Anda di halaman 1dari 18

PAKET - PAKET MYC

DIREKTORAT JENDERAL BINA MARGA


BALAI BESAR PELAKSANAAN JALAN NASIONAL WILAYAH ACEH
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH ACEH

NILAI DIPA
NO NAMA PAKET (RP) DESEMBER SISA
Rp % Rp %
Satker Pelaksanaan Jalan Nasional Wilayah Aceh ###
PRESERVASI REKONSTRUKSI JALAN BTS. KOTA
1 BANDA ACEH - BTS. ACEH JAYA 50,400,000,000.00 Err:509 Err:509 Err:509 Err:509
PRESV.9.01 - 2018

2 Rekonstruksi Jalan Err:509 Err:509 Err:509 Err:509 Err:509


3 Pemeliharaan Rutin Jalan 1,288,440,800.00 224,933,700.00 17.46 1,063,507,100.00 82.54
4 Pemeliharaan Rutin Kondisi 589,357,000.00 10,550,000.00 1.79 578,807,000.00 98.21
5 Pemeliharaan Rutin Jembatan 468,750,000.00 294,923,000.00 62.92 173,827,000.00 37.08
PRESERVASI REKONSTRUKSI JALAN BTS. ACEH
6 BESAR - CALANG (MYC) 57,600,000,000.00 15,524,836,521.00 26.95 42,075,163,479.00 73.05
PRESV.9.02 - 2018

7 Rekonstruksi Jalan 53,294,930,000.00 14,756,502,169.00 27.69 38,538,427,831.00 72.31


8 Pemeliharaan Rutin Jalan 3,626,220,000.00 695,086,573.00 19.17 2,931,133,427.00 80.83
9 Pemeliharaan Rutin Jembatan 678,850,000.00 73,247,779.00 10.79 605,602,221.00 89.21

PENGADAAN PERANGKAT PENGOLAH DATA DAN


KOMUNIKASI 19,000,000.00 - - 19,000,000.00 100.00
PENGADAAN PERALATAN DAN FASILITAS
PELAYANAN PERKANTORAN 22,625,000.00 Err:509 Err:509 Err:509 Err:509

Konsumsi Bahan Makanan 6,000,000.00 2,618,500.00 43.64 3,381,500.00 56.36

ATK/Bahan Cetakan 30,000,000.00 9,747,200.00 32.49 20,252,800.00 67.51

Sewa Kantor 36,000,000.00 36,000,000.00 100.00 - -


Sewa Kendaraan Roda 4/Minibus Operasional
Kantor da Lapangan 32,650,000.00 45,710,000.00 140.00 (13,060,000.00) (40.00)

Belanja Perjalanan Biasa 92,648,000.00 8,171,300.00 8.82 84,476,700.00 91.18

Belanja Peralatan Mesin 10,000,000.00 3,090,000.00 30.90 6,910,000.00 69.10

B elanja Lembur 43,632,000.00 - - 43,632,000.00 100.00

Honor Operasional Satuan Kerja 93,480,000.00 6,790,000.00 7.26 86,690,000.00 92.74

Biaya Cetak, Foto Copy Eksploitasi Operasional,


Pengadaan dan Pelaporan dan Internet 54,000,000.00 9,506,500.00 17.60 44,493,500.00 82.40

Pengiriman Surat Dinas 1,200,000.00 - - 1,200,000.00 100.00

Listrik 24,000,000.00 4,518,000.00 18.83 19,482,000.00 81.18

Telepon/Fax 1,200,000.00 263,759.00 21.98 936,241.00 78.02

Langganan Air 2,400,000.00 630,090.00 26.25 1,769,910.00 73.75

Belanja Biaya Peralatan Mesin 4,060,000.00 - - 4,060,000.00 100.00

TOTAL 108,472,895,000 Err:509 Err:509 Err:509 Err:509


RE
Satuan Kerja Pel

PPK : PPK 2.3 PROVINSI ACEH


Nama PPK : HARDIVA LISMARYANDI, ST., MT
Alamat PPK: JLN. BAHAGIA NO. 12 LAMLAGANG, BANDA ACEH

Target
No. Ruas Nama Pejabat Pembuat Komitmen Sumber Penanganan
No/Nama Paket/No. Ruas Dana Awal
Efektif Fungsi
1 2 3 4 5
PPK 09 (BTS. KOTA BANDA ACEH - APBN MURNI
17.05 KM 132.05 KM
CALANG) DAN APBN
SBSN Realisasi Thdp Total Pagu TA. 2019
Pemeliharaan Rutin Jalan Ruas Bts.
1 - 32.10 KM
Kota Banda Aceh - Bts. Aceh Jaya

Pemeliharaan Rutin Kondisi Jalan Ruas


2 - 21.80 KM
Bts. Kota Banda Aceh - Bts. Aceh Jaya

Pemeliharaan Rutin Kondisi Jalan


Target
No. Ruas Nama Pejabat Pembuat Komitmen Sumber Penanganan
No/Nama Paket/No. Ruas Dana Awal
Efektif Fungsi
1 Pemeliharaan Rutin2 Kondisi Jalan 3 4 5
3 (Holding) Ruas Bts. Kota Banda Aceh - - 3.9 KM
Bts. Aceh Jaya

Pemeliharaan Rutin Jembatan Ruas Bts.


4 - 938.1 M
Kota Banda Aceh - Bts. Aceh Jaya
027 PRESERVASI REKONSTRUKSI JALAN
12.85 KM 78,45 KM
BTS. ACEH BESAR - CALANG (MYC)
SBSN
PRESV.9.02 - 2018 Realisasi Thdp Pagu Tahun 2019
Realisasi Thdp Kontrak
114,785,861,000.000

Rekonstruksi Jalan 12.85 KM -

Pemeliharaan Rutin Jalan - 78.45 KM

Pemeliharaan Rutin Jembatan - 1,357.7 M

Layanan Dukungan Administrasi PPK 09


APBN
Target
No. Ruas Nama Pejabat Pembuat Komitmen Sumber Penanganan
No/Nama Paket/No. Ruas Dana Awal
Efektif Fungsi
1 2 3 4 5
Administrasi Kegiatan PPK 09A

Konsumsi Bahan Makanan

ATK/Bahan Cetakan

Sewa Kantor

Sewa Kendaraan Roda 4

Belanja Perjalanan Biasa

Belanja Peralatan Mesin


Target
No. Ruas Nama Pejabat Pembuat Komitmen Sumber Penanganan
No/Nama Paket/No. Ruas Dana Awal
Efektif Fungsi
1 2 3 4 5

Layanan Sarana dan Prasarana Internal

Pengadaan Peralataan Pengolah Data PPK


09

LAYANAN PERKANTORAN
APBN

Pembayaran Gaji dan Tunjangan PPK 09

Belanja Lembur
Penyelenggaraan Operasional dan
Operasional dan Pemeliharaan
Perkantoran PPK 09P
Honor Operasional Satuan Kerja

Biaya Cetak, Foto Copy Eksploitasi


Operasional,
Target
No. Ruas Nama Pejabat Pembuat Komitmen Sumber Penanganan
No/Nama Paket/No. Ruas Dana Awal
Efektif Fungsi
1 2 3 4 5
Internet

Pengiriman Surat Dinas

Listrik

Telepon/Fax

Langganan Air

Belanja Biaya Peralatan Mesin

JUMLAH TOTAL
REALISASI FISIK DAN KEUANGAN
n Kerja Pelaksanaan Jalan Nasional Wilayah II Provinsi Aceh
PPK 2.3 PROVINSI ACEH
STATUS 15 APRIL 2019

Terhadap Terhadap Realisasi SPM Realisasi SPM Realisasi SPM


Dana Revisi DIPA Kontrak Awal GOL / PLN GOL / PLN GOL / PLN
2019 2019 s.d Yang Lalu Saat Ini s.d Saat Ini thd Pagu
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
8 9 11 12 13 = (11 + 12)
81,564,524,000.00 62,100,385,000.00 10,099,130,713.00 6,085,721,351.00 16,184,852,064.00
2019 19.84
#REF! 2,391,741,500.00 #REF!
1,038,998,000.00 1,038,998,000.00 198,683,700.00 26,250,000.00 224,933,700.00
19.12 2.53 21.65
68,993,030.00 #REF!
2,276,865,000.00 2,276,865,000.00 10,550,000.00 - 10,550,000.00
0.46 - 0.46
Terhadap Terhadap Realisasi SPM Realisasi SPM Realisasi SPM
Dana Revisi DIPA Kontrak Awal GOL / PLN GOL / PLN GOL / PLN
2019 2019 s.d Yang Lalu Saat Ini s.d Saat Ini thd Pagu
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
8 9 11 12 13 = (11 + 12)
699,120,000.00 699,120,000.00 294,923,000.00 - 294,923,000.00
42.18 - 42.18

515,955,000.00 515,955,000.00 - - -
- - -
76,650,000,000.00 57,185,861,000.00 9,475,651,670.00 6,049,184,851.00 15,524,836,521.00
019 20.25
73,124,836,521.00
63.71

72,592,101,000.00 53,834,101,000.00 8,920,361,844.00 5,836,140,325.00 14,756,502,169.00


16.57 10.84 27.41

3,379,049,000.00 2,965,392,600.00 491,268,380.00 203,818,193.00 695,086,573.00


16.57 6.87 23.44

678,850,000.00 386,367,400.00 64,021,446.00 9,226,333.00 73,247,779.00


16.57 2.39 18.96
173,358,000.00 173,358,000.00 98,874,500.00 6,462,500.00 105,337,000.00
Terhadap Terhadap Realisasi SPM Realisasi SPM Realisasi SPM
Dana Revisi DIPA Kontrak Awal GOL / PLN GOL / PLN GOL / PLN
2019 2019 s.d Yang Lalu Saat Ini s.d Saat Ini thd Pagu
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
8 9 11 12 13 = (11 + 12)
173,358,000.00 98,874,500.00 6,462,500.00 105,337,000.00
57.03 3.73 60.76
8,280,000.00 1,703,000.00 915,500.00 2,618,500.00
24,000,000.00 5,745,200.00 4,002,000.00 9,747,200.00
36,000,000.00 36,000,000.00 - 36,000,000.00
45,710,000.00 45,710,000.00 - 45,710,000.00
49,812,000.00 8,171,300.00 - 8,171,300.00
9,556,000.00 1,545,000.00 1,545,000.00 3,090,000.00
Terhadap Terhadap Realisasi SPM Realisasi SPM Realisasi SPM
Dana Revisi DIPA Kontrak Awal GOL / PLN GOL / PLN GOL / PLN
2019 2019 s.d Yang Lalu Saat Ini s.d Saat Ini thd Pagu
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
8 9 11 12 13 = (11 + 12)

12,000,000.00 12,000,000.00 - -
- - -
12,000,000.00

198,228,000.00 198,228,000.00 20,447,843.00 3,824,000.00 24,271,843.00

43,283,000.00 - - -
- - -
43,283,000.00 - - -

154,945,000.00 20,447,843.00 3,824,000.00 24,271,843.00


13.20 2.47 15.66
81,480,000.00 6,790,000.00 - 6,790,000.00

28,605,000.00 5,682,500.00 3,824,000.00 9,506,500.00


Terhadap Terhadap Realisasi SPM Realisasi SPM Realisasi SPM
Dana Revisi DIPA Kontrak Awal GOL / PLN GOL / PLN GOL / PLN
2019 2019 s.d Yang Lalu Saat Ini s.d Saat Ini thd Pagu
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
8 9 11 12 13 = (11 + 12)
12,000,000.00 2,563,494.00 - 2,563,494.00
1,200,000.00 - - -
24,000,000.00 4,518,000.00 - 4,518,000.00
1,200,000.00 263,759.00 - 263,759.00
2,400,000.00 630,090.00 - 630,090.00
4,060,000.00 - - -

10,099,130,713.00 6,085,721,351.00 16,184,852,064.00


81,564,524,000.00
12.38 7.46 19.84

SATUAN KE
Terhadap Terhadap Realisasi SPM Realisasi SPM Realisasi SPM
Dana Revisi DIPA Kontrak Awal GOL / PLN GOL / PLN GOL / PLN
2019 2019 s.d Yang Lalu Saat Ini s.d Saat Ini thd Pagu
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
8 9 11 12 13 = (11 + 12)

HAR
Progres Fisik Terhadap Rencana
Ket.
Terhadap TA 2019 Terhadap TA 2018/2019
Renc. Real. Dev. Renc. Real. Dev.
14 15 16 17 18 19 20

16.72 21.65 4.93

16.20 18.43 2.23


Progres Fisik Terhadap Rencana
Ket.
Terhadap TA 2019 Terhadap TA 2018/2019
Renc. Real. Dev. Renc. Real. Dev.
14 15 16 17 18 19 20
42.00 42.18 0.18

14.92 16.80 1.88

35.99 49.79 13.80 65.23 68.22 2.99

33.70 50.50 16.80 66.00 68.19 2.19

19.13 38.98 19.85 58.21 68.40 10.19

10.00 33.20 23.20 31.19 70.51 39.32


. .
Progres Fisik Terhadap Rencana
Ket.
Terhadap TA 2019 Terhadap TA 2018/2019
Renc. Real. Dev. Renc. Real. Dev.
14 15 16 17 18 19 20
Progres Fisik Terhadap Rencana
Ket.
Terhadap TA 2019 Terhadap TA 2018/2019
Renc. Real. Dev. Renc. Real. Dev.
14 15 16 17 18 19 20
Progres Fisik Terhadap Rencana
Ket.
Terhadap TA 2019 Terhadap TA 2018/2019
Renc. Real. Dev. Renc. Real. Dev.
14 15 16 17 18 19 20

UAN KERJA PELAKSANAAN JALAN NASIONAL


WILAYAH II PROVINSI ACEH
PPK 2.3 PROVINSI ACEH
Progres Fisik Terhadap Rencana
Ket.
Terhadap TA 2019 Terhadap TA 2018/2019
Renc. Real. Dev. Renc. Real. Dev.
14 15 16 17 18 19 20

HARDIVA LISMARYANDI, ST., MT


NIP. 19750321 200312 1 003

Anda mungkin juga menyukai