Anda di halaman 1dari 9

LAPORAN PRAKTEK KERJA LAPANGAN

SISTEM AUTOMATIC TRANSFER SWITCH (ATS) – AUTOMATIC MAIN


FAILURE (AMF) LISTRIK PLN – GENERATOR SET PADA 12 BASE
TRANSCEIVER STATION (BTS) JARINGAN TELKOMSEL AREA
SUMBAWA

Oleh :
Nama : Anas Muliadin
Nim : 15.01.072.006

PROGRAM STUDI TEKNIK ELEKTRO


FAKULTAS TEKNIK
UNIVERSITAS TEKNOLOGI SUMBAWA
2019

i
ii
HALAMAN PENGESAHAN

Judul Kuliah PKL : Sistem Automatic Transferr Switch (ATS) – Automatic


Main Failure (AMF) Listrik PLN – Generator Set pada
12 Base Transceiver Station (BTS) Jaringan Telkomsel
Area Sumbawa
Nama : Anas Muliadin
NIM : 15.01.072.006

Menyetujui,
Dosen Penguji 1 Dosen Penguji 2

Ahmad Jaya, M.T. Rizqi Renafasih Alinra, S.T.,


NIP.198312062018091287 NIP.199503222018091282

Mengetahui,
Ketua Program Studi Teknik Elektro,

Titi Andriani, S.T., M.T.


NIP.198501032015112124

Tanggal disetujui : 14 Februari 2019

iii
KATA PENGANTAR

Puji dan syukur penulis panjatkan kehadirat Allah SWT, karena berkat
limpahan rahmat dan karunia-Nya penulis dapat menyelesaikan kegiatan Praktek
Kerja Lapangan (PKL) di PT. Telnusa Tridaya Engineering area Sumbawa selama
55 hari waktu aktif kerja yang terhitung dari tanggal 07 September - 31 Oktober
2018.
Dalam penulisan laporan hasil praktek kerja lapangan ini, penulis berusaha
untuk memaparkan kegiatan yang telah penulis laksanakan selama kerja praktek
lapangan yang tentu sesuai dengan judul yang dipilih, yaitu : ” Sistem Automatic
Transfer Switch (ATS) – Automatic Main Failure (AMF) Listrik PLN – Generator
Set Pada 12 BTS Jaringan Telkomsel Area Sumbawa”
Penulis berterima kasih atas kerjasama serta dukungan-dukungan dari
beberapa pihak secara moral maupun material. Untuk itu ucapan terima kasih
penulis ucapkan kepada :
1. Allah SWT. karena atas rahmat-Nya penulis dapat menyelesaikan kegiatan
praktek kerja lapangan dan laporan hasil kerja praktek ini.
2. Keluarga yang turut mendoakan kesehatan dan kelancaran selama proses
praktek kerja lapangan
3. Pihak perusahaan atas segala bantuan dan dukungan yang diberikan kepada
penulis selama penulis melakukan kegiatan praktek kerja lapangan hingga
menyelesaikan praktek kerja lapangan dan penyusunan laporan hasil
praktek kerja lapangan ini
4. Bapak Nova Aryanto, S.T. selaku dosen pembimbing praktek perja
lapangan.
5. Rekan-rekan teknisi yang bersedia membagi ilmu dan pengalamannya
mengenai siklus kerja dan sistematika dan teknis lapangan di PT. Telnusa
Tridaya Engineering area Sumbawa.
6. Seluruh orang–orang luar biasa, terutama teman–teman yang luar biasa
yang selalu memberikan dukungannya kepada penulis.

iv
Sekali lagi ucapan terima kasih yang sebesar-besarnya penulis ucapkan
kepada semua pihak yang telah membantu dan mendukung selama penulis
malaksanakan kegiatan praktek kerja lapangan dan penulisan hasil praktek kerja
lapangan ini, dan mohon maaf atas segala kesalahan yang pernah penulis lakukan
selama mengikuti praktek kerja lapangan ini baik disengaja atau tidak disengaja.
Penulis berharap semoga laporan ini dapat menjadi suatu ilmu yang bermanfaat
bagi penulis pribadi dan bagi pembaca pada umumnya.

Sumbawa, 12 Februari 2019


Penulis

ANAS MULIADIN
NIM. 15.01.072.006

v
DAFTAR ISI

COVER ………………………………………………………………………….. i
HALAMAN PENGESAHAN ............................................................................. ii
KATA PENGANTAR .......................................................................................... iii
DAFTAR ISI ........................................................................................................ vi
DAFTAR GAMBAR .......................................................................................... viii
DAFTAR TABEL ................................................................................................ ix

BAB I PENDAHULUAN ..................................................................................... 1


1.1. Latar Belakang ....................................................................................... 1
1.2. Perumusan Masalah ............................................................................... 2
1.3. Tujuan .................................................................................................... 3
1.4. Manfaat .................................................................................................. 3

BAB II TINJAUAN PUSTAKA ......................................................................... 5


2.1. BTS (Base Tranceiver Station) .............................................................. 5
2.2. Generator Set (Genset) ........................................................................ 13
2.3. Komponen-komponen Listrik yang digunakan pada sebuah Sistem ATS
– AMF Listrik PLN – Generator Set ................................................... 14

BAB III METODE PELAKSANAAN PKL .................................................... 21


3.1. Nama Kegiatan .................................................................................... 21
3.2. Waktu Dan Tempat PKL ..................................................................... 21
3.3. Metode Pelaksanaan dan Penyusunan Laporan Hasil PKL ................. 21
3.4. Flowchart Kegiatan PKL ..................................................................... 22
3.5. Jadwal PKL .......................................................................................... 23
3.6. Timeline PKL ....................................................................................... 23

BAB IV TINJAUAN UMUM PERUSAHAAN ............................................... 24


4.1 Sejarah Umum Perusahaan ................................................................... 24
4.2 Lokasi Perusahaan ................................................................................ 24
4.3 Visi dan Misi Perusahaan ......................................................................25

vi
4.4 Struktur Organisasi Perusahaan Area Sumbawa ................................. 25

BAB V HASIL DAN PEMBAHASAN ........................................................... 26


5.1. Hasil Praktek Kerja Lapangan ........................................................... 26
5.2. Pembahasan ........................................................................................ 36

BAB VI KESIMPULAN DAN SARAN .......................................................... 38


5.1. Kesimpulan ......................................................................................... 38
5.2. Saran ................................................................................................... 39

DAFTAR PUSTAKA ....................................................................................... 40


LAMPIRAN-LAMPIRAN

vii
DAFTAR GAMBAR

Gambar 2.1 Topologi BTS ......................................................................................... 7


Gambar 2.2 Sistem Downlink dan Uplink pada BTS ............................................. 7
Gambar 2.3 Tower 4 Kaki …........................................................................................ 8
Gambar 2.4 Tower 3 Kaki …….................................................................................... 9
Gambar 2.5 Tower 1 Kaki ............................................................................................ 10
Gambar 2.6 Antena Sektoral ........................................................................................ 11
Gambar 2.7 Antena Microwave .................................................................................... 12
Gambar 2.8 Engine ……………………....................................................................... 13
Gambar 2.9 Alternator ……………………………………........................................... 13
Gambar 2.10 Bentuk Fisik Relay ................................................................................. 14
Gambar 2.11 Struktur Sederhana Relay ....................................................................... 15
Gambar 2.12 Jenis Relay Berdasarkan Pole dan Throw ……...................................... 17
Gambar 2.13 Kontaktor Magnetik 3 Phasa ................................................................. 18
Gambar 2.14 Timer 220 VAC dan kontak timer 220 VAC ......................................... 18
Gambar 2.15 Timer 24 VDC dan kontak Timer 24 VDC ............................................ 19
Gambar 2.16 Bentuk fisik MCB ……………………….............................................. 19
Gambar 3.1 Flowchart PKL ....................................................................................... 22
Gambar 4.1 Logo PT. Telnusa ................................................................................... 24
Gambar 4.2 Struktur Organisasi PT. Telnusa Area Sumbawa ............................... 25
Gambar 5.1 Generator Set 50 kVA di BTS Sumbawa 3 ....................................... 26
Gambar 5.2 Generator Set 20 kVA di BTS Pekat ................................................... 27
Gambar 5.3 Diagram Blok ATS – AMF pada BTS ................................................. 29
Gambar 5.4 Single Line Diagram ATS – AMF pada BTS ...................................... 30
Gambar 5.5 Single Line Diagram ATS – AMF pada BTS ...................................... 30
Gambar 5.6 Panel ATS – AMF pada BTS Pekat ...................................................... 31
Gambar 5.7 Battery 12-24 VDC .................................................................................. 33
Gambar 5.8 Pengecekan Listrik PLN dan Generator Set …..................................... 34
Gambar 5.9 Pengecekan Battery ….............................................................................. 35
Gambar 5.10 Pengecekan Tangki BBM …................................................................. 35
Gambar 5.11 Troubleshoot Jaringan …....................................................................... 36

viii
DAFTAR TABEL

Tabel 3.1 Timeline PKL ............................................................................................... 23

ix

Anda mungkin juga menyukai