R A M U N I C K E L
The subsidiaries of MCC (MCC 13% Jiuquan Iron and Steel Group
Ramu), Highlands Pacific Limited
(RNL) and MRDC (MRML and 8.56% Ramu Nickel Ltd (a subsidiary of Highlands Pacific)
MRRL) formed Ramu NiCo Joint
Venture for the project 3.94% Mineral Resources Ramu Ltd (MRRL; a subsidiary of MRDC)
development in 2006. Ramu NiCo
Management (MCC) Ltd is Joint Venture Partners in the Ramu Project.
and exploration. 2008 with much of the physical been constructed in such a short
structure of the mine and plant time. The speed and efficiency of
Ore from the Kurumbukari mine almost completed by the end of the construction are a credit to the
site, which will be rehabilitated with 2009 and early 2010. staff, both international and local,
the use of top soil removed and who have worked tirelessly to see
stored prior to mining, is treated at The following figures provide a the project grow and succeed.
the beneficiation plant to produce sense of scale of this construction These achievements are also credit
3.3 million tonnes a year at full and engineering feat: 4.5 million to the host community whose loyal
production that will be piped as metres of earth works completed; support enabled this development
slurry to the Basamuk refinery 195,000 cubic metres of concrete to happen.
plant. The slurry pipeline that laid, 48,000 tonnes of steel
connects the mine with the structures erected, more than Current Status
Basamuk refinery plant on the coast, 23,000 units of equipment installed
75km east of Madang, is 135km with a total weight of 16,000 The US$1.5 billion project
long. tonnes and 227 kilometres of currently employs 1,367 people at
supply/drainage and process pipe the Kurumbukari mine and
The Basamuk plant will produce a Basamuk refinery plant.
laid, in addition to the 135
high grade, high purity mixed nickel
kilometre pipeline.
and cobalt hydroxide product that Commissioning of the project was
will be exported for smelting and More than 2,000 nationals were originally scheduled to commence
refining. This product will contain employed by the contractors and in November 2009 but this was
31,150 tonnes of nickel and 3,300 Ramu NiCo during the peak period delayed substantially through
tonnes of cobalt annually. of the construction litigation regarding the deep sea
tailings placement (DSTP) system
Construction Ramu NiCo has succeeded in for the tailings.
In November 2006, the ground constructing an international
standard mining project in just over The two year hiatus in project
breaking ceremony was held at
two years, having overcome completion, following substantial
Basamuk, where the refinery was
countless challenges. Even capital expenditure, only came to an
designed to be located.
internationally, few mining project end when the Supreme Court on 22
Large scale construction began in of such size and complexity have December, 2011 refused to grant a
RAMU NICKEL
sampling, and hydrological site concerns, the company used the to teach agricultural skills to local
inspection. The first phase of the seminars to reiterate commitment landowners. The Community
study concentrated around the to minimising impacts and to share Affairs Department’s Agriculture
Kurumbukari mine site, which the data and analysis behind the section assists farmers in the inland
includes Marum, Banu, Anagri, company’s mitigation strategies. and coastal pipeline areas with
Eastern and Banap rivers. The planting cocoa – a potential cash
second phase focused on the Ramu To date, the company has invested crop for the local area. It also
River, starting at the Moimara more than US$3 million in provides training in rice cultivation
swamp area upstream of the newly environmental management and vegetable farming.
built Ramu NiCo bridge and the programs.
mine site. The monitoring Major activities for Community
Investing in the Community Affairs agriculture program include:
continued at several sites along the
Ramu River, including Sepu, Pursuing sustainable development provision of agricultural extension
Useruk and Bamun. for the project impacted landowners services; regular monitoring, and
is also a commitment of Ramu evaluation to determine people-
Ramu NiCo has made a concerted NiCo. The Ramu Project region level impacts; and formulation of
effort to raise awareness and covers some of the least developed community developmental proposal
improve understanding about its areas. Ramu NiCo takes its Social for submission to government
environment impacts and its and Economic (SEDP) program where possible.
environmental protection strategies. commitments as seriously as its
The company conducted several The overall purpose of the
commercial commitments.
environmental awareness seminars agricultural programs is to maintain
at various locations in the project During 2009 and 2010, the project food security in the project
impacted areas reaching over has invested US$350,000 to impacted and affected areas, wealth
16,000 people. improve education and health creation and increased economic
access, and increase agriculture activity at village level,
These awareness programs provided production in the project area. empowerment of people
Ramu NiCo with opportunities to (employment creation) and to
better understand the issues most The agriculture assistance program enable project impacted people to
concerning the host communities has been progressing well. A take better ownership of mine’s
and to obtain feedback on the number of model farms have been primary activities.
company’s environmental set up in the Basamuk plant site area
conservation efforts. In addition to with the assistance of Chinese The company has spent K10 million
addressing the communities’ agricultural experts, as training sites on kit homes under a relocation
RAMU NICKEL
Mr. Cyril, community based health officer at Kurumbukari mine site, examining a child.
program for landowners affected by support for sustainable priority basis as follows: project
the project. In accordance with the development. However, challenges impacted landowners, Madang
Relocation and Compensation associated with the execution of Province nationals, PNG nationals,
Agreement, the company has so far some assistance projects are then from the international market.
constructed 45 houses in two illustrative of larger systemic
relocation sites, 30 at Enekuai and challenges that exist in Madang Ongoing Challenges
15 at Danagar. Province. Ramu is the first nickel project in
PNG, and utilises leading edge high
The relocation has been used as a The company is seeking improved
pressure acid leach (HPAL)
local business development collective commitment to these
technology. Commissioning is
opportunity and more than half of projects from all parties involved,
complicated and challenging
the expenditure related to including the Government and local
especially as it involves three very
relocation construction was partners. A challenge that may be
large autoclaves.
committed to landowner greater than the lack of physical
companies. infrastructure is that of human Looking Ahead
capacity. Improved human capacity
Five primary schools and two clinic will help to ensure these assistance The Ramu Project will continue to
centres were built by Ramu NiCo projects yield tangible benefits for play a valuable part in the socio-
for the impacted landowners, as well the local people over the longer- economic development of the
as four offices for the project term. immediate communities, the
landowner associations. Water and district, the Madang province and
power supplies were also provided Strengthening HR the nation. It has provided
for three villages at Basamuk. Free Management increased revenue to the local
medicines are donated every month people, job opportunities, taxation
to the clinics and school Ramu NiCo Management (MCC) is benefits, infrastructure
sponsorships and fees are provided also moving forward to build a improvement during the project
annually for landowner children. comprehensive human resource construction and commissioning
management system for the phase, with more such benefits to
By the end of 2011, MCC had operational phase. This is vital with come during the operation phase.
spent over K500 million procuring the construction phase ending and
local supplies. It had also awarded commissioning underway and Ramu NiCo, is a genuine and
spin-off business worth over K200 production imminent. determined developer that is
million to landowner companies. striving to achieve sustainable
Over K10 million was paid in It also ensures that challenges faced development for the project, the
compensation to landowners, in by the HR System during the local communities and all other
addition to support for a range of construction phase are solved stakeholders.
community projects. gradually and confidently during
the operation and production. This is manifested in the Project’s
By fulfilling its MoA obligations, motto, “One Ramu NiCo, One
Ramu NiCo is demonstrating its Employment at the project is on a Community.”