1. SPECIFICATIONS
1.1. ALL WORKS SHALL COMPLY WITH THE MINISTERIO DAS OBRAS PUBLICAS
(PREVIOUSLY MTCPW) STANDARD SPECIFICATIONS FOR ROADS, BRIDGES AND
AIRPORTS 2005, AND WITH THE SPECIAL PROVISIONS & SUPPLEMENTAL
SPECIFICATIONS PERTAINING TO THIS PROJECT.
2. DIMENSIONS
2.1. DISTANCES AND ELEVATIONS SHOWN ON THE PLANS ARE IN METERS (m) UNLESS
OTHERWISE SPECIFIED.
2.2. DIMENSIONS OF CULVERTS, BRIDGES AND OTHER STRUCTURES ARE MEASURED
AND EXPRESSED IN MILIMETERS UNLESS OTHERWISE SPECIFIED.
3. STATIONING
3.1. STATIONING OF ROAD, BRIDGE, ELEMENTS OF CURVE FOR BOTH HORIZONTAL
AND VERTICAL ALIGNMENTS ARE RECKONED FROM THE ROAD CENTERLINE.
3.2. STATION TICK MARKS ARE SHOWN AT 20m AND STATION LABELS AT 100m
INTERVAL STATIONS ARE SHOWN ALSO AT THE LOCATIONS OF CULVETRS,
BRIDGES AND AT EVERY IMPORTANT POINTS OF HORIZONTAL AND VERTICAL
GEOMETRY.
JS Costa Page 2
[ROAD NETWORKING UPGRADING PROJECT SECTION 2: TASI-TOLU-TIBAR
FINAL INTERNSHIP REPORT] August 1, 2019
8. DRAINAGE STRUCTURES
8.1. EXACT LOCATIONS, SLOPES, OUTFALLS, AND INVERT ELEVATIONS OF DRAINAGE
STRUCTURE SHALL BE CHECKED IN THE FIELD BY THE CONTRACTOR BEFORE
JS Costa Page 3
[ROAD NETWORKING UPGRADING PROJECT SECTION 2: TASI-TOLU-TIBAR
FINAL INTERNSHIP REPORT] August 1, 2019
JS Costa Page 4
[ROAD NETWORKING UPGRADING PROJECT SECTION 2: TASI-TOLU-TIBAR
FINAL INTERNSHIP REPORT] August 1, 2019
12. OTHERS
12.1.1. ALL SCHEDULES/LISTING FOR GUARDRAILS, SLOPE PROTECTION
STRUCTURES, PAVEMENT MARKINGS, ROAD SIGNS, AND OTHER RELATED
SCHEDULES/LISTINGS SHOWN ON THE PLANS ARE SUBJECTED TO
ADJUSTMENT/MODIFICATION TO SUIT ACTUAL FIELD CONDITION.THE
ENGINEER MAY ISSUE WRITING ORDER FOR THE INSTALLATION OF NEW
STRUCTURES/ OR MISCELLANEOUS ITEMS IF IN HIS OPINION IS DEEMED
NECESSARY IN ADDITION TO THE APPROVED SCHEDULES AND LISTINGS.
12.1.2. ADEQUATE ROAD SIGNAGE AND SAFETY PRECAUTION SHALL BE
PROVIDED TO INFORM. WARM AND ALERT MOTORISTS DURING
CONSTRUCTION.
A. DESIGN CRITERIA
1. DESIGN SPECIFICATIONS
A. THE AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASTHO) LFRD BRIDGE DESIGN SPECIFICATIONS, SI UNITS 6 TH EDITION 2012.
B. JAPAN ROAD ASSOCIATION SPECIFICATION FOR HIGHWAY BRIDGES.
2. DESIGN METHODOLOGY
LOAD AND RESISTANCE FACTOR DESIGN (LRFD)
JS Costa Page 5
[ROAD NETWORKING UPGRADING PROJECT SECTION 2: TASI-TOLU-TIBAR
FINAL INTERNSHIP REPORT] August 1, 2019
3. LOADING
3.1.DEAD LOADS
WEIGHT
A. CONCRETE 24.00 KN/M3
B. STEEL 77 KN/M3
C. EARTH 19 KN/M3
D. WEARING SURFACE (50mm THK.) 1.1 KN/M3
3.2. LIVE LOADS
A. AASTHO MS18 (HS20-44), TRUCK LOAD 1.
D. LANE LOADING
JS Costa Page 6
[ROAD NETWORKING UPGRADING PROJECT SECTION 2: TASI-TOLU-TIBAR
FINAL INTERNSHIP REPORT] August 1, 2019
E. PEDESTRIAN LOADS
W: SIDEWALK WIDTH
a. W>600mm ; 3.6Kpa
b. BRIDGE FOR PEDESTRIAN/ BYCICLE ; 4.1Kpa
3.3.DYNAMIC LOAD ALLOWANCE, IM
IN ACCORDANCE WITH LRFD 2007 BRIDGE DESIGN SPECIFICATION (LRFD…..3.6.2)
3.4. SEISMIC LOAD
IN ACCORDANCE WITH LRFD 2012 6TH EDITION STANDARD SPECIFICATIONS FOR
HIGWAY BRIDGES USING ACCELERATION COEFFICIENT OF 0.5g.
3.5. HYDRAULIC DATA
SEE GENERAL PLAN OF BRIDGES FOR HYDRAULIC DESIGN DATA.
3.6.TEMPERATURE RANGE
ASSUMED BASE TEMPERATURE: +28C0
MINIMUN AMBIENT AIR TEMPERATURE: +18C0
MAXIMUN AMBIENT AIR TEMPERATURE: +38 C0
TEMPERATURE DIFFERENCE BETWEEN TOP OF SLAB AND OTHER PARTS OF STRUCTURE:
+10C0
3.7.CONSTRUCTION LOADS
CONSTUCTION LOADS SHALL BE AS STIPULATED IN THE AASTHO GUIDE
SPECIFICATIONS THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT THESE
LOADS ARE NOT EXCEEDED AND THAT THE MEMBER STRESSES ARE WITH WUTHUN
ALLOWABLE DURING CONSTRUCTION.
3.8.OTHER LOADS
IN ACCORDANCE WITH AASTHO STANDARD SPECIFICATIONS, 2002.
3.9.LOAD COMBINATION (LOAD AND RESISTANCE FACTOR DESIGN)
γ
A. STRENGTH 1= p[ DC+ DD + DW + EH + EV + ES + EL ] +1.75 [ LL + IM + CE + BR + PL +
LS ] + 1.0 WA + 1.00 FR + γtg TG + γse SE
B. STRENGHT 4 = γp [ DC+ DD + DW + EH + EV + ES + EL ] +1.75 [ LL + IM + CE + BR + PL
+ LS ] + 1.0 WA + 1.00 FR
C. EXTREME EVENT 1= p[ DC+ DD q DW + EH + EV + ES + EL ] + γeq [ LL + IM + CE + BR
+ PL + LS ] + 1.0 WA + 1.00 FR + 1.00 EQ.
JS Costa Page 7
[ROAD NETWORKING UPGRADING PROJECT SECTION 2: TASI-TOLU-TIBAR
FINAL INTERNSHIP REPORT] August 1, 2019
MATERIALS
1. CONCRETE
UNLESS INDICATED OTHERWISE ON PLANS, THE CONCRETE CLASS AND STRENGH
SHOULD BE AS FOLLOWS:
*NOTE :
2. REINFORCING STEEL
a. REINFORCING STEEL SHALL CONFORM TO AASTHO M31 (ASTM A615), GRADES 40 &
60 DEFORMED WITH MINIMUN YIELD STRENGTH AS DECRIBED BELOW.
YIELD STRENGTH
REBAR GRADE STRUCTURAL MEMBER
fy (Mpa)
ALL MEMBERS FOR SUPERSTRUCTURE
60 414
APPROACH SLABS, EXCEPT OTHERWISE SPECIFIED
OTHERWISE SPECIFIED:
CONSTRUCTION
THESE NOTES ARE PROVIDED FOR QUICK REFERENCE ONLY AND SHALL BE READ IN
CONJUNCTION WITH THE TECHNICAL SPECIFICATIONS FOR THE PROJECT.
1. DIMENSIONS
JS Costa Page 8
[ROAD NETWORKING UPGRADING PROJECT SECTION 2: TASI-TOLU-TIBAR
FINAL INTERNSHIP REPORT] August 1, 2019
2. SETTING OUT.
THE SETTING OUT AND THE ELEVATIONS OF THE DIFFERENT COMPONENT OF THE
STUCTURE SHALL BE APPROVED BY THE ENGINEER PRIOR TO THE START OF ANY
CONSTRUCTION WORK..
3. REINFORCED CONCRETE.
3.1. CAST IN PLACE SHALL BE CLASS “A” UNLESS OTHERWISE NOTED ON THE PLANS,
ALL EXPOSED EDGES SHALL BE CHAMFERED 20 mm EXCEPT RAILINGS AND RE-
ENTRANT ANGLES WHICH SHALL BE CHAMFERED AND FILLETED 13mm
RESPECTIVELY.
3.2. CONCRETE MIX AND PLACING
JS Costa Page 9
[ROAD NETWORKING UPGRADING PROJECT SECTION 2: TASI-TOLU-TIBAR
FINAL INTERNSHIP REPORT] August 1, 2019
7. CRACK SPLICES.
JS Costa Page 10
[ROAD NETWORKING UPGRADING PROJECT SECTION 2: TASI-TOLU-TIBAR
FINAL INTERNSHIP REPORT] August 1, 2019
3.6. FALSEWORK
ALL FALSEWORK SHALL BE DESIGNED BY THE CONTRACTOR SUBJECTED TO THE
APPROVAL OF THE ENGINEEER.
3.7. FORMWORK
FORMWORK SHALL BE CONSTRUCTED SUCH THAT IT WILL NOT YIELD UNDER THE
LOAD AND SHALL BE SUCH AS TO AVOID THE FORMATION OF FINS AT
INTERSECTION OF SURFACES.ALL CORNERS OF CONCRETE MEMBERS SHALL
CHAMFERED TO 25 mm UNLESS NOTED OTHERWISE ON DRAWINGS,STRIPPING OF
FORMS AND SHORES SHALL BE AS DESIGNATED BY THE ENGINEER.THE
FOLLOWING MAY BE USED AS A GUIDE.
MIN.TIME
SHORING UNDER GIRDERS,BEAMS & FRAME ---------------------- 14 DAYS
DECK SLABS ------------------------------------------------------------------- 14 DAYS
WALLS --------------------------------------------------------------------------- 7 DAYS
COLUMS ------------------------------------------------------------------------- 7 DAYS
SIDES OF BEAMS AND ALL VERTICAL SURFACES ---------------- 2 DAYS
JS Costa Page 11
[ROAD NETWORKING UPGRADING PROJECT SECTION 2: TASI-TOLU-TIBAR
FINAL INTERNSHIP REPORT] August 1, 2019
6. CAMBER
7. ESCAVATION
ESCAVATION FOR STRUCTURE SHALL BE TO THE NEAT LINES OF FOOTING OR AS
SPECIFIED IN THE STANDARD SPECIFICATIONS.
8. WATER ELEVATION
WATER ELEVATION SHOWN ON PLANS ARE APPROXIMATE ONLY ANY VARIATION
FOUND DURING CONSTRUCTION SHALL NOT BE CONSIDERED AS BASIS FOR EXTRA
COMPENSATION.
JS Costa Page 12
[ROAD NETWORKING UPGRADING PROJECT SECTION 2: TASI-TOLU-TIBAR
FINAL INTERNSHIP REPORT] August 1, 2019
JS Costa Page 13