Anda di halaman 1dari 57

Project: CONSTRUCTION OF ACCESS CONTROLLED NAGPUR - MUMBAI SUPER COMMUNICATION EXPRESSWAY

(MAHARASHTRA SAMRUDDHI MAHAMARG) IN THE STATE OF MAHARASHTRA ON EPC MODE FOR PACKAGE 06, FROM
KM. 259.900 TO KM. 296.000, (Section- Village Belgaon to Village Parda) in District Buldhana

Design note of UTILITY DUCT @ KM


269+100,269+500,274+200,276+400,278+320,279+000,280+785,282+200,283
Title: +200,286+800,289+365,291+300,292+500,293+800,294+300 (Single cell box
type) of size 2 m x 2 m with0.54m earthcushion, PQC 0.310m and 0.150m DLC
(Total cushion 1m)

269+100,269+500,274+200,276+400,278+320,279+000,280+785,282+200,283+200,286+800,289+365,291+30
0,292+500,293+800,294+300

MAHARASHTRA STATE ROAD DEVELOPMENT


CLIENT
CORPORATION LTD. (MSRDC)

R0 26-02-2019
Rev Date Description

Design consultant :
CIVIL MANTRA INFRACON PRIVATE LIMITED
Index

S.NO. DESCRIPTION Page No

1.0 Introduction 3

2.0 Dimension of Box 4

3.0 Basic input data 5

4.0 Idealised Structure for Staad Analysis 6

5.0 Load Calculation 7-16

6.0 STAAD input file 17-36

7.0 Summary of Design Moments 37-38

8.0 Design of Top Slab 39-42

9.0 Design of Bottom slab 43-47

10.0 Design of outer wall 48-55

12.0 Summary of reinforcement provided 64-65

13.0 Base pressure check 66


1.0 Introduction

Design note of UTILITY DUCT @ KM


269+100,269+500,274+200,276+400,278+320,279+000,280+785,282+200,283+200,286+800,289+
365,291+300,292+500,293+800,294+300 (Single cell box type) of size 2 m x 2 m with0.54m
1.2 Design Basis PQC 0.310m and 0.150m DLC (Total cushion 1m)
earthcushion,

All the Loads are calculated based on IRC : 6 and design has been done based on IRC : 112 - 2011.
Structure has been analysed as a box section resting over a series of soil springs with stiffness
being considered depending on SBC of soil and allowable settlement.

The Structure is modelled as two dimensional centre line model, All other inputs are given with
load combinations as per IRC 6 and the results thus obtained for various members at different
locations are extracted for design in Ultimate limit state and checked for serviceability limit state.
For crack width check quasi permanent load combinations have been used.

1.3 Reference documents :-

a) IRC 6 d) Specialised literature as relevant


b) IRC 21 e) IRC 112-2011
c) IRC 78

1.4 Loads has been adopted as per IRC-6

a) Dead load -Self weight command is assigned to all members for calculating the dead load of the structure

b) Superimposed dead load-As structure is analyze for unit width, 0.5m width is considered for
crash barrier/railing.

c) Earth Pressure-The earth pressure at rest has been applied on walls reatining earth as structure
is not free to deform.

d) Live load - SV, 70R Wheel ,70R Tracked, 40 T Boggie load considered using effective width method
given in clause B 3.2 of Annexure 3 of IRC 112.

e) Live load Surcharge-The Live load surcharge equivalent to 1.2m fill has been applied on walls
reatining earth.

f) Temperature- Linear & gradient both temperatur case has been considered as per clause 215 of IRC 6:2017.

h) Cushion/fill load (if any) is considered as dead load.

i) Impact factor considered for live load (Clause 208.3 of IRC:6-2017) = 1.25.

1.5 Load cases considered:


Load combination as per IRC - 6 : 2017 have been considered in STAAD model.
2.0 Dimension of Box

No. of Cells 1 No.

Clear Depth 2.00 m

Clear Span 1 Ministry of Road Transport and Highway 2.00 m

Top slab thickNess 0.200 m

Bottom slab thickNess 0.250 m

ThickNess of Outer Wall 0.250 m

0.200
0.540

0.200
2.000 0.15
0.15

2.00
#N/A
2.45

0.250

0.250
0.250 2.00

0
0

0.250
2.500

2.225 2.250

Idealised Structure for Staad Analysis

The Structure is modeled using STAAD as a plane frame in X-Y plane of unit (1m) width.
3.0 Basic Input Data

Skew angle 0.00 degree


Free board 0.000 m
No of cells 1
Clear span 2.00 m
Clear Height 2.00 m
Water Height 0.00 m
Top slab thickNess 0.200 m
Bottom slab thickNess 0.250 m
Side wall thickNess 0.250 m
Haunch Size 0.15 X 0.15 m
Total width of deck slab 17.50 m
ThickNess of wearing coat 0.460 m
Carriageway 17.50 m
Crash barrier width/Parapet 0.50 m
Imapact factor 1.25

Basic Parameters
Concrete Grade 35 Mpa
Steel Grade 500.00 Mpa
Co-efficient of earth pressure at rest 0.50
Co-efficient of active earth pressure 0.279
БSc (Concrete) 11.67 MPa
БSt (Steel) 435 Mpa
Modular ratio 8
Net Safe Bearing pressure (As per geotechnical report) 120 kN/m2
Earth cushion 0.54 m
Live load Surcharge 1.20

Unit Weight
Unit weight of concrete 25.00 kN/m3
Unit weight of earth 20.00 kN/m3
Unit weight of water 10.00 kN/m3
Unit Weight of Wearing Coat/PQC,DLC 24.00 kN/m3
4.0 Idealised Structure for Staad Analysis

The Structure is modeled using STAAD as a plane frame in X-Y plane of unit (1m) width.
The structural model is shown in figure 2.0.

Ministry of Road Transport and Highway

8
8
4
2.225 2.250 0.000 2

0.5

Figure-C/L of Box

a) Material properties:-

Density Modulus E Posion


Material Grade
(kg/m^3) kN/mm^2 ratio(v)
Conrete M-35 2500 32 0.20
Steel Fe-500 7850 200 0.30

Nos of beam for one span at bottom = 10 Nos.


Spacing between support = 0.225 m
Modulus of Subgrade Reaction = 1600 kN/m3
Spring constant at intermediate support = 360 kN/m
Spring constant at end support = 180 kN/m

1.2
b) Number of Load Cases 25
c) Load combination 487
5.0 Load Calculation

5.1 Dead load Calucations on top slab (DL)


a) Weight of wearing coat = 0.46*24 11.04 kN/m2
b) Self Weight of slab = 0.2*25 5.00 kN/m2
c) Weight of Crash Barrier/Parapet = 0.36*25 9.00 kN/m2
d) Dead weight due earth fill = 0.54*20 10.80 kN/m2

5.2 Side Wall Loads :

Earth presuure is applied as linearly varying load on each member. The model is centre line model,
so the resultant force and moment caused due to earth pressure between outer face
of slab and centre line are applied as nodal loads on the corresponding nodes.

5.2.1 Active Earth Pressure Height

3.01 Kn/m2 0.54 m Top of Slab


3.57 Kn/m2 0.64 m Cg of Top Slab

14.73 Kn/m2 2.64 m Cg of Wall

15.43 Kn/m2 2.77 m Cg of Base Slab


16.13 Kn/m2 2.89 m Base Slab Bottom

Earth pressure at rest (Dry conditions) =0.5*(2+0.2/2+0.25/2+0.54)*20


= 27.650
Earth pressure at rest (HFL conditions) =0.5*(2+0.2/2+0.25/2+0.54)*(20-10)
+10*(2+0.2/2+0.25/2+0.54)*0
2
= 13.825 kN/m
Active Earth pressure (Dry conditions) =0.279*(2+0.2/2+0.25/2+0.54)*20
2
= 17.996 kN/m
Active Earth pressure (HFL conditions) =0.279*(2+0.2/2+0.25/2+0.54)*(20-10)
+10*(2+0.2/2+0.25/2+0.54)*0
= 7.714 kN/m2
5.2.2 Live Load Surcharge

Earth Pressure at base due to live load surcharge = 0.5*20*1.2


2
(1.2m surcharge) at rest = 12.00 kN/m

Earth Pressure at base due to live load surcharge = 0.279*20*1.2


2
(1.2m surcharge) active earth pressure conditions = 6.696 kN/m

Earth Pressure at base due to live load surcharge =0.279*(20-10)*1.2+10*1.2*0


(1.2m surcharge) active earth pressure conditions(HFL) = 3.348 kN/m2

5.3 Dead load on base slab due to water =10*0


2
= 0.000 kN/m
5.5 Live Load on Top slab

A) 70 R (Tracked on Midspan)

Direction of Traffic

b = 17.50 m

8
0.84 8
4
2
350 Kn 350 Kn
4.57 lo = 2.00 m
0.5

2.12 2.06

Total Load= 700 Kn 6.97 m 2.00 m


350.00 Kn/m

Effective width of Loading

a = 1.00 m
b1 = 2.84 m
b/lo = 8.75
α = 2.60
beff = 4.14 m
2.06 m < 4.14 m

Therefore overlaping due to load dispersion occurs.

Effective width = 6.20 m


Width along span = 6.57 m
Load intensity = 17.18 Kn/m2
Increase due to impact = 21.48 Kn/m2
Say = 21.50 Kn/m2
B) 70 R (Tracked at support)

Total Load= 700 Kn 5.23 m 2.00 m


350.00 Kn/m 12

Effective width of Loading = 0.279*20*1.2

a = 1.00 m
b1 = 2.84 m
b/lo = 8.75
α = 2.60
beff = 4.14 m
2.06 m < 4.14 m

Therefore overlaping due to load dispersion occurs.

Effective width = 6.20 m


Width along span = 6.570 m
Load intensity = 17.18 Kn/m2
Increase due to impact = 21.48 Kn/m2
Say = 21.50 Kn/m2
C) 40 T (Boggie load on Midspan)

Direction of Traffic

b = 17.50 m

0.86

0.22

100 Kn 100 Kn
100 Kn 100 Kn 1.22 lo = 2.00 m

2.13 1.93

40 T (Boggie load midspan)

Total Load= 400 Kn 2.00 m 3.84 m


200.00 Kn/m

Effective width of Loading

a = 1.00 m
b1 = 2.86 m
b/lo = 8.75
α = 2.60
beff = 4.16 m
1.93 m < 4.16 m

Therefore overlaping due to load dispersion occurs.

Effective width = 6.09 m


Width along span = 3.84 m
Load intensity = 17.10 Kn/m2
Increase due to impact = 21.38 Kn/m2
Say = 21.40 Kn/m2
D) 40 T (Boggie load at support)

Total Load= 400 Kn 2.00 m 2.64 m


200.00 Kn/m

Effective width of Loading

a = 0.61 m
b1 = 2.86 m
b/lo = 8.75
α = 2.600
beff = 3.96 m
1.93 m < 3.96 m

Therefore overlaping due to load dispersion occurs.

Effective width = 5.89 m


Width along span = 2.64 m
Load intensity = 25.71 Kn/m2
Increase due to impact = 32.14 Kn/m2
Say = 32.10 Kn/m2
E) 70R Wheel Case 1

12 12 17 17 17 17

1.52 2.13 1.37 3.05m 1.37m 0.86m 1.93m 0.86m

1.00m
Width along span = 2.620m

S.No. Load a a beff Overlap Eff. Width Load Int. With Imp.
1 166.77 0.94m 2.60 4.16m Yes 6.09m 10.5 kN/sqm 13 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm

F) 70R Wheel Case 2

12 12 17 17 17 17

1.52 1.5 1.37 3.05m


2.13 1.37

1.13m
Width along span = 2.620m

S.No. Load a a beff Overlap Eff. Width Load Int. With Imp.
1 166.77 0.940 2.60 4.16m Yes 6.09m 10.5 kN/sqm 13 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
H) SV LOADING Case 1

18 18 18 18 18 18 0.156 2.156

1.5 1.5 1.5 1.5m 1.5 m 1.5 m 0.274m 1.2000m 0.274m

1.00m
Width along span = 2.674m

S.No. Load a a beff Overlap Eff. Width Load Int. With Imp.
1 176.58 0.91m 2.60 3.45m Yes 4.76m 13.9 kN/sqm 14 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.00m 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm

I) SV LOADING CASE 2

18 18 18 18 18 18

1.5 1.5 1.5 1. 1.5m 1.5m

1.13m
Width along span = 2.674m

S.No. Load a a beff Overlap Eff. Width Load Int. With Imp.
1 176.58 0.913 2.60 3.45m Yes 4.76m 13.9 kN/sqm 14 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
0 0 0.000 0.00 0.00m No 0.00m 0.0 kN/sqm 0 kN/sqm
H) Braking load 20% Av. Eff. Width Load per meter
Load on the span 70R Wheel 167 kN 33 kN 6.09m 0 kN/m
Load on the span 40T 400 kN 80 kN 5.89m 0 kN/m
Load on the span 70R Track 700 kN 140 kN 6.20m 0 kN/m
Load on the span sv loading 177 kN 35 kN 4.76m 0 kN/m
Max. force 0 kN/m
5.6 Calculation for Temperature Load ( IRC : 6 - 2017 )

Maximum air shade temperature 0 °C


Minimum air shade temperature 3.75 °C
Mean of max and min temperature 1.875 °C
Temperature Rise 11.875 °C
Temperature fall -8.125 °C
+/- 0
Temperature force 2698.92 kN

Effect of temperature Gradient

The Box has been checked for temperature differential

F= Ec*a*Dt*A
Ec= Modulus of Elasticity of concrete 3.21E+06 t/m^2
a= Coefficient of thermal expansion 1.20E-05 /° C (as per IRC 6)
Dt= Temperature Differential
A= X sectional area of of section where temperature
differential is Dt

Average Thickness of Deck 200 mm

Effect of temperature rise:


#N/A
4 13.8

0.06 m 1 2

3
0.10 m
0.20 m

-0.02 m
1.2
23
0.06 m 4

2.1
Sr. no. Dt b t A=bxt F(force) Acting at Eccentricity Moment

m m sqm kN m m kN-m
1 4.00 1.00 0.060 0.060 92.534 0.030 0.070 6.477
2 6.90 1.00 0.060 0.060 159.622 0.020 0.080 12.770
3 2.00 1.00 0.100 0.100 77.112 0.093 0.007 0.514
4 1.05 1.00 0.060 0.060 24.290 0.180 -0.080 -1.943
SF 353.559 Moment 17.818

Effect of temperature drop:

9.9 0.7
2
1 0.04 m

3
0.05 m
0.20 m
0.02 m

0.05 m
6
5 0.04 m
4
5.8 0.8

Acting at
Sr. no. Dt b t A=bxt F(force) Eccentricity e Moment
from top
m m sqm kN m m kN-m
1 0.70 1.00 0.040 0.040 10.796 0.020 0.080 0.864
2 4.95 1.00 0.040 0.040 76.341 0.013 0.087 6.616
3 0.35 1.00 0.050 0.050 6.747 0.057 0.043 0.292
4 2.90 1.00 0.040 0.040 44.725 0.187 -0.087 -3.876
5 0.80 1.00 0.040 0.040 12.338 0.180 -0.080 -0.987
6 0.40 1.00 0.050 0.050 7.711 0.143 -0.043 -0.334
SF 158.658 Moment 2.575
6.0 STAAD input file
Ministry of Road Transport and Highway
STAAD SPACE
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1000
2 0 2.225 0
3 2.25 2.225 0
4 2.25 0 0
5 0.225 0 0
6 0.45 0 0
7 0.675 0 0
8 0.9 0 0
9 1.125 0 0
10 1.35 0 0
11 1.575 0 0
12 1.8 0 0
13 2.025 0 0
MEMBER INCIDENCES
112
223
334
415
556
667
778
889
9 9 10
10 10 11
11 11 12
12 12 13
13 13 4
***********************************
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 32000000
POISSON 0.17
DENSITY 25
ALPHA 1e-005
DAMP 0.05
END DEFINE MATERIAL
CONSTANTS
MATERIAL CONCRETE ALL
MEMBER PROPERTY INDIAN
2 PRIS YD 0.2 ZD 1
1 3 PRIS YD 0.25 ZD 1
4 to 13 PRIS YD 0.25 ZD 1
SUPPORTS
1 FIXED BUT MX MY MZ KFY 180
5 TO 13 FIXED BUT MX MY MZ KFY 360
4 FIXED BUT MX MY MZ KFY 180
********************************************
***DL***
LOAD 1 LOADTYPE Dead TITLE DEAD LOAD
SELFWEIGHT Y -1 LIST ALL
***DL HFL CASE***
LOAD 2 LOADTYPE Dead TITLE DEAD LOAD (HFL)
SELFWEIGHT Y -1 LIST 2
SELFWEIGHT Y -0.85 LIST 1 3 TO 13
***SIDL+ Earth Fill****
LOAD 3 LOADTYPE Dead TITLE SIDL+ EARTH FILL
MEMBER LOAD
2 UNI GY -9
2 UNI GY -10.8
**Surfacing (wearing coat)
LOAD 4 LOADTYPE Dead TITLE WEARING COAT
MEMBER LOAD
2 UNI GY -11.04
****ACTIVE EARTH PRESSURE ****
LOAD 5 LOADTYPE None TITLE EARTH PRESSURE NORMAL CONDITION
MEMBER LOAD
3 TRAP GX -3.5712 -17.9955
1 TRAP GX 17.9955 3.5712
LOAD 6 LOADTYPE None TITLE LL SURCHARGE NORMAL CONDITIONS
MEMBER LOAD
3 UNI GX -6.696
1 UNI GX 6.696
LOAD 7 LOADTYPE None TITLE HFL EARTH PRESSURE
MEMBER LOAD
3 TRAP GX -1.7856 -7.71435
1 TRAP GX 7.71435 1.7856
LOAD 8 LOADTYPE None TITLE HFL LL SURCHARGE
MEMBER LOAD
3 UNI GX -3.348
1 UNI GX 3.348
LOAD 9 LOADTYPE None TITLE EARTH PRESSURE AT REST
MEMBER LOAD
3 TRAP GX -6.4 -27.65
1 TRAP GX 27.65 6.4
LOAD 10 LOADTYPE None TITLE HFL EARTH PRESSURE AT REST
MEMBER LOAD
3 TRAP GX -3.2 -13.825
1 TRAP GX 13.825 3.2
LOAD 11 WT. OF WATER ON BOTTOM SLAB
MEMBER LOAD
4 TO 13 UNI GY -0
****CLASS 70R (TOP SLAB AT MID SPAN)*******
LOAD 12 CLASS 70R (TOP SLAB AT MID SPAN)
JOINT LOAD
2 FX 0
MEMBER LOAD
2 UNI GY -21.5
******CLASS 40T (TOP SLAB AT MID SPAN)*********
LOAD 13 CLASS 40T (TOP SLAB AT MID SPAN)
JOINT LOAD
2 FX 0
MEMBER LOAD
2 UNI GY -21.4
******CLASS 40T AT SUPPORT (TOP SLAB AT SUPP.)*********
LOAD 14 CLASS 40T AT SUPPORT (TOP SLAB AT SUPP.)
JOINT LOAD
2 FX 0
MEMBER LOAD
2 UNI GY -32.1
******CLASS 70R AT SUPPORT (TOP SLAB AT SUPP.)**
LOAD 15 CLASS 70R AT SUPPORT (TOP SLAB AT SUPP.)
JOINT LOAD
2 FX 0
MEMBER LOAD
2 UNI GY -21.5
****CLASS 70R Wheel Case 1(TOP SLAB AT SUPPORT)*******
LOAD 16 CLASS 70R WHEEL CASE 1
JOINT LOAD
2 FX 0
MEMBER LOAD
2 UNI GY -13.08 0 2.25
**
**
**
**
**
**
****CLASS 70R Wheel Case 2(TOP SLAB AT MID SPAN)*******
LOAD 17 CLASS 70R WHEEL CASE 2
JOINT LOAD
2 FX 0
MEMBER LOAD
2 UNI GY -13.08 0 2.25
**
**
**
**
**
**
****CLASS 70R Wheel Case 3(TOP SLAB AT MID SPAN)*******
LOAD 18 CLASS 70R WHEEL CASE 3
JOINT LOAD
2 FX 0
MEMBER LOAD
**
**
**
**
**
**
LOAD 23 SV LOADING CASE 1
JOINT LOAD
2 FX 0
MEMBER LOAD
2 UNI GY -13.87 0 2.25
**
**
**
**
**
**
****SV LOADING Case 2(TOP SLAB AT MID SPAN)*******
LOAD 24 SV LOADING CASE 2
JOINT LOAD
2 FX 0
MEMBER LOAD
2 UNI GY -13.87 0 2.25
**
**
**
**
**
**
****SV LOADING Case 3(TOP SLAB AT MID SPAN)*******
LOAD 25 SV LOADING CASE 3
JOINT LOAD
2 FX 0
MEMBER LOAD
**
**
**
**
LOAD 19 TEMPERATURE LOADING (RISE)
TEMPERATURE LOAD
2 TEMP 0
*********Uniform decrease****
LOAD 20 TEMPERATURE LOADING (FALL)
TEMPERATURE LOAD
2 TEMP 0
***********Temperature gradient
LOAD 21 TEMPERATURE GRADIENT (RISE)
JOINT LOAD
2 FX -0
3 FX 0
2 MZ 0
3 MZ -0
LOAD 22 TEMPERATURE GRADIENT (FALL)
JOINT LOAD
2 FX 0
3 FX -0
2 MZ -0
3 MZ 0
*Partial Safety for Verification of Structural Strength (Basic Combination)
LOAD COMBINATION 26 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 12 1.15 19 1.5 21 1.5 11 1
LOAD COMBINATION 27 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 13 1.15 19 1.5 21 1.5 11 1
LOAD COMBINATION 28 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 14 1.15 19 1.5 21 1.5 11 1
LOAD COMBINATION 29 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 15 1.15 19 1.5 21 1.5 11 1
LOAD COMBINATION 30 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 16 1.15 19 1.5 21 1.5 11 1
LOAD COMBINATION 31 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 17 1.15 19 1.5 21 1.5 11 1
LOAD COMBINATION 32 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 18 1.15 19 1.5 21 1.5 11 1
LOAD COMBINATION 33 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 23 1 19 1.5 21 1.5 11 1
LOAD COMBINATION 34 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 24 1 19 1.5 21 1.5 11 1
LOAD COMBINATION 35 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 25 1 19 1.5 21 1.5 11 1
LOAD COMBINATION 36 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 12 1.5 20 1.5 22 1.5
LOAD COMBINATION 37 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 13 1.5 20 1.5 22 1.5
LOAD COMBINATION 38 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 14 1.5 20 1.5 22 1.5
LOAD COMBINATION 39 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 15 1.5 20 1.5 22 1.5
LOAD COMBINATION 40 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 16 1.5 20 1.5 22 1.5
LOAD COMBINATION 41 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 17 1.5 20 1.5 22 1.5
LOAD COMBINATION 42 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 18 1.5 20 1.5 22 1.5
LOAD COMBINATION 43 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 23 1 20 1.5 22 1.5
LOAD COMBINATION 44 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 24 1 20 1.5 22 1.5
LOAD COMBINATION 45 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 25 1 20 1.5 22 1.5
LOAD COMBINATION 46 BASIC COMBINATION STR. AT REST
1 1.35 3 1.35 4 1.75 9 1.5
*HFL Partial Safety for Verification of Structural Strength (Basic Combination)
LOAD COMBINATION 47 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 8 1.2 12 1.15 11 1 19 1.5 21 1.5
LOAD COMBINATION 48 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 8 1.2 13 1.15 11 1 19 1.5 21 1.5
LOAD COMBINATION 49 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 8 1.2 14 1.15 11 1 19 1.5 21 1.5
LOAD COMBINATION 50 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 8 1.2 15 1.15 11 1 19 1.5 21 1.5
LOAD COMBINATION 51 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 8 1.2 16 1.15 11 1 19 1.5 21 1.5
LOAD COMBINATION 52 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 8 1.2 17 1.15 11 1 19 1.5 21 1.5
LOAD COMBINATION 53 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 8 1.2 18 1.15 11 1 19 1.5 21 1.5
LOAD COMBINATION 54 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 8 1.2 23 1 11 1 19 1.5 21 1.5
LOAD COMBINATION 55 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 8 1.2 24 1 11 1 19 1.5 21 1.5
LOAD COMBINATION 56 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 8 1.2 25 1 11 1 19 1.5 21 1.5
LOAD COMBINATION 57 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 8 1.2 12 1.5 11 1 20 1.5 22 1.5
LOAD COMBINATION 58 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 8 1.2 13 1.5 11 1 20 1.5 22 1.5
LOAD COMBINATION 59 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 8 1.2 14 1.5 11 1 20 1.5 22 1.5
LOAD COMBINATION 60 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 8 1.2 15 1.5 11 1 20 1.5 22 1.5
LOAD COMBINATION 61 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 8 1.2 16 1.5 11 1 20 1.5 22 1.5
LOAD COMBINATION 62 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 8 1.2 17 1.5 11 1 20 1.5 22 1.5
LOAD COMBINATION 63 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 8 1.2 18 1.5 11 1 20 1.5 22 1.5
LOAD COMBINATION 64 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 8 1.2 23 1 11 1 20 1.5 22 1.5
LOAD COMBINATION 65 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 8 1.2 24 1 11 1 20 1.5 22 1.5
LOAD COMBINATION 66 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 8 1.2 25 1 11 1 20 1.5 22 1.5
LOAD COMBINATION 67 BASIC COMBINATION STR. AT REST
2 1.35 3 1.35 4 1.75 10 1.5 11 1
*Partial Safety for Verification of Structural Strength (Basic Combination)
LOAD COMBINATION 68 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 19 1.5 21 1.5
LOAD COMBINATION 69 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 19 1.5 21 1.5
LOAD COMBINATION 70 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 19 1.5 21 1.5
LOAD COMBINATION 71 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 19 1.5 21 1.5
LOAD COMBINATION 72 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 19 1.5 21 1.5
LOAD COMBINATION 73 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 19 1.5 21 1.5
LOAD COMBINATION 74 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 19 1.5 21 1.5
LOAD COMBINATION 75 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 20 1.5 22 1.5
LOAD COMBINATION 76 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 20 1.5 22 1.5
LOAD COMBINATION 77 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 20 1.5 22 1.5
LOAD COMBINATION 78 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 20 1.5 22 1.5
LOAD COMBINATION 79 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 20 1.5 22 1.5
LOAD COMBINATION 80 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 20 1.5 22 1.5
LOAD COMBINATION 81 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 20 1.5 22 1.5
LOAD COMBINATION 82 BASIC COMBINATION STR. AT REST
1 1.35 3 1.35 4 1.75 9 1.5
*HFL Partial Safety for Verification of Structural Strength (Basic Combination)
LOAD COMBINATION 83 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 11 1 19 1.5 21 1.5
LOAD COMBINATION 84 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 11 1 19 1.5 21 1.5
LOAD COMBINATION 85 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 11 1 19 1.5 21 1.5
LOAD COMBINATION 86 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 11 1 19 1.5 21 1.5
LOAD COMBINATION 87 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 11 1 19 1.5 21 1.5
LOAD COMBINATION 88 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 11 1 19 1.5 21 1.5
LOAD COMBINATION 89 BASIC COMBINATION EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 11 1 19 1.5 21 1.5
LOAD COMBINATION 90 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 11 1 20 1.5 22 1.5
LOAD COMBINATION 91 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 11 1 20 1.5 22 1.5
LOAD COMBINATION 92 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 11 1 20 1.5 22 1.5
LOAD COMBINATION 93 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 11 1 20 1.5 22 1.5
LOAD COMBINATION 94 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 11 1 20 1.5 22 1.5
LOAD COMBINATION 95 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 11 1 20 1.5 22 1.5
LOAD COMBINATION 96 BASIC COMBINATION LIVE LOAD AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 11 1 20 1.5 22 1.5
LOAD COMBINATION 97 BASIC COMBINATION STR. AT REST
2 1.35 3 1.35 4 1.75 10 1.5 11 1
*Partial Safety for Verification of Serviceability Limit State (Accidental Combination)
LOAD COMBINATION 98 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 12 0.75 19 0.5 21 0.5
LOAD COMBINATION 99 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 13 0.75 19 0.5 21 0.5
LOAD COMBINATION 100 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 14 0.75 19 0.5 21 0.5
LOAD COMBINATION 101 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 15 0.75 19 0.5 21 0.5
LOAD COMBINATION 102 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 16 0.75 19 0.5 21 0.5
LOAD COMBINATION 103 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 17 0.75 19 0.5 21 0.5
LOAD COMBINATION 104 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 18 0.75 19 0.5 21 0.5
LOAD COMBINATION 105 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 23 0.75 19 0.5 21 0.5
LOAD COMBINATION 106 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 24 0.75 19 0.5 21 0.5
LOAD COMBINATION 107 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 25 0.75 19 0.5 21 0.5
LOAD COMBINATION 108 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 12 0.75 20 0.5 22 0.5
LOAD COMBINATION 109 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 13 0.75 20 0.5 22 0.5
LOAD COMBINATION 110 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 14 0.75 20 0.5 22 0.5
LOAD COMBINATION 111 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 15 0.75 20 0.5 22 0.5
LOAD COMBINATION 112 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 16 0.75 20 0.5 22 0.5
LOAD COMBINATION 113 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 17 0.75 20 0.5 22 0.5
LOAD COMBINATION 114 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 18 0.75 20 0.5 22 0.5
LOAD COMBINATION 115 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 23 0.75 20 0.5 22 0.5
LOAD COMBINATION 116 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 24 0.75 20 0.5 22 0.5
LOAD COMBINATION 117 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.2 25 0.75 20 0.5 22 0.5
LOAD COMBINATION 118 THERMAL AT REST CONDITIONS
1 1 3 1 4 1 9 1 19 0.5 21 0.5
LOAD COMBINATION 119 THERMAL AT REST CONDITIONS
1 1 3 1 4 1 9 1 20 0.5 22 0.5
* HFL Partial Safety for Verification of Serviceability Limit State (Accidental Combination)
LOAD COMBINATION 120 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 12 0.75 19 0.5 21 0.8 11 1
LOAD COMBINATION 121 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 13 0.75 19 0.5 21 0.8 11 1
LOAD COMBINATION 122 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 14 0.75 19 0.5 21 0.8 11 1
LOAD COMBINATION 123 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 15 0.75 19 0.5 21 0.8 11 1
LOAD COMBINATION 124 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 16 0.75 19 0.5 21 0.8 11 1
LOAD COMBINATION 125 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 17 0.75 19 0.5 21 0.8 11 1
LOAD COMBINATION 126 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 18 0.75 19 0.5 21 0.8 11 1
LOAD COMBINATION 127 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 23 0.75 19 0.5 21 0.8 11 1
LOAD COMBINATION 128 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 24 0.75 19 0.5 21 0.8 11 1
LOAD COMBINATION 129 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 25 0.75 19 0.5 21 0.8 11 1
LOAD COMBINATION 130 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 12 0.75 20 0.5 22 0.8 11 1
LOAD COMBINATION 131 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 13 0.75 20 0.5 22 0.8 11 1
LOAD COMBINATION 132 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 14 0.75 20 0.5 22 0.8 11 1
LOAD COMBINATION 133 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 15 0.75 20 0.5 22 0.8 11 1
LOAD COMBINATION 134 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 16 0.75 20 0.5 22 0.8 11 1
LOAD COMBINATION 135 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 17 0.75 20 0.5 22 0.8 11 1
LOAD COMBINATION 136 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 18 0.75 20 0.5 22 0.8 11 1
LOAD COMBINATION 137 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 23 0.75 20 0.5 22 0.8 11 1
LOAD COMBINATION 138 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 24 0.75 20 0.5 22 0.8 11 1
LOAD COMBINATION 139 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.2 25 0.75 20 0.5 22 0.8 11 1
LOAD COMBINATION 140 THERMAL AT REST CONDITIONS
2 1 3 1 4 1 10 1 19 0.5 21 0.5 11 1
LOAD COMBINATION 141 THERMAL AT REST CONDITIONS
2 1 3 1 4 1 10 1 20 0.5 22 0.5 11 1
*Partial Safety for Verification of Serviceability Limit State (Rare Combination)
LOAD COMBINATION 142 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 12 1 19 0.8 21 0.8
LOAD COMBINATION 143 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 13 1 19 0.8 21 0.8
LOAD COMBINATION 144 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 14 1 19 0.8 21 0.8
LOAD COMBINATION 145 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 15 1 19 0.8 21 0.8
LOAD COMBINATION 146 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 16 1 19 0.8 21 0.8
LOAD COMBINATION 147 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 17 1 19 0.8 21 0.8
LOAD COMBINATION 148 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 18 1 19 0.8 21 0.8
LOAD COMBINATION 149 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 23 1 19 0.8 21 0.8
LOAD COMBINATION 150 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 24 1 19 0.8 21 0.8
LOAD COMBINATION 151 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 25 1 19 0.8 21 0.8
LOAD COMBINATION 152 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 12 1 20 0.8 22 0.8
LOAD COMBINATION 153 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 13 1 20 0.8 22 0.8
LOAD COMBINATION 154 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 14 1 20 0.8 22 0.8
LOAD COMBINATION 155 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 15 1 20 0.8 22 0.8
LOAD COMBINATION 156 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 16 1 20 0.8 22 0.8
LOAD COMBINATION 157 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 17 1 20 0.8 22 0.8
LOAD COMBINATION 158 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 18 1 20 0.8 22 0.8
LOAD COMBINATION 159 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 23 1 20 0.8 22 0.8
LOAD COMBINATION 160 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 24 1 20 0.8 22 0.8
LOAD COMBINATION 161 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 25 1 20 0.8 22 0.8
LOAD COMBINATION 162 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 12 0.75 19 1 21 1
LOAD COMBINATION 163 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 13 0.75 19 1 21 1
LOAD COMBINATION 164 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 14 0.75 19 1 21 1
LOAD COMBINATION 165 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 15 0.75 19 1 21 1
LOAD COMBINATION 166 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 16 0.75 19 1 21 1
LOAD COMBINATION 167 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 17 0.75 19 1 21 1
LOAD COMBINATION 168 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 18 0.75 19 1 21 1
LOAD COMBINATION 169 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 23 0.75 19 1 21 1
LOAD COMBINATION 170 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 24 0.75 19 1 21 1
LOAD COMBINATION 171 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 25 0.75 19 1 21 1
LOAD COMBINATION 172 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 12 0.75 20 1 22 1
LOAD COMBINATION 173 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 13 0.75 20 1 22 1
LOAD COMBINATION 174 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 14 0.75 20 1 22 1
LOAD COMBINATION 175 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 15 0.75 20 1 22 1
LOAD COMBINATION 176 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 16 0.75 20 1 22 1
LOAD COMBINATION 177 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 17 0.75 20 1 22 1
LOAD COMBINATION 178 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 18 0.75 20 1 22 1
LOAD COMBINATION 179 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 23 0.75 20 1 22 1
LOAD COMBINATION 180 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 24 0.75 20 1 22 1
LOAD COMBINATION 181 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 6 0.8 25 0.75 20 1 22 1
LOAD COMBINATION 182 THERMAL AT REST CONDITIONS
1 1 3 1 4 1 9 1 19 1 21 1
LOAD COMBINATION 183 THERMAL AT REST CONDITIONS
1 1 3 1 4 1 9 1 20 1 22 1
* HFL Partial Safety for Verification of Serviceability Limit State (Rare Combination)
LOAD COMBINATION 184 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 12 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 185 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 13 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 186 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 14 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 187 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 15 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 188 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 16 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 189 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 17 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 190 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 18 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 191 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 23 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 192 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 24 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 193 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 25 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 194 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 12 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 195 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 13 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 196 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 14 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 197 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 15 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 198 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 16 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 199 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 17 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 200 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 18 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 201 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 23 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 202 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 24 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 203 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 25 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 204 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 12 0.75 19 1 21 1 11 1
LOAD COMBINATION 205 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 13 0.75 19 1 21 1 11 1
LOAD COMBINATION 206 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 14 0.75 19 1 21 1 11 1
LOAD COMBINATION 207 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 15 0.75 19 1 21 1 11 1
LOAD COMBINATION 208 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 16 0.75 19 1 21 1 11 1
LOAD COMBINATION 209 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 17 0.75 19 1 21 1 11 1
LOAD COMBINATION 210 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 18 0.75 19 1 21 1 11 1
LOAD COMBINATION 211 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 23 0.75 19 1 21 1 11 1
LOAD COMBINATION 212 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 24 0.75 19 1 21 1 11 1
LOAD COMBINATION 213 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 25 0.75 19 1 21 1 11 1
LOAD COMBINATION 214 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 12 0.75 20 1 22 1 11 1
LOAD COMBINATION 215 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 13 0.75 20 1 22 1 11 1
LOAD COMBINATION 216 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 14 0.75 20 1 22 1 11 1
LOAD COMBINATION 217 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 15 0.75 20 1 22 1 11 1
LOAD COMBINATION 218 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 16 0.75 20 1 22 1 11 1
LOAD COMBINATION 219 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 17 0.75 20 1 22 1 11 1
LOAD COMBINATION 220 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 18 0.75 20 1 22 1 11 1
LOAD COMBINATION 221 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 23 0.75 20 1 22 1 11 1
LOAD COMBINATION 222 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 24 0.75 20 1 22 1 11 1
LOAD COMBINATION 223 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 8 0.8 25 0.75 20 1 22 1 11 1
LOAD COMBINATION 224 THERMAL AT REST CONDITIONS
2 1 3 1 4 1 10 1 19 1 21 1 11 1
LOAD COMBINATION 225 THERMAL AT REST CONDITIONS
2 1 3 1 4 1 10 1 20 1 22 1 11 1
*Partial Safety for Verification of Serviceability Limit State (Frequent Combination)
LOAD COMBINATION 226 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 12 0.75 19 0.5 21 0.5
LOAD COMBINATION 227 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 13 0.75 19 0.5 21 0.5
LOAD COMBINATION 228 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 14 0.75 19 0.5 21 0.5
LOAD COMBINATION 229 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 15 0.75 19 0.5 21 0.5
LOAD COMBINATION 230 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 16 0.75 19 0.5 21 0.5
LOAD COMBINATION 231 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 17 0.75 19 0.5 21 0.5
LOAD COMBINATION 232 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 18 0.75 19 0.5 21 0.5
LOAD COMBINATION 233 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 23 0.75 19 0.5 21 0.5
LOAD COMBINATION 234 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 24 0.75 19 0.5 21 0.5
LOAD COMBINATION 235 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 25 0.75 19 0.5 21 0.5
LOAD COMBINATION 236 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 12 0.75 20 0.5 22 0.5
LOAD COMBINATION 237 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 13 0.75 20 0.5 22 0.5
LOAD COMBINATION 238 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 14 0.75 20 0.5 22 0.5
LOAD COMBINATION 239 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 15 0.75 20 0.5 22 0.5
LOAD COMBINATION 240 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 16 0.75 20 0.5 22 0.5
LOAD COMBINATION 241 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 17 0.75 20 0.5 22 0.5
LOAD COMBINATION 242 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 18 0.75 20 0.5 22 0.5
LOAD COMBINATION 243 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 23 0.75 20 0.5 22 0.5
LOAD COMBINATION 244 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 24 0.75 20 0.5 22 0.5
LOAD COMBINATION 245 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 25 0.75 20 0.5 22 0.5
LOAD COMBINATION 246 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 12 0.2 19 0.6 21 0.6
LOAD COMBINATION 247 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 13 0.2 19 0.6 21 0.6
LOAD COMBINATION 248 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 14 0.2 19 0.6 21 0.6
LOAD COMBINATION 249 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 15 0.2 19 0.6 21 0.6
LOAD COMBINATION 250 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 16 0.2 19 0.6 21 0.6
LOAD COMBINATION 251 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 17 0.2 19 0.6 21 0.6
LOAD COMBINATION 252 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 18 0.2 19 0.6 21 0.6
LOAD COMBINATION 253 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 23 0.2 19 0.6 21 0.6
LOAD COMBINATION 254 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 24 0.2 19 0.6 21 0.6
LOAD COMBINATION 255 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 25 0.2 19 0.6 21 0.6
LOAD COMBINATION 256 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 12 0.2 20 0.6 22 0.6
LOAD COMBINATION 257 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 13 0.2 20 0.6 22 0.6
LOAD COMBINATION 258 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 14 0.2 20 0.6 22 0.6
LOAD COMBINATION 259 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 15 0.2 20 0.6 22 0.6
LOAD COMBINATION 260 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 16 0.2 20 0.6 22 0.6
LOAD COMBINATION 261 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 17 0.2 20 0.6 22 0.6
LOAD COMBINATION 262 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 18 0.2 20 0.6 22 0.6
LOAD COMBINATION 263 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 23 0.2 20 0.6 22 0.6
LOAD COMBINATION 264 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 24 0.2 20 0.6 22 0.6
LOAD COMBINATION 265 THERMAL AS LEADING LOAD
1 1 3 1 4 1 5 1 25 0.2 20 0.6 22 0.6
LOAD COMBINATION 266 THERMAL AT REST CONDITIONS
1 1 3 1 4 1 9 1 19 0.6 21 0.6
LOAD COMBINATION 267 THERMAL AT REST CONDITIONS
1 1 3 1 4 1 9 1 20 0.6 22 0.6
* HFL Partial Safety for Verification of Serviceability Limit State (Frequent Combination)
LOAD COMBINATION 268 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 12 0.75 19 0.5 21 0.5 11 1
LOAD COMBINATION 269 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 13 0.75 19 0.5 21 0.5 11 1
LOAD COMBINATION 270 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 14 0.75 19 0.5 21 0.5 11 1
LOAD COMBINATION 271 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 15 0.75 19 0.5 21 0.5 11 1
LOAD COMBINATION 272 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 16 0.75 19 0.5 21 0.5 11 1
LOAD COMBINATION 273 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 17 0.75 19 0.5 21 0.5 11 1
LOAD COMBINATION 274 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 18 0.75 19 0.5 21 0.5 11 1
LOAD COMBINATION 275 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 23 0.75 19 0.5 21 0.5 11 1
LOAD COMBINATION 276 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 24 0.75 19 0.5 21 0.5 11 1
LOAD COMBINATION 277 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 25 0.75 19 0.5 21 0.5 11 1
LOAD COMBINATION 278 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 12 0.75 20 0.5 22 0.5 11 1
LOAD COMBINATION 279 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 13 0.75 20 0.5 22 0.5 11 1
LOAD COMBINATION 280 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 14 0.75 20 0.5 22 0.5 11 1
LOAD COMBINATION 281 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 15 0.75 20 0.5 22 0.5 11 1
LOAD COMBINATION 282 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 16 0.75 20 0.5 22 0.5 11 1
LOAD COMBINATION 283 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 17 0.75 20 0.5 22 0.5 11 1
LOAD COMBINATION 284 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 18 0.75 20 0.5 22 0.5 11 1
LOAD COMBINATION 285 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 23 0.75 20 0.5 22 0.5 11 1
LOAD COMBINATION 286 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 24 0.75 20 0.5 22 0.5 11 1
LOAD COMBINATION 287 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 25 0.75 20 0.5 22 0.5 11 1
LOAD COMBINATION 288 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 12 0.2 19 0.6 21 0.6 11 1
LOAD COMBINATION 289 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 13 0.2 19 0.6 21 0.6 11 1
LOAD COMBINATION 290 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 14 0.2 19 0.6 21 0.6 11 1
LOAD COMBINATION 291 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 15 0.2 19 0.6 21 0.6 11 1
LOAD COMBINATION 292 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 16 0.2 19 0.6 21 0.6 11 1
LOAD COMBINATION 293 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 17 0.2 19 0.6 21 0.6 11 1
LOAD COMBINATION 294 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 18 0.2 19 0.6 21 0.6 11 1
LOAD COMBINATION 295 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 23 0.2 19 0.6 21 0.6 11 1
LOAD COMBINATION 296 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 24 0.2 19 0.6 21 0.6 11 1
LOAD COMBINATION 297 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 25 0.2 19 0.6 21 0.6 11 1
LOAD COMBINATION 298 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 12 0.2 20 0.6 22 0.6 11 1
LOAD COMBINATION 299 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 13 0.2 20 0.6 22 0.6 11 1
LOAD COMBINATION 300 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 14 0.2 20 0.6 22 0.6 11 1
LOAD COMBINATION 301 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 15 0.2 20 0.6 22 0.6 11 1
LOAD COMBINATION 302 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 16 0.2 20 0.6 22 0.6 11 1
LOAD COMBINATION 303 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 17 0.2 20 0.6 22 0.6 11 1
LOAD COMBINATION 304 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 18 0.2 20 0.6 22 0.6 11 1
LOAD COMBINATION 305 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 23 0.2 20 0.6 22 0.6 11 1
LOAD COMBINATION 306 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 24 0.2 20 0.6 22 0.6 11 1
LOAD COMBINATION 307 THERMAL AS LEADING LOAD
2 1 3 1 4 1 7 1 25 0.2 20 0.6 22 0.6 11 1
LOAD COMBINATION 308 THERMAL AT REST CONDITIONS
2 1 3 1 4 1 10 1 19 0.6 21 0.6 11 1
LOAD COMBINATION 309 THERMAL AT REST CONDITIONS
2 1 3 1 4 1 10 1 20 0.6 22 0.6 11 1
*Partial Safety for Verification of Serviceability Limit State (Quasi-permanent Combination)
LOAD COMBINATION 310 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 19 0.5 21 0.5
LOAD COMBINATION 311 LL AS LEADING LOAD
1 1 3 1 4 1 5 1 20 0.5 22 0.5
*HFL Partial Safety for Verification of Serviceability Limit State (Quasi-permanent Combination)
LOAD COMBINATION 312 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 19 0.5 21 0.5 11 1
LOAD COMBINATION 313 LL AS LEADING LOAD
2 1 3 1 4 1 7 1 20 0.5 22 0.5 11 1
*Combination for Base Pressure and Design of Foundation (Combination 1 )
LOAD COMBINATION 314 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 12 1.15 19 0.9 21 0.9
LOAD COMBINATION 315 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 13 1.15 19 0.9 21 0.9
LOAD COMBINATION 316 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 14 1.15 19 0.9 21 0.9
LOAD COMBINATION 317 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 15 1.15 19 0.9 21 0.9
LOAD COMBINATION 318 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 16 1.15 19 0.9 21 0.9
LOAD COMBINATION 319 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 17 1.15 19 0.9 21 0.9
LOAD COMBINATION 320 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 18 1.15 19 0.9 21 0.9
LOAD COMBINATION 321 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 23 1 19 0.9 21 0.9
LOAD COMBINATION 322 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 24 1 19 0.9 21 0.9
LOAD COMBINATION 323 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 25 1 19 0.9 21 0.9
LOAD COMBINATION 324 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 12 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 325 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 13 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 326 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 14 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 327 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 15 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 328 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 16 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 329 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 17 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 330 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 18 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 331 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 23 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 332 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 24 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 333 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 6 1.2 25 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 334 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 12 1.5 19 0.9 21 0.9
LOAD COMBINATION 335 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 13 1.5 19 0.9 21 0.9
LOAD COMBINATION 336 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 14 1.5 19 0.9 21 0.9
LOAD COMBINATION 337 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 15 1.5 19 0.9 21 0.9
LOAD COMBINATION 338 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 16 1.5 19 0.9 21 0.9
LOAD COMBINATION 339 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 17 1.5 19 0.9 21 0.9
LOAD COMBINATION 340 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 18 1.5 19 0.9 21 0.9
LOAD COMBINATION 341 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 23 1 19 0.9 21 0.9
LOAD COMBINATION 342 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 24 1 19 0.9 21 0.9
LOAD COMBINATION 343 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 25 1 19 0.9 21 0.9
LOAD COMBINATION 344 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 12 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 345 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 13 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 346 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 14 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 347 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 15 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 348 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 16 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 349 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 17 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 350 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 18 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 351 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 23 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 352 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 24 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 353 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 6 1.2 25 1 20 0.9 22 0.9 11 1
*HFL Combination for Base Pressure and Design of Foundation (Combination 1 )
LOAD COMBINATION 354 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 12 1.15 19 0.9 21 0.9 11 1
LOAD COMBINATION 355 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 13 1.15 19 0.9 21 0.9 11 1
LOAD COMBINATION 356 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 14 1.15 19 0.9 21 0.9 11 1
LOAD COMBINATION 357 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 15 1.15 19 0.9 21 0.9 11 1
LOAD COMBINATION 358 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 16 1.15 19 0.9 21 0.9 11 1
LOAD COMBINATION 359 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 17 1.15 19 0.9 21 0.9 11 1
LOAD COMBINATION 360 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 18 1.15 19 0.9 21 0.9 11 1
LOAD COMBINATION 361 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 23 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 362 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 24 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 363 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 25 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 364 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 12 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 365 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 13 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 366 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 14 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 367 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 15 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 368 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 16 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 369 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 17 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 370 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 18 1.15 20 0.9 22 0.9 11 1
LOAD COMBINATION 371 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 23 1 21 0.9 23 0.9 11 1
LOAD COMBINATION 372 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 24 1 21 0.9 23 0.9 11 1
LOAD COMBINATION 373 EARTH PRESSURE AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1.5 6 1.2 25 1 21 0.9 23 0.9 11 1
LOAD COMBINATION 374 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 12 1.5 19 0.9 21 0.9 11 1
LOAD COMBINATION 375 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 13 1.5 19 0.9 21 0.9 11 1
LOAD COMBINATION 376 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 14 1.5 19 0.9 21 0.9 11 1
LOAD COMBINATION 377 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 15 1.5 19 0.9 21 0.9 11 1
LOAD COMBINATION 378 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 16 1.5 19 0.9 21 0.9 11 1
LOAD COMBINATION 379 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 17 1.5 19 0.9 21 0.9 11 1
LOAD COMBINATION 380 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 18 1.5 19 0.9 21 0.9 11 1
LOAD COMBINATION 381 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 23 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 382 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 24 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 383 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 25 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 384 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 12 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 385 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 13 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 386 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 14 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 387 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 15 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 388 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 16 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 389 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 17 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 390 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 18 1.5 20 0.9 22 0.9 11 1
LOAD COMBINATION 391 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 23 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 392 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 24 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 393 LL AS A LEADING LOAD
2 1.35 3 1.35 4 1.75 7 1 6 1.2 25 1 20 0.9 22 0.9 11 1
LOAD COMBINATION 394 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 12 1.15 19 0.9 21 0.9
LOAD COMBINATION 395 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 13 1.15 19 0.9 21 0.9
LOAD COMBINATION 396 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 14 1.15 19 0.9 21 0.9
LOAD COMBINATION 397 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 15 1.15 19 0.9 21 0.9
LOAD COMBINATION 398 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 16 1.15 19 0.9 21 0.9
LOAD COMBINATION 399 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 17 1.15 19 0.9 21 0.9
LOAD COMBINATION 400 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 18 1.15 19 0.9 21 0.9
LOAD COMBINATION 401 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 12 1.15 20 0.9 22 0.9
LOAD COMBINATION 402 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 13 1.15 20 0.9 22 0.9
LOAD COMBINATION 403 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 14 1.15 20 0.9 22 0.9
LOAD COMBINATION 404 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 15 1.15 20 0.9 22 0.9
LOAD COMBINATION 405 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 16 1.15 20 0.9 22 0.9
LOAD COMBINATION 406 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 17 1.15 20 0.9 22 0.9
LOAD COMBINATION 407 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 18 1.15 20 0.9 22 0.9
LOAD COMBINATION 408 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 23 1 20 0.9 22 0.9
LOAD COMBINATION 409 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 24 1 20 0.9 22 0.9
LOAD COMBINATION 410 EARTH PRESSURE AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1.5 25 1 20 0.9 22 0.9
LOAD COMBINATION 411 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 12 1.5 19 0.9 21 0.9
LOAD COMBINATION 412 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 13 1.5 19 0.9 21 0.9
LOAD COMBINATION 413 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 14 1.5 19 0.9 21 0.9
LOAD COMBINATION 414 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 15 1.5 19 0.9 21 0.9
LOAD COMBINATION 415 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 16 1.5 19 0.9 21 0.9
LOAD COMBINATION 416 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 17 1.5 19 0.9 21 0.9
LOAD COMBINATION 417 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 18 1.5 19 0.9 21 0.9
LOAD COMBINATION 418 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 23 1 19 0.9 21 0.9
LOAD COMBINATION 419 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 24 1 19 0.9 21 0.9
LOAD COMBINATION 420 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 25 1 19 0.9 21 0.9
LOAD COMBINATION 421 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 12 1.5 20 0.9 22 0.9
LOAD COMBINATION 422 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 13 1.5 20 0.9 22 0.9
LOAD COMBINATION 423 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 14 1.5 20 0.9 22 0.9
LOAD COMBINATION 424 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 15 1.5 20 0.9 22 0.9
LOAD COMBINATION 425 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 16 1.5 20 0.9 22 0.9
LOAD COMBINATION 426 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 17 1.5 20 0.9 22 0.9
LOAD COMBINATION 427 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 18 1.5 20 0.9 22 0.9
LOAD COMBINATION 428 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 23 1 20 0.9 22 0.9
LOAD COMBINATION 429 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 24 1 20 0.9 22 0.9
LOAD COMBINATION 430 LL AS A LEADING LOAD
1 1.35 3 1.35 4 1.75 5 1 25 1 20 0.9 22 0.9
*Combination for Base Pressure and Design of Foundation (Combination 2 )
LOAD COMBINATION 431 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 12 1 19 0.8 21 0.8
LOAD COMBINATION 432 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 13 1 19 0.8 21 0.8
LOAD COMBINATION 433 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 14 1 19 0.8 21 0.8
LOAD COMBINATION 434 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 15 1 19 0.8 21 0.8
LOAD COMBINATION 435 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 16 1 19 0.8 21 0.8
LOAD COMBINATION 436 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 17 1 19 0.8 21 0.8
LOAD COMBINATION 437 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 18 1 19 0.8 21 0.8
LOAD COMBINATION 438 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 23 1 19 0.8 21 0.8
LOAD COMBINATION 439 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 24 1 19 0.8 21 0.8
LOAD COMBINATION 440 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 25 1 19 0.8 21 0.8
LOAD COMBINATION 441 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 12 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 442 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 13 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 443 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 14 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 444 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 15 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 445 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 16 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 446 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 17 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 447 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 18 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 448 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 23 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 449 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 24 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 450 EARTH PRESSURE AS A LEADING LOAD
1 1 3 1 4 1 5 1.3 6 1 25 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 451 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 12 1.3 19 0.8 21 0.8
LOAD COMBINATION 452 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 13 1.3 19 0.8 21 0.8
LOAD COMBINATION 453 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 14 1.3 19 0.8 21 0.8
LOAD COMBINATION 454 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 15 1.3 19 0.8 21 0.8
LOAD COMBINATION 455 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 16 1.3 19 0.8 21 0.8
LOAD COMBINATION 456 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 17 1.3 19 0.8 21 0.8
LOAD COMBINATION 457 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 18 1.3 19 0.8 21 0.8
LOAD COMBINATION 458 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 23 1 19 0.8 21 0.8
LOAD COMBINATION 459 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 24 1 19 0.8 21 0.8
LOAD COMBINATION 460 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 25 1 19 0.8 21 0.8
LOAD COMBINATION 461 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 12 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 462 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 13 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 463 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 14 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 464 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 15 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 465 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 16 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 466 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 17 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 467 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 18 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 468 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 23 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 469 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 24 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 470 LL AS A LEADING LOAD
1 1 3 1 4 1 5 0.8 6 1 25 1 20 0.8 22 0.8 11 1
*HFL Combination for Base Pressure and Design of Foundation (Combination 2 )
LOAD COMBINATION 471 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 12 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 472 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 13 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 473 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 14 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 474 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 15 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 475 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 16 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 476 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 17 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 477 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 18 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 478 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 23 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 479 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 24 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 480 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 25 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 481 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 12 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 482 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 13 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 483 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 14 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 484 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 15 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 485 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 16 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 486 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 17 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 487 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 18 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 488 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 23 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 489 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 24 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 490 EARTH PRESSURE AS A LEADING LOAD
2 1 3 1 4 1 7 1.3 6 1 25 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 491 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 12 1.3 19 0.8 21 0.8 11 1
LOAD COMBINATION 492 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 13 1.3 19 0.8 21 0.8 11 1
LOAD COMBINATION 493 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 14 1.3 19 0.8 21 0.8 11 1
LOAD COMBINATION 494 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 15 1.3 19 0.8 21 0.8 11 1
LOAD COMBINATION 495 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 16 1.3 19 0.8 21 0.8 11 1
LOAD COMBINATION 496 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 17 1.3 19 0.8 21 0.8 11 1
LOAD COMBINATION 497 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 18 1.3 19 0.8 21 0.8 11 1
LOAD COMBINATION 498 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 23 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 499 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 24 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 500 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 25 1 19 0.8 21 0.8 11 1
LOAD COMBINATION 501 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 12 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 502 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 13 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 503 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 14 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 504 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 15 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 505 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 16 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 506 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 17 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 507 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 18 1.3 20 0.8 22 0.8 11 1
LOAD COMBINATION 508 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 23 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 509 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 24 1 20 0.8 22 0.8 11 1
LOAD COMBINATION 510 LL AS A LEADING LOAD
2 1 3 1 4 1 7 0.8 6 1 25 1 20 0.8 22 0.8 11 1
** For base pressure check only
LOAD COMBINATION 511 BASE PRESSURE CHECK FOR LWL CONDITION
1 1 3 1 4 1 5 1 6 1 14 1
LOAD COMBINATION 512 BASE PRESSURE CHECK FOR HFL CONDITION
2 1 3 1 4 1 7 1 8 1 14 1 11 1
PERFORM ANALYSIS PRINT STATICS CHECK
FINISH
7.0 - Summary of Design moments
Values from stadd model

Dimension of Cell TOP SLAB BOTTOM SLAB OUTER SLAB

Moment in Mid- Moment at end Moment in Mid- Moment at end Moment in Mid- Moment at top Moment at Bottom
Load Case
span support span support span support support

Bottom Face Top Face Inner face


kN-m kN-m kN-m kN-m kN-m kN-m

Partial safety factor for verification


of structural strength(Basic 32.76 17.71 - - 19.14 29.22 25.58
combination) LC-23 to 52

Partial safety factor for verification


of structural strength(Accidental 19.44 10.52 - - 11.05 17.38 15.79
combination) LC-53 to 84

Partial safety factor for verification


of Serviceability limit state(Rare 21.67 12.30 30.69 15.52 12.10 19.78 17.73
combination) LC-85 to 144

Partial safety factor for verification


of Serviceability limit
19.61 10.35 28.36 13.23 11.35 17.35 15.67
state(Frequent combination) LC-
145 to 204

Partial safety factor for verification


of Serviceability limit state (Quasi- 11.37 6.55 17.82 9.93 5.31 10.87 10.87
permanent) LC-205 to 208

Partial safety factor for design of


foundation(Combination-1) - - 47.96 21.51 - - -
LC-209 to 264

Partial safety factor for design of


foundation(Combination-2)
LC-265 to 320
- - 35.11 16.63 - - -
0.5

Summary of Design Shear Force at deff from face of support

Top slab Bottom slab Outer wall Inner wall


Load Case
kN kN kN

Partial safety for verification of


structural strength(Basic 80.76 - 22.80 49.21
combination)

Partial safety factor for design of


91.57
foundation(Combination-1)

Partial safety factor for design of


70.02
foundation(Combination-2)
8.1 Verification of structural strength for top slab
Grade of Concrete fck 35 N/mm2

fcd 15.63 N/mm2 For Basic Combination


fcd 19.54 N/mm2 For Accidental Combination
fcd 15.63 N/mm2 For Seismic Combination
Ec 32000 Mpa As per Table A4.2 of (IRC 112-
2011)
Grade of Steel fy 500.00 N/mm2
As per clause 6.4.2.8, IRC : 112-2011
fyd 434.78 N/mm2 For Basic Combination
fyd 500.00 N/mm2 For Accidental Combination
fyd 434.78 N/mm2 For Seismic Combination
Compressive force in concrete Cu= fcd *b*(3/7xu + 2/3*4/7xu)
17/21*fcd*b*xu
Tensile force in steel Tu= fyd * Ast
Lever Arm = d - (0.416*xu)

Basic combination Accidental combination


Moment of the section Mid span Support Mid span Support Unit

Factored Moment (M1) 32.76 17.71 19.44 10.52 kNm


Design Moment(M=M1) 32.76 17.71 19.44 10.52 kNm
Width(b) 1000 1000 1000 1000 mm
Overall depth of section(D) 200 200 200 200 mm
Cover 45 45 45 45 mm
Effective depth(d) 150 150 150 150 mm
fck 35 35 35 35 N/mm2
fy 500 500 500 500 N/mm2
fctm 2.8 2.8 2.8 2.8
2
Ru = 4.6*Mu/(fck*b*d ) 0.191 0.103 0.114 0.061
Area of design steel required (Ast =fck/fy*b*d/2*[1-(1-Ru)0.5]) 529.0 279.0 307.1 163.9 mm2
Minimum steel req.(0.13bd%) or 0.26 fctm/fyk bt d 251.2 251.2 251.2 251.2 mm2
Ast required 529.0 279.0 307.1 251.2 mm2
Dia of Bar 10 10 10 10 mm
Spacing of bar 240 240 240 240 mm
Dia of Bar 10 12 10 12 mm
Spacing of bar 240 240 240 240 mm
Ast provided 654.5 798.5 654.5 798.5 mm2
Pt(%) provided 0.436 0.532 0.436 0.532
Hence Safe Hence Safe Hence Safe Hence Safe
Distrubtion steel
Ast required 130.90 159.70 130.90 159.70 mm2
Dia of Bar 8 8 8 8 mm
Spacing of bar 300 300 300 300 mm
Ast Provided 167.55 167.55 167.55 167.55 mm2
OK OK OK OK

Check for Shear


Shear force from face of wall
Ultimate design shear force per m length 80.76 kN
Shear Stress(Tv) 0.538 N/mm2
Pt(%) provided 0.532
Depth of section at critical point
cl. 10.3.2(2) Eq. 10.2 of IRC :112-2011
K = 1+Sqrt(200/d) <= 2.0 2.000
cl. 10.3.2(2) Eq. 10.3 of IRC :112-2011
vmin = 0.031 K3/2 fck1/2 0.519
cl. 10.3.1 of IRC :112-2011
p1 = Asl/(bw d) <= 0.02 0.0053
0.12* K *(80* p1* fck )0.33 0.585
Axial compressive force NEd (KN) 0.00 kN
σcp = NEd / Ac < 0.2 fcd 0.00 N/mm2
cl. 10.3.2(2) Eq. 10.1 of IRC :112-2011
VRd.c= [0.12*K*(80*p1 *fck )0.33 + 0.15*σcp]*b*d 88 kN
Min. value VRd.c= [Vmin+ 0.15*σcp]*b*d 78 kN
VRd.c(Max of above two value) 88 kN
Ultimate design shear force per m length 80.76 kN
Ok
cl. 10.3.2(5) Eq. 10.6 of IRC :112-2010
v = 0.6 ( 1 - fck / 310) 0.53
cl. 10.3.2(5) Eq. 10.5 of IRC :112-2011
0.5 bw d n fcd 832 kN
OK

8.2 Verification for serviceability limit state for top slab

Grade of Concrete fck 35 N/mm2


As per clause 12.2.1, IRC : 112-2011
fcd 16.80 N/mm2 For Rare Combination
fcd 16.80 N/mm2 For Frequent Combination
fcd 12.60 N/mm2 For Quasi-perma. Combination

Ec 32000 Mpa As per Table A4.2 of (IRC 112-


2011)
Grade of Steel fy 500.00 N/mm2
As per clause 12.2.2, IRC : 112-2011
fyd 300.00 N/mm2 For Rare Combination
fyd 300.00 N/mm2 For Frequent Combination
fyd 300.00 N/mm2 For Quasi-perma. Combination

Rare Combination Quasi-permanent


Moment of the section Mid span Support Mid span Support Unit
Factored Moment (M1) 21.67 12.30 11.37 6.55 kNm
Design Moment(M=M1) 21.67 12.30 11.37 6.55 kNm
Width(b) 1000 1000 1000 1000 mm
Overall depth of section(D) 200 200 200 200 mm
Cover 45 45 45 45 mm
Effective depth(d) 150 150 150 150 mm
fck 35 35 35 35 N/mm2
fy 500 500 500 500 N/mm2
fctm 2.8 2.8 2.8 2.8
Ru = 4.6*Mu/(fck*b*d2) 0.127 0.072 0.066 0.038
Area of design steel required (Ast =fck/fy*b*d/2*[1-(1-Ru)0.5]) 343.5 192.1 177.3 101.4 mm2
Minimum steel req.(0.13bd%) or 0.26 fctm/fyk bt d 251.16 251.16 251.16 251.16 mm2
Ast required 343.5 251.2 251.2 251.2 mm2
Dia of Bar 10 10 10 10 mm
Spacing of bar 240 240 240 240 mm
Dia of Bar 10 12 10 12 mm
Spacing of bar 240 240 240 240 mm
Ast provided 654.5 798.5 654.5 798.5 mm2
Pt(%) provided 0.436 0.532 0.436 0.532
Hence Safe Hence Safe Hence Safe Hence Safe
Distrubtion steel
Dia of Bar 8 8 8 8 mm
Spacing of bar 300 300 300 300 mm
Ast required 130.9 159.7 130.9 159.7 mm2
Ast Provided 167.55 167.55 167.55 167.55 mm2
OK OK OK OK

x (mm) 14.61 17.82 19.48 23.76 mm

xu,sls/d 0.70 0.70 0.70 0.70


x/d 0.10 0.12 0.13 0.16
OK OK OK OK
z (mm) 143.92 142.59 141.90 140.11
MRsls (KNm) 28.26 34.16 27.86 33.56
OK OK OK OK
ssc = M/( As z ) 230 108 122 59 N/mm2
OK OK OK OK
sca = M/( 0.8095 z b xu ) 12.73 5.98 5.08 2.43 N/mm2
OK OK OK OK

Calculation of crack width :- LONG TERM Mid span Support


Creep Coefficient, Φ 1.82 1.82
Ecm'= Ecm/(1+Φ) 12.39 12.39
m1 = Es/Ecm 16.14 16.14
m2 = 280/3σcbc 6.20 6.20
m1 16.14 16.14
cl. 12.3.4 (3) of IRC :112-2011
Cover 40.00 45.00
k1 0.80 0.80
k2 0.50 0.50
For skew slab refer eq. 12.10 of IRC :112-2011
r p.eff = As / Ac,eff 0.01 0.01
Sr,max ={ 3.4 c + ( 0.425 k1 k2 f ) / rp.eff } 555 497

cl. 12.3.4 (3) of IRC :112-2011


kt 0.50 0.50
fct,eff 2.90 2.90
Es 200000 200000
Ecm 32000 32000
ae = Es / Ecm 6.25 6.25
(esm-ecm)=(ssc-kt fct,eff(1+ae rp,eff)/rp,eff )/Es >=0.6ssc/Es 0.0004 0.0002
cl. 12.3.4 (2) of IRC :112-2011
Wk = Sr,max (esm - ecm ) 0.204 0.09
cl. 12.3.4 (1) of IRC :112-2011
OK OK

CREEP CALCULATION

Age of concrete at the time of loading,t0 = 28 day


Age of concrete in days at the moment considered, t = 36500 days
Grade of concrete = M35
Mean compressive strength of concrete at age of 28 days,fcm = MPa
M45
Relative humidity,RH = 80 %
Notional size of member,h = 200 mm
0.7
 43.75 
 
Coefficient, α1 =
 f cm 
0.980
0.2
 43.75 
Coefficient, α2 =
 
0.994  f cm 
0.5
 43.75 
 
Coefficient, α3 =
 f cm 
0.986
ϕ o β c (t, t o )
Creep coefficient φ(t,to) =
= 1.8248

φo = ϕ RH .β ( f cm ).β (to )
= 1.835

1 − RH/100
Factor to allow for the effect of RH on notional creep coeff,φRH= 1+
0.13 h o For fcm <= 45
MPa
 1 − RH / 100 
= 1 + .α1 α 2 For fcm > 45
 0.13 ho  MPa
= 1.342

Factor to allow for the effect of concrete strength on notional creep


coeff,β(fcm)= 18.78/√fcm
= 2.800

Factor to allow for the effect of concrete age at loading on notional


creep coeff,β(to)= 1/(0.1+to0.2)
= 0.488
0 .3
coefficient to describe the development of creep with time after  (t − t 0 ) 
loading,βc(t,to)=  
 β H + t − t0 
= 0.994
Coefficient, βH = 1.5[1+(0.012RH)18]ho+250 <= 1500, for fcm <= 45
1.5[1+(0.012RH)18]ho+250α3 <= 1500α3, for fcm > 45
= 693.881001
246.503324
Calculation of crack width :- SHORT TERM Mid span Support
n1 4.17 4.17
n2 4.17 4.17
φ eq =( n1 φ12 + n2φ22 ) / (n1 φ1+n2 φ2) 10.00 11.09
cl. 12.3.4 (3) of IRC :112-2011
Cover 45.00 45.00
k1 0.80 0.80
k2 0.50 0.50
For skew slab refer eq. 12.10 of IRC :112-2011
r p.eff = As / Ac,eff 0.01 0.01
Sr,max ={ 3.4 c + ( 0.425 k1 k2 f ) / rp.eff } 413 389

cl. 12.3.4 (3) of IRC :112-2011


kt 0.50 0.50
fct,eff 2.90 2.90
Es 200000 200000
Ecm 32000 32000
ae = Es / Ecm 6.25 6.25
(esm-ecm)=(ssc-kt fct,eff(1+ae rp,eff)/rp,eff )/Es >=0.6ssc/Es 0.0004 0.0002
cl. 12.3.4 (2) of IRC :112-2011
Wk = Sr,max (esm - ecm ) 0.15 0.07
cl. 12.3.4 (1) of IRC :112-2011
OK OK

CHECK STRESS AS PER IRC : 112-2011

INPUTS
Grade of Concrete fck = 35 Mpa
Clear Cover c = 45 mm
Depth of Section h = 200 mm
Effective Depth d = 150 mm
Width of section b = 1000 mm
Modulus of elascticity Es = 200000.0 Mpa
Diameter of bar φ1 = 10 mm
n1 = 4
Bar spacing = 240 mm
Diameter of bar φ2 = 10 mm
n2 = 4
Area of Steel As = 654.50 mm2
Bending Moment M = 21.67 kN-m
allowable crack width Wmax = 0.300 mm
Ecm = 32308 Mpa
(Eq. A2-5)
CALCULATIONS

Crack Width : Wk = Ser,max *(ɛsm -ɛcm ) (Eq 12.5)

Calculation of Sr max : (max. crack spacing)

Depth of Neutral Axis x = 46.72 mm

-m*Ast+SQRT(m*Ast)^2+2*mAst.bd
x=
b

Cracked Moment of Inertia (In steel units)


=

I= (bx^3)/3 +mAst (d-x)^2 146682418.2 mm4

The Concrete Stress at Top of section

σc = M*x/I = 6.90 Mpa

The Reinforcement Stress

σs = m* (M* (d-x)/I) = 246.30 Mpa


9.1 Verification of structural strength for Bottom slab
Grade of Concrete fck 35 N/mm2

fcd 15.63 N/mm2 Combination-1


fcd 19.54 N/mm2 Combination-2
fcd 15.63 N/mm2 For Seismic Combination
Ec 32000 Mpa As per Table A4.2 of (IRC
112-2011)
Grade of Steel fy 500.00 N/mm2
As per clause 6.4.2.8, IRC : 112-2011
fyd 434.78 N/mm2 Combination-1
fyd 500.00 N/mm2 Combination-2
fyd 434.78 N/mm2 For Seismic Combination
Compressive force in concrete Cu= fcd *b*(3/7xu + 2/3*4/7xu)
17/21*fcd*b*xu
Tensile force in steel Tu= fyd * Ast
Lever Arm = d - (0.416*xu)

Combination-1 Combination-2
Moment of the section Mid span Support Mid span Support Unit

Factored Moment (M1) 47.96 21.51 35.11 16.63 kNm


Design Moment(M=M1) 47.96 21.51 35.11 16.63 kNm
Width(b) 1000 1000 1000 1000 mm
Overall depth of section(D) 250 250 250 250 mm
Cover 45 75 45 75 mm
Effective depth(d) 200 170 200 170 mm
fck 35 35 35 35 N/mm2
fy 500 500 500 500 N/mm2
fctm 2.8 2.8 2.8 2.8
Ru = 4.6*Mu/(fck*b*d2) 0.158 0.098 0.115 0.076
Area of design steel required (Ast =fck/fy*b*d/2*[1-(1-Ru)0.5]) 575.2 298.5 416.1 229.4 mm2
Minimum steel req.(0.13bd%) or 0.26 fctm/fyk bt d 334.9 284.6 334.9 284.6 mm2
Ast required 575.2 298.5 416.1 284.6 mm2
Dia of Bar 10 10 10 10 mm
Spacing of bar 240 240 240 240 mm
Dia of Bar 12 12 12 12 mm
Spacing of bar 240 240 240 240 mm
Ast provided 798.5 798.5 798.5 798.5 mm2
Pt(%) provided 0.399 0.470 0.399 0.470
Hence Safe Hence Safe Hence Safe Hence Safe
Distrubtion steel
Ast required 159.70 159.70 159.70 159.70 mm2
Dia of Bar 8 8 8 8 mm
Spacing of bar 300 300 300 300 mm
Ast Provided 167.55 167.55 167.55 167.55 mm2
OK OK OK OK

Check for Shear


Shear force from face of wall
Ultimate design shear force per m length 91.57 kN
Shear Stress(Tv) 0.539 N/mm2
Pt(%) provided 0.470
Depth of section at critical point
cl. 10.3.2(2) Eq. 10.2 of IRC :112-2010
K = 1+Sqrt(200/d) <= 2.0 2.000
cl. 10.3.2(2) Eq. 10.3 of IRC :112-2010
vmin = 0.031 K3/2 fck1/2 0.519
cl. 10.3.1 of IRC :112-2011
p1 = Asl/(bw d) <= 0.02 0.0047
0.12* K *(80* p1* fck )0.33 0.562
Axial compressive force NEd (KN) 0.00 kN
σcp = NEd / Ac < 0.2 fcd 0.00 N/mm2
cl. 10.3.2(2) Eq. 10.1 of IRC :112-2010
VRd.c= [0.12*K*(80*p1 *fck )0.33 + 0.15*σcp]*b*d 95 kN
Min. value VRd.c= [Vmin+ 0.15*σcp]*b*d 88 kN
VRd.c(Max of above two value) 95 kN
Ultimate design shear force per m length 91.57 kN
Ok
cl. 10.3.2(5) Eq. 10.6 of IRC :112-2010
v = 0.6 ( 1 - fck / 310) 0.53
cl. 10.3.2(5) Eq. 10.5 of IRC :112-2011
0.5 bw d n fcd 1040 kN
OK

9.2 Verification for serviceability limit state for Bottom slab

Grade of Concrete fck 35 N/mm2


As per clause 12.2.1, IRC : 112-2011
fcd 16.80 N/mm2 For Rare Combination
fcd 16.80 N/mm2 For Frequent Combination
fcd 12.60 N/mm2 For Quasi-perma. Combination

Ec 32000 Mpa As per Table A4.2 of (IRC


112-2011)
Grade of Steel fy 500.00 N/mm2
As per clause 12.2.2, IRC : 112-2011
fyd 300.00 N/mm2 For Rare Combination
fyd 300.00 N/mm2 For Frequent Combination
fyd 300.00 N/mm2 For Quasi-perma. Combination

Rare Combination Quasi-permanent


Moment of the section Mid span Support Mid span Support Unit
Factored Moment (M1) 30.69 15.52 17.82 9.93 kNm
Design Moment(M=M1) 30.69 15.52 17.82 9.93 kNm
Width(b) 1000 1000 1000 1000 mm
Overall depth of section(D) 250 250 250 250 mm
Cover 45 75 45 75 mm
Effective depth(d) 200 170 200 170 mm
fck 35 35 35 35 N/mm2
fy 500 500 500 500 N/mm2
fctm 2.8 2.8 2.8 2.8
Ru = 4.6*Mu/(fck*b*d2) 0.101 0.071 0.059 0.045
Area of design steel required (Ast =fck/fy*b*d/2*[1-(1-Ru)0.5]) 362.3 213.8 208.0 135.9 mm2
Minimum steel req.(0.13bd%) or 0.26 fctm/fyk bt d 334.88 284.65 334.88 284.65 mm2
Ast required 362.3 284.6 334.9 284.6 mm2
Dia of Bar 10 10 10 10 mm
Spacing of bar 240 240 240 240
Dia of Bar 12 12 12 12
Spacing of bar 240 240 240 240 mm
Ast provided 798.5 798.5 798.5 798.5 mm2
Pt(%) provided 0.399 0.470 0.399 0.470
Hence Safe Hence Safe Hence Safe Hence Safe
Distrubtion steel
Dia of Bar 8 8 8 8 mm
Spacing of bar 300 300 300 300 mm
Ast required 159.7 159.7 159.7 159.7 mm2
Ast Provided 167.55 167.55 167.55 167.55 mm2
OK OK OK OK

x (mm) 17.82 17.82 23.76 23.76 mm

xu,sls/d 0.70 0.70 0.70 0.70


x/d 0.09 0.10 0.12 0.14
OK OK OK OK
z (mm) 192.59 162.59 190.11 160.11
MRsls (KNm) 46.13 38.95 45.54 38.35
OK OK OK OK
ssc = M/( As z ) 200 120 117 78 N/mm2
OK OK OK OK
sca = M/( 0.8095 z b xu ) 11.04 6.62 4.87 3.22 N/mm2
OK OK OK OK

Calculation of crack width:- LONG TERM Mid span Support


Creep Coefficient, Φ 1.79 1.79
m = Es/Ecm 15.94 15.94
m 15.94 15.94
cl. 12.3.4 (3) of IRC :112-2011
Cover 40.00 50.00
k1 0.80 0.80
k2 0.50 0.50
For skew slab refer eq. 12.10 of IRC :112-2011
r p.eff = As / Ac,eff 0.01 0.01
Sr,max ={ 3.4 c + ( 0.425 k1 k2 f ) / rp.eff } 560 594

cl. 12.3.4 (3) of IRC :112-2011


kt 0.50 0.50
fct,eff 2.90 2.90
Es 200000 200000
Ecm 32000 32000
ae = Es / Ecm 6.25 6.25
(esm-ecm)=(ssc-kt fct,eff(1+ae rp,eff)/rp,eff )/Es >=0.6ssc/Es 0.0004 0.0002
cl. 12.3.4 (2) of IRC :112-2011
Wk = Sr,max (esm - ecm ) 0.197 0.138
cl. 12.3.4 (1) of IRC :112-2011
OK OK

CREEP CALCULATION

Age of concrete at the time of loading,t0 = 28 day


Age of concrete in days at the moment considered, t = 36500 days
Grade of concrete = M35
Mean compressive strength of concrete at age of 28 days,fcm = 45 MPa
Relative humidity,RH = 80 %
Notional size of member,h = 250 mm
0.7
 43.75 
Coefficient, α1 =
 
0.980
 f cm 
0.2
 43.75 
Coefficient, α2 =
 
0.994  f cm 
0.5
 43.75 
 
Coefficient, α3 =
 f cm 
0.986

Creep coefficient φ(t,to) = ϕ o β c (t, t o )


= 1.7898

φo = ϕ RH .β ( f cm ).β (t o )
= 1.802

1 − RH/100 For fcm <= 45


Factor to allow for the effect of RH on notional creep coeff,φRH= 1+
0.13 h o MPa
 1 − RH / 100 
= 1 + .α1 α 2 For fcm > 45
 0.13 ho  MPa
= 1.317

Factor to allow for the effect of concrete strength on notional creep


coeff,β(fcm)= 18.78/√fcm
= 2.800

Factor to allow for the effect of concrete age at loading on notional


creep coeff,β(to)= 1/(0.1+to0.2)
= 0.488
0.3
coefficient to describe the development of creep with time after  (t − t 0 ) 
loading,βc(t,to)=  
 β H + t − t0 
= 0.993
Coefficient, βH = 1.5[1+(0.012RH)18]ho+250 <= 1500, for fcm <= 45
1.5[1+(0.012RH)18]ho+250α3 <= 1500α3, for fcm > 45
= 804.851251
246.503324
Calculation of crack width :- SHORT TERM Mid span Support
n1 4.17 4.17
n2 4.17 4.17
φ eq =( n1 φ12 + n2φ22 ) / (n1 φ1+n2 φ2) 11.09 11.09
cl. 12.3.4 (3) of IRC :112-2011
Cover 40.00 50.00
k1 0.80 0.80
k2 0.50 0.50
For skew slab refer eq. 12.10 of IRC :112-2011
r p.eff = As / Ac,eff 0.01 0.01
Sr,max ={ 3.4 c + ( 0.425 k1 k2 f ) / rp.eff } 384 418

cl. 12.3.4 (3) of IRC :112-2011


kt 0.50 0.50
fct,eff 2.90 2.90
Es 200000 200000
Ecm 32000 32000
ae = Es / Ecm 6.25 6.25
(esm-ecm)=(ssc-kt fct,eff(1+ae rp,eff)/rp,eff )/Es >=0.6ssc/Es 0.0004 0.0002
cl. 12.3.4 (2) of IRC :112-2011
Wk = Sr,max (esm - ecm ) 0.14 0.10
cl. 12.3.4 (1) of IRC :112-2011
OK OK

CHECK STRESS AS PER IRC : 112-2011

INPUTS
Grade of Concrete fck = 35 Mpa
Clear Cover c = 45 mm
Depth of Section h = 250 mm
Effective Depth d = 200 mm
Width of section b = 1000 mm
Modulus of elascticity Es = 200000.0 Mpa
Diameter of bar φ1 = 10 mm
n1 = 4
Bar spacing = 240 mm
Diameter of bar φ2 = 12 mm
n2 = 4
Area of Steel As = 798.49 mm2
Bending Moment M = 30.69 kN-m
allowable crack width Wmax = 0.300 mm
Ecm = 32308 Mpa
(Eq. A2-5)
CALCULATIONS

Crack Width : Wk = Ser,max *(ɛsm -ɛcm ) (Eq 12.5)

Calculation of Sr max : (max. crack spacing)

Depth of Neutral Axis x = 59.75 mm

-m*Ast+SQRT(m*Ast)^2+2*mAst.bd
x=
b

Cracked Moment of Inertia (In steel units)


=

I= (bx^3)/3 +mAst (d-x)^2 321491029 mm4

The Concrete Stress at Top of section

σc = M*x/I = 5.7 Mpa

The Reinforcement Stress

σs = m* (M* (d-x)/I) = 213.43 Mpa


10.1 Verification of structural strength for Outer wall
Grade of Concrete fck 35 N/mm2

fcd 15.63 N/mm2 For Basic Combination


fcd 19.54 N/mm2 For Accidental Combination
fcd 15.63 N/mm2 For Seismic Combination
Ec 32000 Mpa As per Table A4.2 of (IRC 112-
Ministry of Road Transport and Highway 2011)
Grade of Steel fy 500.00 N/mm2
As per clause 6.4.2.8, IRC : 112-2011
fyd 434.78 N/mm2 For Basic Combination
fyd 500.00 N/mm2 For Accidental Combination
fyd 434.78 N/mm2 For Seismic Combination
Compressive force in concrete Cu= fcd *b*(3/7xu + 2/3*4/7xu)
17/21*fcd*b*xu
Tensile force in steel Tu= fyd * Ast
Lever Arm = d - (0.416*xu)

Basic combination Accidental combination


Bottom Bottom
Moment of the section Top support Top support Unit
Support Support

Factored Moment (M1) 29.22 25.58 17.38 15.79 kNm


Design Moment(M=M1) 29.22 25.58 17.38 15.79 kNm
Width(b) 1000 1000 1000 1000 mm
Overall depth of section(D) 250 250 250 250 mm
Cover 45 75 45 75 mm
Effective depth(d) 200 170 200 170 mm
fck 35 35 35 35 N/mm2
fy 500 500 500 500 N/mm2
fctm 2.8 2.8 2.8 2.8
Ru = 4.6*Mu/(fck*b*d2) 0.096 0.116 0.057 0.072
Area of design steel required (Ast =fck/fy*b*d/2*[1-(1-Ru)0.5]) 344.5 356.8 202.8 217.6 mm2
Minimum steel req.(0.13bd%) or 0.26 fctm/fyk bt d 334.9 284.6 334.9 284.6 mm2
Ast required 344.5 356.8 334.9 284.6 mm2
Dia of Bar 10 10 10 10 mm
Spacing of bar 240 240 240 240
Dia of Bar 12 12 12 12
Spacing of bar 240 240 240 240 mm
Ast provided 798.5 798.5 798.5 798.5 mm2
Pt(%) provided 0.399 0.470 0.399 0.470
Hence Safe Hence Safe Hence Safe Hence Safe
Distrubtion steel
Ast required 159.70 159.70 159.70 159.70 mm2
Dia of Bar 8 8 8 8 mm
Spacing of bar 300 300 300 300 mm
Ast Provided 167.55 167.55 167.55 167.55 mm2
OK OK OK OK

Check for Shear


Shear force from face of wall
Ultimate design shear force per m length 22.80 kN
Shear Stress(Tv) 0.134 N/mm2
Pt(%) provided 0.470
Depth of section at critical point
cl. 10.3.2(2) Eq. 10.2 of IRC :112-2010
K = 1+Sqrt(200/d) <= 2.0 2.000
cl. 10.3.2(2) Eq. 10.3 of IRC :112-2010
vmin = 0.031 K3/2 fck1/2 0.519
cl. 10.3.1 of IRC :112-2011
p1 = Asl/(bw d) <= 0.02 0.0047
0.12* K *(80* p1* fck )0.33 0.562
Axial compressive force NEd (KN) 0.00 kN
σcp = NEd / Ac < 0.2 fcd 0.00 N/mm2
cl. 10.3.2(2) Eq. 10.1 of IRC :112-2010
V = [0.12*K*(80*p *f )0.33 + 0.15*σ ]*b*d 95 kN
Min. value VRd.c= [Vmin+ 0.15*σcp]*b*d 88 kN
VRd.c(Max of above two value) 95 kN
Ultimate design shear force per m length 22.8 kN
Ok

cl. 10.3.2(5) Eq. 10.6 of IRC :112-2010


v = 0.6 ( 1 - fck / 310) 0.53
cl. 10.3.2(5) Eq. 10.5 of IRC :112-2011
0.5 bw d n fcd 1040 kN
OK

10.2 Verification for serviceability limit state for Outer wall

Grade of Concrete fck 35 N/mm2


As per clause 12.2.1, IRC : 112-2011
fcd 16.80 N/mm2 For Rare Combination
fcd 16.80 N/mm2 For Frequent Combination
fcd 12.60 N/mm2 For Quasi-perma. Combination

Ec 32000 Mpa As per Table A4.2 of (IRC 112-


2011)
Grade of Steel fy 500.00 N/mm2
As per clause 12.2.2, IRC : 112-2011
fyd 300.00 N/mm2 For Rare Combination
fyd 300.00 N/mm2 For Frequent Combination
fyd 300.00 N/mm2 For Quasi-perma. Combination

Rare Combination Quasi-permanent


Bottom Bottom
Moment of the section Top support Support Top support Support Unit
Factored Moment (M1) 19.78 17.73 10.87 10.87 kNm
Design Moment(M=M1) 19.78 17.73 10.87 10.87 kNm
Width(b) 1000 1000 1000 1000 mm
Overall depth of section(D) 250 250 250 250 mm
Cover 45 75 45 75 mm
Effective depth(d) 200 170 200 170 mm
fck 35 35 35 35 N/mm2
fy 500 500 500 500 N/mm2
fctm 2.8 2.8 2.8 2.8
Ru = 4.6*Mu/(fck*b*d2) 0.065 0.081 0.036 0.049
Area of design steel required (Ast =fck/fy*b*d/2*[1-(1-Ru)0.5]) 231.3 245.0 126.2 148.9 mm2
Minimum steel req.(0.13bd%) or 0.26 fctm/fyk bt d 334.88 284.65 334.88 284.65 mm2
Ast required 334.9 284.6 334.9 284.6 mm2
Dia of Bar 10 10 10 10 mm
Spacing of bar 240 240 240 240 0
Dia of Bar 12 12 12 12 0
Spacing of bar 240 240 240 240 mm
Ast provided 798.5 798.5 798.5 798.5 mm2
Pt(%) provided 0.399 0.470 0.399 0.470
Hence Safe Hence Safe Hence Safe Hence Safe
Distrubtion steel
Dia of Bar 8 8 8 8 mm
Spacing of bar 300 300 300 300 mm
Ast required 159.7 159.7 159.7 159.7 mm2
Ast Provided 167.55 167.55 167.55 167.55 mm2
OK OK OK OK

x (mm) 17.82 17.82 23.76 23.76 mm

xu,sls/d 0.70 0.70 0.70 0.70


x/d 0.09 0.10 0.12 0.14
OK OK OK OK
z (mm) 192.59 162.59 190.11 160.11
MRsls (KNm) 46.13 38.95 45.54 38.35
OK OK OK OK
ssc = M/( As z ) 129 137 72 85 N/mm2
OK OK OK OK
sca = M/( 0.8095 z b xu ) 7.12 7.56 2.97 3.53 N/mm2
OK OK OK OK

Bottom
Top support
Calculation of crack width Support
Creep Coefficient, Φ 1.79 1.79
Ecm'= Ecm/(1+Φ) 12.55 12.55
m = Es/Ecm 15.94 15.94
m2 = 280/3σcbc 8.00 8.00
m 15.94 15.94
cl. 12.3.4 (3) of IRC :112-2011
Cover 45.00 75.00
k1 0.80 0.80
k2 0.50 0.50
For skew slab refer eq. 12.10 of IRC :112-2011
r p.eff = As / Ac,eff 0.01 0.01
Sr,max ={ 3.4 c + ( 0.425 k1 k2 f ) / rp.eff } 577 679

cl. 12.3.4 (3) of IRC :112-2011


kt 0.50 0.50
fct,eff 2.90 2.90
Es 200000 200000
Ecm 32000 32000
ae = Es / Ecm 6.25 6.25
(esm-ecm)=(ssc-kt fct,eff(1+ae rp,eff)/rp,eff )/Es >=0.6ssc/Es 0.0002 0.0003
cl. 12.3.4 (2) of IRC :112-2011
Wk = Sr,max (esm - ecm ) 0.12 0.173
cl. 12.3.4 (1) of IRC :112-2011
OK OK

CREEP CALCULATION

Age of concrete at the time of loading,t0 = 28 day


Age of concrete in days at the moment considered, t = 36500 days
Grade of concrete = M35
Mean compressive strength of concrete at age of 28 days,fcm = 45 MPa
Relative humidity,RH = 80 %
Notional size of member,h = 250 mm
0.7
 43.75 
 
Coefficient, α1 =
 f cm 
0.980
0.2
 43.75 
 
Coefficient, α2 =
0.994
 f cm 
0.5
 43.75 
 
Coefficient, α3 =
 f cm 
0.986

Creep coefficient φ(t,to) =


ϕ o β c (t, t o )
= 1.7898

φo = ϕ RH .β ( f cm ).β (to )
= 1.802

1 − RH/100
Factor to allow for the effect of RH on notional creep coeff,φRH= 1+
0.13 h o For fcm <= 45
MPa

 1 − RH / 100 
= 1 + .α1 α 2 For fcm > 45
 0.13 ho  MPa
= 1.317

Factor to allow for the effect of concrete strength on notional creep


coeff,β(fcm )= 18.78/√fcm
= 2.800

Factor to allow for the effect of concrete age at loading on notional


creep coeff,β(to)= 1/(0.1+to0.2)
= 0.488
0 .3
coefficient to describe the development of creep with time after  (t − t 0 ) 
loading,βc(t,to)=  
 β H + t − t0 
= 0.993
Coefficient, βH = 1.5[1+(0.012RH)18]ho+250 <= 1500, for fcm <= 45
1.5[1+(0.012RH)18]ho+250α3 <= 1500α3, for fcm > 45
= 804.851251
246.503324
Calculation of crack width :- SHORT TERM Top support Bottom Support
n1 4.17 4.17
n2 4.17 4.17
φ eq =( n1 φ12 + n2φ22 ) / (n1 φ1+n2 φ2) 11.09 11.09
cl. 12.3.4 (3) of IRC :112-2011
Cover 45.00 75.00
k1 0.80 0.80
k2 0.50 0.50
For skew slab refer eq. 12.10 of IRC :112-2011
r p.eff = As / Ac,eff 0.01 0.01
Sr,max ={ 3.4 c + ( 0.425 k1 k2 f ) / rp.eff } 448 550

cl. 12.3.4 (3) of IRC :112-2011


kt 0.50 0.50
fct,eff 2.90 2.90
Es 200000 200000
Ecm 32000 32000
ae = Es / Ecm 6.25 6.25
(esm-ecm)=(ssc-kt fct,eff(1+ae rp,eff)/rp,eff )/Es >=0.6ssc/Es 0.0002 0.0003
cl. 12.3.4 (2) of IRC :112-2011
Wk = Sr,max (esm - ecm ) 0.10 0.14
cl. 12.3.4 (1) of IRC :112-2011
OK OK

CHECK STRESS AS PER IRC : 112-2011

INPUTS
Grade of Concrete fck = 35 Mpa
Clear Cover c = 45 mm
Depth of Section h = 250 mm
Effective Depth d = 200 mm
Width of section b = 1000 mm
Modulus of elascticity Es = 200000.0 Mpa
Diameter of bar φ1 = 10 mm
n1 = 4
Bar spacing = 240 mm
Diameter of bar φ2 = 12 mm
n2 = 4
Area of Steel As = 798.49 mm2
Bending Moment M = 19.78 kN-m
allowable crack width Wmax = 0.300 mm
Ecm = 32308 Mpa
(Eq. A2-5)
CALCULATIONS

Crack Width : Wk = Ser,max *(ɛsm -ɛcm ) (Eq 12.5)

Calculation of Sr max : (max. crack spacing)

Depth of Neutral Axis x = 59.75 mm

-m*Ast+SQRT(m*Ast)^2+2*mAst.bd
x=
b

Cracked Moment of Inertia (In steel units)


=

I= (bx^3)/3 +mAst (d-x)^2 321491029 mm4

The Concrete Stress at Top of section

σc = M*x/I = 3.68 Mpa

The Reinforcement Stress

σs = m* (M* (d-x)/I) = 137.57 Mpa


10.3 Verification of structural strength for Outer wall
Grade of Concrete fck 35 N/mm2

fcd 15.63 N/mm2 For Basic Combination


fcd 19.54 N/mm2 For Accidental Combination
fcd 15.63 N/mm2 For Seismic Combination
Ec 32000 Mpa As per Table A4.2 of (IRC
Ministry of Road Transport and Highway 112-2011)
Grade of Steel fy 500.00 N/mm2
As per clause 6.4.2.8, IRC : 112-2011
fyd 434.78 N/mm2 For Basic Combination
fyd 500.00 N/mm2 For Accidental Combination
fyd 434.78 N/mm2 For Seismic Combination
Compressive force in concrete Cu= fcd *b*(3/7xu + 2/3*4/7xu)
17/21*fcd*b*xu
Tensile force in steel Tu= fyd * Ast
Lever Arm = d - (0.416*xu)

Basic combination Accidental combination


Bottom Bottom
Moment of the section Midspan Support Midspan Support Unit

Factored Moment (M1) 19.14 25.58 11.05 15.79 kNm


Design Moment(M=M1) 19.14 25.58 11.05 15.79 kNm
Width(b) 1000 1000 1000 1000 mm
Overall depth of section(D) 250 250 250 250 mm
Cover 45 75 45 75
Effective depth(d) 199 165 199 165 mm
fck 35 35 35 35 N/mm2
fy 500 500 500 500 N/mm2
fctm 2.8 2.8 2.8 2.8
Ru = 4.6*Mu/(fck*b*d2) 0.064 0.124 0.037 0.076
Area of design steel required (Ast =fck/fy*b*d/2*[1-(1-Ru)0.5]) 224.8 368.4 128.9 224.5 mm2
Minimum steel req.(0.13bd%) or 0.26 fctm/fyk bt d 333.2 276.3 333.2 276.3 mm2
Ast required 333.2 368.4 333.2 276.3 mm2
Dia of Bar 12 20 12 20 mm
Spacing of bar 240 200 240
Dia of Bar 0 20 0 23
Spacing of bar 240 200 240 200 mm
Ast provided 471.2 3141.6 471.2 #DIV/0! mm2
Pt(%) provided 0.237 1.904 0.237 #DIV/0!
Hence Safe Hence Safe Hence Safe #DIV/0!
Distrubtion steel
Ast required 94.25 628.32 94.25 #DIV/0! mm2
Dia of Bar 8 10 8 10 mm
Spacing of bar 300 120 300 120 mm
Ast Provided 167.55 654.50 167.55 654.50 mm2
OK OK OK #DIV/0!

10.4 Verification for serviceability limit state for Outer wall

Grade of Concrete fck 35 N/mm2


As per clause 12.2.1, IRC : 112-2011
fcd 16.80 N/mm2 For Rare Combination
fcd 16.80 N/mm2 For Frequent Combination
fcd 12.60 N/mm2 For Quasi-perma. Combination

Ec 32000 Mpa As per Table A4.2 of (IRC


112-2011)
Grade of Steel fy 500.00 N/mm2
As per clause 12.2.2, IRC : 112-2011
fyd 300.00 N/mm2 For Rare Combination
fyd 300.00 N/mm2 For Frequent Combination
fyd 300.00 N/mm2 For Quasi-perma. Combination

Rare Combination Quasi-permanent


Bottom Bottom
Moment of the section Midspan Support Midspan Support Unit
Factored Moment (M1) 12.10 17.73 5.31 10.87 kNm
Design Moment(M=M1) 12.10 17.73 5.31 10.87 kNm
Width(b) 1000 1000 1000 1000 mm
Overall depth of section(D) 250 250 250 250 mm
Cover 45 75 45 75 0
Effective depth(d) 199 165 199 165 mm
fck 35 35 35 35 N/mm2
fy 500 500 500 500 N/mm2
fctm 2.8 2.8 2.8 2.8
Ru = 4.6*Mu/(fck*b*d2) 0.040 0.086 0.018 0.052
Area of design steel required (Ast =fck/fy*b*d/2*[1-(1-Ru)0.5]) 141.3 252.7 61.6 153.6 mm2
Minimum steel req.(0.13bd%) or 0.26 fctm/fyk bt d 333.21 276.28 333.21 276.28 mm2
Ast required 333.2 276.3 333.2 276.3 mm2
Dia of Bar 12 20 12 20 mm
Spacing of bar 240 200 240 0 0
Dia of Bar 0 20 0 23 0
Spacing of bar 240 200 240 200 mm
Ast provided 471.2 3141.6 471.2 #DIV/0! mm2
Pt(%) provided 0.237 1.904 0.237 #DIV/0!
Hence Safe Hence Safe Hence Safe #DIV/0!
Distrubtion steel
Dia of Bar 8 10 8 10 mm
Spacing of bar 300 120 300 120 mm
Ast required 94.2 628.3 94.2 #DIV/0! mm2
Ast Provided 167.55 654.50 167.55 654.50 mm2
OK OK OK #DIV/0!

x (mm) 10.52 112.20 14.02 #DIV/0! mm

xu,sls/d 0.70 0.70 0.70 0.70


x/d 0.05 0.68 0.07 #DIV/0!
OK OK OK #DIV/0!
z (mm) 194.62 118.32 193.17 #DIV/0!
MRsls (KNm) 27.51 111.52 27.31 #DIV/0!
OK OK OK #DIV/0!
ssc = M/( As z ) 132 48 58 #DIV/0! N/mm2
OK OK OK #DIV/0!
sca = M/( 0.8095 z b xu ) 7.30 1.65 2.42 #DIV/0! N/mm2
OK OK OK #DIV/0!

Calculation of crack width Midspan


Creep Coefficient, Φ 1.79
Ecm'= Ecm/(1+Φ) 12.55
m = Es/Ecm 15.94
n2 4.17
m 15.94
cl. 12.3.4 (3) of IRC :112-2011
Cover 45.00
k1 0.80
k2 0.50
For skew slab refer eq. 12.10 of IRC :112-2011
r p.eff = As / Ac,eff 0.00
Sr,max ={ 3.4 c + ( 0.425 k1 k2 f ) / rp.eff } 872

cl. 12.3.4 (3) of IRC :112-2011


kt 0.50
fct,eff 2.90
Es 200000
Ecm 32000
ae = Es / Ecm 6.25
(esm-ecm)=(ssc-kt fct,eff(1+ae rp,eff)/rp,eff )/Es >=0.6ssc/Es 0.0002
cl. 12.3.4 (2) of IRC :112-2011
Wk = Sr,max (esm - ecm ) 0.15
cl. 12.3.4 (1) of IRC :112-2011
OK

CREEP CALCULATION

Age of concrete at the time of loading,t0 = 28 day


Age of concrete in days at the moment considered, t = 36500 days
Grade of concrete = M35

Mean compressive strength of concrete at age of 28 days,fcm = MPa


45
Relative humidity,RH = 80 %
Notional size of member,h = 250 mm
0.7
 43.75 
 
Coefficient, α1 =
 f cm 
0.980
0.2
 43.75 
 
Coefficient, α2 =
0.994
 f cm 
0.5
 43.75 
Coefficient, α3 =
 
0.986  f cm 

Creep coefficient φ(t,to) = ϕ o β c (t, t o )


= 1.7898

φo =
ϕ RH .β ( f cm ).β (to )
= 1.802

1 − RH/100
Factor to allow for the effect of RH on notional creep coeff,φRH= 1+
0.13 h o For fcm <= 45
MPa
 1 − RH / 100 
= 1 + .α1 α 2 For fcm > 45
 0.13 ho  MPa
= 1.317

Factor to allow for the effect of concrete strength on notional creep


coeff,β(fcm)= 18.78/√fcm
= 2.800

Factor to allow for the effect of concrete age at loading on notional


creep coeff,β(to)= 1/(0.1+to0.2)
= 0.488
0. 3
coefficient to describe the development of creep with time after  (t − t 0 ) 
loading,βc(t,to)=  
 β H + t − t0 
= 0.993
Coefficient, βH = 1.5[1+(0.012RH)18]ho+250 <= 1500, for fcm <= 45
1.5[1+(0.012RH)18]ho+250α3 <= 1500α3, for fcm > 45
= 804.851251
246.503324
Calculation of crack width :- SHORT TERM Midspan
n1 4.17
n2 4.17
φ eq =( n1 φ12 + n2φ22 ) / (n1 φ1+n2 φ2) 12.00
cl. 12.3.4 (3) of IRC :112-2011
Cover 45.00
k1 0.80
k2 0.50
For skew slab refer eq. 12.10 of IRC :112-2011
r p.eff = As / Ac,eff 0.00
Sr,max ={ 3.4 c + ( 0.425 k1 k2 f ) / rp.eff } 608

cl. 12.3.4 (3) of IRC :112-2011


kt 0.50
fct,eff 2.90
Es 200000
Ecm 32000
ae = Es / Ecm 6.25
(esm-ecm)=(ssc-kt fct,eff(1+ae rp,eff)/rp,eff )/Es >=0.6ssc/Es 0.0002
cl. 12.3.4 (2) of IRC :112-2011
Wk = Sr,max (esm - ecm ) 0.11
cl. 12.3.4 (1) of IRC :112-2011
OK

CHECK STRESS AS PER IRC : 112-2011

INPUTS
Grade of Concrete fck = 35 Mpa
Clear Cover c = 45 mm
Depth of Section h = 250 mm
Effective Depth d = 199 mm
Width of section b = 1000 mm
Modulus of elascticity Es = 200000.0 Mpa
Diameter of bar φ1 = 12 mm
n1 = 4
Bar spacing = 240 mm
Diameter of bar φ2 = 0 mm
n2 = 4
Area of Steel As = 471.24 mm2
Bending Moment M = 5.31 kN-m
allowable crack width Wmax = 0.300 mm
Ecm = 32308 Mpa
(Eq. A2-5)
CALCULATIONS

Crack Width : Wk = Ser,max *(ɛsm -ɛcm ) (Eq 12.5)

Calculation of Sr max : (max. crack spacing)

Depth of Neutral Axis x = 31.94 mm

-m*Ast+SQRT(m*Ast)^2+2*mAst.bd
x=
b

Cracked Moment of Inertia (In steel units)


=

I= (bx^3)/3 +mAst (d-x)^2 220526615.3 mm4

The Concrete Stress at Top of section

σc = M*x/I = 0.77 Mpa

The Reinforcement Stress

σs = m* (M* (d-x)/I) = 64.13 Mpa


12.0 Summary of provided reinforcement 1X2X2 WITH 1.0M CUSHION

i) Top slab
At Midspan (Bottom reinforcement) 528.97 mm2
Area of steel provided = 654.50 mm2
10 mm @ 240 mm C/C
10 mm @ 240 mm C/C
ok
At Support (Top reinforcement) 278.96 mm2
Area of steel provided = 798.49 mm2
10 mm @ 240 mm C/C
12 mm @ 240 mm C/C
ok
ii) Bottom slab
At Midspan (Top reinforcement) 575.17 mm2
Area of steel provided = 798.49 mm2
10 mm @ 240 mm C/C
12 mm @ 240 mm C/C
ok

298.505507 mm2
At Support (Bottom reinforcement) 798.488133 mm2
Area of steel provided = 798.49 mm2
10 mm @ 240 mm C/C
12 mm @ 240 mm C/C
ok
iii) Outer wall
At midspan 333.21 mm2
Area of steel provided = 471.24 mm2
12 mm @ 240 mm C/C
0 mm @ 240 mm C/C
v) Distrubution steel

Top slab
Area of steel provided = 167.6 mm2
8 mm @ 300 mm C/C
ok
Bottom slab
Area of steel provided = 167.6 mm2
8 mm @ 300 mm C/C
ok
Outer wall
Area of steel provided = 167.6 mm2
8 mm @ 300 mm C/C
ok
13 Base Pressure Check

Check for Base Pressure

Weight of Top Slab 1.25 t/m


Weight of Bottom Slab 1.56 t/m
Weight of Side wall 2.50 t/m
Weight of Intermediate side wall 0.00 t/m
Weight of Railing/Crash Barrier 2.25 t/m
Weight of wearing coat+crust 2.76 t/m
Weight of earth cushion 2.7 t/m

Base Pressure Without Live Load 5 t/m2


Base Pressure With Live Load 7 t/m2

Anda mungkin juga menyukai