Anda di halaman 1dari 1

IDENTIFIKASI BAHAYA PADA COAL HANDLING SYSTEM MENGGUNAKAN

INTEGRASI METODE BARRIER ANALYSIS (BA), FTA DAN ETA DI PT.PJB UBJ
O&M PLTU PAITON 9
HAZARD IDENTIFICATION IN COAL HANDLING SYSTEM USING INTEGRATION OF
BARRIER ANALYSIS (BA), FTA AND ETA METHODS IN PT. PJB UBJ O & M PAITON 9
PLTU
Artanto, Dwi Arum Styaning (2016)
Original Paraphrase
PT. PJB UBJ O&M Paiton 9 is one of the PT. PJB UBJ O&M Paiton 9 is one of the power
companies engaged in power generation. generation companies.
PT. PJB UBJ O&M Paiton 9 is divided into three There are three main cycles of PT. PJB UBJ
main cycles, namely the fuel cycle, cycles of O&M Paiton 9 that are fuel cycle, combustion air
combustion air, water and steam cycle. cycles, water and steam cycle.
In providing fuel cycle there is a process of There is a process of distributing coal for supply
transporting coal, known as Coal Handling the fuel cycle, known as the Coal Handling
System. System.
The process of Coal Handling System is a system The Coal Handling System process is a system
to handle coal from dismantling of ships / barges for handling coal from ship/barge demolishing
(Jetty Area) up to an area of accumulation / (Jetty Area) to an area of accumulation / storage
storage in the stockpile or directly charging into in stockpile or direct charging into bunkers
bunkers (silos). (silos).
Based HIRARC by the company, Coal Handling
System has a high level of risk caused by coal.
The Coal Handling System has a high level of
Then do further research on the hazards
risk caused by coal due to the company's
identification of coal in the coal handling
HIRARC, so further research on hazard
process.
identification is held out using the integration of
Hazard identification is done by using integration
Barrier Analysis (BA), FTA and ETA methods.
methods of Barrier Analysis (BA), FTA and
ETA.
BA is an analytical technique to identify hazards
BA is a technical analysis to identify hazards
specifically associated with energy sources or
specifically related to energy sources or
hazardous materials.
hazardous materials while FTA and ETA are
FTA and ETA methods used in the form of
used as quantitative methods to determine the
quantitative methods to determine the value of
initial probability value before and after barriers
the probability of failure before and after the
have been added.
addition of barriers.
This value is then taken as the likelihood for This value is then taken as the probability for the
Initial Mishap Risk Index (IMRI) and Final Index of Initial Mishap Risk (IMRI) and the
Mishap Risk Index (FMRI). Index of Final Mishap Risk (FMRI).
From the results of hazard identification and the
The IMRI Value for Fires in Area Crusher house
additions of barriers, FMRI value is less than the
0.52 and 0.14 for FMRI, and for air pollution due
value of IMRI.
to coal dust obtained IMRI values of 0.54 and
The score of Fire in Crusher House are 0,52 for
0.22 for FMRI from the results of hazard
IMRI and 0,14 for FMRI. The score of pollution
identification and addition of barriers performed.
of coal ash are 0,54 for IMRI and 0,22 for FMRI.
This result shows that the addition of barriers are
This result shows that attaching barriers is
effective and can reduce the value of risk that
effective and can reduce potential risk value.
may occur.

Anda mungkin juga menyukai