat of zinc chromate primer and necessary holdfasts for fixing in concrete.

Earth filling with available earth at site in layers of 200mm to the required levels and slope
including watering & compaction Earth filling with available earth at site in layers of
7.6 200mm to the required levels and slope including watering & compaction with 8 to 10 T
power roller or mechanical rammer where road roller can not be employed so as to obtain
95% relative compaction ( 5-6 times rolling)

Strech-05
Strech-01 Entrance Tree Area Back Filling Cum
Entry Portal Cum
Sl. No. Particulars Unit
Electrical Cabel near Boom Barrier Cum
Swale Area Cum
Swale Area Cum
Cum
Provision Qty Cum
Total Qty -

RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

Preperation of subgrade after trimming to the required cambers and gradients, watering,
compacting Preperation of subgrade after trimming to the required cambers and
gradients, watering, compacting the same using 8-10 T vibratory power roller (5-6 Times
7.7 rolling) to achieve required density including.( NOTE: Surface shall be checked for CBR which
shall be more than 12 failing which contractor shall redo the subgrade as per the relavent
codes and instructions from consultants)
Sl. No. Particulars Unit
At All Strech Curve Portion Sqm
Total Qty
RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum


Sl. No. Particulars Unit

Providing and laying granular sub-base of Grade - 1 consisting of sand, moorum, crushed
stone and gravel mixed in proportions as specified below for Roads & Pavements
Providing and laying granular sub-base of Grade - 1 consisting of sand, moorum, crushed
stone and gravel mixed in proportions as specified below for Roads & Pavements
Sieve designation % by weight passing
90mm 100
53mm 80 - 100
26.50mm 55 - 75
7.8 4.75mm 10 - 30
75 micron 00 - 10 or subgrade to a compacted thickness of 200mm laid in
single layer using good quality graded materials from approved source and mixed in the specified
proportion including cost and conveyance of all materials, stacking and mixing in the specified
proportion, spreading after mixing to required camber, levelling, watering with all leads to obtain
moisture levels of mix between 1% above and 2% below the optimum moisture content at the time
of compaction and compacting each layer with 8 - 10 tonne vibratory power roller to obtain the
required proctor density including all labour, charges for all tools and plants employed and all other
incidental charges etc. all complete as per IRC /and MORTH specifications and as directed CBR value
shall not be less than 30 for sub base

Concret Area Sqm


Paver Area Sqm
Sl. No. Particulars Unit
Front Area Ramp Side Sqm

Provision Qty Sqm


Total Qty
RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum


Sl. No. Particulars Unit
Supplying, Fabricating & fixing in position reinforcement for RCC work with high yield
strength ribbed cold twisted tor steel (HSD) bar of various diameters and grade of steel as
specified below conforming Supplying, Fabricating & fixing in position reinforcement for
RCC work with high yield strength ribbed cold twisted tor steel (HSD) bar of various
diameters and grade of steel as specified below conforming to IS specification including
cutting, providing, supplying & bending, hoisting, fabricating and placing in position
7.9 according to drawings and binding the reinforcement with GI wire of double fold of 18
gauge and providing PVC cover blocks for placing the reinforcements in position and for
maintaining the cover specified and/or according to relevant IS.

Provision Qty MT

Total Quantity
RA BILL-01 Cum

RA BILL-02 Cum

RA BILL-03 Cum

RA BILL-04 Cum

RA BILL-05 Cum

Total Cumulative Qty Cum

Promanede Area
Sl. No. Particulars Unit
1 SUB GRADE PREPERATION
Cleaning and grubbing for removal of vegetation, shrubs, small trees, bushes, stumps,
weeds, grass including roots, debris, unusable materials and disposal of the same by burning
or any other means including dumping to approved areas within the project site or at the
areas designated by authorities out side site, removal of 250mm depth top soil by using
manual or mechanical method, stacking useable materials at places shown with all leads and
lifts, cost of all labour, hire and fuel charges for all tools and plants employed and all other
1.01 incidental charges etc., all complete and as directed.

Sqm
Total Quantity
2 PLAIN CEMENT CONCRETE

Providing and laying P.C.C of M10 grade 75mm thick wherever specified using M sand,
2.01 20mm and down size metal including sub grade preparation, leveling, all leads and lifts,
rough finishing at the top surface, curing and shuttering if necessary etc.,

150 mm Block Work Bottam PCC


CUM
Tree Area
CUM
Tree Area
CUM
Swell Area
CUM
Sl. No. Particulars Unit
150 mm Block Top Concret
CUM
CUM
CUM
Total Quantity

6
MASONRY WORKS
Providing and construction Solid Cement Concrete block masonry in specified cement
mortar ratio using factory made, load bearing, approved quality of blocks not less than 1800
kg/cum. Minimum average compressive strength of 4.0 N/sqmm and minimum strength of
individual is 3.2 N/sqmm, set to level plumb including setting in position, providing
scaffolding, curing, raking out joints wherever necessary etc., complete with all leads and all
as per specification and direction of Engineer-in-charge.

6.01 150 mm Block Work in CM 1:4 as Edge Kerb Rmt


Tree Area
Rmt
Tree Area
Rmt
Swell Area Rmt
Total Quantity
9 PAVERS
Sl. No. Particulars Unit
Supply and fixing of Basant betons make Concrete pavers "Great Fifteen" of specified sizes as
per sample with compressive strength of 45 N/mm2, laid over 50mm thick M.sand bed
cushion compacted with 1.5 Ton surface vibrators. Cost to include all materials, necessary
9.01 machineries, consumables, all labour charges and other necessary charges, filling of M.sand
in paver joints and surface vibrating etc., to complete as per EIC.

Sqm

Sqm
Sqm
Deduction of Tree Area Sqm
Total Quantity
2 EXCAVATION AT ENTRY PORTAL
Sl. No. Particulars Unit
Contractor shall take all required permissions from the appropriate authorities for
Excavation, Blasting, Carting away materials etc. and shall bear all the expenses for the same.
Rate includes removal of all kinds of vegetation ,small shrubs etc. dewatering water to be let
out of the building area through proper pipes & channels if required, The contractor at his
own expenses shall water very well, ram and throughly, consolidate the bottom of all
excavation & ground before the construction of foudation/footing/plinth beam,filling in
basment floor or other work is commanced. The rate for excavation shall include for shoring
sides or trenches with approved timber/steel accessories wherever necessary to prevent
sides from falling including bailing or pumping out of water if necessary and include if there
are any shrubs, bushes, trees,roots of the trees to be removed for min depth 5'0". Lift & lead
outside campus are to be considered to suit the local regulation. Contour level to be taken
jointly with the Project Manager and prior written approvel br taken before starting any
excavation/filling at every 3/5 mt grids for arriving at the actual quantity. Measruments for
filling will be taken for consolidated thickness only. Cost to include all and necessary royalty
and other premission charges required to executed the works. Unless noted otherwise
measurements shall be considered to the edge of PCC only

General Excavation at Entry Poratal General Excavation


by mechanical means in all types of soil including dense soil, disintegrated/ weathered/ soft
rock including necessary manual excavation for dressing the edges & leveling, all leads and
2.1 lifts, back filling in layers of 150mm with watering and compaction. Rate to include disposing
the excess earth and spreading in layers to the required levels within the site wherever
specified and carting away out side the site to the designated areas identified by the local
authorities.dewatering of both ground and surface water, removal of slurry generated while
excavation and keeping the area free of water with necessary shoring, struting, required for
keeping earth in position etc,. excavating loose pockets and compacting the same. Note:PCC
Footing
area shallExcavation
be considered for measurement (Working space & provision of slopes if required Cum
for execution shall not be paid separately).
up to 3.00m depth
Sl. No. Particulars Unit

Filling with excavated earth available at site.


Supply and filling in foundations and the area whereever specified with approved good
quality filling materials in plinths, area development etc. wherever specified in layers of not
exceeding 150mm thick including breaking clods, storing, transportation, double handling,
watering, compacting each layer with vibratory compactor and at unaccessible places with
wooden/steel rammers to achieve 90 to 95% proctor density at optimum moisture content,
2.2 all leads and lifts, bailing / pumping out of water to keep site dry while backfilling; cost shall
include conveyance of all materials, labour, machinery etc. complete as directed.

Up To Bottam OF SSL RL 100.10 mt Cum


Deduction Cum
Footing
Cum
Footing
Cum
Coloumn Cum
Coloumn Cum
Plinth Beam PB1
Cum
Plinth Beam PB3,PB4,PB11,PB8,PB12,PB4,PB12 Cum
footing pcc Cum
Cum
Sl. No. Particulars Unit
Total Qty Cum

Up To Bottam OF SSL RL 100mt


Cum

Deduction Cum
Footing
Cum
Coloumn
Cum
sump tank
Cum
Recharge Pit
Cum
footing pcc
Cum
sump tank pcc
Cum
Total Qty Cum
Total Qty
Sl. No. Particulars Unit
Filling With approved quality earth brought from outside
Supply and filling in foundations and the area whereever specified with approved
good quality filling materials in plinths, area development etc. wherever specified
in layers of not exceeding 150mm thick including breaking clods, storing,
transportation, double handling, watering, compacting each layer with vibratory
2.3 compactor and at unaccessible places with wooden/steel rammers to achieve 90 to
95% proctor density at optimum moisture content, all leads and lifts, bailing /
pumping out of water to keep site dry while backfilling; cost shall include
conveyance of all materials, labour, machinery etc. complete as directed.

ANTI-TERMITE TREATMENT WORKS at Entry portal

Anti - Termite treatment - Providing and injecting chemical emulsion for pre-constructional
Anti-Termite treatment with minimum 10 years guarantee, creating a chemical barrier under
and all around the foundation pits etc., complete with chlorophyrifos 20 emulsifiable
2.4 concentrate in proportion 1:19 (1 part of chlorophyrifos 20EC and 19 parts of water). Cost
shall include all material and labour, etc. Treatment shall be carried out only through
specialised and approved agency

3 FLOORING WORKS at Entry portal


Sl. No. Particulars Unit
Providing and laying Vitrified floor tiles of size 600x600mm at Entry portal
Providing and laying Vitrified floor tiles of different sizes (thickness to be specified by the
manufacturer) with water absorption’s less than 0.08% and conforming to IS : 15622 of
3.1 approved make in all colours, laid on 20mm thick cement mortar of 1:4 (1 cement: 4 coarse
sand) with 2mm spacer joints including treating the joints with cement grouting with
matching shade etc., complete as per engineer incharge.

Providing and laying Vitrified floor tiles of size 300x300mm at Entry portal
Providing and laying Vitrified floor tiles of different sizes (thickness to be
specified by the manufacturer) with water absorption’s less than 0.08% and
3.2 conforming to IS : 15622 of approved make in all colours, laid on 20mm thick
cement mortar of 1:4 (1 cement: 4 coarse sand) with 2mm spacer joints including
treating the joints with cement grouting with matching shade etc., complete as
per engineer incharge.

Providing and fixing vitrified SKIRTING at Entry portal


Providing and fixing vitrified tiles with 2mm spacers for skirting of approved make
3.3 in all colours, shades of any size as approved by Engineer-in-Charge over 12 mm
thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) including treating the
joints with cement grouting with matching shade, necessary hacking of RCC
surface etc., complete as per engineer incharge.

Providing and fixing Ceramic Glazed tiles DADOING at Entry portal

3.4
Sl. No. Particulars Unit
Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS : 15622
(thickness to be specified by the manufacture) of approved make in all colours,
3.4 shades and size as approved by Engineer-in-Charge in dados over 12 mm thick bed
of cement Mortar 1:3 (1cement: 3 coarse sand) and jointing with grey cement
slurry @ 3.3kg per sqm including pointing in grouting cement of matching shade
complete.

4 FORM WORK at Entry portal


Providing, fabricating and erecting form work at all levels and places and profiles
wherever needed/specified as per drawing including striking with 12mm Plastic
coated, marine resistant waterproof ply/Smooth finished MS plates with
adjustable steel props of acceptable Staging system and with sufficient bracing as
approved by consultant. Cost to include designing of proper form work and staging
system to suit the requirements,Submission of design calculations and shop
drawings for approval,sealing the joints with heavy duty brown self adhesive tape,
aligning to line and levels including M.S. Ties, PVC Spacer, Providing openings/
cutouts/ pockets, applying deshuttering chemical, Deshuttering as approved by the
consultant etc., complete at all levels, double/tripple heights and profiles for
Note : Only plan area shall be considered.No extra shall be paid for Side shuttering
of Drop panel/column capitals.
1) plywood shuttering shall be considered for all vertical elements, beam soffit,
corewalls, stairs, ramps, tanks, RCCpedestals Etc.,
2) M.S. plates shall be considered for foundation,slabs only.
3) Shuttering & deshuttering sequence shall be 100%, 80% & 40% from the slab to
4.01 be cast respectively.
Foundation, Rafts and Footings at Entry portal Sqm
Foundation, Rafts and Footings at Entry portal Sqm
Total Qty
4.02 Pedestal at Entry portal
Sl. No. Particulars Unit
Pedestal at Entry portal

4.03 Plinth Beam at Entry portal


Plinth Beam at Entry portal
PB7 Bottam Sqm
Side of the Beam Sqm
Sqm
PB5 Bottam Sqm
Side of the Beam Sqm
Sqm
PB6 Bottam Sqm
Side of the Beam Sqm
Sqm
PB1 Outer Side Sqm
PB3 Outer Side Sqm
Total Qty
4.04 Column at Entry portal Ground level Sqm
Column at Entry portal Ground level Sqm
First Floor Column No.1 Sqm
Sqm
First Floor Column No.2 Sqm
First Floor Column No.3 Sqm
First Floor Column No.3 Sqm
Sl. No. Particulars Unit
First Floor Column No.4 Sqm
First Floor Column No.5 Sqm
Sqm
First Floor Column No.6 Sqm

Sqm
First Floor Column No.7 Sqm
Sqm
First Floor Column No.8 Sqm
Total Qty Sqm

4.05 UG Sump (Walls & Top slab) at Entry portal Sqm


UG Sump (Walls & Top slab) at Entry portal Sqm
Bottam Raft Sqm
Bottam Raft Sqm
Top Slab Sqm
PIT SIDE Sqm
Pit side Sqm
Total Qty
4.06 Grade slab at Entry portal Sqm
Grade slab at Entry portal steps side Sqm
Sqm
4.07 Lintels at Entry portal Sqm
Sl. No. Particulars Unit
Lintels at Entry portal Sqm
Electrical Room Bootam Sqm
Electrical Room Side Sqm
Total Qty Sqm
4.08 Roof Slab at Entry portal Sqm
Roof Slab at Entry portal Sqm
Top Slab Sqm
Toilet 50mm Offset Slab Sqm
Canopy Cantilevel Projection Sqm
Toilet Slab Sqm
Total Qty Sqm
Planter Box Pedesetal at Entry portal
4.09 Planter Box Pedesetal at Entry portal

RC Wall at Entry portal


4.1 RC Wall at Entry portal

Roof Beams at Entry portal


4.11 long beam outer side Sqm
long beam inner side Sqm
shorter beam outer side Sqm
shorter beam inner side Sqm
inverted beam Sqm
Sl. No. Particulars Unit
canopy cantilever beam bottom Sqm
side Sqm
side Sqm
side Sqm
Toilet Beam
inv beam b outer side
inner side Sqm
inv beam a outer side Sqm
Sqm
Sqm
Total Qty

Overall Qty

MASONRY WORKS at Entry portal


5 MASONRY WORKS at Entry portal

150 mm Block Work in CM 1:6


Sl. No. Particulars Unit
Providing and construction Solid Cement Concrete block masonry in specified
cement mortar ratio using factory made, load bearing, approved quality of blocks
not less than 1800 kg/cum. Minimum average compressive strength of 4.0 N/sqmm
5.1 and minimum strength of individual is 3.2 N/sqmm, set to level plumb including
setting in position, providing scaffolding, curing, raking out joints wherever
necessary etc., complete with all leads and all as per specification and direction of
Engineer-in-charge.

UG Sump Wall

150mm thick block masonary long wall sqm


short wall sqm
FIrst floor 150mm block work
Security room sqm
window deduction sqm
Toilet outer wall sqm
partion wall l shape sqm
sqm
Electrical room sqm
sqm
sqm
Sl. No. Particulars Unit

100 mm Block Work in CM 1:4


Providing and construction Solid Cement Concrete block masonry in specified
cement mortar ratio using factory made, load bearing, approved quality of blocks
not less than 1800 kg/cum. Minimum average compressive strength of 4.0 N/sqmm
and minimum strength of individual is 3.2 N/sqmm, set to level plumb including
setting in position, providing scaffolding, curing, raking out joints wherever
necessary etc., complete with all leads and all as per specification and direction of
Engineer-in-charge.
Toilet Room
5.2 Sqm
Sqm
Dedution door Sqm
Total qty
PAINTING WORKS at Entry portal
PAINTING WORKS at Entry portal

6 Providing and applying putty works at Entry portal


Sl. No. Particulars Unit

Providing and applying white cement based wall putty in two coats to a thickness
of 1.5mm (total thickness) over cement plastered wall surface to make it even
and smooth using "JK" wall putty or "Birla" wall care putty or equivalent all
complete. (The rate quoted is inclusive of all operations of removal of dust, dirt
and foreign matter etc., before applying the putty and curing the applied surface
with water for sufficient days after the application of the putty and preparing the
dried putty surface with fine emery paper fit to receive the paint

Providing and applying super acrylic painting at Entry portal


Painting internal plastered surfaces with two or more coats of super acrylic
6.1 emulsion paint of approved brand and colour to give an even shade with required
finish over a coat of water thinnable cement primer including cleaning the
surfaces, filling the crevices with approved filler, scaffolding, etc., complete all as
per specifications.

PLAIN CEMENT CONCRETE at Entry portal


6.2
PLAIN CEMENT CONCRETE at Entry portal

7 Plum Concrete at Entry portal

Providing and laying Plum concrete1: 5: 10. wherever specified using river sand,
40mm and down size metal and boulders of 150mm (proportion 60: 40 for concrete
: boulder ) including sub grade preparation, leveling, all leads and lifts, rough
finishing at the top surface, curing,and shuttering if necessary etc.,
Sl. No. Particulars Unit

PCC M10 at Entry portal

7.1 Providing and laying P.C.C. 1:3:6 (M10) of specified thick wherever specified using
river sand, 20mm and downsize metal including base reperation, Compaction,
levelling, all leads and lifts, curing and shuttering if necessary etc., Complete

Footing

7.2
Cum
Cum
UG Sump Bootam PCC Cum
Total Qty

ROUGH PLASTERING Works at Entry portal


Plastering 12mm thick rough plaster with in CM 1:4 cement mortar (Mix specified is
for cement : coarse sand), finished rough including scaffolding, curing, etc.,
complete for CLADDING SURFACES inclusive of sills, jambs, soffits, ceilings, etc.;
complete. The work shall include cost of materials, labour, loading and unloading,
transportation, scaffolding and all other incidental charges etc., complete and as
directed by Engineer-in-charge.
Sl. No. Particulars Unit
wall plastring
Sqm
8.1
Sqm
Sqm
Sqm
sump tank long wall Sqm
shorter wall Sqm
Sqm
Total Qty

WALL PLASTERING WORKS at Entry portal

Providing and Plastering 15 mm thick in CM 1:5 smooth finished, including


scaffolding, curing, etc.; complete for INTERNAL SURFACES of walls, beam, ribs,
sills, jambs, ceiling, etc., complete all as per specifications at all heights. Mix
specified is for cement : fine sand. Rate shall include curing, proper hacking to
RCC surfaces, fixing of 150mm wide GI plaster mesh (Arpita or equivalent) of
approved make in the junctions of the masonry & R.C.C work wherever applicable
as per manufacturer's specifications, & plastering the mesh in CM 1:2. The work
shall include cost of materials, labour, loading and unloading, transportation,
scaffolding and all other incidental charges etc., complete and as directed by
Engineer-in-charge.

Sump tank
Long wall
8.2
shorter wall Sqm
Sl. No. Particulars Unit
out side wall long wall Sqm
shorter wall
Sqm
Sqm
Total Qty

REINFORCED CEMENT CONCRETE at Entry portal

Providing & laying controlled reinforced cement concrete M25 grades as specified
using 20mm down size aggregates at any depth or heights, Excluding
Reinforcement steel, including scaffolding (single or double), but including
compacting with vibrations, curing and hacking the exposed surfaces etc.,
complete as per specifications and drawings at all levels including all leads and
lifts as per the instructions of Engineer in Charge. The rate shall include for
providing recess in walls or columns, sleeves in slabs, construction joints, sunk
slabs, cantilever slabs, making holes or cutting formwork for taking out Electrical
conduits or dowels for column to Brick work or Block work, to the required shape,
size, slope shown in drawings for the following items of work.

12
Foundation, Rafts and Footings at Entry portal
Foundation, Rafts and Footings
12.1 Footing CUM
Sl. No. Particulars Unit
CUM
sump tank raft CUM
pit wall side CUM
Total Qty

12.2 Plinth Beams at Entry portal


Plinth Beams
12.3 PB5 CUM
PB6 CUM
PB5 CUM
PB7 CUM
PB1 CUM
PB1 CUM
PB3 CUM
PB4 CUM
PB11 CUM
PB8 CUM
PB12 CUM
PB4 CUM
PB12 CUM
CUM
Total Qty CUM
Sl. No. Particulars Unit
Columns/wall at Entry portal
Columns/wall Ground level CUM
12.4
First floor column concrete CUM
coloumn no-1 CUM
coloumn no-2 CUM
coloumn no-3 CUM
coloumn no-4 CUM
coloumn no-5 CUM
coloumn no-6 CUM
coloumn no-7 CUM
coloumn no-8 cum
Total Qty CUM

Grade slab at Entry portal CUM


Grade slab CUM
12.5 step concrete CUM
extra concrete both side CUM
canopy grade slab CUM
Total Qty

Electrical room ventilation lintal at Entry portal


Lintels CUM
Sl. No. Particulars Unit
12.6 Total Qty
First floor Roof Slab at Entry portal
Roof slab cum
cantilever slab cum
toilet Slab cum
12.7 Total Qty CUM

Planter Box Pedesetal at Entry portal


Planter Box Pedesetal
12.8
RC Wall inculding grinding, buffing for smooth and even finish ( SCC) at Entry
portal
First floor 'Roof Beams
12.9 long beam CUM
12.10 short beam CUM
inv short beam CUM
Total Qty

Overall Qty

12.11 Fe 500 Reinf Steel at Entry portal


Sl. No. Particulars Unit
RAB-1
Provision Qty
Total Qty
MESUREMENT SHEET
Nos L B D Qty

1.00 15.70 6.68 0.15 15.73

(5.00) 1.05 0.90 0.15 (0.71)


(9.00) 6.00 0.40 0.15 (3.24)
1.00 14.10 2.15 0.10 3.03
14.81

180.96

356.16

202.77
Nos L B D Qty
14.81

754.70

1.00 15.70 6.68 104.85

1,213.00

2,374.43

1,204.13

104.85

4,896.41
Nos L B D Qty
3.00 58.40 175.20

19.00 13.00 247.00

1.00 15.40 15.40

1.00 12.25 12.25

1.00 6.75 6.75

2.00 9.00 18.00

2.00 6.80 13.60

3.00 90.20 270.60

11.00 8.20 90.20

21.00 6.20 130.20

16.00 6.05 96.80

7.00 8.05 56.35

3.00 82.40 247.20

1.00 9.30 9.30

2.00 7.30 14.60


Nos L B D Qty
2.00 125.30 250.60

28.00 6.05 169.40

13.00 8.05 104.65

2.00 134.50 269.00

28.00 6.05 169.40

10.00 8.05 80.50

1.00 5.85 5.85

1.00 7.70 7.70

1.00 11.20 11.20

1.00 10.15 10.15

1.00 9.50 9.50

1.00 6.80 6.80

1.00 11.50 11.50

1.00 100.00 100.00

2,333.70
Nos L B D Qty

276.00

2,333.70

2,609.70
Nos L B D Qty

1.00 25.00
25
25.00

156.60
Nos L B D Qty
58.20

25.00

239.80

1.00 20.00 20.00

20.00

10.00

177.91

121.20

20.00

329.11
Nos L B D Qty

130.00

130.00
Nos L B D Qty

10.00

10.00

10.00

30.00

26.40 26.40

26.40
Nos L B D Qty

37.00

89.25

26.40

152.65

1.00 5.80 2.30 13.34


Nos L B D Qty
4.00 1.80 0.06 0.43

9.00 0.16 0.27 0.38

14.15

127.58

371.09

649.78

14.15

1,162.60

271.49
181.73
Nos L B D Qty
1.00 1.50 1.10 0.90 1.49
1.00 1.50 1.50 0.60 1.35
1.00 20.40 0.90 0.80 14.69
1.00 140.00 12.00 1.20 2,016.00
1.00 12.00 0.90 0.70 7.56
1.00 5.00 0.70 0.75 2.63
2,496.93
499.39
2996.32
185.24

4,458.50

128.30

2,996.32

7,768.36
Nos L B D Qty

104.85

1,215.00

2,374.43

1,204.13

104.85

4,898.41
Nos L B D Qty
Nos L B D Qty

1.00 3.20 0.60 1.10 2.11


1.00 2.80 0.60 1.10 1.85
1.00 5.00 0.90 1.10 4.95
8.91
1.78

10.69

74.33

4.48

10.69
Nos L B D Qty
89.50

2.00 1.30 0.90 2.34


2.00 0.80 0.90 1.44
2.00 1.20 0.60 1.44
2.00 1.20 0.60 1.44
1.00 12.50 2.00 25.00
1.00 8.00 1.55 12.40
1.00 12.00 1.00 12.00
1.00 2.00 2.00 4.00
1.00 1.00 0.90 0.90
1.00 2.00 1.50 3.00
2.00 1.20 1.00 2.40
Nos L B D Qty
66.36

13.27

79.63

244.06

37.68

79.63

361.37

2.00 1.30 0.90 2.34


2.00 0.80 0.90 1.44
2.00 1.20 0.60 1.44
Nos L B D Qty
2.00 1.20 0.60 1.44
1.00 12.50 2.00 25.00
1.00 12.50 0.20 2.50
2.00 12.00 1.00 24.00
2.00 2.00 2.00 8.00
66.16
16.54
82.70

252.94

52.80

82.70

388.44

1.00 4.00 4.00


Nos L B D Qty
4.00

4.00

4.00
Nos L B D Qty
1.00
4.00

3.00

1.00

8.00

1.00 1.50 1.10 1.65


1.00 1.50 1.50 2.25
1.00 5.80 2.30 13.34
1.00 133.30 0.30 39.99
1.00 30.00 0.10 3.00
1.00 12.00 0.90 10.80
Nos L B D Qty
1.00 7.00 0.60 4.20
50.00
125.23
25.05
150.28

195.07

156.15

375.42

150.28

876.91

1.00 5.80 2.30 0.20 2.67


Nos L B D Qty
1.00 5.80 2.30 0.10 1.33

1.00 8.00 0.20 0.45 0.72

1.00 2.80 1.85 0.15 0.78

5.50

1.92

12.92
23.60

34.89

40.61

12.92

112.03
Nos L B D Qty

150.00

150.00
675.70

150.00
Nos L B D Qty
825.70

7.00 6 42.00
42.00

42.00

42.00
Nos L B D Qty
-

6.14

1.83

7.97

255.53
1.00 5.00 4.00 1.50 30.00
1.00 22.00 15.00 0.25 82.50
Nos L B D Qty
1.00 5.00 0.70 0.75 2.63
1.00 35.00 5.00 1.50 262.50
1.00 10.00 12.00 0.45 54.00
687.16
137.43
- - - - 824.59
52.56

251.57

824.59

1,128.72
Nos L B D Qty
4.00 10.00 1.50 60.00
60.00
9,188.91

1,295.72

60.00

10,544.63
Nos L B D Qty

1.00 16 6.68 104.85


1.00 13 5.98 75.95
Nos L B D Qty
1.00 21 2.00 41.60
222.40
100.08
322.48
3,556.83

2,427.44

322.48

6,306.74
Nos L B D Qty

0.50
0.50

2.99

5.92

6.71

3.65

0.50

19.78
Nos L B D Qty

1 159.90 9.34 1494.08


1,494.08

0.08 1.57
1.00 104.73 0.20
0.08 0.77
17.00 3.00 0.20
0.08 0.46
17.00 1.80 0.20
0.08 3.00
1.00 133.50 0.30
Nos L B D Qty
0.10 1.05
1.00 104.73 0.10
0.10 0.51
17.00 3.00 0.10
0.10 0.31
17.00 1.80 0.10
7.66

1 104.73 104.73
17 3 51
17 1.8 30.6
1 133.5 133.5
319.83
Nos L B D Qty

1 100 3 331.01

1 4.7 2.4 11.28


1 16 2.13 34.13
-17 1.6 1.1 -29.92
346.50
Nos L B D Qty

1.00 18.45 7.15 1.35 178.09


Nos L B D Qty

1.00 8.30 7.15 2.04 121.06

(6.00) 1.30 1.30 0.30 (3.04)

(2.00) 0.95 0.95 0.30 (0.54)


(6.00) 0.35 0.35 1.56 (1.15)
(2.00) 0.20 0.20 1.56 (0.12)

(2.00) 8.30 0.20 0.30 (1.00)

(7.00) 2.15 0.20 0.30 (0.90)


(6.00) 1.30 1.30 0.08 (0.81)
(2.00) 0.95 0.95 0.08 (0.14)
Nos L B D Qty
113.35

1.00 12.15 7.15 1.94 168.53

(4.06)
(8.00) 1.30 1.30 0.30

(8.00) 0.35 0.35 1.56 (1.53)

(13.23)
(1.00) 5.85 1.45 1.56

(1.56)
(1.00) - - 1.76
(1.08)
(8.00) 1.30 1.30 0.08
(5.43)
(8.00) 5.85 1.45 0.08
141.64
255.00
Nos L B D Qty
Nos L B D Qty
Nos L B D Qty

14.00 5.20 0.30 21.84


2.00 3.80 0.30 2.28
24.12
-
Nos L B D Qty
-
-
-
-
1.00 2.50 0.20 0.50
2.00 2.50 0.30 1.50
-
1.00 2.50 0.20 0.50
2.00 2.50 0.30 1.50
-
1.00 2.50 0.20 0.50
2.00 2.50 0.30 1.50
-
2.00 7.90 0.45 7.11
1.00 2.45 0.45 1.10
14.21
14.00 1.40 - 1.56 30.58
2.00 0.80 - 1.56 2.50
2.00 0.45 2.88 2.59
1.00 0.15 2.88 0.43
2.00 0.45 2.88 2.59
1.00 0.15 2.88 0.43
2.00 0.45 2.88 2.59
Nos L B D Qty
2.00 0.45 2.88 2.59
2.00 0.30 2.88 1.73
-
2.00 0.30 2.88 1.73
1.00 0.15 2.88 0.43
2.88 -
2.00 0.45 2.88 2.59
-
2.00 0.45 2.88 2.59
53.34

2.00 1.55 0.15 0.47


4.00 1.35 0.15 0.81
1.00 1.15 5.55 6.38
2.00 0.80 0.80 1.28
2.00 0.80 0.80 1.28
10.22
-
2.00 18.45 0.10 3.69

-
Nos L B D Qty
-
1.00 0.45 0.15 0.07
2.00 0.75 0.15 0.23
0.29
-
-
1.00 7.70 2.15 16.56
1.00 2.15 1.30 2.80
1.00 2.15 1.20 2.58
1.00 2.15 1.10 2.37
24.30
-
-
-
-
-
-
-
-
2.00 6.73 0.30 4.04
2.00 6.28 0.18 2.20
1.00 2.45 0.30 0.74
1.00 2.15 0.18 0.38
Nos L B D Qty
2.00 2.15 - 0.18 0.75
2.00 1.20 0.15 0.36
2.00 1.20 0.13 0.30
1.00 1.20 0.13 0.15
-
-
2.00 1.30 0.30 0.78
2.00 1.30 0.18 0.46
1.00 2.15 0.30 0.65
1.00 2.15 0.18 0.38
11.16

141.33
Nos L B D Qty

2.00 5.85 1.71 20.01


2.00 1.15 1.71 3.93

2.00 2.40 2.88 13.80


(1.00) 0.95 2.05 (1.95)
2.00 1.00 2.88 5.75
1.00 1.00 2.88 2.88
1.00 1.05 2.88 3.02
1.00 1.50 2.88 4.31
1.00 2.45 2.88 7.04
1.00 1.50 2.88 4.31
63.11
Nos L B D Qty

1.00 2.15 2.55 5.48


1.00 2.15 2.73 5.86
(1.00) 2.15 0.80 (1.72)
9.62
Nos L B D Qty
Nos L B D Qty

14.00 1.50 1.50 0.08 2.52


2.00 1.15 1.15 0.08 0.21
1.00 5.85 1.55 0.08 0.73
3.46

-
Nos L B D Qty

1.00 2.55 3.30 8.42


1.00 5.00 3.30 16.50
1.00 2.50 3.30 8.25
1.00 2.55 3.30 8.42
1.00 5.00 3.30 16.50
2.00 5.55 1.71 18.98
2.00 1.15 1.71 3.93
80.99

2.00 5.55 1.71 18.98


Nos L B D Qty
2.00 1.15 1.71 3.93
-
2.00 5.85 1.71 20.01
2.00 1.45 1.71 4.96
47.88

14.00 1.30 1.30 0.30 7.10


Nos L B D Qty
2.00 0.95 0.95 0.30 0.54
1.00 5.85 1.45 0.15 1.27
4.00 0.80 0.10 0.80 0.26
9.17
-
-
-
1.00 2.50 0.20 0.30 0.15
1.00 2.50 0.20 0.30 0.15
1.00 2.50 0.20 0.30 0.15
1.00 2.50 0.20 0.30 0.15
1.00 9.48 0.30 0.30 0.85
1.00 9.48 0.40 0.30 1.14
1.00 2.05 0.40 0.30 0.25
1.00 2.05 0.40 0.30 0.25
1.00 2.05 0.40 0.30 0.25
1.00 2.05 0.40 0.30 0.25
1.00 2.05 0.40 0.30 0.25
1.00 2.05 0.40 0.30 0.25
1.00 2.05 0.40 0.30 0.25
1.00 2.05 0.40 0.30 0.25
4.56
Nos L B D Qty

14.00 0.35 0.35 1.56 2.68


-
1.00 0.45 0.15 2.88 0.19
1.00 0.45 0.15 2.88 0.19
1.00 0.45 0.15 2.88 0.19
1.00 0.45 0.15 2.88 0.19
1.00 0.45 0.15 2.88 0.19
1.00 0.30 0.15 2.88 0.13
1.00 0.30 0.15 2.88 0.13
1.00 0.45 0.15 2.88 0.19
1.00 0.45 0.15 2.88 0.19
4.29

1.00 7.90 2.45 0.15 2.90


1.00 10.30 2.45 0.15 3.79
2.00 18.20 0.33 0.10 1.20
2.00 10.15 0.30 0.20 1.22
1 2.45 1.2 0.15 0.44
9.55

-
1 0.75 0.15 0.15 0.02
Nos L B D Qty
0.02

1.00 7.90 2.45 0.13 2.42


1.00 2.45 1.20 0.13 0.37
1.00 2.15 1.20 0.13 0.32
3.11
)

-
-
-

2.00 6.28 0.15 0.18 0.33


1.00 2.15 0.15 0.18 0.06
1.00 2.15 0.55 0.18 0.21
0.59

31
Nos L B D Qty
1.92
0.2
2.12
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks

JMR
Remarks

JMR
Remarks
Remarks

20% of the Total Qty


Remarks
Remarks
Remarks

20% of the Total Qty


Remarks
Remarks

20% of the Total Qty


Remarks

25% of the Total Qty


Remarks
Remarks
Remarks

20% of the Total Qty


Remarks

35% of the Total Qty


Remarks
Remarks
Remarks
Remarks

20% of the Total Qty


Remarks
Remarks
Remarks

45% of the Total Qty


Remarks
Remarks
Remarks
Remarks
Remarks

1.35
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks

-
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks
Remarks

Anda mungkin juga menyukai