132/11 kV GARD

Subcontractor/
Sl.No Item Manufacturer/Fabricator Vendor Status

1 Details of Basement Access CAT Ladder . Standard Fabrication Approved

3 Basement Grating Trench Standard Fabrication Approved

Basement Steps - Handrail (Basement Switchgear-1 &


4 Standard Fabrication Approved
2 and 132kV Cable Basement-1 & 2)

7 Details of ladder & crane Maintenance Access platform Standard Fabrication Approved

Cable riser-1 platform details @ First floor & ground


10 Standard Fabrication Approved
floor

Offloading Platform Handrail Ground Floor (in-front of


11 Standard Fabrication Approved
GIS and Capacitor Room)

12 Offloading Platform Handrail- First Floor Standard Fabrication Approved


Subcontractor/
Sl.No Item Manufacturer/Fabricator Vendor Status

13 Staircase Handrail-1, 2, 3 & 4 Standard Fabrication Approved

14 Cage Ladders Standard Fabrication Approved

15 IDT Roof Truss Standard Fabrication Approved

16 Shunt Reactor Roof Truss Standard Fabrication Approved

17 ET Roof Truss Standard Fabrication Approved

18 IDT 1 , 2 & 3, Reactor front enclosure mesh Standard Fabrication Approved

19 ET 1,2 & 3 front enclosure mesh Standard Fabrication Approved

20 ET Trench Grating and support Standard Fabrication Approved


Subcontractor/
Sl.No Item Manufacturer/Fabricator Vendor Status

21 IDT Trench Grating and support Standard Fabrication Approved

22 GRP Access Ladder IDT 1, 2 & 3 Essac Fibre Approved

23 Main gate Standard Fabrication Approved

24 Sliding Gate Standard Fabrication Approved

25 Wicket Gate Standard Fabrication Approved

26 Boundary wall Spikes Standard Fabrication Approved

27 Precast cover farmes Standard Fabrication Approved

28 GRC Elements Extra co Approved

29 Floor hatch door Extra co Approved


Subcontractor/
Sl.No Item Manufacturer/Fabricator Vendor Status

30 Over Head Door- GIS Room Middle east insulation Approved

31 Steel doors Al Khaeez Approved

32 Aluminum Doors & Window Lootah Alluminium Approved

33 Raised Floor System Top Floor Approved

34 Gypsum Bulk Head Details Intex International Approved

35 False ceiling Intex International Approved

36 Capacitor bank Chain link fence Hi Tech Approved


Subcontractor/
Sl.No Item Manufacturer/Fabricator Vendor Status

Water tank shelter details- Security Room & Main


37 Lootah Alluminium Approved
Building Roof

38 Stainless Steel Ladder Specialised Metal Design Approved

39 GRP /GRE lining Essac Fibre Approved


132/11 kV GARDEN CITY SUBSTATION STRUTURAL STEEL SCHEDULE AS OF 12-03-2019

Status of Shop
Engineer drawing Status P.O. Contact Details
Drawing

Approved IAS/GNCTY/CONT/06/2018 Received Umesh- 0557565493


'umesh@stanfab.com'

Drawing sent for Umesh- 0557565493


Approved IAS/GNCTY/CONT/06/2018 Prepration 28-11-2018 'umesh@stanfab.com'

Drawing sent for Umesh- 0557565493


Approved IAS/GNCTY/CONT/06/2018 prepration 'umesh@stanfab.com'

Umesh- 0557565493
Approved IAS/GNCTY/CONT/06/2018 Received 'umesh@stanfab.com'

Submitted for Umesh- 0557565493


Approved IAS/GNCTY/CONT/06/2018 preperation 'umesh@stanfab.com'

Submitted for Umesh- 0557565493


Approved IAS/GNCTY/CONT/06/2018 preperation 'umesh@stanfab.com'

Submitted for Umesh- 0557565493


Approved IAS/GNCTY/CONT/06/2018 preperation 'umesh@stanfab.com'
Status of Shop
Engineer drawing Status P.O. Contact Details
Drawing

Umesh- 0557565493
Approved IAS/GNCTY/CONT/06/2018 Submitted for approval 'umesh@stanfab.com'

Umesh- 0557565493
Approved IAS/GNCTY/CONT/06/2018 Drawing Received 'umesh@stanfab.com'

Umesh- 0557565493
Approved IAS/GNCTY/CONT/06/2018 Drawing Received 'umesh@stanfab.com'

Approved IAS/GNCTY/CONT/06/2018 Drawing Received Umesh- 0557565493


'umesh@stanfab.com'

Umesh- 0557565493
Approved IAS/GNCTY/CONT/06/2018 Drawing Received 'umesh@stanfab.com'

Umesh- 0557565493
Drawing not Received IAS/GNCTY/CONT/06/2018 'umesh@stanfab.com'

Drawing sent for Umesh- 0557565493


Approved IAS/GNCTY/CONT/06/2018 Prepration 15-12-2018- 'umesh@stanfab.com'
11-2018

Drawing Sent for Umesh- 0557565493


Approved IAS/GNCTY/CONT/06/2018 Preperation 'umesh@stanfab.com'
28/11/2018
Status of Shop
Engineer drawing Status P.O. Contact Details
Drawing

Drawing Sent for Umesh- 0557565493


Approved IAS/GNCTY/CONT/06/2018 Preperation 'umesh@stanfab.com'
28/11/2018

Umesh- 0557565493
Approved Issued 'umesh@stanfab.com'

Umesh- 0557565493
Approved IAS/GNCTY/CONT/06/2018 'umesh@stanfab.com'

Umesh- 0557565493
Approved IAS/GNCTY/CONT/06/2018 'umesh@stanfab.com'

Umesh- 0557565493
Approved IAS/GNCTY/CONT/06/2018 'umesh@stanfab.com'

Umesh- 0557565493
Approved IAS/GNCTY/CONT/06/2018 'umesh@stanfab.com'

Umesh- 0557565493
Approved IAS/GNCTY/CONT/06/2018 'umesh@stanfab.com'

Approved Issued Drawing Received Mr Vinu- 0502601076

Approved C8523 Drawing Received Finny James- 502602075


Status of Shop
Engineer drawing Status P.O. Contact Details
Drawing

Drawing Sent for


Approved To be issued Mr Zaheer- 05551232983
prepration

Mr Patson- 0504588232
Approved Issued Drawing Received frsd@coatingb.ae

Approved Issued Drawing Received Mr Wasim- 0524242166

Mr Gafoor- 0506679894
Approved Issued Drawing Received gafooraloor@gmail.com

Drawing sent for Mr Narendra- 0506260094


Approved Issued Prepration 28-11-2018 iul@emirates.net.ae

Drawing sent for Mr Narendra- 0506260094


Approved Issued Prepration 28-11-2018 iul@emirates.net.ae

Drawing Sent for Mr Tanveer- 0506506418


Approved Issued prepration on 4-04- amfence1@hitechgroupuae.c
2019 om
Status of Shop
Engineer drawing Status P.O. Contact Details
Drawing

Mr Wasim- 0524242166
Approved Issued alum.project@lootahgroup.c
om

Nadin- 0507054787/ Kaisar-


Approved Issued 043386036
smdesign@eim.ae

Rijo 0557096416
Approved Issued rijo@eissafiber.com
9

Fabrication Galvnizing &


Shop Drawing Shop drawing Raw Material Ready for
completion prior Painting
Submission Approval status Inspection delivery to site
to galvanizing (duration)

12/5/2018 Approved

2/10/2019 Approved

4/30/2019

Submitted on 26/11/2018 Approved Done on 08-04-2019 4/25/2019

4/27/2019
Fabrication Galvnizing &
Shop Drawing Shop drawing Raw Material Ready for
completion prior Painting
Submission Approval status Inspection delivery to site
to galvanizing (duration)

Submitted for 04-04-2019

Submitted on 26/11/2018 Approved

Submitted on 26/11/2018 Approved

Submitted on 26/11/2018 Approved

Submitted on 26/11/2018 Approved

Submitted on 05/02/2019 Approved


Fabrication Galvnizing &
Shop Drawing Shop drawing Raw Material Ready for
completion prior Painting
Submission Approval status Inspection delivery to site
to galvanizing (duration)

Inspection done on Inspection done


Submitted on 05/02/2019 Approved 25-03-2019 on 9-04-2019

Submitted on 20/02/2019 Approved

Submitted on 24/10/2018 Approved Materail Delivered


Fabrication Galvnizing &
Shop Drawing Shop drawing Raw Material Ready for
completion prior Painting
Submission Approval status Inspection delivery to site
to galvanizing (duration)

3/15/2019

Drawing Submitted on Drawing Approved


26/11/2018

Drawing submittted Approved

Drawing Submitted on 21-


04-2019

Drawing Submitted Approved

Drawing Submitted Approved

4/25/2019
Fabrication Galvnizing &
Shop Drawing Shop drawing Raw Material Ready for
completion prior Painting
Submission Approval status Inspection delivery to site
to galvanizing (duration)
IAS LOOTAH CONTRACTING
PROJECT: 132/11kV GARDEN CITY S/S

STUCTURAL STEEL WORKS INSTALLATION- TENTATIVE COMPLETION DATES

Sl.No Items delivery Installation start Installation Finish Remarks


Fabrication

1 IDT Roof Truss Completed 7/1/2019 8/15/2019


6/30/2019

2 Basement Grating Trench 6/30/2019 7/10/2019 7/11/2019 7/14/2019

3 Staircase Handrail- 1 7/10/2019 7/21/2019 7/26/2019


7/20/2019

4 Staircase Handrail- 2 7/15/2019 7/26/2019 7/31/2019


7/25/2019

Basement Steps - Handrail (Basement Switchgear-1


5 7/15/2019 7/29/2019 8/3/2019
& 2 and 132kV Cable Basement-1 & 2)
7/28/2019

6 Staircase Handrail- 4 7/15/2019 7/29/2019 8/1/2019


7/28/2019

7 Staircase Handrail- 3 7/15/2019 8/2/2019 8/5/2019


7/28/2019

8 Cage Ladders- Mainbuilding 7/20/2019 8/10/2019 8/11/2019


7/30/2019

9 ET Trench Grating and support 7/20/2019 7/31/2019 8/8/2019


7/30/2019

10 ET Roof Truss 7/20/2019 8/1/2019 8/22/2019


7/31/2019
Offloading Platform Handrail Ground Floor (in-front of
11 7/18/2019 8/4/2019 8/14/2019
GIS and Capacitor Room) 8/3/2019

12 Offloading Platform Handrail- First Floor 8/1/2019 8/8/2019 8/10/2019


8/7/2019
IAS LOOTAH CONTRACTING
PROJECT: 132/11kV GARDEN CITY S/S

STUCTURAL STEEL WORKS INSTALLATION- TENTATIVE COMPLETION DATES

Sl.No Items delivery Installation start Installation Finish Remarks


Fabrication
Cable riser-1 platform details @ First floor & ground
13 7/25/2019 8/11/2019 8/14/2019
floor 8/10/2019

14 Shunt Reactor Roof Truss 7/30/2019 8/11/2019 8/26/2019


8/10/2019

15 Cage Ladders- Auxilary Buildings 7/30/2019 8/11/2019 8/20/2019


8/10/2019

16 ET 1,2 & 3 front enclosure mesh 7/25/2019 8/11/2019 8/20/2019


8/10/2019

17 Boundary wall Spikes 8/1/2019 8/13/2019 8/19/2019


8/12/2019

18 IDT 1 , 2 & 3, Reactor front enclosure mesh 8/1/2019 8/16/2019 8/30/2019


8/15/2019

19 Main gate 8/1/2019 9/11/2019 9/14/2019


9/10/2019

20 Sliding Gate 8/3/2019 9/13/2019 9/17/2019


9/12/2019

21 Wicket Gate 8/1/2019 9/15/2019 9/16/2019


9/14/2019

22 Precast cover farmes 8/15/2019 Partial will be


9/15/2019 delivered before

23 Details of Basement Access CAT Ladder . Installed

Details of ladder & crane Maintenance Access


24 Installed
platform
IAS LOOTAH CONTRACTING
PROJECT: 132/11kV GARDEN CITY S/S

STUCTURAL STEEL WORKS INSTALLATION- TENTATIVE COMPLETION DATES

Sl.No Items delivery Installation start Installation Finish Remarks


Fabrication

25 IDT Trench Grating and support Delivered 6/16/2019 6/30/2019