Anda di halaman 1dari 2

GOVERNMENT OF ANDHRA PRADESH

ABSTRACT

R&B Dept- Chittoor District – Kuppam Constituency – 1) Improvements to Inner


Ring Road (Arm - II) to Kuppam town from Km 2/4 to 4/8 in Chittoor district 2)
Improvements to Inner Ring Road (Arm - III) to Kuppam town from Km 4/8 to 7/4
in Chittoor district–Administrative Sanction under PLAN MDR - Accorded - Orders -
Issued.
---------------------------------------------------------------------------------------------
TRANSPORT, ROADS & BUILDINGS (R.III) DEPARTMENT

G.O.RT.No. 271 Dated: 13-06-2018


Read:

From the C.E(R&B) MDR, SH & MD, APRDC, AP, Lr.No.6171/PLAN/


CE(MDR)/EE (TEC)/ DEE 7/ AEE 2/ 2018, dt.5.2.2018

ORDER:

The Chief Engineer (R&B) MDR in his letter read above, has stated that
proposed Inner Ring Road to Kuppam town is 10.45 kms length, which comprise 4
Arms. The Arm-I (North side) for a length of 2.40 Km is named as Linked road, for
which Land acquisition process is completed and the construction work is in
progress. The Arm – IV (East side) length of 3.05 Km is a part of the existing NH-
219 and no development is required. For the balance two arms – Arm – II (West
side - 2.40 Km) & Arm –III (South side -2.60 Km) the Stage-I activities i.e., Land
Acquisition & shifting of utilities for both the Arms are in brisk progress. Hence the
Chief Engineer (R&B) MDR has requested to accord Administrative sanction for the
two said two arms i.e., Arm-II and Arm-III under PLAN MDR.

2) In the circumstances stated by the Chief Engineer (R&B) MDR, AP in his


letter read above and after careful examination of the matter Government hereby
accord administrative sanction for the two following works for an amount of
Rs.3890.00 Lakhs (Rupees Three Thousand Eight Hundred Ninty Lakh only) under
PLAN MDR scheme for formation of Inner Ring Road to Kuppam town in Chittor
district:
S.No Name of the work Length Estimate
amount
Kms (Rs.in
Lakhs)
1. Improvements to Inner Ring Road ( Arm II ) to 2.40
Kuppam town from Km 2/4 to 4/8 in Chittoor 2300.00
district
2. Improvements to Inner Ring Road ( Arm III ) to 2.60
Kuppam town from Km 4/8 to 7/4 in Chittoor 1590.00
district
Total 3890.00

3) The outcome of the above works is as below.

Sl. Name of the road Road Outcome


NO. Number Item Length / Nos
1 Inner Ring Road New road Formation BT road 1.800 km
(Arm II) to Kuppam to be with 2L+Paved
town formed shoulders ( Km 2/4 to
3/300, 3/600 to
3/900 and km
4/200 to 4/800)
Formation of CC road 0.300 km
with 2L + Paved
shoulders ( From
km 3/900 to 4/000
and 4/000 to 4/200 )
Construction of Box 4 nos
culverts
Construction of Pipe 10 nos
culverts
CC drains in village 600m
limits
Construction of 105m
Retaining wall
2 Inner Ring Road New road Formation BT road 2.180 km
(Arm III) to to be with 2L+Paved
Kuppam town formed shoulders ( Km 4/8 to
6/980)
Strengthening 0.420 km
existing 4 lane
Industrial estate road
( km 6/980 to 7/4)
Construction of pipe 13 nos
culverts
Construction of Box 4 nos
Culverts

4) The amount sanctioned in para (2) above, shall be met from the Head of
Account “ 5054 Capital outlay on Roads and Bridges - 04 District and Other Roads –
MH.337 Road Works–GH.11 State Development Schemes – SH (09) Major District
Roads –530 Major Works - 531 Other Expenditure”.

5) The Chief Engineer (R&B) MDR, AP shall take further necessary action
accordingly.

6) This order issues with the concurrence of Finance Dept vide their
U.O.No.17023/76/FMU-TR&B/2018, dt.25.05.2018
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)

NEERABH KUMAR PRASAD


SPECIAL CHIEF SECRETARY TO GOVERNMENT

To
The Chief Engineer (R&B), MDR, A.P., Vijayawada.
Copy to:
The Director of Treasuries Accounts, A.P., Vijayawada.
The Pay and Accounts Office, AP., Chittoor District.
The Director of Works and Accounts, AP, Vijayawada.
The Finance (FMU.TR&B) Dept.
The P.S. to Hon’ble M (R&B)
The P.S. to Spl.Chief Secretary, TR&B Dept.
Sf/Sc

// FORWARDED :: BY ORDER //

SECTION OFFICER