Anda di halaman 1dari 8

6200005692 / 17.08.

2018

SERVICE ORDER Format No.: PUR/02/F,JSLO/F/MM/06


Jindal Stainless Limited :AMD Nov/15
Unit: Steel Melting Shop

Postal Address/Reply us at: Corporate Office :


Kalinga Nagar Industrial Complex Jajpur - 755026, Odisha Jindal Centre, 12, Bhikaji Cama Place,New Delhi-110066
Phone:+91-6726-266031 Phone :(011)26188345-360 Fax: 26161271, 41659169
Fax: 6726-266030 CIN:L26922HR1980PLC010901

Vendor / Service Provider: P.O. No. : 6200005692 Jindal Stainless Limited


2005457 P.O. Date : 17.08.2018
S. R. ENTERPRISES Central Excise :
Contact Person: Sailesh K Mohanty Range-STATE GST AND SALES TAX
HOUSE NO 103 Contact No: 9777451037 JAJPUR RANGE, JAJPUR-755019(ODISHA)
JAJPUR - 755020 Odisha Email: Division-STATE GST AND SALES TAX,
India sailesh.mohanty@jindalstainless.com JAJPUR-755019(ODISHA)
GSTIN: 21ANLPN7044D1Z8 Commissionerate-OLD CIRCUIT HOUSE
Vendor: COMPOUND,BUXI
BAZAR,CUTTACK,PIN-753001
Ref/Qtn No: Offer PAN No: AABCJ1969M
Tel No:04298223161 Contact Person: Mr. KGR Nair GSTIN: 21AABCJ1969M1ZF
Mob No:08658962003 Contact No: 8658962003
Email:mssrenterprises2011@rediffmai

Jindal Stainless Limited is pleased to release this purchase order subjected to following term and conditions in
addition to those mentioned in enclosed #Annexure A#:

Definitions:

OWNER : Jindal Stainless Limited, O.P. Jindal Marg. The terms purchaser includes its successors by amalgamation or otherwise and assigns of JSL.
CONTRACTOR:The persons, firm or corporation to whom this service/work order is addressed & the term Supplier/Contractor includes its successors and permitted assigns.
SERVICES:All the work, specified in scope of work (SOW), including design, delivery, installation, inspection, testing and commissioning, specified to complete this work
order.
WORK ORDER: The order placed by Purchaser for the supply of the goods/services.

TERMS & CONDITIONS:


Terms of Payment Key: 100% WITHIN 15 DAYS FROM THE DATE OF INVOICE
Amendment-1
Delivery date is extended up to 28.02.2020 without imposition of LD.
--------------------------------------------------------------------------------
MODIFICATION OF 12189 CRANE CT MECHANISM.

Contract Owner: Mr. R S Vaidya / 9938250017


Mr. K K Gurbaxanu / 9938250210
EIC of contract: Mr. D Ghose / 9938250381

SCOPE OF WORK FOR CT MODIFICATION OF 60/20t INDUCTION CRANE:

1. Dismantling of existing CT from existing crane height to zero level.


2. All existing components i:e Motors, gearboxes, brakes ,etc dismantling.
3. Modify the CT structural part as per requirement.
4. Additional support beam, foundations and necessary modifications in CT for rotating 90 deg.to both hoist mechanism with reference
to existing position.
5. All necessary foundations alignment shall be proper as per requirement.
6. All modifications in existing system if require to be done by contractor.
7. Rerouting of existing cables if require.
8. Prefixing of all mechanical and electrical components with proper alignment.
9. While dismantling crane CT if any part is in damage/ non usable condition then contractor has repair/replace it.
10. Any other work which is not necessary but essential for the successful working of the whole system is in the scope of contractor.
11. Most of the work may be carried out on running plant; therefore, contractor has take all safety precautions while carrying out in
the job.
12. All the tools, tackles, welding machine & consumable and other materials required for the execution of the job shall be arranged
by the contractor at his own cost.
Page 1 of 8
6200005692 / 17.08.2018

13. .The scrap material generated shall be returned to the specified area as per instruction of Site In charge.
14. Any Mobile crane for dismantling of trolley and again re positioning at crane shall be provided by JSL.
15. Working 24 Hrs on need basis to finish work on scheduled time.
16. The supplier will be responsible for the safety of his men and machinery .Supplier are required to provide all safety equipment to
his workers.
17. Safety appliances require to carry out the job at height shall be provided by the contractor to his workers and supervisors.

Supplier Scope:-
1. All tools and tackles (chain block, wire rope sling,D-shackles,spanners etc),consumables shall be of contractor's scope.
2. Contractor has to mobilise required manpower before schedule shutdown period.
3. Contractor will arrange medical fitness certificate and height of work permits for concerned workmen prior to job starting.
4. Job to be continued round o'clock. Accordingly sufficient manpower shall be available to complete the job within specific time.
5. Contractor shall not leave the job in between. Penalty will be imposed as deemed fit for non-completion of jobs.
6. Penalty will be calculated for any delay occurred in completion period due to reason attributable to contractor.
7. Contractor has to depute skilled supervisor throughout the job execution time.

Taxes & Duties: GST is extra & TDS shall be deducted on actual basis.

Payment terms:
100% payment within 15 days after completion & submission of certified bills.

Contract Period: Validity up to 10.09.2018

Sr. Item No. Cur Rate Quantity Unit/ Delivery Date


No. Service Code/ Price
SAC Code
Detailed Description or Scope of Work
1 MODIFICATION OF 12189 CRANE CT INR 1.000 AU 28.02.2020
MECHANISM

Gross Price 360000 360,000.00


Total 360,000.00 360,000.00
The item covers the following services:

10 3091019 360,000.00 1.000 AU


MODIFICATION OF 12189 CRANE CT
MECHANISM

Scheduled Quantity 1.000 AU 28.02.2020

Delivery address for Item no.- 1 Unit: Steel Melting Shop


Kalinga Nagar Industrial Compl
Jajpur 755026 (Odisha)

Total PO Value INR 360,000.00


Total value FOR JSL SITE INR 360000.00 ( Rupees Three Lakh Sixty Thousand Only )

*************************This is a system generated order and does not need any signature**************************

Page 2 of 8
6200005692 / 17.08.2018

IMPORTANT :
1) Kindly send your order acceptance within 7 days after receipt; no communication shall be construed as acceptance.
2) Invoice must be submitted in triplicate along with supplies.
3) Please mention Jindal Stainless Limited in all your documents.
4) Please mention our Purchase Order No., Supplier Code and description in your Invoice to expedite payments.
5) GST Invoice must have pre-printed No.
6) In case where the freight is in JSL account, only JSL nominated transporter shall be deputed. Noncompliance shall lead for the deduction of freight amount
from the pending payments of the vendor.
Green Statement: JSL strongly believes incorporate social responsibility and is committed to help protect the environment. JSL has set an environmental goal
to reduce harmful environmental effects by restricting the use of lead, mercury and certain other hazardous substances and encourage suppliers for usage of
recyclable, reusable packaging of products. Your support in this endeavour will be most appreciated.

Page 3 of 8
6200005692 / 17.08.2018
Annexure-A

GENERAL CONDITIONS OF THE CONTRACT :

This PO for the works (the Agreement ) is entered approaches to the Owner-Provided Work Areas and it (a) provide any cost or schedule relief for Contractor and/or guarantees of the contractor under this contract.
into at Jajpur, Odisha as per the Date mentioned is fully acquainted with all environmental, surface or entitle Contractor to a Change under Change
herein, BY AND BETWEEN, Jindal Stainless and subsurface conditions existing within or near the Order/Amendment nor (b) relieve Contractor of its LABOR LAWS
Limited Owner-Provided Work Areas. Contractor has obligations under this Contract.
(hereinafter referred as JSL or Owner or Us or examined the Owner-Provided Work Areas and all of In dealing with labor and employees, the Contractor and
Our ), a Company incorporated and registered in India their surroundings, has compared its findings with the CONSTRUCTION WATER QUALITY the Subcontractors shall comply with all Applicable
under the provisions of the Companies Act, 1956 Owner-Provided Information and has familiarized Laws as may be applicable for the employment of
having its office at Kalinga Nagar Industrial itself and satisfied itself that the nature of the Contractor expressly assumes all risk of any personnel/workmen. The Contractor shall be responsible
Complex, PO. Danagadi, Jajpur Rd., Jajpur, Odisha accommodations available, materials and equipment, conditions of quality of water for and accountable for any non-compliance with the
and Regd. Office at O.P. Jindal Marg, Hisar all means of communication, entry to and departure execution/construction of the works, whether or not Applicable Laws relating to labor employment, either by
(Haryana), which also includes its successors by from the Owner-Provided Work Areas and all other described in the Owner-Provided Information. itself or by any Subcontractor and shall pay all claims,
amalgamation of and registration otherwise and matters necessary for execution and maintaining the damages and/or penalties as may be payable in respect of
assigns of JSL. Work are sufficient for performance of Contractor#s HAZARDOUS SUBSTANCES such non-compliance(s) to the relevant statutory
obligations under this Contract and has taken them authorities forthwith on demand. The Contractor shall
AND into account prior to bidding/quoting, executing this (A) Discovery of Hazardous Substances: If, during indemnify and keep the Owner indemnified against all
Contract and undertaking the Work. Contractor has the course of performing the Work, Contractor losses, claims, expenses, liabilities, damages suffered by
TheContractor/Proprietor/Firm/a Company made local and other independent inquiries as to the becomes aware of any Hazardous Substance on or the Owner and reimburse all Owner's Costs incurred by
(incorporated and registered in India under the availability and supply, for the entire period for under any Owner-Provided Work Area, whether or the Owner on account of violation of any Applicable
provisions of the Companies Act, 2013 ) mentioned performance of the Work, of materials, services, labor not created, released or brought on any Laws as may be applicable for employment of labor by
herein under this PO, ( hereinafter referred as and other items necessary for the execution of the Owner-Provided Work Area by Contractor, the Contractor. The owner shall be entitled to
Service Provider or Contractor or You which Work, and has satisfied itself that the nature, quality, Contractor shall contain such Hazardous Substance, retain/recover from the dues of the contractor towards all
expression shall unless repugnant to the subject or extent and practicability of each is sufficient for make all reports to any and all Concerned Authorities liabilities of the contractor under applicable law in
context be deemed to include its successor and performance of Contractor#s obligations under this or other Persons as required by any Applicable Law connection with this contract, in the event it comes to the
permitted assigns). Contract. The failure of Contractor to fully and report such condition to Owner in writing knowledge of the owner that the contractor has failed to
familiarize itself with the foregoing conditions or any immediately and before disturbing (or further comply with any of its statutory obligations. Such
WHEREAS, both the Owner and the Contractor are of the Owner-Provided Information or any disturbing) such Hazardous Substance. Contractor retention or recovery of the owner shall be without
collectively referred to as the Parties and discrepancy between the actual Site conditions shall be liable for the removal of any Hazardous prejudice to any of the rights of the owner under this
individually as the Party hereinafter encountered by the Contractor during the progress of Substance that was on or under any Owner-Provided contract and under law.
the Work and those Site conditions which the Work Area. Contractor shall perform such clean-up,
WHEREAS Contractor anticipated at the date of the Contract, removal or disposal immediately. The Contractor LABOR TO BE CONTRACTOR'S EMPLOYEE
shall neither (a) provide any cost or schedule relief shall be solely liable for any Hazardous Substance
A. The Contractor has represented itself to be for Contractor or entitle Contractor to a Change under that (i) is on any Contractor-Provided Work Area or The Parties agree unconditionally that the employment of
engaged in the business of executing works as per the Change Order/Amendment nor (b) relieve Contractor (ii) Contractor brings onto, or creates at, any the personnel and/or workmen by the Contractor or a
scope of work mentioned hereof, and represents itself of its obligations under this Contract. Owner-Provided Work Area, and the Contractor shall Sub-contractor in relation to the execution of the Work
to be technically and financially capable and having perform all clean-up, removal and disposition shall not constitute any Owner-employee relationship
requisite expertise in executing of similar works, services with respect thereto. between the Owner and such personnel and/or workmen
capability, know-how and experience of executing the NATURE OF THE WORK as employed by the Contractor or any Subcontractor in
works (defined below) in a safe and environmentally (B) Clean-Up Plan: Prior to the performance by relation to the execution of the Work. Such
responsible manner. Contractor has taken all steps necessary to fully Contractor of any clean-up, removal and disposition personnel/workmen shall, at all times, be deemed to be
understand the nature of the Work, the general local services for which Contractor is liable pursuant to this persons employed by the Contractor and the Owner shall
B. On the above representation of the Contractor, the conditions that can affect the Work and the cost Section, or that Owner has instructed Contractor to not be the "principal Owner" or "manager" in respect of
Owner is interested in awarding the works as per thereof. Failure by Contractor to fully inform itself of perform, Contractor, in accordance with this Contract the Contractor's personnel/workmen. The Contractor
scope of work mentioned hereof, to the Contractor as the conditions that may affect the Work, including and Applicable Law, shall formulate a plan for shall indemnify and keep the Owner indemnified against
per the terms and conditions, the General Conditions conditions relating to transportation, handling, performance of such services and submit such plan to any claims, liabilities, costs, expenses, charges, losses
of the Contract and the Special Conditions of the storage of materials, import and export issues, Taxes, Owner for review and comment. Contractor shall and damages that the Owner may incur in relation to the
Contract. insurance, availability of qualified labor, water, revise such plan to reflect all reasonable comments of Contractor's or any Subcontractor's employees or that the
electrical power, roads, weather, topographic Owner and shall perform the clean-up, removal and Owner may incur as a result of Contractor's or
C. The Contractor acknowledges that, in order to conditions, the matters that are the subject of disposal services in accordance with such plan. Subcontractors' failure to comply with applicable labor
maintain the quality and timely completion of the Contractor#s representations and warranties, Neither Owner's review or comment nor Contractor's laws of the Country.
Work, the Owner/JSL has the prerogative/right to Applicable Laws and the character and availability of acceptance of Owner's comments shall mean that
take out any part of the awarded works and carry it equipment and facilities needed preliminary to and Owner has control over the clean-up, removal and RELATIONSHIP
out either by itself or through any other third party or during the execution of the Work, shall be disposal services or subject Owner to any liability
parties appointed by JSL at its sole discretion and at Contractor#s risk and shall neither (a) provide any with respect to such services or the Hazardous Nothing in the Agreement or these Conditions will be
the risk and cost of the Contractor. cost or Areas, the premises adjacent thereto and the Substance with respect to which such services are to construed as creating a relationship of partnership,
approaches to the Owner-Provided Work Areas and it be performed. Contractor shall conduct such agency, joint venture, or employment or any other
NOW THEREFORE, in consideration of the is fully acquainted with all environmental, surface clean-up, removal and disposal at its own. In any relationship of a similar nature between us. JSL shall not
foregoing and the respective covenants and and subsurface conditions existing within or near the event, Contractor shall use its best efforts to conduct be responsible for your acts or omissions. You and JSL
agreements set forth in this Agreement, the Owner-Provided Work Areas. Contractor has such clean-up, removal and disposal so as to cause are independent in their dealings with each other.
sufficiency and adequacy of which is hereby examined the Owner-Provided Work Areas and all of minimum disruption to the scheduled completion of
acknowledged, the Parties hereby agree to be legally their surroundings, has compared its findings with the the packages, and any such disruption shall be at INDEMNITY AND LIMITATION OF LIABILITY
bound as follows: Owner-Provided Information and has familiarized Contractor's risk. Contractor shall comply with
itself and satisfied itself that the nature of the Applicable Laws (including the obtaining of Indemnity: The Contractor alongside its Sub-Contractor
SCOPE OF WORK (GUIDELINES) accommodations available, materials and equipment, necessary licenses and permits) with respect to all shall indemnify and hold harmless the Owner, the
all means of communication, entry to and departure Hazardous Substances. Contractor shall dispose of Owner's directors, employees and their respective agents
Contractor shall undertake the scope of work as from the Owner-Provided Work Areas and all other any Hazardous Substance only by lawful means at against and from all suits, actions or administrative
mentioned herein. For this purpose it shall do and matters necessary for execution and maintaining the properly permitted sites. proceedings, claims, demands, losses, damages, costs,
shall provide or procure all things necessary for the Work are sufficient for performance of Contractor#s and expenses of whatsoever nature, including attorney's
safe and successful completion of all works and obligations under this Contract and has taken them (C) Indemnification for Hazardous Substances: fees and expenses in respect or arising out of:
achievement of the intent of this Contract. Without into account prior to bidding/quoting, executing this Contractor shall indemnify, defend and hold harmless
limiting to the foregoing, Contractor shall at its cost: Contract and undertaking the Work. Contractor has Owner from and against any and all Items to the bodily injury, sickness, disease or death, of any person
made local and other independent inquiries as to the extent arising out of or in connection with any whatsoever arising out of or in the course of or by reason
1. be responsible, in liaison with Owner, for availability and supply, for the entire period for Hazardous Substance brought, created, released, of the design, execution and completion of the Works
interfacing with, and coordinating with the Related performance of the Work, of materials, services, labor exacerbated, increased or enlarged on any and the remedying of any defect;
Works and the work of Related Contractors; and other items necessary for the execution of the Owner-Provided Work Area by Contractor. any act of commission or omission on part of the
2. Procure all Equipment, materials or other goods Work, and has satisfied itself that the nature, quality, Contractor and/or its Sub-Contractor;
or things required and execute the work; extent and practicability of each is sufficient for NO COST OR SCHEDULE RELIEF any default of the terms and conditions of the Agreement
3. Perform such activity to demonstrate compliance performance of Contractor#s obligations under this by the Contractor; and
with this Contract, the Technical Specifications, Contract. The failure of Contractor to fully The Contractor is deemed to have made itself aware by reason of the negligence of the Contractor or its
Good Industry Practices and the Contractor#s and familiarize itself with the foregoing conditions or any of the availability of labor resources for the Work to Sub-Contractors, or their employees, officers or agents.
manufacturers# standard procedures; of the Owner-Provided Information or any avoid any delays to the Project and shall not be
4. as necessary, rectify any Defects in the Equipment discrepancy between the actual Site conditions entitled to any cost or schedule relief (including Limitation of Liability: There shall be no limitation of
arising and notified to the Contractor or of which the encountered by the Contractor during the progress of compensation, damages or other remuneration) for (a) liability of the Contractor for the loss of any profit, for
Contractor becomes, or ought reasonably to have the Work and those Site conditions which the delay or extensions of time given for the addition, any direct, indirect or consequential loss/damage which
become aware; Contractor anticipated at the date of the Contract, replacement or renewal of any Personnel or (b) any may be suffered by the Owner under the Agreement.
5. as necessary, rectify and remedy any Defects in shall neither (a) provide any cost or schedule relief labor shortage of any kind.
the Work and meet its Warranty obligations wherever for Contractor or entitle Contractor to a Change under The Contractor shall make all arrangements at its own Notwithstanding anything contained in this Agreement,
applicable in accordance with the terms and Change Order/Amendment nor (b) relieve Contractor cost, of accommodation of its workmen with all the Contractor shall have no right to raise any claim
conditions of the Contract; of its obligations under this Contract. hygiene conditions. Contractor shall arrange water for against Owner/JSL.
6. ensure compliances with all applicable statutory use of their workmen, sanitary arrangement, drinking
requirements at all times in connection with this water of potable water quality and safe power supply PERMITTING
contract; and NATURE OF THE WORK to labor accommodation. In case a temporary
7. provide timely responses to requests for accommodation provided by the Owner, the Contractor shall obtain, pay for and maintain in effect all
information made by Owner, Contractor has taken all steps necessary to fully Contractor has to make his workmen stay in the the Permits/licenses/authorizations as required under
All the foregoing shall collectively be referred to as understand the nature of the Work, the general local allotted place as identified by the Owner/JSL. Applicable Laws in connection of the work or
the Work or Scope of Work . conditions that can affect the Work and the cost performance of the work.
thereof. Failure by Contractor to fully inform itself of RATES OF WAGES
COOPERATION WITH OWNER the conditions that may affect the Work, including
conditions relating to transportation, handling, The Contractor shall pay rates of wages and observe COMPLIANCE WITH APPLICABLE LAWS
Contractor shall co-operate with the efforts of the storage of materials, import and export issues, Taxes, conditions of engagement of labor as per the
Owner, Owner Official/Officials and any Owner insurance, availability of qualified labor, water, Applicable Laws and Owner's instructions time to Contractor shall, cause all Subcontractors to, comply
nominee in connection with this Contract. electrical power, roads, weather, topographic time. In the event of default being made in the with all Applicable Laws. The Contractor shall be
conditions, the matters that are the subject of payment of any money in respect of wages of any responsible for Statutory Compliance in respect of all
SITE EXAMINATION Contractor#s representations and warranties, person employed by the Contractor or any applicable laws of land which interalia includes
Contractor hereby represents and warrants that it has Applicable Laws and the character and availability of Subcontractor for carrying out the Contract, the Central/State Labour laws and Regulations/Rules made
conducted a thorough examination of the equipment and facilities needed preliminary to and Owner may at its sole discretion, make payment of there under including but not limited to Compliance of
Owner-Provided Information and the during the execution of the Work, shall be such claim on behalf of the Contractor to the said provisions of Contract Labour (Regulation and
Owner-Provided Work Areas, the premises adjacent Contractor#s risk and shall neither labor authorities and recover the same from the dues Abolition) Act, 1970,
thereto and the

Page 4 of 8
6200005692 / 17.08.2018
Annexure-A

GENERAL CONDITIONS OF THE CONTRACT :

Employees Provident Funds and Miscellaneous be properly displayed by them at site. SEVERABILITY promotional or other material in relation to or for the
Provisions Act, 1952, EPS, 1995, Employee's In order to facilitate issue of gate passes by JSL for purposes of the Agreement shall be construed as giving
Compensation Act, 1923, Minimum Wages Act, materials,the Contractor shall submit to the company, The provisions of the Agreement and these to you any right, title or interest of any nature whatsoever
1948, Industrial Disputes Act, 1947, Industrial a list of equipment etc. and/or other materials that Conditions are severable and the validity of to any of JSLs intellectual property rights,except to the
Employment (Standing Orders) Act, 1946, Payment shall be taken inside the site from time to time. Such remaining clauses, provisions, terms and parts of the extent specifically permitted byJSL
of Bonus Act, 1965, Payment of Gratuity Act, 1972, movement of materials, equipment, tools, tackles, etc. Agreement or these Conditions shall not be affected in writing. You shall not do any act that would violate the
Payment of Wages Act, 1936, Employee's shall be subject to permission of the company. by a court, administrative board or other proceeding intellectualproperty rights of JSL or of any other third
Compensation Act, 1923, Interstate Migrant of competent jurisdiction deciding that a clause, party.
Workmen (Regulation of Employment and Two wheeler movements inside the plant premises is provision, term or part of this Agreement is illegal,
Conditions of Service) Act, 1979, Factories Act, strictly prohibited, contractor shall adhere to this and unenforceable, void, in conflict with any law or ASSIGNMENT
1948, Apprenticeship Act, 1961, Employees State make their own arrangement for smooth continuity of contrary to public policy.
Insurance Act, 1948, Orissa Minor Mineral this contract. Neither the Agreement nor any part of it is assignable,
Concession Rules, 2004, Contractor shall also be ENTIRE AGREEMENT transferable, sub-licensable, sub-contractable or
solely responsible for maintenance of records and CANCELLATION OF WORK BY OWNER conveyable by you, either by operation of law or
filing of various forms/ returns prescribed under all This Contract contains the entire agreement between otherwise, without the express, prior, written consent of
applicable Central/State Labour laws and JSL reserves the right to cancel/suspense the work in the Parties with respect to the subject matter hereof JSL
Regulations/Rules made there under in respect of whole or inpart at any time by giving and the same includes all the Schedules, Annexure,
personnel employed by it. Any other enactment / rule contractor/supplier a clear notice (without limiting to Appendix etc. This Agreement supersedes any and all TECHNICAL SPECIFICATION
in force or made applicable from time to time. the number of days) in writing of such effect stating prior and contemporaneous written and oral
Contractor shall secure and possess valid license the nature, the date and the anticipated duration of agreements, proposals, negotiations, understandings The Technical Specifications are the minimum criteria
under Contract Labour (Regulation & Abolition Act) such cancellation/suspension. In the event of and representations pertaining to the subject matter for safety, efficiency, reliability, operability,
1970 and Interstate Migrant Workmen (Regulation of cancellation/suspension of contract or order, hereof, and all proposals submitted thereto and all maintainability, quality of equipment and performance of
Employment and Conditions of Service) Act, 1979, & Company will not be liable to pay any damage or loss letters, correspondence and other communications equipment and systems. Where the Technical
the Rules made thereunder, permit for excavation of to the contractor for idle labour caused by such between the Parties (or any agents of any thereof) Specifications are different from the applicable industry
minor minerals as required under Orissa Minor period. However, if the contract /order is terminated prior to the Effective Date or prior to the performance codes and standards or Applicable Laws in effect as of
Minerals Concession Rules, 2004 and shall obtain due to any unforeseen circumstances which may lead of any Work). the Effective Date, the more stringent of these shall
other necessary licenses/Registration/permit as to the force closure of the work for reasons such as apply. Where the Technical Specifications and
applicable to him under various other Laws and shall resource crunch, non-availability of funds, and for CHANGE IN LAW Construction Documents describe portions of the Work
submit its copy with the Owner within such date as other administrative reasons etc., the Contractor shall in general terms, but not in complete detail, it is
may be permitted by the owner. In the event of failure be compensated only for the quantum of work, Change in Law means a change in, or the enactment, understood that, subject to Contractor meeting the
of the Contractor to comply with any of the applicable services or supplies has rendered till effective date of promulgation, issuance or entry into law of, any requirements of this Contract (including the Technical
statutory requirements, the Owner shall be entitled to foreclosure. Any other claims like compensation for Applicable Law by a Government Authority of the Specifications), Good Industry Practices shall prevail.
impose such penalty on the contractor as may be loss in profit, loss of reputation etc. or any other Country that occurs subsequent to the Effective Details of the Work that are not specifically mentioned
decided by the owner. In case statutory consequential damages claimed by the Date/Contract Awarding Date, including the in, or otherwise specified by, the Technical
noncompliance continue to exist at work site despite Contractor/supplier shall not be entertained or given introduction of any new Tax or change in the rate of Specifications and Construction Documents shall be
notice by the Owner, the same shall be construed as a by the Company. any existing Tax, but excluding: (a) any changes of performed by Contractor at no extra cost if such details
serious breach of the contract giving rise to exercise law relating to taxation of income or fee, royalty or are necessary to complete the Work and achieve the
of all possible recourse under the Contract and under SURVIVAL charge for which Contractor is responsible under this general purpose of this Contract. Detailed Technical
law by the Owner against the Contractor. Contract or (b) any changes of law that are enacted on Specification, if any, to be followed as mentioned in this
Notwithstanding anything to the contrary contained in or before the Effective Date but will come into force Contract
the Agreement or these Conditions or otherwise and after the Effective Date;
SAFETY & SECURITY in addition to such provisions as are specifically If as a result of Change in Law , the Contractor MATERIAL SPECIFICATION
stated as surviving beyond the expiry or termination suffers any additional costs in the execution of the
The Contractor shall see that his workmen are strictly of the Agreement, Clauses of these Conditions shall Works or in relation to the performance of its other The material specification including Contractors tools &
following the provisions of the Safety & Security continue and survive any expiry or termination of obligations under this Agreement, the Contractor Tackles, Consumable Materials, Construction Materials
regulations promulgated by the Company. The these Conditions. shall, within 15 (fifteen) days from the date it etc. all are the utmost important on account of safety,
Contractor shall take adequate safety precautions for becomes reasonably aware of such addition in cost, efficiency, reliability , operability , Maintainability,
prevention of any accidents for the workmen at site FORCE MAJEURE notify JSL of such additional cost implication due to quality and performance of this contract and to be
and provide the necessary safety equipment to his Change in Law . adhered strictly by the service provider per Technical
workers at his own cost. In case the Contractor fails Any time during the continuance of this Contract, the If as a result of Change in Law , the Contractor specification and guidelines and/or delegation conveyed
to provide the safety equipment to his workers, the performance by either party under this Contract is benefits from any reduction in costs for the execution by the authorized representative of JSL.If the service
company may supply the same and the cost thereof prevented by reasons of any War (whether declared or of this Agreement or in accordance with the provider fails to comply with the aforesaidspecification,
will be realized from the Contractor. The Contractor not), Hostility, Acts of the public or Enemy, Civil provisions of this Agreement, either Party shall, JSL Reserves its absolute right to take suitable action on
shall make his own arrangement for providing Commotion, Sabotage, Fire, Flood, Earthquake, within 15 (fifteen) days from the date it becomes the lapses of service provider as per the Provisions under
drinking water to his staff and labors during Explosion, Epidemic, Quarantine Restrictions or reasonably aware of such reduction in cost, notify the this Contract.
performance of the work assigned. other Acts of God (hereinafter referred to as other Party of such reduction in cost due to Change in
#eventuality' or #Calamities ) then provided notice of Law. QUALITY ASSURANCE PLAN
The Contractor shall provide at his cost to all staff the happening of any such eventuality is given by JSL shall, within 15 (fifteen) days from the date of
and workers directly or indirectly employed in the either party to the others within fifteen (15) days from receipt of the notice from the Contractor, determine Contractor shall prepare a draft Quality Assurance Plan
works, all amenities for securing proper working and the date of the occurrence thereof, neither party shall, any addition or reduction to the Contract Price, as the in accordance with the Owner#s requirement, for
living conditions and also will provide medical by reason of such eventuality be entitled to terminate case may be, due to the Change in Law . Owner#s review and comment within Seven (07) days
facilities at the site as per rules in force in relation to this Contract, nor shall either party have any claim for after the Contract/WO/LOA Awarding Date. Once
strength of their staff and workmen deployed at site. damages against the other in respect of such NOTICES approved by the Owner, the Contractor shall issue the
non-performance or no- execution of work/supply Quality Assurance Plan. Any compliance by the
The Contractor shall be responsible for safety under this Contract shall be resumed as soon as Any notice, instruction, direction, order, consent or Contractor with the Owner's comments shall neither; (a)
arrangements for all equipment used in connection practicable after such eventuality has come to an end decision pursuant to this Contract shall be given by constitute a Change Order/Amendment or provide any
with execution of the work and shall ensure or ceased to exist. Under such circumstances the fax / e-mail subsequently followed by letter sent by cost or schedule relief to the Contractor; nor (b) relieve
employment of only trained workman to handle the contractual delivery period shall be extended by a Post/recognized courier service, mailed to the the Contractor of its obligations under the Contract.
equipment. Only tested and certified tools, equipment period equal to the extent of such eventuality following addresses: Contractor shall (i) update the Quality Assurance Plan
etc. shall be used and shall periodically be tested to continued/operated plus an additional period as from time to time to ensure that it is updated as the
the satisfaction of the Company as per provision of deemed fit, if any, as may be considered reasonable If to Owner: procurement process progresses and is fully compliant
Factory Act 1948. The CONTRATOR shall ensure by both the parties i.e. Purchaser and Contractor. To, with this Contract and (ii) deliver to Owner quality
that the workmen at work use safety belts, gloves, Whether the eventuality has come to an end or ceased The Owner's Authorized Representative/EIC assurance/quality control manuals provided by vendors.
color helmets, masks, etc. necessary for their safety. to exist will be deliberated and mutually settled. Jindal Stainless Limited, Owner shall have the right (but not the obligation) to
All test certificates shall be made available to the Should one or both parties be prevented from Kalinga Nagar Industrial Complex, review and comment on any update or other proposed
Company at site as and when required for fulfilling their contractual obligations by a state of PO- Danagadi, Jajpur Road, change to the Quality Assurance Plan. No proposed
verification. In case of pilferage / theft of materials, force majeure lasting continuously for a period of at Jajpur, Odisha change to the Quality Assurance Plan shall be effective
the contractor shall have to lodge FIR at local Police least six (6) months, both the parties shall consult unless Owner approves of such proposed change.
Station with a copy to the principal employer or each other regarding the implementation/ If to Contractor: Notwithstanding any comments provided by the Owner,
Company. execution/enforcement of the Contract, provided Address mentioned in this Contract the Contractor shall remain fully responsible for the
always that, if no mutually agreed arrangement is Quality Assurance Plan, including rectifying all defects
The Contractor shall, in connection with the arrived at within a period of three (3) month from the NON-DISCLOSURE OF CONFIDENTIAL therein.
execution of the work, ensure provision and expiry of the six (6) Months referred to above, the INFORMATION
maintenance at his own cost all lights, guards, fencing Contract shall be deemed to have expired at the end Contractor shall follow and comply with the Quality
with gates and watching when and where necessary or of the nine (9) months. The Parties agree that the Confidential Information Assurance Plan and shall not amend it without the prior
required by the client or by any duly constituted shall be kept confidential by them during the term of written consent of the Owner. Owner may, at any time
authority for the protection of work and/or for the ARBITRATION this Contract and for a period of five (5) years after during performance of the Work, conduct a compliance
safety and convenience of the public or others. the earliest of (a) Final Completion, (b) a Work audit with respect to the Quality Assurance Plan. If such
All disputes of differences whatsoever arising Termination or (c) the termination of this Contract. audit demonstrates non-compliance with any aspect of
The Contractor shall take adequate safety precautions between the parties out of or in relation to the present Notwithstanding the foregoing, Owner may disclose the Quality Assurance Plan, Owner may notify
for prevention of accidents at site. The Contractor contract or breach thereof, shall be settled amicably. the Confidential Information of Contractor to those of Contractor of such non-compliance and Contractor shall
shall also ensure that their employees/workmen However, if the parties are unable to resolve them its officers, directors, employees, consultants, promptly undertake appropriate remedial action, at
observe the statutory safety rules and regulations as amicably, the same shall be resolved by the financing parties, lenders, potential lenders and Contractor#s sole risk, cost and expense.
also those lay down by the Company from time to Arbitration of Unit Head of JSL or his nominee in advisors (Owner's Representatives) that need to know
time. accordance with the Arbitration and Concil-itio Act, the confidential information in order to assist Owner WORK/DELIVERY SCHEDULE
1996 read with its amendments from time to time and in connection with the development and
The Contractor shall provide at his cost necessary the award of the said Arbitrator in pursuance implementation of the Project and the enforcement of The Contractor shall submit a works schedule (according
watch and ward force as may be approved by the thereafter ought to be final and binding on the parties. Owner's rights against Contractor. to which the Contractor agrees to execute and complete
company to ensure security and safety of all This contract shall be construed, governed and the Work/Service to the full satisfaction of the Owner)
buildings, structures, equipment and materials under enforced in accordance with the law of India. The INTELLECTUAL PROPERTY RIGHTS within 07 (Seven) days from the date of awarding of this
their custody at the site of work. venue of arbitration shall be at Jajpur Road, Orissa Agreement for the approval of the Owner including any
(India) and arbitration proceedings shall be conducted JSL shall retain all rights, title and interest in its revision therein, from time to time. The Contractor shall
The Contractor shall abide by all security regulations in English language only. The parties hereby agree intellect-ual property rights including trademarks, execute the Works in accordance with the works
at site promulgated by the Company from time to that jurisdiction over any dispute arising under this patents, copyrights etc. and that nothing contained in schedule as approved by the Owner. Notwithstanding
time. If required the Contractor shall provide identity agreement shall be vested only in the Courts at Jajpur the Agreement or in these Conditions, nor the use of anything contained herein, the Owner shall have a right
badges to their personnel and workmen which must Road exclusively. the trademark/logos on the publicity, advertising, to review the Works Schedule later on and may make any

Page 5 of 8
6200005692 / 17.08.2018
Annexure-A

GENERAL CONDITIONS OF THE CONTRACT :

revision as and when deemed fit by the Owner. It is any other Person shall constitute an acceptance of any The agency has to give an undertaking to the effect order to do the job safely and without damage to plant,
the primary obligation of the Contractor that the of the Work furnished by Contractor or shall relieve that he has verified the credentials of the workmen to personnel, equipment and the environment.
Works are executed, to the full satisfaction of the Contractor of any of its obligations or liabilities under be engaged by him and he is responsible for any "During the execution of work the Contractor shall
Owner, as per the. this Contract omission & commission of any workman. ensure the required Safety measurers at his own cost and
Approved Works Schedule/Agreed Work Schedule. COMPLETION PERIOD & FINAL COMPLETION shall ensure that no damage, injury or loss is caused or is
The Contractor shall complete the Works in terms of OF WORK Personal safety appliances to the workmen shall be likely to be caused to any person or property.
the Work Schedule, and achieve the Work Milestones Period to complete the contract work scope is as issued by the agency as per guidelines of Safety "Contractor shall not start the job without reporting to the
thereto defined herein, from the date of awarding of this Department. All safety norms shall be adhered to, by Owner's site Engineer and Safety Department and shall
Contract. Time is the essence of this Contract and the agency Under any circumstances the agency shall obtain a written safety work permit from them before
DELAY COMPLETION LIQUIDATED DAMAGE therefore Contractor shall meet the requirements of not make less payment than the prescribed minimum starting the work.
all its contractual obligations within the agreed time wage as per JSL norms and notification by the "Contractor shall provide all safety equipments like
The Contractor shall pay liquidated damages to the frame to complete the entire work with right manner Government of Orissa from time to time. shoes, helmets, gloves etc. to his workers depending on
Owner at the rate 0.5% of the PO Value (without and spirit. In case the Contractor fails to complete the The wages bill for a month shall be deposited in the working conditions and as advised by Owner's Safety
GST) per Week of delay from the scheduled work within the contract Completion Period, the advance. department.
Completion Date as stated above. The total amount of Owner reserves its absolute right to engage any other Within 15 days of issuance of work order, the "In case of any accident (fatal or otherwise) at site,
Liquidated Damages shall not exceed 5% of the PO agency to get the balance job done at Contractor's agencies shall have to produce valid Labour License, Contractor shall immediately inform to Owner's Safety
Value (without GST). The Owner may deduct Risk and Cost. Insurance coverage policy under WC Act, PF code No department about the details. The Contractor shall also
liquidated damages from payments due to the to Sr. Manager (Personnel). Unless they submit the take the injured person(s) to the Owner's Plant Medical
Contractor or from the Security Amount deposited Final Completion of the work shall be achieved when same their Ra Bill cannot be released Unit. In no case, Contactor is allowed to take injured
with the Owner. the Contractor has performed all its contractual persons directly to his own Hospital. "The Contractor
obligations and complete the entire scope of work 1. It is contractor's responsibility to maintain proper shall be fully responsible for accidents caused due to his
Time is an important feature of the Contract and under this Contract, including repairing and making housekeeping at work place. The removed and scrap or his agents or workmen's negligence or carelessness in
payment or deduction of liquidated damages shall not good of any defect/all defects (that may have been material are to be shifted at the place designated. regard to the observance of the Owner's Safety
relieve the contractor from his obligation to complete discovered) to the Owner's satisfaction, and in requirements and shall be liable to pay compensation for
the work as per agreed construction program or from compliance with all the Statutory Laws and other 2. QUANTUM OF WORK: The quantum of work is injuries and shall indemnify the Owner if any claim is
any other obligations of the contractor's and liabilities Applicable Laws and as per the Good Industry estimated. The Owner reserves the right to change the lodged against the Owner in the cases mentioned above.
under the contract. In case of non-fulfillment of the Practices. quantum of the work involved or altogether delete
contractor obligation beyond the tolerable limit and any particulars item of work, depending on the 11.SAFETY OF WORKERS: In addition to the
excessive delay, the security deposit is liable to be AMENDMENT circumstances. The Owner also reserves the right to provisions of law on the subject Contractor shall be fully
forfeited. The Owner shall be entitled to recover all increase or decrease quantum of the work or even responsible for the safety of Contractor's workers and
costs, damages, expenses, from the bills of the No alteration or amendment of the Contract shall be brings it to zero level and Contractor shall not claim maintain an attendance register of the workers present;
Contractor which the Owner may have incur or effective unless it is in writing, refers specifically to compensation on this account. such register shall be presented daily for countersignature
become liable to incur as a result of the negligence of the Contract and is duly executed in writing by duly by an authorized representative of the Owner.
the Contractor or any other action that may originate authorized signatory of JSL. 3.Contractor shall provide at its own cost all the
such cost, charges, expenses etc. In case the bill necessary Protection & cover to the goods while in its 12.INSURANCE: Contractor shall get all Contractors'
amount of the Contractor is not sufficient to cover WARRANTIES, REPRESENTATIONS and custody either during transit or when being loaded or Labour (s) insured so as to cover them against any minor
such recovery amount, the balance shall be deducted UNDERTAKINGS unloaded from vehicles. Contractor shall be / major injury, disability and fatal accident. In all the
from any sum which may become due to him at any responsible for the damage or loss, if any of materials Insurance policies 'Principals interest protected' clause
time thereafter under this or any other contract which You hereby warrant and represent to JSL that: at the time of loading and during transit or any will be provided.
he may have with the Owner. Should this sum also a) You have the right and full authority to enter into reasons whatsoever.
not be sufficient to cover the full amount recoverable, this Agreement; 13.GATE PASSES: Entry of Contractor's workers inside
then the Owner reserves its absolute right to cover the b) All your obligations under this Agreement are 4. On the very first page of the Purchase order the factory shall be by gate pass for which Contractor
same as remedies available under Law. legal, valid and binding obligations upon you and are company registration related information of Jindal shall apply to the Personnel Officer of JSL well in time.
enforceable in law; Stainless Limited is given to the supplier for The gate pass of the dismissed or discharged worker (s)
TAXES c) You are an authorized business establishment and appropriate mention in the dispatch/delivery should be immediately returned to the Personnel Officer.
hold all the requisite permissions, authorities, documents. Any delay loss confiscation, hold up etc.
Contractor shall administer, pay and bear for all approvals and sanctions to conduct your business and By statutory or other authorities due to defective 14. INSTRUCTIONS OF OWNER'S OFFICERS: The
corporate income tax and all other applicable taxes to enter into the Agreement with JSL. You shallat all documentation is at the risk, cost and account of the Contractor shall follow strictly the instructions of the
with respect to its profits, all corporate income tax times ensure compliance with all the requirements Supplier. Owner's Supervising Officer who shall have full
and all other applicable Taxes with respect to its applicable to your business and for the purposes of authority to detect the work performed by Contractor and
profits, all Taxes in connection with the employment this Agreement including but not limited to 5.DOCUMENTATION: The supplier is obligated disallow the bill raised therefore.
of any Contractor Person and any withholding Taxes compliance with laws relating to Intellectual Property accurately to raise all the relevant documents and
in connection with labor that Contractor is required to Rights, weights and measurements, sale of goods, delivery notes. If the supplier fail to do so, JSL shall 15. HEALTH OF WORKERS: Contractor shall be fully
deduct from any payments to Subcontractors, taxation and duties; not be responsible for any risk or delays in responsible for the health and discipline of its workers
including but not limited to unemployment insurance, d) The statements, representations and warranties processing. and shall forthwith remove any worker or Supervisor
social security contributions, retirement benefits, made by you in this Agreement do not contain any whose continued employment is considered by the Owner
pensions and annuities now imposed, or hereafter untrue statement of a material fact or omit to state a 6. LANGUAGE: All documents, statements, as in contravention of any law or standards laid by the
imposed, by any Government Authority with respect material fact necessary to make the statements instructions, catalogues, brochures, pamphlets, design Owner.
to, assessed against or measured by wages, salaries or contained herein or therein, in light of the data, drawings, operation and maintenance manuals,
other remuneration paid to Persons employed by any circumstances under which they were made, not notices and all other communications pertaining to 16. LIAISON: Contractor shall keep close liaison with
Contractor Person in connection with the Work, any misleading to the best of your knowledge. this order shall be in English language. the Owner's officials and supervisory staff to ensure
business tax, withholding tax, and any other Taxes or smooth operations.
charges relating to the work including goods, APPENDIX A 7. Risk and Cost Clause: Alternatively in the event of
material, equipment etc, any taxes imposed on failure on the part of Contractor to undertake the 17.Contractor shall also maintain close co-operation with
Contractor or any of its Subcontractors which OTHER GENERAL GUIDELINES work as per scope at any given time, Management any other contractor (s) who may be engaged for works
Contractor or any of its Subcontractors has a primary reserves the right to engage alternate source/ agency which have some Inter-relations with the work being
legal obligation to pay in as a result of the The Contractor agency must have obtained valid at the entire risk and cost of the Contractor. carried out by him, to ensure that there is no interruption
performance of the Work or Applicable Laws, Labour license, provident fund code number from in the working or loss or damage on.
royalties including royalty for extraction/excavation statutory authority before execution of work. (i) The owner shall, at its option, get the work
of minerals including minor minerals under Orissa In addition to the agency shall require covering the executed elsewhere at the risk and cost of the 18.Any liability of the Contract or to the Owner, arising
Minor Mineral Concession Rules, 2004, levies and required manpower under insurance for the period of Contractor irrespective of the fact whether the scope from his obligations under the Contract
impositions including Works Contract Tax, Welfare contract as per the WC Act or ESI Act, if the area is of work is identical to the Scope of work as per the would be immediately discharged to the satisfaction of
Cess Act,1996 and the Rules made there under and covered under the said Act in future. The agency shall Contract or not and in case the Owner chooses this the Owner.
any penalties, interest or similar charge arising from also take adequate insurance of all erection materials course, it will be entitled to recover compensation/
non-payment, late payment or short payment of any against theft, pilferage, etc. damage from the Contractor. 19.Decision of the Owner on various terms and
item mentioned herein above and as per the statutory The agency have to comply statutory requirements, (ii) The owner may by giving two weeks notice to the conditions of the Contract and any matter in executing
rules of the Country. The above taxes, collective including submission of returns with various statutory Contractor to terminate the Contract without the Contract, shall he final and binding to the Contractor.
referred as Contractor's Taxes do not include the authorities under CL (R& A) Act, Minimum Wages prejudice to the Owner's right under this Risk and
GST; which will be paid additionally as per the Act, Payment of Wages Act, WC Act or ESI Act, EPF Cost Clause (i) above or any other provisions 20.The Owner reserves the right to add and/or to modify
applicability and justifying with the requisite Act & EPS Factories Act. Etc. contained in the Contract to determine the Contract & /change the terms and conditions at a later date or as and
supporting documents. Specific guidelines including pro-forma in regard to claim damages from the Contractor. when circumstances so warrant.
statutory compliance shall be given to the concerned (iii) The Contractor shall not raise the question of
CONTRACT PRICE agency by Personnel Department, after award of proving actual loss suffered by the Owner consequent 21.The Owner's interpretation or decision in regards to
contract. on the said delay in completion/ failure. all or any of the terms and conditions hereof any matter
Contractor shall perform the Work or Service for the The agency has to maintain Wage Sheet cum Muster arising there from shall be final and binding on the
amount specified in this Contract. The Contract Price Roll and all other documents as required under the 7. NO ESCALATION ALLOWED: No escalation in Contractor.
shall be in full consideration to Contractor for various Acts. rates would be allowed for the work (s) awarded to
complete performance of the Work in accordance In case of pilferage to theft or any unforeseen Contractor during the pendency of the contract. 22. INDUSTRIAL PROPERTYRIGHT: The contractor
with this Contract. The Contract Price is a price as per circumstances JSLshall not be responsible for making warrants that no third-party rights are violated in context
fixed rates mentioned against items. The Parties agree of these losses good or any compensation of any kind. 8. PARALLEL CONTRACT: The Owner reserves the with his deliveries.
that the Contract Price is inclusive of all Contractor's The agency/contractor is liable for compliance of right to enter into a parallel contract with any other
Taxes. statutory provisions and in case of agency during the currency of the contract. 23. Being an ISO 14001 Company, we always endeavour
non-compliance;JSL may enforce the same by & encourage suppliers to follow & maintain eco-friendly
VARIATION deduct-ing the amount from RA bill and deposit with 9.RULES AND REGULATION: operations. We shall appreciate your following safe &
the statutory authorities. In engaging Labour inside the factory Contractor shall healthy practice in your processes for manufacturing the
The Scope of Work and its quantum mentioned Disbursement of wages to the workers by the agency follow all the Rules and Regulation under the product and selecting such transporters which are ISO
herein can vary depending upon the requirement of shall be made on or before 7th days of succeeding Factories Act and other Labour levies in force during 14000 recognized and/or are following the environment
the Owner solely and necessary notification to this month. The agency shall be resourceful enough to the currency of this contract. The contractor shall be friendly norms. Additional weightage will be given to
extent to be informed to the Contractor for onward meet the wage payment of workmen without waiting liable to pay minimum wages as per statutory such service providers during service provider rating
compliance. for RA bill clearance/payment every month. provisions by State Govt of owner of this order. process.
The payment of wages to workmen shall be made in *Life Cycle and final disposal of supplied products after
PAYMENT OR USE IS NOT ACCEPTANCE OF front of JSL representative. 10. SAFETY CODES: use, method shall be provided.
WORK RA bill shall be routed through Personnel Department "Contractor shall abide by the provisions of safety APPENDIX B
for classification in regard to compliance of statutory code measures prescribed by the Government."
No Payment or other payment/payments to the obligations. Contractor shall take all safety precautions and HR COMPLIANCES
Contractor or any use of the packages by Owner or. . provide adequate supervision by competent persons in
That, the Contractor shall obtain License immediately as

Page 6 of 8
6200005692 / 17.08.2018
Annexure-A

GENERAL CONDITIONS OF THE CONTRACT :

required under the Contract Labour (Regulation & wages of the previous month wage payment register, PPEs will be given to the workmen as per JSL PPE by the contractor, the loss to JSL company will be
Abolition) Act, 1970 and the Rules made thereunder, attendance sheet (attendance punching report from matrix (Appendix-D) & records to be maintained. debited from the RA bill of the Contractor, in addition to
if the deployment of workmen is 20 or more at any ARS of the employees duly approved by user Suitable clothing (long pants, prefera-bly the safety penalty due to gross violation for carrying out
time. department), failing which the bill shall be rejected by short-sleeved shirts (no loose fitting clothing) must be unsafe action/condition. All direct and indirect expenses
That, the Contractor shall obtain License under the the Company. worn and adequate foot wear IS-15298 along with on account of any accident pertaining to contractor's
Inter-State Migrant Workmen (Regulation of In case of final bill, non-submission of documents i.e. safety helmet IS-2925 (Only Yellow colour helmets work - scope shall be borne by the contractor.
Employment and Conditions of Services) Act, 1979 No dues Certificate from the Labour Department and with company Logo for the contract Labours / The contractor shall obey all the guidelines given by EHS
and Orissa State Rules if deployment of Inter-State documentary evidence against terminal benefits of workers). dept of
migrant workmen exceeds 4 at any time. employees, the Contractor hereby authorise the All the contractor supervisor / In-charges shall wear JSL All the heavy vehicle drivers must be accompanied
That, the Contractor has accepted to undertake & Company to hold the entire final bill until such Blue Colour helmet with their company Logo to with a helper, and must be provided with required PPEs.
execute the job by himself. However, in case, wants compliance. differentiate from the working labours. The chin strap Workers must be transported to work place by passenger
to engage Sub-Contractor/s, the Contractor shall That, the Contractor further declares that, in case of to be tied while using the helmet at site. Contractor's carrier vehicles not in goods carrier vehicle.
obtain permission from Head-Commercial and Head - non-payment of PF and ESI Contributions, the Safety officers may be permitted to use Green helmet During material transportation unsafe loading, carrying,
HR. The Contractor shall indemnify on behalf of such Company shall withhold three times of financial only. For working at height Full body safety harness beyond capacity or extended more than the carrier will be
Sub-Contractors to be engaged and also submit an liability arising out of such non-compliance from the of double lanyard, shock absorber with snap hook penalized as per JSL penalty procedure
Indemnity Bond on non-judicial stamp paper worth of said bill until such compliance subject to Penalty of opening 50 mm, IS-3521 to be used. Workers will not allow going inside any barricaded,
Rs.100/- (Rupees one hundred only) duly certified by Rs.5000/- (Rupees Five thousand only) on payment / For each instance of safety non-compliance, unauthorized, prohibited, high voltage, cautioned &
the Notary Public in the prescribed format. In such submission of documents. appropriate penalty will be imposed as per penalty danger marked zone.
case, the provisions of law as applicable to the That, in case of any liability pertaining to Contractor's procedure of JSL. Contractor if using any measuring instrument & etc must
Contractor shall be applicable to the Sub Contractor employees is to be discharged by the Company for For repeated serious violation cancellation of contract get them calibrated & certified by any govt. regd.
as well. any lapse , the Contractor hereby declares to or black listing of contractor may be initiated Agency.
That, the Contractor shall apply for renewal of reimburse the same or the Company is authorised to If the contractor fails to provide required PPEs of Carrying of cooking materials such as Gas / Kerosene
License under the Contract Labor (R&A) Act and the deduct the same from the dues as payable including good quality or in sufficient nos.,JSL would levy stove etc into the plant premises are prohibited in any
Inter-State Migrant Workmen (RE & CS) Act within Penalty amount as per rules of the Company. appropriate penalty on the contra-ctor for the vehicle. Violation of this rule will be penalized with Rs
the stipulated time and get renewed the license, a The contractor shall ensure that contractor labour same.JSL would also provide the same PPEs(Other 2000 on each instance / per vehicle.
copy of which shall be furnished to the Company for should not enter inside the plant premises with thansafety helmet & Safety Shoes) to the contractors / Waste Management and Disposal:
their record mobile phone for safety point of view. They should his workers and debit the relevant amount from the Hazardous Waste # The Contractor is responsible for all
That, the Contractor shall apply for issue of Gate also ensure that no contractor labor should sleep running bills of the contractor. contractor and subcontractor purchased chemicals and
Passes for workmen as per the approved Format along during working hours inside the factory premises as All vehicles (LMV, HMV, trucks, trailers, any hazardous waste generated by the contractor and
with the police verification report of the persons to per the safety rule of the company. Any violation of commercial, heavy equipments etc.) of contractors / subcontractor using their purchased materials in the
enter into the premises of the Company after the conditions of safety rule can be penalized to the transporters / service providers must have valid ordinary course of their work, e.g., left over paint, etc.
completion of safety induction and pre-employment contractor by deducting Rs.1000/- per case and Registration Certificate (RC),Valid fitness certificate The Contractor is responsible for the prompt removal
health check up. In case of loss of Gate passes or for repetition of the same may lead to cancelation of (Maximum allowed for 10 years), valid insurance from JSL sites of any such hazardous waste generated
replacement due to mutilation, the Prescribed Charges contract with the company. coverage, PUC certificate, Good Physical condition, under the guidance of JSL contract execution incharge.
fixed by the Company i.e Rs.60/- (Rupees Sixty only) _______________ main horn, reverse horn, all lights in good condition Solid Waste Storage, Disposal, and Recycling # The
for replacement and Rs.300/- (Three hundred only) and drivers with valid relevant driving license. Contractor and Subcontractor personnel are required to
for each Gate pass (against non-return of the old gate APPENDIX C All traffic rules must be mandatorily obeyed such as sort, separate, and recycle recyclable materials while
passes) shall be deposited in the Finance Dept of the speed limit (20 KMPH), stop signs, using mobile performing work on the JSL site. The Contractor and the
Company by the Contractor before issue of New Gate SPECIAL EHS CONDITIONS during driving, no overtake, yield signs, parking Subcontractor personnel will adhere to the following:
Passes. All Labour, Factories & Boilers, Fire & Safety rules restrictions, pedestrian crosswalks, maintaining safe No hazardous wastes will be placed into any trash
That, the Contractor shall cover all employees under and codes notified by Govt. of India / Govt. of Odisha distance, etc. For each instance of traffic violation as receptacle or compactor on JSL sites.
the Employees Provident Fund & Miscellaneous and JSL regarding Safety,Fire ,Other statutory rules per JSL vehicle check list, penalty will be imposed as All chemical containers must be empty before placing
Provisions Act, 1952 and the Employee's State and Environment shall be observed and omplied per JSL penalty procedure including forfeiting of gate them in any trash receptacle. Empty is defined as having
Insurance Act, 1948 from their first day of by the contractor / sub-contractor / service strictly c pass including retaining of vehicle will be levied on no liquids, pastes, or large amounts of residue remaining
engagement. provider and his personnel without exception. the individual &/ the contractor for the thirdinstance in the container. If not empty, chemical container may be
That, the Contractor shall deposit the PF The contractor shall have full responsibility and will be levied on the individual & / on the contractor required to be disposed of as hazardous waste.
Contributions both employer and employee in his accountability of safe execution of job at work place / .This penality is over and above the recovering the The Contractor must remove chemical containers brought
individual code on or before 15th of the succeeding site and safety of the personnel conducted inside the cost of damage to men, machine, materials or on site by the Contractor.
month by submitting ECR on line in the EPFO Portal premises of JSL, Jajpur. He shall include all resource property damage caused to JSL company by doing
and shall also deposit the ESI Contributions both requirements for accident prevention. the unsafe action & practices by any of the APPENDIX D
employer and employee in his individual Code on or The Contractor shall conduct their activities such that contractor personnelor by the drivers.
before 15th of the succeeding month. In case of the personnel, equipments, working Inside entire JSL premise, photography, selling & PLANT-WISE PPE REQUIREMENT
delayed payment after the scheduled date, penalty of methods,conditions are safe and without risk to smoking of cigarette /bidi /cigars, selling & chewing
Rs.5000/- (Rupees five thousand only) shall be levied hea-lth,injury, accidents etc for their own personnel, of tobacco / Gutka, Consumption/ working under FERRO ALLOYS:
for each occasion of non-compliance. equipments,JSL personnel /equipments & other influence of alcoholic liquor / intoxicants is banned
That, the Contractor shall submit the Combined business associates at the site. and to be strictly ensured and adhered to by the MANDATORY PPE: Safety shoes, Safety helmet, Dust
Annual Returns under the applicable labor laws The Contractor shall ensure he & his workers shall contractor. Else, he will be liable to severe masks, Safety goggles, Reflective Jacket
within the stipulated time. In case of non-submission not remove or interfere unless duly authorized, with disciplinary action / /removed from site ,besides TRADE-WISE / JOB SPECIFIC PPE: Leather hand
of return, the Contractor hereby authorize the any moving / stationary Machine/ equipment or penalty up to Rs. 500 per instance. gloves, cotton hand gloves, kevler hand gloves, PVC
Company to retain 5% of the bill amount subject to facility. For an EHS violation, JSL will direct the contractor hand gloves, rubber hand gloves, PVC apron, Full Body
maximum of Rs.1,00,000/-(Rupees One Lakh only) The Contractor shall undertake immediate action to to immedia- ately stop the work or leave the site or safety harness with double lanyard (FBSH), ear plug
from the running bill until such compliance. In case correct all unsafe conditions/ practices as identified/ pay heavy penalization as dee- med fit at the /muff, FR apron, gum boots, helmet with face shield,
of delayed submission of returns beyond the reported. discretion of Unit head / Plant Head / EHS Head. welding helmet, safety net, Tight fitting clothing, Nitrile
stipulated date, the Company is hereby authorized to Ensuring that all incidents that may occur at Without limiting to any of the above conditions, sole safety shoes.
deduct a penalty of Rs.5000/- (Rupees five thousand contractor's working sites are properly reported and whatsoever the unsafe acts or unsafe unconditions,
only) for each occasion, from the bill. investigated JSL shall debit / levy appropriate penalty up to Rs.1 CPP:
That, the Contractor declares to pay the wages to his The Contractor shall ensure that all his workers and lacslacs on contractor /transporter / service provider MANDATORY PPE: Safety shoes, Safety helmet, Dust
workmen on or before 10th of the succeeding month sub # contractors are provided the necessary for any unsafe acts &or condition contravention to masks, Safety goggles, ear plug, Reflective Jacket
and the wages so paid shall not be less than the documentation as required by EHS department, ISI statutory rules & regulations/JSL's/EHS rules & TRADE-WISE / JOB SPECIFIC PPE: Leather hand
minimum wages notified by the Government of approved or equivalent standards of PPEs to be issued policies depending upon thegravity of the situation on gloves, cotton hand gloves, Kevler hand gloves, PVC
Odisha from time to time or as agreed under the to all their staffs & workers & PPEs issue register to case to case basis. This penalty is over and above the hand gloves, rubber hand gloves of rated capacity
Work Order awarded to me, whichever is higher. be maintained properly and informed them of their recovering the cost of damage caused to men, (e.g.11KV, 33KV etc), PVC apron, FBSH, ear plug
That, the Contractor further declares that no workmen safety obligations. machine & materials or property by the unsafe action /muff, gum boots, welding helmet, boiler suit, safety net,
shall be engaged on overtime. The Contractor shall ensure that all the lifting & practices of the electrical safety shoes, electric flash over suit.
That, the Contractor shall pay all legitimate/terminal machines, tools and tackles including pressure vessels contractor & his personnel. Job specific PPEs will be
benefits to his workmen on termination of the work to be used in the Factory premises by Contractor are provided by the contractor to the workmen & records CRMHS:
order or in case of resignation of the workmen. certified by the competent authority (Approved by to be maintained. However suitable additional safety MANDATORY PPE: Safety shoes, Safety helmet, Dust
That, the Contractor shall comply with the Labor Director of Factories & Boilers, Office, Odisha) for appliances, if required considering the work involved masks, Safety goggles, Reflective Jacket
Laws as applicable to Contract Labor as per the use inside the factory. Such certificates should be are to be provided by the contractor. TRADE-WISE / JOB SPECIFIC PPE: Leather hand
provisions contained therein. duly valid at all points of time. For any unsafe act by the workmen of your agency gloves, cotton hand gloves, PVC hand gloves, rubber
That, the Contractor shall maintain all registers and For jobs carried out in the plant, Contractor shall resulting damage to the human being or equipment, hand gloves, , FBSH, ear plug /muff, gum boots, shield,
records under the provisions of the applicable labor obtain proper work permit system prior to the job as you will be held responsible and any cost arising out welding helmet, safety net, Tight fitting clothing
laws to the Contract Labor. Such as, the Payment of per JSL requirements. of such act shall be fully recovered from you. COKE OVEN:
Wages Act,1936, the Minimum Wages Act, 1948, the The Contractor shall maintain and ensure continuous All the contractor personnel including workers must MANDATORY PPE: Safety shoes, Safety helmet, Dust
Maternity Benefit Act, 1961 (wherever applicable), availability of First #Aid facilities for all their undergo health check up & certified fit by an masks, Safety goggles, Reflective Jacket
Orissa Industrial Establishments (National & personnel. approved Medical Practitioner / Certifying Surgeon.
Festival) Holidays Act, 1969, the Payment of Bonus The Contractor shall deploy supervisors (qualified & In case of working at height and potentially high risk TRADE-WISE / JOB SPECIFIC PPE: Leather hand
Act, 1965, the Factories Act, 1948, The Employees experienced with relevant knowledge) to co-ordinate areas, the required contractor workers have to pass gloves, cotton hand gloves, kevler hand gloves, PVC
Provident Fund & Miscellaneous Provisions Act, and supervise all the works. Contractor shall ensure & through a special health check up applicable for hand gloves, rubber hand gloves, PVC apron, FBSH, ear
1952, The Employees State Insurance Act, 1948, The impart necessary training on safety & knowledge of working at height and other potentially high risk plug /muff, FR apron, gum boots, helmet with face
Employees' Compensation Act, 1923 (wherever the jobs to areas, by an approved Medical Practitioner / shield, welding helmet, safety net, acid alkali
applicable), The Payment of Gratuity Act, 1972, The all their employees on daily basis. Certifying Surgeon. vapour masks, Tight fitting clothing, Nitrile sole safety
Industrial Disputes Act, 1947 etc. The Contractor shall deploy the right personnel for shoes , boiler suit, electrical safety shoes
That, the Contractor shall produce the records and right job with relevant qualification and sufficient The entire contractor worker must undergo safety SMS:
registers maintained under the various applicable knowledge and experience. Induction Training before making the Gate pass at MANDATORY PPE: Safety shoes, Safety helmet (FR),
labor laws at any time for inspection of the Company The Contractor shall deploy one safety supervisor for HR for deployment at work. Dust masks, Safety goggles, ear plug/Muff,
as well as Inspecting Authority under the Acts. every fifty workmen and at least one safety officer for The contactor should keep and maintain PPEs Reflective Jacket
That, the Contractor shall submit the bills to the every 100 workmen with necessary qualifications and resister, Training resister and monthly safety report TRADE-WISE / JOB SPECIFIC PPE: Leather hand
Company through Single Window along with the experiences as per JSL requirements. and gloves, cotton hand gloves, kevler hand gloves, PVC
attendance punching report of the employees from shall produce the same when ever asked by the JSL hand gloves, rubber hand gloves, PVC apron, FBSH,
Attendance Recording System (ARS) of previous The Contractor shall ensure that his workers are management ear plug /muff, FR apron, gum boots, helmet with face
month duly approved by user department. He shall provided with appropriate ISI approved or equivalent The contractor will be responsible to maintain good shield, welding helmet, safety net , Tight fitting clothing,
produce documentary evidence with an undertaking standards personal protective equipment PPE's and health & safety of their workers Nitrile sole safety shoes, melting goggles, hot metal
of the deposits of EPF and ESI contributions in these should be at no cost to the employees. These splashing retardant jacket/ apron, electrical safety shoes
respect of his workmen under consideration of PPE's should be used in accordance with job The entire contractor worker must be provided with HSM:
payment of requirements and replace as necessary. Job specific 100% & BIS certified PPEs. MANDATORY PPE: Safety shoes, Safety helmet,
In case of any Accident, Near miss, Property damage

Page 7 of 8
6200005692 / 17.08.2018
Annexure-A

GENERAL CONDITIONS OF THE CONTRACT :

Cotton hand gloves, ear plug, Reflective Jacket AUTOMOBILE: MRSS: TRADE-WISE / JOB SPECIFIC PPE: cotton hand
TRADE-WISE / JOB SPECIFIC PPE: Rubber hand MANDATORY PPE: Safety shoes, Safety helmet, MANDATORY PPE: Safety shoes, Safety helmet, gloves, safety goggles, dust masks
gloves, Kevlar hand gloves , leather hand gloves, Reflective Jacket Reflective Jacket
aluminized hand gloves, shockproof hand gloves , TRADE-WISE / JOB SPECIFIC PPE: Leather hand CENTRAL UTILITY:
helmet with face shield ( clear and heat resistance), gloves, cotton hand gloves, safety goggles, face TRADE-WISE / JOB SPECIFIC PPE: Leather hand
welding helmet, gum boots, chemical suit, tight shield, PVC/Rubber hand gloves, welding helmet, gloves, cotton hand gloves, PVC hand gloves, rubber MANDATORY PPE: Safety shoes, Safety helmet,
fitting cloth, safety goggles (splash, cobalt), ear safety goggles, dust masks hand gloves of rated capacity (e.g. 11KV, 33KV etc), Reflective Jacket
muff, FBSH, electrical safety shoes, aluminized heat HR & ADMIN: PVC apron, FBSH, ear plug /muff, electric flash over TRADE-WISE / JOB SPECIFIC PPE: Leather hand
resistance coat pant, dust mask MANDATORY PPE: Safety shoes, Safety helmet, suit, gum boots, welding helmet gloves, cotton hand gloves, safety goggles, face shield,
CRM: Reflective Jacket PVC/Rubber hand gloves, welding helmet, safety
MANDATORY PPE: Safety shoes, Safety helmet, I & SM: PPC: goggles, dust masks, FBSH, safety net.
Cotton hand gloves, Reflective Jacket MANDATORY PPE: Safety shoes, Safety helmet, MANDATORY PPE: Safety shoes, Safety helmet,
TRADE-WISE / JOB SPECIFIC PPE: Leather hand Reflective Jacket Reflective Jacket EHS:
gloves, cotton hand gloves, kevler hand gloves, PVC TRADE-WISE / JOB SPECIFIC PPE: Leather hand TRADE-WISE / JOB SPECIFIC PPE: cotton hand
hand gloves, rubber hand gloves, PVC apron, FBSH, gloves, cotton hand gloves, safety goggles, face gloves, safety goggles, dust masks MANDATORY PPE: Safety shoes, Safety helmet,
ear plug /muff, FR apron, gum boots, electrical safety shield, PVC/Rubber hand gloves, welding helmet, Reflective Jacket
shoes, helmet with face shield, welding helmet, safety safety goggles, dust masks QUALITY: TRADE-WISE / JOB SPECIFIC PPE: PVC hand gloves,
net, acid alkali vapour masks, boiler suit, Acid IT: MANDATORY PPE: Safety shoes, Safety helmet, rubber hand gloves, PVC apron, FBSH, FR apron, fire
resistance suit, Acid resistance hand gloves, Cut MANDATORY PPE: Safety shoes, Safety helmet, Reflective Jacket proximate suit, gum boots, cotton hand gloves, leather
resistance hand gloves Reflective Jacket hand gloves, Safety goggles, dust masks, acid alkali
CENTRAL CIVIL: TRADE-WISE / JOB SPECIFIC PPE: Leather hand TRADE-WISE / JOB SPECIFIC PPE: cotton hand vapor masks.
MANDATORY PPE: Safety shoes, Safety helmet, gloves, cotton hand gloves, safety goggles, face gloves, leather hand gloves, safety goggles, dust
Reflective Jacket shield, PVC/Rubber hand gloves, welding helmet, masks, cut resistance hand gloves, Apron acid Colour Coding an IS Code of PPEs:
TRADE-WISE / JOB SPECIFIC PPE: Gum boots, safety goggles resistance, Acid resistance hand gloves
FBSH, Dust masks, PVC/Rubber hand gloves, Safety LOGISTICS: Helmet #Yellow colour (IS 2925)
net, welding helmet, leather hand gloves MANDATORY PPE: Safety shoes, Safety helmet, SALES: Safety shoe- IS15298
CENTRAL GROWTH SHOP: Reflective Jacket MANDATORY PPE: Safety shoes, Safety helmet, Reflective Jacket- Orange colour ( Three side opening
MANDATORY PPE: Safety shoes, Safety helmet, TRADE-WISE / JOB SPECIFIC PPE: cotton hand Reflective Jacket with chest adjustment Velcro type attachment, PP wire
Ear plug/muff, Reflective Jacket gloves, safety goggles, dust masks TRADE-WISE / JOB SPECIFIC PPE: cotton hand mess fabric with 135 GSM, reflective tape-regular RT
TRADE-WISE / JOB SPECIFIC PPE: Tight fitting PURCHASE: gloves, safety goggles, dust masks tape with two vertical one horizontal size 1.5 inch
clothing, Leather hand gloves, cotton hand gloves, MANDATORY PPE: Safety shoes, Safety helmet, F & A: ,SAFETY IS MY RESPONSIBILITY in circle in front
safety goggles, face shield, PVC/Rubber hand gloves, Reflective Jacket side left chestarea and ASSOCIATES with JSL logo in
electrical safety shoes, welding helmet, safety TRADE-WISE / JOB SPECIFIC PPE: cotton hand MANDATORY PPE: Safety shoes, Safety helmet, back side to be printed reflectivity # 150 CD/Lux,
goggles, dust masks gloves, safety goggles, dust masks Reflective Jacket Visibility # 200 to 250 meters )

Page 8 of 8