Anda di halaman 1dari 94

RUMAH SAKIT UMUM DAERAH dr.

ABDUL AZI
KOTA SINGKAWANG

ENGINEER ESTIMATE ( EE )

PEKERJAAN
0
0

SUMBER DANA : APBD


TAHUN ANGGARAN 2018
UMUM DAERAH dr. ABDUL AZIZI
OTA SINGKAWANG

INEER ESTIMATE ( EE )

PEKERJAAN
0
0

SUMBER DANA : APBD


TAHUN ANGGARAN 2018
LUAS PENAMPANG TULANGAN BAJA (mm2)

RUMUS 1/4 X p d2 (mm2)


BERAT JENIS 7,850 kg/m3

Berat/m' diameter LUAS PENAMPANG (mm2)


(kg) batang JUMLAH BATANG
(mm) 1 2 3 4 5 6 7 8 9
0.222 6 28.3 56.6 84.9 113.1 141.4 169.7 198.0 226.3 254.6
0.395 8 50.3 100.6 150.9 201.1 251.4 301.7 352.0 402.3 452.6
0.500 9 63.6 127.3 190.9 254.6 318.2 381.9 445.5 509.1 572.8
0.617 10 78.6 157.1 235.7 314.3 392.9 471.4 550.0 628.6 707.1
0.888 12 113.1 226.3 339.4 452.6 565.7 678.9 792.0 905.1 1018.3
1.042 13 132.8 265.6 398.4 531.1 663.9 796.7 929.5 1062.3 1195.1
1.209 14 154.0 308.0 462.0 616.0 770.0 924.0 1078.0 1232.0 1386.0
1.579 16 201.1 402.3 603.4 804.6 1005.7 1206.9 1408.0 1609.1 1810.3
1.998 18 254.6 509.1 763.7 1018.3 1272.9 1527.4 1782.0 2036.6 2291.1
2.227 19 283.6 567.3 850.9 1134.6 1418.2 1701.9 1985.5 2269.1 2552.8
2.467 20 314.3 628.6 942.9 1257.1 1571.4 1885.7 2200.0 2514.3 2828.6
2.985 22 380.3 760.6 1140.9 1521.1 1901.4 2281.7 2662.0 3042.3 3422.6
3.855 25 491.1 982.1 1473.2 1964.3 2455.4 2946.4 3437.5 3928.6 4419.6
4.836 28 616.0 1232.0 1848.0 2464.0 3080.0 3696.0 4312.0 4928.0 5544.0
5.187 29 660.8 1321.6 1982.4 2643.1 3303.9 3964.7 4625.5 5286.3 5947.1
6.316 32 804.6 1609.1 2413.7 3218.3 4022.9 4827.4 5632.0 6436.6 7241.1
7.994 36 1018.3 2036.6 3054.9 4073.1 5091.4 6109.7 7128.0 8146.3 9164.6
9.869 40 1257.1 2514.3 3771.4 5028.6 6285.7 7542.9 8800.0 10057.1 11314.3
15.420 50 1964.3 3928.6 5892.9 7857.1 9821.4 11785.7 13750.0 15714.3 17678.6
ANG TULANGAN BAJA (mm2)

LUAS PENAMPANG (mm2)


JUMLAH BATANG
10 11 12
282.9 311.1 339.4
502.9 553.1 603.4
636.4 700.1 763.7
785.7 864.3 942.9
1131.4 1244.6 1357.7
1327.9 1460.6 1593.4
1540.0 1694.0 1848.0
2011.4 2212.6 2413.7
2545.7 2800.3 3054.9
2836.4 3120.1 3403.7
3142.9 3457.1 3771.4
3802.9 4183.1 4563.4
4910.7 5401.8 5892.9
6160.0 6776.0 7392.0
6607.9 7268.6 7929.4
8045.7 8850.3 9654.9
10182.9 11201.1 12219.4
12571.4 13828.6 15085.7
19642.9 21607.1 23571.4
REKAPITULASI RENCANA A
ENGGINEERING EST

KEGIATAN :
PEKERJAAN :

LOKASI :
SUMBER DANA :
TAHUN ANGGARAN :

NO URAIAN PEKERJAAN

1 2

A PEKERJAAN PENDAHULUAN
B PEKERJAAN PONDASI
C PEKERJAAN STRUKTUR
D PEKERJAAN LANTAI, DINDING
E PEKERJAAN PLAFOND
F PEKERJAAN PINTU JENDELA & VENTILASI
G PEKERJAAN ATAP
H PEKERJAAN LISTRIK
I PEKERJAAN PENGECATAN
JUMLAH BIAYA

Terbilang :

DiperiksaOleh,
PEJABAT PELAKSANA TEKNIS KEGIATAN

JUMADI, A.Md.Kep
NIP. 19780812 199803 1 002
JUMADI, A.Md.Kep
NIP. 19780812 199803 1 002
REKAPITULASI RENCANA ANGGARAN BIAYA
ENGGINEERING ESTIMATE (EE)

0
Belanja Jasa Konsultansi Perencanaan Belanja Modal Pengadaan Bangunan
Gedung, Rehab Ruang Mikrobiologi
Rumah Sakit dr. Abdul Aziz Singkawang
0
2018

JUMLAH BIAYA
URAIAN PEKERJAAN
(Rp.)
2 3

N PENDAHULUAN 1,825,232.85
1,319,500.00
-
N LANTAI, DINDING -
-
N PINTU JENDELA & VENTILASI -
-
-
N PENGECATAN -
JUMLAH BIAYA 3,144,732.85

periksaOleh, Dibuat Oleh,


Dibuat Oleh,
KSANA TEKNIS KEGIATAN Konsultan Perencanaan
Konsultan Perencanaan
CV. KARYA CIPTA BERSAMA

ADI, A.Md.Kep RIFKI ALFAINI, ST


0812 199803 1 002 Andri Setiyono, ST
Team Leader
ADI, A.Md.Kep RIFKI ALFAINI, ST
0812 199803 1 002 Andri Setiyono, ST
Team Leader

DiperiksaOleh,
PEJABAT PEMBUAT KOMITMEN
Disetujui Oleh,
RSUD Dr. "Abdul Aziz" Singkawang
Kuasa Pengguna Anggaran
Yang bertindak Sebagai

MULIADI
NIP. 19760314 200604 1 015
RENCANA ANGGARAN BIAYA
(ENGINEER ESTIMATE)

:
:

:
:
:

Estimasi
No URAIAN SATUAN Kode Analisa
Kuantitas
A PEKERJAAN PENDAHULUAN
1 Pengukuran dan Pemasangan Bouwplank lsm A.2.2.1.4 30.50
Jumlah A
B PEKERJAAN PONDASI
1 Pancang Cerucuk Pondasi dia 10/12 cm - 4 m btg 0,25 X bahan 65.00
2 Penggalian Pondasi M3 A.2.3.1.1
3 Pekerjaan Beton Bertulang K.100 t = 10 cm ( Lantai kerja ) M3 A.4.1.1.4
4 Urugan Pasir Alas Pondasi M3 A.2.3.1.11
5 PONDASI SETEMPAT
Pekerjaan Pembesian Dia 12 mm kg A.4.1.1.17
Pekerjaan Bekisting Pondasi M2 A.4.1.1.20
Pekerjaan Beton Bertulang K.225 M3 A.4.1.1.7.a
6 KOLOM PONDASI ( 15/15)
Pekerjaan Pembesian Dia 12 kg A.4.1.1.17
Pekerjaan Pembesian Dia 8 mm kg A.4.1.1.17
Pekerjaan Bekisting Kolom M2 A.4.1.1.22
Pekerjaan Beton Bertulang K.225 M3 A.4.1.1.7
7 SLOF PONDASI (15/20)
Pekerjaan Pembesian Dia 12 mm kg A.4.1.1.17
Pekerjaan Pembesian Dia 8 mm kg A.4.1.1.17
Pekerjaan Bekisting Sloof M2 A.4.1.1.21
Pekerjaan Beton Bertulang K.225 M3 A.4.1.1.7
Jumlah B
C PEKERJAAN STRUKTUR
4 KOLOM ( 15/15)
Pekerjaan Pembesian Dia 12 mm kg A.4.1.1.17
Pekerjaan Pembesian Dia 8 mm kg A.4.1.1.17
Pekerjaan Bekisting Kolom M2 A.4.1.1.22
Pekerjaan Beton Bertulang K.225 M3 A.4.1.1.7
10 RING BALOK RANGKA ATAP
Pekerjaan Pembesian Dia 12 mm kg A.4.1.1.17
Pekerjaan Pembesian Dia 8 mm kg A.4.1.1.17
Pekerjaan Bekisting Balok M2 A.4.1.1.23
Pekerjaan Beton Bertulang K.225 M3 A.4.1.1.7
Jumlah C
D PEKERJAAN LANTAI, DINDING
11 Pekerjaan Timbunan Pasir M3 A.2.3.1.11
12 Pekerjaan Lantai t= 7 cm( K175 ) M3 A.4.1.1.5
13 Pekerjaan Wiremesh M6 ( satu lapis ) kg A.4.1.1.17.b
14 Pekerjaan Dinding Batako 7 x 20 x 40 M2 P. Dnd. 03
15 Pekerjaan Plesteran Camp. 1Pc : 3Ps Tebal 1,5 cm M2 A.4.4.2.3
16 Pekerjaan Lantai Keramik 40 x 40 M2 A.4.4.3.11.a
Jumlah D
E PEKERJAAAN PLAFOND
17 Rangka langit-langit (60 x 60) cm, kayu kelas II M2 A.4.6.1.20
18 Plafond GRC board M2 4.5.1.7.a
Jumlah E
F PEKERJAAN PINTU JENDELA & VENTILASI
19 PEKERJAAN PINTU
Kusen Pintu Kayu Kls I Buah A.4.6.1.1
Daun Pintu Panel Kayu Kls I Buah A.4.6.1.5
Engsel Buah A.4.6.2.5
Kunci 2 Slaag Buah A.4.6.2.2
Slot Buah A.4.6.2.11
20 PEKERJAAN JENDELA I
Kusen Kayu Kelas 1 M3 A.4.6.1.1
Kaca Bening 5mm M2 A.4.6.2.17
21 PEKERJAAN JENDELA II
Kusen Kayu Kelas 1 M3 A.4.6.1.1
Frame Jendela M2 A.4.6.1.6
Kaca Bening 5mm M2 A.4.6.2.17
Engsel Buah A.4.6.2.6
Slot Buah A.4.6.2.11
Kait Angin Buah A.4.6.2.9
22 PEKERJAAN VENTILASI
Ventilasi M2 A.4.6.1.10
Jumlah F
G PEKERJAAN ATAP
23 Konstruksi kuda-kuda konvensional M3 A.4.6.1.13
24 Konstruksi gordeng, kayu kelas II M3 A.4.6.1.15
25 Kasau + Reng Atap Genteng Metal Kayu Kelas II M2 P.K. 33
26 Pekerjaan Bubungan seng datar 0,3 M' A.4.5.2.36
27 Lisplank ukuran (3 x 20) cm M' A.4.6.1.21
28 Penutup atap genteng metal M2 A.4.5.2.32
Jumlah G
H PEKERJAAN LISTRIK
29 Sakelar Ganda Buah
30 Sakelar Tunggal Buah
31 Stop Kontak Ganda Buah
32 Lampu Phillips 24 watt Buah
33 Fitting Lampu Buah
34 Instalasi Titik Lampu plus kabel 2 x 2,5 Titik
Jumlah H
I PEKERJAAN PENGECATAN
35 Pengeteran Rangka Kuda kuda M2 P.Ct. 09
36 Pengecatan Kayu M2 A.4.7.1.4
37 Pengecatan Tembok M2 A.4.7.1.10

Jumlah I
Jumlah A + B + C + D + E + F + G + H + I+J
RENCANA ANGGARAN BIAYA
(ENGINEER ESTIMATE)

Harga Satuan Jumlah Biaya


( Rp )
( Rp )

59,843.70 1,825,232.85
umlah A 1,825,232.85

20,300.00 1,319,500.00
63,000.00 -
929,959.79 -
177,450.00 -

16,609.99 -
164,125.50 -
1,253,626.99 -

16,609.99 -
16,609.99 -
251,122.69 -
1,253,626.99 -

16,609.99 -
16,609.99 -
174,275.50 -
1,253,626.99 -
umlah B 1,319,500.00

16,609.99 -
16,609.99 -
251,122.69 -
1,253,626.99 -

16,609.99 -
16,609.99 -
258,202.31 -
1,253,626.99 -
umlah C -

177,450.00 -
1,140,835.30 -
21,382.40 -
86,579.10 -
60,305.28 -
167,100.99 -
umlah D -
127,114.33 -
48,438.14 -
umlah E -

11,034,321.25 -
616,700.00 -
38,649.78 -
168,575.00 -
35,140.00 -

11,034,321.25 -
215,911.00 -

11,034,321.25 -
537,415.00 -
215,911.00 -
19,521.25 -
35,140.00 -
33,357.50 -

656,633.50 -
umlah F -

5,920,007.25 -
7,095,086.50 -
68,078.75 -
62,997.50 -
88,405.22 -
97,388.50 -
umlah G -

18,955.00 -
16,725.00 -
18,955.00 -
50,175.00 -
13,380.00 -
150,000.00 -
umlah H -

17,603.75 -
42,922.85 -
26,625.50 -

Jumlah I -
3,144,732.85
DAFTAR HARGA SATUAN UPAH DAN BAHAN

Kegiatan :
Pekerjaan :
Lokasi :
Tahun Anggaran :

HARGA
NO TENAGA KERJA SATUAN
(Rp)

A. UPAH
1 Mandor Lapangan Org/hari 120,000.00
2 Kepala Tukang Org/hari 125,000.00
3 Tukang Org/hari 110,000.00
4 Pekerja Org/hari 80,000.00

HARGA
NO MATERIAL SATUAN
(Rp)

B. BAHAN PENGISI
1 Batako 7 x 20 x 40 cm Bh 2,453.00
6 Batu pecah 2/3 cm M³ 431,375.00
7 Batu pecah 1/2 cm M³ 456,750.00
8 Batu pecah 1/1 cm M³ 507,500.00
9 Pasir beton M³ 152,250.00
10 Pasir pasang M³ 147,175.00
11 Pasir urug M³ 126,875.00
12 Semen PC Zak 81,952.50
13 Semen PC Kg 1,639.05
14 Semen warna Kg 16,725.00

C. BAHAN ATAP
1 Genteng metal 0,35 mm 80x88mm Lbr 47,945.00
2 Seng datar Polos BJLS 0,30 Lbr 55,750.00
3 Bubungan Seng Plat BJLS 0,3 M 61,325.00
HARGA
NO MATERIAL SATUAN
(Rp)

D. BAHAN KAYU
1 Kayu klas I uk. 8/8 - 4 M ( tdk ketam ) M³ 7,105,000.00
2 Papan kayu klas I ( ketam ) M³ 5,252,625.00
3 Papan kayu klas II M³ 3,857,000.00
4 Papan kayu klas III M³ 2,030,000.00
5 Ky klas II ( tdk ketam) M³ 3,146,500.00
6 Ky klas III M³ 2,030,000.00
7 Kayu cerucuk /dolken ø 6/8 - Pj. 4 M Btg 12,687.50
8 Kayu cerucuk /dolken ø10/12 - Pj. 4 M Btg 16,240.00

E. BAHAN LANTAI
1 Keramik 40 x 40 cm (Polos) Kotak 82,510.00

F. BAHAN BESI
1 Besi tulangan beton Kg 14,104.75
2 Wiremesh 6m Kg 20,070.00
3 Kawat ikat beton Kg 22,300.00
HARGA
NO MATERIAL SATUAN
(Rp)

G. ALAT PENGUNCI DAN PENGGANTUNG


1 Engsel jendela 3" Buah 25,645.00
2 Engsel pintu 4" Buah 27,875.00
3 Handle jendela Buah 12,822.50
4 Kait angin Buah 12,822.50
5 Kunci double slagh besar Buah 133,800.00
6 Kunci double slagh kecil Buah 105,925.00
8 Slot Bh 8,920.00
9 Paku atap Kg 33,450.00
10 Paku campuran Kg 21,185.00
11 Paku GRC Ktk 33,450.00
12 Paku Gypsum Ktk 33,450.00
13 Sikrup Gypsum Kg 42,370.00
15 Baut (Srew driver) Bh 557.50
16 Dynabol dia 12 x 120 mm Bh 2,230.00

H. BAHAN LANGIT-LANGIT
1 GRC / Kalsiboard 120 x 240 x 40 cm Lbr 82,510.00
2 Triplek t. 4 mm Lbr 80,280.00
3 Triplek t. 9 mm Lbr 195,125.00

I BAHAN KACA
1 Kaca cermin t. 3 mm M² 284,325.00
2 Kaca Rayban, t. 5 mm M² 183,975.00
3 Kaca 3 mm M² 172,825.00
4 Kaca 5 mm M² 178,400.00
HARGA
NO MATERIAL SATUAN
(Rp)

J BAHAN FINISHING / CAT


1 Amplas besi / kayu Lbr 3,345.00
2 Cat dasar Kg 22,300.00
3 Cat kilat Kg 66,900.00
4 Cat tembok Kg 50,175.00
5 Dempul Kg 13,380.00
6 Oker Kg 16,725.00
7 Plamur Kg 16,725.00
8 Ter / Residu Ltr 16,725.00
9 Thiner Ltr 20,070.00
10 Meni Kg 50,175.00
11 Lem Kayu Kg 17,840.00
12 Kuas 4" Bh 22,300.00
14 Plastik Cor M² 3,345.00

K BAHAN LISTRIK
1 Lampu Phillips 24 watt Buah 50,175.00
3 Fitting Lampu Buah 13,380.00
4 Kabel 3 x 2,5 M 13,380.00
4 Saklar double Buah 18,955.00
5 Saklar tunggal Buah 16,725.00
6 Stop kontak 3 lobang Buah 25,645.00
REKAPITULASI ANALISA BIAYA KONSTRUKSI BANG
DAN PERUMA

NO KODE ANALISA
1 2
DIVISI A.2.2.1 PEK
1 A.2.2.1.4
2 A.2.2.1.9
DIVISI A.2.3.1 PE
1 A.2.3.1.1
2 A.2.3.1.10
3 A.2.3.1.11
DIVISI A.4.1.1 PE
1 A.4.1.1.4
2 A.4.1.1.5
3 A.4.1.1.7.a
4 A.4.1.1.17
5 A.4.1.1.17.b
5 A.4.1.1.20
6 A.4.1.1.21
7 A.4.1.1.22
8 A.4.1.1.23
9 A.4.1.1.24.a
PEKERJAAN D
1 P. Dnd. 03
DIVISI A.4.4.2 PEKE
2 A.4.4.2.3
DIVISI A.4.4.3 PEKERJAAN P
1 A.4.4.3.11.a
DIVISI A.4.5.1 PEK
1 4.5.1.7.a
DIVISI A.4.5.2 PEKER
1 A.4.5.2.32
2 P.K. 33
3 A.4.5.2.36
DIVISI A.4.6.1 P
1 A.4.6.1.1
2 A.4.6.1.5
3 A.4.6.1.6
4 A.4.6.1.10
5 A.4.6.1.13
6 A.4.6.1.15
7 A.4.6.1.20
8 A.4.6.1.21
DIVISI A.4.6.2 PEKERJ
1 A.4.6.2.2
2 A.4.6.2.5
3 A.4.6.2.6
NO KODE ANALISA
1 2
4 A.4.6.2.11
5 A.4.6.2.9
6 A.4.6.2.17
DIVISI A.4.7.1 PEKE
1 A.4.7.1.4
2 A.4.7.1.10
3 P.Ct. 09
SI ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG
DAN PERUMAHAN ( SNI 2013 )

HARGA SATUAN
URAIAN PEKERJAAN
(Rp)
3 4
DIVISI A.2.2.1 PEKERJAAN PERSIAPAN
Pengukuran dan Pemasangan 1 m’ Bouwplank 59,843.70
Pembersihan 1 m2 Lapangan dan Perataan 14,000.00
DIVISI A.2.3.1 PEKERJAAN TANAH
Penggalian 1 m3 tanah biasa sedalam 1 m 63,000.00
Pemadatan tanah 1 m3 tanah ( per 20 cm) 46,000.00
Pengurugan 1 m3 dengan pasir urug 177,450.00
DIVISI A.4.1.1 PEKERJAAN BETON
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 929,959.79
Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66 1,140,835.30
Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58 1,253,626.99
Pembesian 1 kg dengan besi polos atau besi ulir 16,609.99
Pemasangan 1 kg jaring kawat baja (wiremesh) 21,382.40
Pemasangan 1 m2 bekisting untuk pondasi 164,125.50
Pemasangan 1 m2 bekisting untuk sloof 174,275.50
Pemasangan 1 m2 bekisting untuk kolom 251,122.69
Pemasangan 1 m2 bekisting untuk balok 258,202.31
Pemasangan 1 m2 bekisting untuk lantai 321,532.00
PEKERJAAN DINDING (P.Dnd.)
1m2 Pasang Batako uk. 20/40/7(P.Dnd. 03) 86,579.10
DIVISI A.4.4.2 PEKERJAAN PLESTERAN
Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. 60,305.28
DIVISI A.4.4.3 PEKERJAAN PENUTUP LANTAI DAN DINDING
Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm 167,100.99
DIVISI A.4.5.1 PEKERJAAN PLAFOND
1m2 Langit-langit GRC 48,438.14
DIVISI A.4.5.2 PEKERJAAN PENUTUP ATAP
Pemasangan 1 m2 genteng metal 97,388.50
1m2 Pasang Kasau + Reng Atap Genteng Metal Kayu Kelas II 68,078.75
62,997.50
DIVISI A.4.6.1 PEKERJAAN KAYU
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I 11,034,321.25
Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I 616,700.00
Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II 537,415.00
Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II 656,633.50
Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III 5,920,007.25
Pemasangan 1 m3 konstruksi gordeng, kayu kelas II 7,095,086.50
Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 127,114.33
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 88,405.22
DIVISI A.4.6.2 PEKERJAAN KUNCI DAN KACA
Pemasangan 1 buah kunci tanam biasa 168,575.00
Pemasangan 1 buah engsel pintu 38,649.78
Pemasangan 1 buah engsel jendela 19,521.25
HARGA SATUAN
URAIAN PEKERJAAN
(Rp)
3 4
Pemasangan 1 buah kunci slot 35,140.00
Pemasangan 1 buah kait angin 33,357.50
Pemasangan 1 m2 kaca tebal 5 mm 215,911.00
DIVISI A.4.7.1 PEKERJAAN PENGECATAN
1 m² Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup ) 42,922.85
Pengecatan 1 m2 tembok baru ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) 26,625.50
1m2 Pelaburan Bidang Kayu Dengan Cat Residu dan Ter 17,603.75
AN GEDUNG
( SNI 2013 )

HAL
5
AN PERSIAPAN

AAN TANAH

AAN BETON

NG (P.Dnd.)

AN PLESTERAN

UP LANTAI DAN DINDING

AN PLAFOND

N PENUTUP ATAP

JAAN KAYU

KUNCI DAN KACA


HAL
5

N PENGECATAN
DIVISI A.2.2.1 PEKERJAAN PERSIAPAN

A.2.2.1.4 Pengukuran dan Pemasangan 1 m’ Bouwplank


HARGA
No. URAIAN SAT SATUAN KOEFISIEN
( Rp. )
1 2 3 4 5
A TENAGA
1 Tukang Kayu OH 110,000.00 0.100
2 Pekerja OH 80,000.00 0.100
3 Kepala Tukang OH 125,000.00 0.010
4 Mandor OH 120,000.00 0.005
Jumlah
B BAHAN
1 Kayu 5/7 M3 2,030,000.00 0.012
2 Paku 2”-3” Kg 21,185.00 0.020
3 Kayu papan 3/20 M3 2,030,000.00 0.007
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

Pek.Persiapan 25
JUMLAH
HARGA
( Rp. )
6

11,000.00
8,000.00
1,250.00
600.00
20,850.00

24,360.00
423.70
14,210.00
38,993.70

0.00
59,843.70

59,843.70

Pek.Persiapan 26
DIVISI A.2.3.1 PEKERJAAN TANAH

A.2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Mandor OH 120,000.00
Jumlah
B BAHAN

Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.10 Pemadatan tanah 1 m3 tanah ( per 20 cm)


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Mandor OH 120,000.00
Jumlah
B BAHAN

Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug Pek.Tanah 27


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Mandor OH 120,000.00
I A.2.3.1 PEKERJAAN TANAH

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.750 60,000.00
0.025 3,000.00
63,000.00

0.00

0.00
63,000.00
15% x D maksimum
63,000.00

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.500 40,000.00
0.050 6,000.00
46,000.00

0.00

0.00
46,000.00
15% x D maksimum
46,000.00

Pek.Tanah 28
JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.300 24,000.00
0.010 1,200.00
DIVISI A.4.1.1 PEKERJAAN BETON

A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c
HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Batu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Semen Portland Kg 1,639.05
2 Pasir Beton Kg 108.75
3 Kerikil (Maks 30mm) Kg 319.54
4 Air Liter
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.5 Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Batu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Semen Portland Kg 1,639.05
2 Pasir Beton Kg 108.75
3 Kerikil (Maks 30mm) Kg 338.33
4 Air Liter
Jumlah
C PERALATAN

Pek.Beton Bertulang 29
Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

Pek.Beton Bertulang 30
A.4.1.1.7.a Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Batu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Semen Portland Kg 1,639.05
2 Pasir Beton Kg 108.75
3 Kerikil (Maks 30mm) Kg 375.93
4 Air Liter 0.00
Jumlah
C PERALATAN
Sewa Molen 165,000.00
Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

D Harga Satuan
Acuan : SNI DT 91-0008-2007

Beton Ready Mix K 225 ( P.BB.04.a )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 61,000.00
2 Tukang Batu OH 86,000.00
3 Kepala Tukang OH 104,000.00
4 Mandor OH 98,000.00
Jumlah
Jumlah Upah 25%
B BAHAN
1 Beton Ready Mix K 225 M3 951,500.00
Jumlah
C ALAT

Pek.Beton Bertulang 31
1 Sewa Pompa M3 55,000.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Membuat 1m3 Beton Mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 (P
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 61,000.00
2 Tukang Batu OH 86,000.00
3 Kepala Tukang OH 104,000.00
4 Mandor OH 98,000.00
Jumlah
B BAHAN
1 Semen Portland Kg 1,800.00
2 Pasir Kg 88.14
3 Batu pecah 1-2 cm (Kerikil) Kg 393.85
4 Air Liter 0.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Pek.Beton Bertulang 32
Membuat 1m3 Beton Mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 (P
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 61,000.00
2 Tukang Batu OH 86,000.00
3 Kepala Tukang OH 104,000.00
4 Mandor OH 98,000.00
Jumlah
B BAHAN
1 Semen Portland Kg 1,800.00
2 Pasir Kg 55.71
3 Batu pecah 1-2 cm (Kerikil) Kg 393.85
4 Air Liter 0.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%

Beton Ready Mix K 300 ( P.BB.06.a )


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 61,000.00
2 Tukang Batu OH 86,000.00
3 Kepala Tukang OH 104,000.00
4 Mandor OH 98,000.00
Jumlah
B BAHAN
1 Beton Ready Mix K 300 M3 0.00
Jumlah
C ALAT
1 Sewa Pompa M3 0.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0008-2007

Pek.Beton Bertulang 33
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%

Pek.Beton Bertulang 34
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Besi OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Besi Beton (polos/ulir) Kg 14,104.75
2 Kawat Beton Kg 22,300.00
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan per 1 Kg
Acuan : SNI DT 91-0008-2007

A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Kayu kelas III M3 2,030,000.00
2 Paku 5 cm – 10 cm Kg 21,185.00
3 Minyak bekisting Lt 0.00
Jumlah
C PERALATAN

Pek.Beton Bertulang 35
Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Kayu kelas III M3 2,030,000.00
2 Paku 5 cm – 10 cm Kg 21,185.00
3 Minyak bekisting Lt 0.00
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

Pek.Beton Bertulang 36
A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom
HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Kayu kelas III M3 2,030,000.00
2 Paku 5 cm – 12 cm Kg 21,185.00
3 Minyak Bekisting Lt 0.00
4 Balok kayu kelas II M3 3,146,500.00
5 Plywood tebal 9 mm lbr 195,125.00
6 Dolken kayu dia 8-10cm –panj 4 m btg 16,240.00
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)
D Harga Satuan

A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Kayu kelas III M3 2,030,000.00
2 Paku 5 cm – 12 cm Kg 21,185.00
3 Minyak Bekisting Lt 0.00
4 Balok kayu kelas II M3 3,146,500.00

Pek.Beton Bertulang 37
5 Plywood tebal 9 mm lbr 195,125.00
6 Dolken kayu dia 8-10cm –panj 4 m btg 16,240.00
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

Pek.Beton Bertulang 38
A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai
HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Kayu kelas III m3 2,030,000.00
2 Paku 5 cm – 12 cm kg 21,185.00
3 Minyak Bekisting Liter 0.00
4 Balok kayu kelas III m3 2,030,000.00
5 Plywood tebal 9 mm Lbr 80,280.00
6 Dolken kayu galam 8-10cm –panj 4 m Batang 12,687.50
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.17.b Pemasangan 10 kg jaring kawat baja (wiremesh)


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Jaring kawat baja dilas kg 20,070.00
2 Kawat Beton kg 22,300.00
Jumlah
C PERALATAN

Jumlah

Pek.Beton Bertulang 39
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan (D+E) per 1 kg

Pek.Beton Bertulang 40
A.4.1.1 PEKERJAAN BETON

utu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

1.200 96,000.00
0.200 22,000.00
0.020 2,500.00
0.060 7,200.00
127,700.00

230.000 376,981.50
893 97,113.75
1,027 328,164.54
0.00
802,259.79

0.00
929,959.79
15% x D maksimum
929,959.79

,5 MPa (K 175), slump (12 2) cm, w/c = 0,66


JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

1.650 132,000.00
0.275 30,250.00
0.028 3,500.00
0.083 9,960.00
175,710.00

326.00 534,330.30
760.00 82,650.00
1,029.00 348,145.00
0.00
965,125.30

Pek.Beton Bertulang 41
0.00
1,140,835.30
15% x D maksimum
1,140,835.30

Pek.Beton Bertulang 42
,3 MPa (K 225), slump (12 2) cm, w/c = 0,58 A.4.1.1.6. Membuat 1 m³ beton mutu f'c
JUMLAH
KOEFISIEN HARGA
( Rp. ) No
(Rp)
5 6
A
1.323 105,840.00 Pekerja
0.189 20,790.00 Tukang batu
0.002 237.50 Kepala Tukang
0.066 7,920.00 Mandor
JUMLAH TENAGA KERJA
134,787.50
B
371 608,087.55 Semen Portland
698 75,907.50 Pasir beton
1,047 393,594.44 Kerikil (Maks 30 mm)
215 0.00 Air
JUMLAH HARGA BAHAN
1,077,589.49
C
0.250 41,250.00
JUMLAH HARGA ALAT
41,250.00
1,253,626.99
15% x D maksimum D
1,253,626.99 E
F
0.00

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

1.650 100,650.00
0.275 23,650.00
0.028 2,912.00
0.083 8,134.00
135,346.00
33,836.50

1.000 951,500.00
951,500.00

Pek.Beton Bertulang 43
1.000 55,000.00
55,000.00
1,040,336.50
1,040,336.50

7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 (P.BB. 05)


BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

1.650 100,650.00
0.275 23,650.00
0.028 2,912.00
0.083 8,134.00
135,346.00

384.000 691,200.00
692.000 60,994.86
1,039.000 409,212.07
0.000 0.00
1,161,406.93
1,296,752.93
1,296,752.93

Pek.Beton Bertulang 44
4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 (P.BB. 06)
BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

1.650 100,650.00
0.275 23,650.00
0.028 2,912.00
0.083 8,134.00
135,346.00

413.000 743,400.00
681.000 37,941.43
1,021.000 402,122.74
0.000 0.00
1,183,464.17
1,318,810.17
1,318,810.17

i kerikil = 1.350 kg/m3, Buckling factor pasir = 20%

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.165 10,065.00
0.028 2,365.00
0.003 291.20
0.008 813.40
13,534.60

1.000 0.00
0.00

1.000 0.00
0.00
13,534.60
13,534.60

Pek.Beton Bertulang 45
i kerikil = 1.350 kg/m3, Buckling factor pasir = 20%

Pek.Beton Bertulang 46
JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.070 5,600.00
0.070 7,700.00
0.007 875.00
0.004 480.00
14,655.00

10.500 148,099.88
0.150 3,345.00
151,444.88

0.00
166,099.88
15% x D maksimum
166,099.88
16,609.99

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.520 41,600.00
0.260 28,600.00
0.026 3,250.00
0.026 3,120.00
76,570.00

0.040 81,200.00
0.300 6,355.50
0.100 0.00
87,555.50

Pek.Beton Bertulang 47
0.00
164,125.50
15% x D maksimum
164,125.50

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.520 41,600.00
0.260 28,600.00
0.026 3,250.00
0.026 3,120.00
76,570.00

0.045 91,350.00
0.300 6,355.50
0.100 0.00
97,705.50

0.00
174,275.50
15% x D maksimum
174,275.50

Pek.Beton Bertulang 48
JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.660 52,800.00
0.330 36,300.00
0.033 4,125.00
0.033 3,960.00
97,185.00

0.040 81,200.00
0.400 8,474.00
0.200 0.00
0.015 47,197.50
0.350 68,293.75
2.000 32,480.00
237,645.25

0.00
334,830.25
15% x D maksimum
334,830.25
0.75 251,122.69

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.660 52,800.00
0.330 36,300.00
0.033 4,125.00
0.033 3,960.00
97,185.00

0.040 81,200.00
0.400 8,474.00
0.200 0.00
0.018 56,637.00

Pek.Beton Bertulang 49
0.350 68,293.75
2.000 32,480.00
247,084.75

0.00
344,269.75
15% x D maksimum
0.75 258,202.31

Pek.Beton Bertulang 50
JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.660 52,800.00
0.330 36,300.00
0.033 4,125.00
0.033 3,960.00
97,185.00

0.040 81,200.00
0.400 8,474.00
0.200 0.00
0.015 30,450.00
0.350 28,098.00
6.000 76,125.00
224,347.00

0.00
321,532.00
15% x D maksimum
321,532.00

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.025 2,000.00
0.025 2,750.00
0.025 3,125.00
0.001 120.00
7,995.00

10.200 204,714.00
0.050 1,115.00
205,829.00

0.00

Pek.Beton Bertulang 51
213,824.00
15% x D maksimum
213,824.00
21,382.40

Pek.Beton Bertulang 52
A.4.1 AHSP pemancangan secara manual (tanpa mesin) menggunakan tripod dan Ham

F.02 Per-m' penetrasi tiang pancang kayu atau dolken ø 8-10 cm

No. URAIAN SATUAN

1 2 3
A TENAGA
1 Pekerja OH
2 Tukang Batu OH
3 Kepala Tukang OH
4 Mandor OH
Jumlah
B BAHAN
1 Kayu cerucuk /dolken ø10/12 M
Jumlah
C PERALATAN
1 Tripod tinggi 5 m Alat pancang+Hammer Sewa/Hari
2 0,5 ton Sewa/Hari
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

D Harga Satuan
sin) menggunakan tripod dan Hammer

en ø 8-10 cm A.4.1.1.6. Membuat 1 m³ beton mutu f'c = 16,


HARGA JUMLAH
SATUAN KOEFISIEN HARGA
( Rp. ) ( Rp. )
4 5 6
A
80,000.00 0.075 6,000.00
110,000.00 0.025 2,750.00
125,000.00 0.008 1,000.00
120,000.00 0.00
9,750.00
B
4,060.00 1.100 4,466.00
4,466.00
C
215,000.00 0.025 5,375.00
75,000.00 0.025 1,875.00
7,250.00
21,466.00
15% x D maksimum D
21,466.00
F
21,466.00
PEKERJAAN DINDING (P.Dnd.)

1m2 Pasang Batako uk. 20/40/7(P.Dnd. 03)


HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Batu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Batako 20/40/7 (cetak mesin) Bh 2,453.00
2 Semen Portland Kg 1,639.05
3 Pasir Beton / Pasang M3 147,175.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.20

Pek.Dinding 55
PEKERJAAN DINDING (P.Dnd.)

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.32 25,600.00
0.10 11,000.00
0.01 1,250.00
0.015 1,800.00
39,650.00

12.5 30,662.50
7.500 12,292.88
0.027 3,973.73
46,929.10
86,579.10
86,579.10

Pek.Dinding 56
DIVISI A.4.2.1 PEKERJAAN BESI DAN ALUMUNIUM

A.4.2.1.24. Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
No Uraian Kode Satuan Koefisien Harga Satuan (
A TENAGA
Pekerja L.01.01 OH 0.2000 80,000
Tukang Besi L.02.05 OH 0.4500 110,000
Kepala Tukang L.03.01 OH 0.0100 125,000
Mandor L.04.01 OH 0.0500 120,000
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canai dingin C75 M' 3.7200 15,610
Baut (Srew driver) bh 28.0000 558
Dynabol dia 12 x 120 mm bh 2.0000 2,230
Reng Canai Dingin M' 2.7000 7,805
Talang / Jurai Canai Dingin M' 0.1240 7,805
JUMLAH HARGA BAHAN
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit 10% 15%
F Harga Satuan Pekerjaan (D+E) -
DA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
Jumlah Harga (Rp.)

16,000.00
49,500.00
1,250.00
6,000.00
72,750.00

58,069.20
15,610.00
4,460.00
21,073.50
967.82
100,180.52

10,018.05
-
177,939.55

177,939.00
DIVISI A.4.4.2 PEKERJAAN PLESTERAN

A.4.4.2.3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Batu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 PC Kg 1,639.05
2 PP M3 147,175.00
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

Pek.Plasteran 59
SI A.4.4.2 PEKERJAAN PLESTERAN

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.300 24,000.00
0.150 16,500.00
0.015 1,875.00
0.015 1,800.00
44,175.00

7.776 12,745.25
0.023 3,385.03
16,130.28

0.00
60,305.28
15% x D maksimum
60,305.28

Pek.Plasteran 60
DIVISI A.4.4.3 PEKERJAAN PENUTUP LANTAI DAN DINDING

A.4.4.3.11.a Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Batu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Ubin Keramik Bh 13,751.67
2 Semen Portland Kg 1,639.05
3 Pasir Pasang M3 147,175.00
4 Semen Warna Kg 16,725.00

C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

Pek.Penutup LT Dnd 61
RJAAN PENUTUP LANTAI DAN DINDING

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.250 20,000.00
0.125 13,750.00
0.013 1,625.00
0.013 1,560.00
36,935.00

6.630 91,173.55
9.800 16,062.69
0.045 6,622.88
0.975 16,306.88
130,165.99

0.00
167,100.99
15% x D maksimum
167,100.99

Pek.Penutup LT Dnd 62
DIVISI A.4.5.1 PEKERJAAN PLAFOND

4.5.1.7.a 1m2 Langit-langit GRC


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 GRC Board (120 x 240 x 4) Lbr 82,510.00
2 Paku GRC Kg 33,450.00
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.24

Pek.Plafond 63
AFOND

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.100 8,000.00
0.050 5,500.00
0.005 625.00
0.005 600.00
14,725.00

0.364 30,033.64
0.110 3,679.50
33,713.14
48,438.14
48,438.14

Pek.Plafond 64
DIVISI A.4.5.2 PEKERJAAN PENUTUP ATAP

A.4.5.2.32 Pemasangan 1 m2 genteng metal


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Genteng Metal 30 mm Bh 47,945.00
2 Paku Kg 33,450.00
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

Pemasangan 1 m’ nok genteng


metal
A.4.5.2.36
HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Nok Genteng Metal Bh 55,750.00
2 Paku Biasa 1/2 - 1 " Kg 33,450.00

Jumlah
C PERALATAN

Pek.Atap 65
Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

P.K. 33 1m2 Pasang Kasau + Reng Atap Genteng Metal Kayu Kelas II
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Kayu Kelas II (Tidak Ketam) M3 3,146,500.00
2 Paku Kg 21,185.00
Jumlah
C Jumlah A + B
D Harga Satuan

Pek.Atap 66
SI A.4.5.2 PEKERJAAN PENUTUP ATAP

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.200 16,000.00
0.100 11,000.00
0.010 1,250.00
0.001 120.00
28,370.00

1.300 62,328.50
0.200 6,690.00
69,018.50

0.00
97,388.50
15% x D maksimum
97,388.50

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.250 20,000.00
0.150 16,500.00
0.015 1,875.00
0.013 1,560.00
38,375.00

1.100 61,325.00
0.050 1,672.50

62,997.50

Pek.Atap 67
0.00
62,997.50
15% x D maksimum
62,997.50

BIAYA
KUANTITAS SATUAN
( Rp. )
5 6

0.100 8,000.00
0.100 11,000.00
0.010 1,250.00
0.005 600.00
20,850.00

0.014 44,051.00
0.150 3,177.75
47,228.75
68,078.75
68,078.75

Pek.Atap 68
DIVISI A.4.6.1 PEKERJAAN KAYU

A.4.6.1.1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
HARGA
No. URAIAN SATUAN SATUAN KOEFISIEN
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 80,000.00 7.000
2 Tukang kayu OH 110,000.00 21.000
3 Kepala tukang OH 125,000.00 2.100
4 Mandor OH 120,000.00 0.350
Jumlah
B BAHAN
1 Balok Kayu Kls II M3 7,105,000.00 1.1000
2 Paku Kg 21,185.00 1.250
3 Lem Kayu Kg 17,840.00 1.000
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I


HARGA
No. URAIAN SATUAN SATUAN KOEFISIEN
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 80,000.00 1.000
2 Tukang kayu OH 110,000.00 3.000
3 Kepala tukang OH 125,000.00 0.300
4 Mandor OH 120,000.00 0.050
Jumlah
B BAHAN
1 Papan Kayu M3 3,857,000.00 0.0400
2 Lem Kayu Kg 17,840.00 0.500
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
HARGA
No. URAIAN SATUAN SATUAN KOEFISIEN
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 80,000.00 0.800
2 Tukang kayu OH 110,000.00 2.400
3 Kepala tukang OH 125,000.00 0.240
4 Mandor OH 120,000.00 0.400
Jumlah
B BAHAN
1 Papan Kayu Kls I M3 5,252,625.00 0.024
2 Lem Kayu Kg 17,840.00 0.300
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.10 Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II


HARGA
No. URAIAN SATUAN SATUAN KOEFISIEN
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 80,000.00 0.670
2 Tukang kayu OH 110,000.00 2.000
3 Kepala tukang OH 125,000.00 0.200
4 Mandor OH 120,000.00 0.335
Jumlah
B BAHAN
1 Papan Kayu Kls I M3 5,252,625.00 0.060
2 Lem Kayu Kg 17,840.00 0.150
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.20 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
HARGA
No. URAIAN SATUAN SATUAN KOEFISIEN
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 80,000.00 0.200
2 Tukang kayu OH 110,000.00 0.300
3 Kepala tukang OH 125,000.00 0.030
4 Mandor OH 120,000.00 0.010
Jumlah
B BAHAN
1 Kasau 4x6 M3 3,146,500.00 0.0163
2 Paku 7 dan 10 cm Kg 21,185.00 0.250
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.21 Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
HARGA
No. URAIAN SATUAN SATUAN KOEFISIEN
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 80,000.00 0.100
2 Tukang kayu OH 110,000.00 0.200
3 Kepala tukang OH 125,000.00 0.020
4 Mandor OH 120,000.00 0.005
Jumlah
B BAHAN
1 Papan Kayu Kls II M3 3,857,000.00 0.0108
2 Paku 5 dan 7 cm Kg 21,185.00 0.100
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.13 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III


HARGA
No. URAIAN SATUAN SATUAN KOEFISIEN
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 80,000.00 4.000
2 Tukang kayu OH 110,000.00 12.000
3 Kepala tukang OH 125,000.00 1.200
4 Mandor OH 120,000.00 0.200
Jumlah
B BAHAN
1 Balok Kayu kls II m3 3,146,500.00 1.200
2 Besi strip tebal 15 mm kg 14,104.75 15.000
3 Paku 12 cm kg 21,185.00 5.600
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.15 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II


HARGA
No. URAIAN SATUAN SATUAN KOEFISIEN
( Rp. )
1 2 3 4 5
A TENAGA
1 Pekerja OH 80,000.00 6.700
2 Tukang kayu OH 110,000.00 20.100
3 Kepala tukang OH 125,000.00 2.010
4 Mandor OH 120,000.00 0.335
Jumlah
B BAHAN
1 Balok Kayu kls II m3 3,146,500.00 1.100
2 Besi strip tebal 15 mm kg 33,450.00 15.000
3 Paku 12 cm kg 31,245.50 3.000
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)
.4.6.1 PEKERJAAN KAYU

JUMLAH
HARGA
( Rp. )
6

560,000.00
2,310,000.00
262,500.00
42,000.00
3,174,500.00

7,815,500.00
26,481.25
17,840.00
7,859,821.25

0.00
11,034,321.25

11,034,321.25

JUMLAH
HARGA
( Rp. )
6

80,000.00
330,000.00
37,500.00
6,000.00
453,500.00

154,280.00
8,920.00
163,200.00

0.00
616,700.00

616,700.00

JUMLAH
HARGA
( Rp. )
6

64,000.00
264,000.00
30,000.00
48,000.00
406,000.00

126,063.00
5,352.00
131,415.00

0.00
537,415.00

537,415.00

JUMLAH
HARGA
( Rp. )
6

53,600.00
220,000.00
25,000.00
40,200.00
338,800.00

315,157.50
2,676.00
317,833.50

0.00
656,633.50

656,633.50

JUMLAH
HARGA
( Rp. )
6

16,000.00
33,000.00
3,750.00
1,200.00
53,950.00
51,287.95
5,296.25
56,584.20

0.00
110,534.20
16,580.13
127,114.33
JUMLAH
HARGA
( Rp. )
6

8,000.00
22,000.00
2,500.00
600.00
33,100.00

41,655.60
2,118.50
43,774.10

0.00
76,874.10
11,531.12
88,405.22

JUMLAH
HARGA
( Rp. )
6

320,000.00
1,320,000.00
150,000.00
24,000.00
1,814,000.00

3,775,800.00
211,571.25
118,636.00
4,106,007.25

0.00
5,920,007.25

5,920,007.25

JUMLAH
HARGA
( Rp. )
6

536,000.00
2,211,000.00
251,250.00
40,200.00
3,038,450.00

3,461,150.00
501,750.00
93,736.50
4,056,636.50

0.00
7,095,086.50

7,095,086.50
DIVISI A.4.6.2 PEKERJAAN KUNCI DAN KACA

A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Kunci Tanam Biasa Bh 105,925.00

Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.5 Pemasangan 1 buah engsel pintu


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah

Pek.Kunci & Kaca 79


B BAHAN
1 Engsel Pintu Bh 13,937.50

Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu

No Uraian Satuan Koefisien

A TENAGA
Pekerja OH 0.010
Tukang kayu OH 0.10
Kepala Tukang OH 0.010
Mandor OH 0.0005
Jumlah
B BAHAN
Engsel kupu-kupu Bh 1.00
Jumlah
C PERALATAN

Jumlah
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

Pek.Kunci & Kaca 80


A.4.6.2.9 Pemasangan 1 buah kait angin
HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Kait Angin Bh 12,822.50

Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.11 Pemasangan 1 buah kunci slot


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Kunci slot Bh 8,920.00

Pek.Kunci & Kaca 81


Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.17 Pemasangan 1 m2 kaca tebal 5 mm


HARGA
No. URAIAN SATUAN SATUAN
( Rp. )
1 2 3 4
A TENAGA
1 Pekerja OH 80,000.00
2 Tukang Kayu OH 110,000.00
3 Kepala Tukang OH 125,000.00
4 Mandor OH 120,000.00
Jumlah
B BAHAN
1 Kaca tebal 5mm M2 178,400.00
2 Sealant kg
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit 15% x D maksimum
F Harga Satuan Pekerjaan (D+E)

Pek.Kunci & Kaca 82


6.2 PEKERJAAN KUNCI DAN KACA

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.010 800.00
0.50 55,000.00
0.050 6,250.00
0.0050 600.00
62,650.00

1.00 105,925.00

105,925.00

0.00
168,575.00
15% x D maksimum
168,575.00

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.015 1,200.00
0.15 16,500.00
0.015 1,875.00
0.0008 96.00
19,671.00

Pek.Kunci & Kaca 83


1.00 13,937.50

13,937.50

0.00
33,608.50
15% x D maksimum 5,041.28
38,649.78

gsel jendela kupu-kupu

Harga Satuan Jumlah


(Rp) Harga
(Rp)

80,000.00 800.000
110,000.00 11,000.000
125,000.00 1,250.000
120,000.00 60.000
13,110.00

6,411.25 6411.25
6,411.25

0.00
19,521.250

19,521.250

Pek.Kunci & Kaca 84


JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.015 1,200.00
0.15 16,500.00
0.015 1,875.00
0.008 960.00
20,535.00

1.00 12,822.50

12,822.50

0.00
33,357.50
15% x D maksimum
33,357.50

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.020 1,600.00
0.20 22,000.00
0.020 2,500.00
0.001 120.00
26,220.00

1.00 8,920.00

Pek.Kunci & Kaca 85


8,920.00

0.00
35,140.00
15% x D maksimum
35,140.00

JUMLAH
KOEFISIEN HARGA
( Rp. )
5 6

0.015 1,200.00
0.15 16,500.00
0.015 1,875.00
0.0008 96.00
19,671.00

1.100 196,240.00
0.050 0.00
196,240.00

0.00
215,911.00
15% x D maksimum
215,911.00

Pek.Kunci & Kaca 86


Memasang 1m kusen pintu alluminium (P. BA 05)
HARGA
No. URAIAN PEKERJAAN SATUAN SATUAN KUANTITAS
( Rp. )
1 2 3 4 5
A TENAGA
1Pekerja OH #REF! 0.043
2Tukang Besi kontruksi OH #REF! 0.043
3Kepala Tukang OH #REF! 0.0043
4Mandor OH #REF! 0.0021
Jumlah
B BAHAN
1 Profil alluminium m' #REF! 1.100
2 Skrup fixer Buah 300.00 2.000
3 Sealant Tube 33,000.00 0.060
Jumlah
C Jumlah A + B
D Harga Satuan
Acuan : SNI DT 91-0014-2007

Pekerjaan Besi & Aluminium 87


BIAYA
SATUAN
( Rp. )
6

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
600.00
1,980.00
#REF!
#REF!
#REF!

Pekerjaan Besi & Aluminium 88


DIVISI A.4.7.1 PEKERJAAN PENGECATAN

P.Ct. 09 1m2 Pelaburan Bidang Kayu Dengan Cat Residu dan Ter

No. URAIAN PEKERJAAN SATUAN

1 2 3
A TENAGA
1 Tukang Cat OH
2 Kepala Tukang OH
Jumlah
B BAHAN
1 Residu dan Ter Ltr

C Jumlah A + B
D Harga Satuan
Acuan : ABK Bangunan Gedung dan Perumahan - 6.12

A.4.7.1.10 Pengecatan 1 m2 tembok baru ( 1lapis plamur, 1 lapis cat dasar, 2 lapis

No. URAIAN SATUAN

1 2 3
A TENAGA
1 Pekerja OH
2 Tukang Cat OH
3 Kepala Tukang OH
4 Mandor OH
Jumlah
B BAHAN
1 Plamuur Kg
2 Cat Dasar Kg
3 Cat Penutup Kg

Pek.Cat 89
Jumlah
C PERALATAN

Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.4. 1 m² Pengecatan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis

No Uraian Satuan

A TENAGA
Pekerja OH
Tukang cat OH
Kepala tukang OH
Mandor OH
JUMLAH TENAGA
B BAHAN
Cat menie Kg
Plamuur Kg
Cat dasar Kg
Cat penutup Kg
Kuas Bh
Pengecer Kg
Ampelas Lbr
JUMLAH HARGA B
C PERALATAN

JUMLAH HARGA

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %)

Pek.Cat 90
F Harga Satuan Pekerjaan (D+E)

Pek.Cat 91
VISI A.4.7.1 PEKERJAAN PENGECATAN

HARGA BIAYA
SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
4 5 6

110,000.00 0.100 11,000.00


125,000.00 0.006 750.00
11,750.00

16,725.00 0.350 5,853.75


5,853.75
17,603.75
17,603.75

u ( 1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)

HARGA JUMLAH
SATUAN KOEFISIEN HARGA
( Rp. ) ( Rp. )
4 5 6

80,000.00 0.020 1,600.00


110,000.00 0.063 6,930.00
125,000.00 0.0063 787.50
120,000.00 0.0030 360.00
9,677.50

16,725.00 0.100 1,672.50


22,300.00 0.100 2,230.00
50,175.00 0.260 13,045.50

Pek.Cat 92
16,948.00

0.00
26,625.50
15% x D maksimum
26,625.50

ru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup )

Koefisien Harga Satuan Jumlah


(Rp) Harga
(Rp)

0.07 80,000.00 5,600.00


0.01 110,000.00 990.00
0.01 125,000.00 750.00
0.00 120,000.00 360.00
JUMLAH TENAGA KERJA 7,700.00

0.20 50,175.00 10,035.00


0.15 16,725.00 2,508.75
0.17 22,300.00 3,791.00
0.26 66,900.00 17,394.00
0.01 22,300.00 223.00
0.03 20,070.00 602.10
0.20 3,345.00 669.00
JUMLAH HARGA BAHAN 35,222.85

JUMLAH HARGA ALAT

42,922.85
15% x D

Pek.Cat 93
42,922.85

Pek.Cat 94

Anda mungkin juga menyukai