Anda di halaman 1dari 12

REPORT 1:

FORMWORK
OF FOOTING
Prepared By: Devarsh Shah(UG180151)
Guided By: Prof. Reshma Shah Atharva Dave(UG180091)

MONSOON SEMISTER 2019 CONSTRUCTION TECHNOLOGY-II


FACULTY OF TECHNOLOGY
TABLE OF CONTENTS

Contents
Activity Introduction _____________________________________________________________ 1
Checklist & Prerequisite 2
Procedure & Labour Productivity _______________________________________________ 3
Time Cycle Analysis_______________________________________________________________ 4

MONSOON SEMISTER 2019 CONSTRUCTION TECHNOLOGY-II


FACULTY OF TECHNOLOGY
ACTIVITY INTRODUCTION

1. Activity: Formwork
2. Element: Footing
3. Activity Observed At: H Block
4. Level: +450 mm from Excavation Level/-10110 mm from Ground Level
5. No of Labours:
Skilled 2
Unskilled 4
6. List Of Drawings Referred: Centre Line Plan
Foundation Drawings
7. Quantity Executed:
8. Footing Observed: FP1, FP3
9. Reference IS Codes: IS4687
IS456(For Deshuttering Time)
10.Tools Used: Hammer
Measure Tape
11.Materials Used: Shutter Plates (0.3*0.9M)
(0.45*0.9M)
(0.6*0.9M)
Wall Plates
Binding Wire (18 Guage)
Nails
Releasing Agent

MONSOON SEMISTER 2019 CONSTRUCTION TECHNOLOGY-II


FACULTY OF TECHNOLOGY
CHECKLIST & PRE-REQUISITE

Sr Particulars Checks
No.
1 Reinforcement should be according to structural drawing Yes

2 Covers should be provided as required distance Yes

3 Column reinforcement should be properly connected with the Yes


footing reinforcement (so that there is no dislocation of
reinforcement because of concreting thrust)
4 Releasing agent should be applied properly Yes
5 Shutter plates should be properly checked Yes
6 Enough no. of labours must be available at site Yes
7 Line, Level and plumb to be maintained Yes
8 For stepped footing the second layer formwork should be laid Yes
once the first layer of concrete is set.

Pre Requisite:
 Excavation is carried out upto (-10560mm from G.L)
 100 mm layer of PCC (1:4:8) is laid after excavation (-10460mm from G.L)
 Geo Textile & HDP sheet is laid on the PCC.
 Another layer of PCC (1:4:8)is laid on the HDP sheet.(-10360mm from G.L)
 Reinforcement cage of raft footing is laid on the PCC layer Thickness of
raft is 250 mm. (-10110mm from G.L)

MONSOON SEMISTER 2019 CONSTRUCTION TECHNOLOGY-II


FACULTY OF TECHNOLOGY
PROCEDURE & LABOUR PRODUCTIVITY

Reinforcement cage of raft footing is laid on the PCC layer.


1. Reinforcement cage for stepped footing & column is laid on the raft in
such a way that they all are connected with each other.
2. Formwork of first step of footing is assembled and joint.
 Fermas are assembled in 2 individual L-sections and are joint with the help of
nails and G.I.wires.
 Wall plates are aligned on the edges of fermas.
 Column reinforcements are provided with supports made up of G.I wire which
are directly connected to the wall plates.
3. Concreting of first step is done and after waiting for a day the formwork
of second step is assembled.
4. Concreting of second step is done.

Total Quantity Executed=22.55 Sq Meter

Productivity= Work done/No. of labours*Time consumed

Skilled labour =22.55/2*4

=2.81 Sq M/Labour hour

Unskilled Labour=22.55/4*4

= 1.4 Sq M/Labour hour

MONSOON SEMISTER 2019 CONSTRUCTION TECHNOLOGY-II


FACULTY OF TECHNOLOGY
TIME CYCLE ANALYSIS

Time(mins.)

Level Checking

Erection

Transportation

Cutting

0 20 40 60 80 100 120 140

Time(mins.)

MONSOON SEMISTER 2019 CONSTRUCTION TECHNOLOGY-II


FACULTY OF TECHNOLOGY
TIME CYCLE ANALYSIS

MONSOON SEMISTER 2019 CONSTRUCTION TECHNOLOGY-II


FACULTY OF TECHNOLOGY
TIME CYCLE ANALYSIS

MONSOON SEMISTER 2019 CONSTRUCTION TECHNOLOGY-II


FACULTY OF TECHNOLOGY
TIME CYCLE ANALYSIS

Financial Statements
STATEMENT OF FINANCIAL POSITION
• Liabilities
• Statement of Financial Position
• Ownership Equity

STATEMENT OF COMPREHENSIVE INCOME (PROFITS AND LOSSES)


• Income
• Expenses
• Profits

STATEMENT OF CHANGES IN EQUITY


Well, it wouldn’t be an annual report without a lot of numbers, right? This section is the place for all those
financial tables.

To get started with a table that looks just like the sample here, on the Insert tab, click Tables, then choose
Quick Tables.

TABLE HEADING

DESCRIPTION REVENUE EXPENSES EARNINGS

STATEMENT OF CASH FLOWS


• Operating
• Investing
• Financing

MONSOON SEMISTER 2019 CONSTRUCTION TECHNOLOGY-II


FACULTY OF TECHNOLOGY
TIME CYCLE ANALYSIS

Notes to Financial Statements


ACCOUNTS
When you have a document that shows a lot of numbers, it’s a good idea to have a little text that explains
the numbers. You can do that here.

DEBT
Of course, we would all prefer to just have profits. But if you’ve got any debt, this is the place to make notes
about it.

GOING CONCERN
Okay, you get the idea. If you’ve got notes to add about your financials, add them here.

CONTINGENT LIABILITIES
Keep in mind that some of these headings might not apply to your business (and you might have others to
add). This one, for example, is about potential liabilities that could arise if something happens in the future,
such as a pending legal decision.

TAKEAWAYS
What would you like your readers to understand? Add notes on key takeaways here.

MONSOON SEMISTER 2019 CONSTRUCTION TECHNOLOGY-II


FACULTY OF TECHNOLOGY
TIME CYCLE ANALYSIS

Independent Auditor’s Report


1.1 Unqualified Opinion
1.2 Qualified Opinion Report
1.3 Adverse Opinion Report
1.4 Disclaimer of Opinion Report
1.5 Auditor’s Report on Internal Controls of Public Companies
1.6 Going Concern

MONSOON SEMISTER 2019 CONSTRUCTION TECHNOLOGY-II


FACULTY OF TECHNOLOGY
TIME CYCLE ANALYSIS

Contact Information
To replace a photo with your own, right-click it and then choose Change Picture.

NAME NAME NAME


TITLE TITLE TITLE

Tel [Telephone] Tel [Telephone] Tel [Telephone]


Fax [Fax] Fax [Fax] Fax [Fax]
[Email Address] [Email Address] [Email Address]

Company Information
[Company]
[Street Address, City, ST ZIP Code]
Tel [Telephone]
Fax [Fax][Website]

MONSOON SEMISTER 2019 CONSTRUCTION TECHNOLOGY-II


FACULTY OF TECHNOLOGY

Anda mungkin juga menyukai