EE 154 (Electrical System Design)

Mid Term Examinations / 2nd Sem. A.Y. 2018-2019

Name: Yr./Sec.: Date:

I. Schedule of Loads and Computation for Service Entrance Conductor and Service Equipment. Complete/Fill-up the given schedule of loads below, also,
compute for the size and rating of the service entrance conductor and service equipment for the given schedule of loads considering that the total floor area
of the dwelling unit is 250 square meters.

Ckt. CB Size Service Conductor


Load Description Qty. VA/Unit Total VA Voltage Current Conduit Size
# AT AF P Size
1 Lighting Load 15 230 2
2 Lighting Load 14 230 2
3 Lighting Load 12 230 2
4 Convenience Outlet 24 230 2
5 Convenience Outlet 19 230 2
6 Convenience Outlet 20 230 2
7 Package Type ACU @ 6kVA 1 230 2
8 1.0 HP ACU @ 8A 1 230 2
9 1.5 HP ACU @ 10A 1 230 2
10 2.0 HP ACU @ 14A 1 230 2
11 Water Heater @ 5kW 1 230 2
12 Laundry Circuit @ 1.5kVA 1 230 2
13 Clothes Dryer @ 5kW 1 230 2
14 1.0 HP Water Pump @ 8A 1 230 2
15 Microwave Oven @ 1.5kW 1 230 2
16 Electric Range @ 3kW 1 230 2
17 Electric Range @ 8kW 1 230 2
18 Wall Mounted Oven @ 4kW 1 230 2
Counter Mounted
19 1 230 2
Cooking Unit @ 6kW
20 - - SPARE - - -- -- -- -- -- -- -- - -- --
II. Determine the number of wires in a conduit. For the given conditions below, draw the electrical wiring diagram and the actual wiring diagram. Also determine
the most economical number of wires per conduit.
Conduit No. No. of Wires
1
2
3
4
Lamp Controlled in Switch 5
A One location S1 6
B 7
Two locations S2 & S3
C 8
D 9
Three locations S4, S5, & S6
E 10
11
12
13
14
15

Electrical Wiring Diagram

Actual Wiring Diagram