Anda di halaman 1dari 3

CLIENT : CONSULTANT :

P a g e |2

Industrial 4.0 Workshop RA-IIoT-SSB-001 REV.A


QUESTIONER

1. Hows the workshop Result bring benefit to you?

No Description 1 2 3 4 5 6

1 How’s the workshop help you understand the Industrial 4.0 as


overall?

2 How’s the workshop help you understand ISA95 hierarcy

3 How’s the workshop help you understand data connectivity (Lv1/2)

4 How’s the workshop help you understand the connectivity between


IT and OT

5 Are you able identify the pain point?

6 Are you able to define the existing condition and target/goal to


achieve?

7 Are you able to identify the resources (e.g parameter) that is


correlate with the pain point

8 Does the workshop help you understand about analytic?

9 Are you able to identify how to make use of analytic for your use case
e.g improve further on the productivity?

9 Does the workshop help you on building a use case for the
contextualization?

10 How’s the workshop help you on understand about Augmented


Reality?

11
How’s the workshop help you on understand about Virtual Reality?

12 How’s the workshop help you understand the risk of the IoT project
implementation e.g data intermittent/missing data, network analysis.

13 How’s the workshop help you to provide a guidance of alternative


mitigation plan for data intermittent/missing data e.g with adding
mini PC or reduce complexity of the network

14 How’s the workshop help you to understand the function of NAT


(network active translation)?

____________________________________________________________________________________________________________
This document is the property of Rockwell Automation. It must not be stored, reproduced or disclosed to others without written
authorisation from Rockwell Automation
CLIENT : CONSULTANT :

P a g e |3

Industrial 4.0 Workshop RA-IIoT-SSB-001 REV.A


QUESTIONER

No Description 1 2 3 4 5 6

15 How’s your overall knowledge of Industrial 4.0 from 2 days


workshop?

2. Do you have any use case?

( Y / N )

If Yes, How confident are you to breakdown into the following structure
 Problem Statement
 Architecture follows ISA95
 Existing Condition vs Target in Chart format (with measureable improvement e.g in %)
 Hardware and Software Bill of material for Lv 1/2/3/4
 List of parameter / resources
 Dashboard use case

6 is most confident
1 is not confident

1 2 3 4 5 6

3. How’s your overall satisfaction of the workshop?

6 is most confident
1 is not confident

1 2 3 4 5 6

4. What is your expectation of the next step after the workshop?

________________________________________________________________________

_______________________________________________________________________

_______________________________________________________________________

____________________________________________________________________________________________________________
This document is the property of Rockwell Automation. It must not be stored, reproduced or disclosed to others without written
authorisation from Rockwell Automation

Anda mungkin juga menyukai