Anda di halaman 1dari 6

CURRICULUM VITAE

(PARTHA BANERJEE)

1. Proposed “Project Job Title” : “ Lead Engineer - Process”

2. Full Name of Staff Member : Mr. Partha Banerjee

3. Date of Birth : 12-02-1967

4. Nationality : Indian

5. No. of Years of Experience : 21 years

6. Present Employer : IOT Design & Engineering Limited

7. Present Employment Title : Dy. General Manager-Process

8. Email Id : partha.banerjee@iotgroup.in

9. Education :
Sr. Name of Institution / Degree(s) or Diploma (s) obtained & Year of
No. University Specialization obtainment
1 Calcutta University B. Tech.-Chemical (Refinery & 1991
Petrochemical Engineering)
2 Calcutta University B.Sc.(Chemistry Honns) 1988

10. Membership in Professional : Chartered Engineer of Institute of Engineers


Association (India)

Associate Member of IChemE, UK.

11. Other Trainings : Lead auditor Training of Green House Gas


Project from DNV

12. Countries of Work Experience : India ,UK (Project induction for 8 weeks)

13. Employment Record :

From [Year] : 2011 To [Year] : Till Now Total [Years] :1.9


Employer Name
IOT Design & Engineering Limited

Position Held Dy. General Manager-Process

PARTHA BANERJEE Page 1 of 6


From [Year] : 2008 To [Year] : 2010 Total [Years] :2.5
Employer Name Foster Wheeler India (Pvt) Ltd.

Position Held Sr. Principal Engineer-Process, Dy. Chief Engineer-Process

From [Year] : 2006 To [Year] : 2008 Total [Years] :2


Employer Name Essar Engineering Ltd

Position Held Dy. General Manger- Process & Project

From [Year] : 1999 To [Year] : 2006 Total [Years] :6.5


Employer Name Haldia Petrochemicals Limited

Position Held Sr. Engineer, Manager, Sr. Manager-Technical Service

From [Year] : 1996 To [Year] : 1998 Total [Years] :3


Employer Name Gulf Oil India ltd

Position Held Production Executive , Dy. Manager-Production

From [Year] : 1991 To [Year] : 1995 Total [Years] :5


Employer Name Hindustan Lever Ltd

Position Held GET, Officer, Sr. Officer-Manufacturing

14. Key Assignments / Task Data :

Sr. Brief Project Description & Duties / Responsibilities assumed in assignment


No.
1. Name of Assignment or Commissioning of Haldia Petrochemicals Tank farm
Project:
Year 1999-2000
Location Haldia
Client Name Haldia Petrochemicals Limited
Main Project Features Commissioning of Horton sphere
Positions held Sr. Engineer-Commissioning
Activities Performed 1. Pre-commissioning activities of LPG, Butene-1 & Propylene
spheres and connected lines .
2. Inertisation of the spheres and connected lines.
3. Hydrocarbon charging with all safety measures.

2. Name of Assignment or Mist cooling System


Project:
Year 2003-04

PARTHA BANERJEE Page 2 of 6


Location Haldia
Client Name Haldia Petrochemicals Limited
Main Project Features Designing of a cooling system which produce a (-) ve approach i.e.
cooling water supply temperature is less than WBT.
Positions held Process coordinator
Activities Performed 1. Conceptualisation.
2. Site visit of performing unit.
3. Process design & BEP preparation which includes line hydraulics,
Design Basis , PFD, P&ID, Equipment list and Data sheet, Instrument
list and data sheet , C&E matrix , utility summary preparation
4. Detail engineering & Commissioning

3 Name of Assignment or Motor Spirit blending (online)


Project:
Year 2004-05
Location Haldia
Client Name Haldia Petrochemicals Limited
Main Project Features Online automatic blending to produce MS
Positions held Process coordinator
Activities Performed 1. Conceptualisation and formulation preparation to produce MS.
2. Process design & BEP preparation which includes line hydraulics,
Design Basis , PFD, P&ID, Equipment list and Data sheet, Instrument
list and data sheet , C&E matrix , utility summary preparation, PSV
sizing, etc.
3. Detail engineering & Commissioning.
4.HAZOP study.

4 Name of Assignment or Revamp of refinery and new Petrochemical for Vadinar Refinery
Project:
Year 2006-08
Location Mumbai & Vadinar
Client Name Essar Oil Ltd
Main Project Features Feasibility study for offsite storage , Utility and refinery units
Positions held Process Manager
Activities Performed 1. Conceptualisation and feasibility study for refinery Tank farm
augmentation to accommodate higher amount and new products.
2. Conceptualisation and feasibility study for refinery Utility units
such as Desalination unit, Condensate recovery unit, DM plant and
cooling tower.
3. Leading a team of Engineers for the Process engineering for the
refinery existing units such as DCU & Petrochemical units such as
PGHU & BDEU which includes line hydraulics, Design Basis, PFD,
P&ID, Equipment list and Data sheet, Instrument list and data sheet,
C&E matrix, utility summary preparation.

5 Name of Assignment or Paradip Refinery Project


Project
Year 2008-10
Location Paradip
Client Name IOCL
Main Project Features Offsite & Utilities
Positions held Process Lead

PARTHA BANERJEE Page 3 of 6


Activities Performed 1. Leading a team of Process Engineers for the Process engineering
for the above which includes line hydraulics, Design Basis, PFD,
P&ID, Equipment list and Data sheet, Instrument list and data sheet,
C&E matrix, utility summary preparation, flare load summary
preparation during FEED & EPC phases.
2. Participated in HAZOP & HAZID study during detail engineering.
3. Participated in the 3D model review.

6 Name of Assignment or CDU Preflash vessel installation to increase the CDU capacity
Project
Year 2011
Location Digboi Refinery
Client Name IOCL
Main Project Features Vessel design, Heat exchanger design, Crude pump design and crude
line hydraulics.
Positions held Process Manager
Activities Performed 1. Overall responsible for the Process design in the Project.
2. Leading a team of Engineers for the Process engineering for the
above which includes line hydraulics, P&ID, Equipment list and
data sheet, Instrument list and data sheet, C&E matrix, and
3. Act as HAZOP chairman during HAZOP study.
4. Process design of Pre-Flash vessel (two phase separator), S&T heat
exchanger, and Crude charge pump.

7 Name of Assignment or DCU columns installation


Project
Year 2011
Location Guwahati Refinery
Client Name IOCL
Main Project Features Column line hydraulics
Positions held Process Manager
Activities Performed 1. Overall responsible for the Process design in the Project.
2. Leading a team of Engineers for the Process engineering for the
above which includes line hydraulics, P&ID, Equipment list and data
sheet, Instrument list and data sheet, C&E matrix, and
3. Vendor data incorporation.

8 Name of Assignment or Routing of Hydrogen rich off gas for Hydrogen recovery in HGU
Project
Year 2011-12
Location Digboi Refinery
Client Name IOCL
Main Project Features KOD, Absorption column, Chloride guard reactor & Amine pump
design and vapour / amine line hydraulics.
Positions held Process Manager
Activities Performed 1. Overall responsible for the Process design in the Project.
2. Leading a team of Engineers for the Process engineering for the
above which includes line hydraulics (vapour & liquid lines), column
hydraulics P&ID, Equipment list and data sheet, Instrument list and
data sheet, C&E matrix, and
3. Vendor data incorporation.
4. Act as HAZOP chairman during HAZOP study.

PARTHA BANERJEE Page 4 of 6


5. Process design of KOD, Absorption column, Chlorine guard
reactor & Amine pump.
6. Process study for adequacy checking of existing equipment and,
existing safety system.
9 Name of Assignment or POL depot for HSD/MS/SKO
Project
Year 2011-12
Location Imphal
Client Name IOCL
Main Project Features Conceptualisation and Designing of tank farm and supporting utility
for storing of fuel oils.
Positions held Process Manager
Activities Performed 1. Overall responsible for the Process design in the Project.
2. Leading a team of Engineers for the Process engineering for the
above which includes line hydraulics, P&ID, Equipment list and data
sheet, Instrument list and data sheet, C&E matrix, and
3.Firewater system design
4. Vendor data incorporation.
5. HAZOP chairman during HAZOP study.
6. Process design of EFRT & Cone roof tank for storing fuel grade
oils.

10 Name of Assignment or LPG terminal & Bottling plant at Tanzania


Project
Year 2011-12
Location Tanzania
Client Name Maestro Oil & Gas company limited
Main Project Features Conceptualisation and Designing of LPG unloading from ship,
storage in sphere, loading to road tankers and bottling plant.
Positions held Process Manager
Activities Performed 1. Overall responsible for the Process design in the Project.
2. Leading a team of Engineers for the Process engineering for the
above which includes line hydraulics, P&ID, Equipment list and data
sheet, Instrument list and data sheet, C&E matrix, and
3. Process design of LPG storage sphere / bullet, unloading
compressor, ship & road tanker loading pumps , and compressed air
system design.
4. Sphere security system and balance of the plant firewater network
design.
5. HAZOP chairman during HAZOP study.
11 Name of Assignment or Study of Fire Water Network for Tank Farm area and LDU in Digboi
Project Refinery
Year 2012
Location Digboi Refinery
Client Name IOCL
Main Project Features Fire Water Network analysis
Positions held Process Manager

12 Name of Assignment or Feasibility Study for Implementing MB Lal Committee


Project Recommendations in Various Tank Farms of Digboi Refinery
Year 2012
Location Digboi Refinery

PARTHA BANERJEE Page 5 of 6


Client Name IOCL
Main Project Features Feasibility Study for Tank Farm Management System
Positions held Project Manager
Activities Performed 1.Overall responsible for the Project which includes
Preparation of Feasibility Study Report.
Preparation of TFMS scheme drawing, P&ID. BOQ for piping
instrumentation & Electrical items.

13 Name of Assignment or Design Engineering of modernisation of Lube Blending Plant of


Project IOCL, Kolkata
Year 2013
Location Kolkata LOBP
Client Name IOCL
Main Project Features Design Engineering of modernisation of LOBP
Positions held Engineering Manager
Activities Performed Overall engineering responsible of the Project
14 Name of Assignment or FEED design of LNG Terminal at Indonesia
Project
Year 2013
Location Bali & Makassar , Indonesia
Client Name WIKA
Main Project Features Feed Design
Positions held Project Lead & Process Lead
Activities Performed Overall responsibility the Project

15. Languages :
Speak Read Write
English Good Good Good
Hindi Good Good Fair
Bengali Good Good Good

PARTHA BANERJEE Page 6 of 6

Anda mungkin juga menyukai