Rab Rumah
Rab Rumah
KODE No Uraian
A PEKERJAAN BANGUNAN RUMAH
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
III PEKERJAAN PASANGAN DAN PLESTERAN
IV PEKERJAAN STRUKTUR BETON BERTULANG
V PEKERJAAN ATAP DAN RANGKA ATAP BAJA
VI PEKERJAAN PINTU DAN JENDELA
VII PEKERJAAN KUNCI DAN PENGGANTUNG
VIII PEKERJAAN PENUTUP LANTAI DAN DINDING
IX PEKERJAAN SANITAIR
X PEKERJAAN PENGECATAN
XI PEKERJAAN MEKANIKAL & ELEKTRIKAL
JUMLAH TOTAL HARGA PEKERJAAN BANGUNAN RUMAH
DIBULATKAN
Harga
Rp 5,846,460.00
Rp 15,871,268.37
Rp 151,460,853.41
Rp 180,388,795.60
Rp 82,214,514.33
Rp 119,404,200.00
Rp 10,336,557.50
Rp 103,353,500.63
Rp 60,983,226.25
Rp 13,954,424.70
Rp 23,340,000.00
Rp 767,153,800.79
Rp 767,154,000.00
Rp 362,360.00
Rp 2,365,179.31
Rp 15,071,575.50
Rp 20,237,500.00
Rp 1,220,965.65
Rp 39,257,580.46
Rp 39,258,000.00
Rp 806,412,000.00
m Juta Empat Ratus Dua belas Ribu Rupiah
RAB RUMAH TINGGAL DUA LANTAI
1 2 3
A PEKERJAAN BANGUNAN RUMAH
I PEKERJAAN PERSIAPAN
PPS1 1 Uitzet dan bowplank
PPS2 2 Pembersihan lahan
JUMLAH I
II PEKERJAAN TANAH
PTN1 1 Galian tanah Pondasi batu kali
PTN2 2 Galian tanah Pondasi footplat
PTN3 3 Urugan kembali
PTN4 4 Urugan Pasir Bawah Pondasi
PTN4 5 Urugan Pasir Bawah lantai
PTN5 6 Urugan Tanah peninggian elevasi lantai
JUMLAH II
III PEKERJAAN PASANGAN DAN PLESTERAN
PPD2 1 Pasangan bata merah lt Dasar (expose) 1/2 bata, 1 Pc : 5 Ps
PPD2 2 Pasangan bata merah lt 2 (expose) 1/2 bata, 1 Pc : 5 Ps
PPD1 3 Pasangan bata merah lt 2 (atap) 1/2 bata, 1 Pc : 5 Ps
PPD2 3 Pasangan bata merah Anak tangga, 1 Pc : 4 Ps
PPT2 4 Plesteran beton 1 Pc : 4 Ps
PPT1 5 Plesteran Dinding 1 Pc : 5 Ps
PPT3 6 Acian
PPT5 7 Sponengan
PPO1 8 Pasangan pondasi batu kali 1 Pc : 6 Ps
PPD3 9 Pasang roster tanah liat 20x20 cm (terakota)
PPD4 10 Pasang glassblock 22 x 22
JUMLAH III
IV PEKERJAAN STRUKTUR BETON BERTULANG
PBT20 1 Sloof (S1) 15x25 Beton bertulang 1:2:3
PBT21 2 Sloof (S2) 15x20 Beton bertulang 1:2:3
PBT22 3 Balok Induk (B1) 20x40 Beton bertulang k250
PBT23 4 Balok Induk (B2) 20x30 Beton bertulang k250
PBT24 5 Balok Induk (B3) 20x35 Beton bertulang k250
PBT25 6 Balok Anak (BA1) 20x25 Beton bertulang k250
PBT26 7 Balok Anak (BA2) 15x20 Beton bertulang k250
PBT27 8 Balok Tangga 15x25 beton bertulang k250
PBT33 9 Balok Latei 10x15 beton bertulang 1:2:3
PBT28 10 Kolom (K1) 30x30 beton bertulang K250
KODE NO. JENIS KEGIATAN
1 2 3
PBT29 11 Kolom (K2) 20x20 beton bertulang 1:2:3
PBT30 12 Kolom Praktis (KP1) 15x15 beton bertulang 1:2:3
PBT31 13 Ring Balok (RB1) 15x20 beton bertulang 1:2:3
PBT32 14 Ring Balok (balok kuda-kuda) (BKK) 15x20 beton bertulang 1:2:3
PBT34 15 Pondasi Footplat 120x120 Beton bertulang 1:2:3
PBT35 16 Plat lantai kamar mandi dan balkon beton bertulang k250 tebal 12 cm
PBT36 17 Plat atap beton bertulang 1:2:3 tebal 10 cm (tower air)
PBT37 18 Plat talang datar beton bertulang 1:2:3 tebal 8 cm
PBT38 19 Plat tangga beton bertulang k250 tebal 12 cm
PBT39 20 Plat lantai keramik beton (keraton)
PBT39 21 Plat atap teras beton bertulang 1:2:3 tebal 8 cm
PBT40 22 Lantai kerja Beton tumbuk 1:3:5
JUMLAH IV
V PEKERJAAN ATAP DAN RANGKA ATAP BAJA
PAT19 1 Rangka Atap Baja Ringan CNP 1 mm Zinkcalume
PAT20 2 Pemasangan Alumunium Foil Double
PAT21 3 Genteng Tanah Liat 29x21 ( Mantilisuper) (isi 22 bh/m2)
PAT22 4 Atap Polycarbonate Solarlite + Rangka Hollow Galvanis
PAT23 5 Plafond Gypsum Jayaboard 9 mm Water Resistance + rangka hollow galvanis
PAT24 6 Lisplank List Plank Material Papan GRC
PSN12 7 Pipa Talang
PSN3 8 Bak Kontrol
PBS2 9 Railing tangga holow (4x6) dan kaca tempered tinggi 1.2 m
PBS3 10 Railing balkon rangka hollow (6x4) & (4x4) tinggi 1.2 m
JUMLAH V
KODE NO. JENIS KEGIATAN
1 2 3
VI PEKERJAAN PINTU DAN JENDELA
PKY1 1 Pekerjaan Kusen pintu kayu Merbau Oven 6/12 (P1) - 1 unit
PKY2 2 Pekerjaan Daun pintu panil kaca rangka kayu Merbau Oven (P1) - 1 set
PKY1 3 Pekerjaan Kusen pintu kayu Merbau Oven 6/12 (P2) - 1 unit
PKY2 4 Pekerjaan Daun pintu panil kaca rangka kayu Merbau Oven (P2) - 1 set
PKY1 5 Pekerjaan Kusen pintu kayu Merbau Oven 6/12 (P3) - 1 unit
PKY2 6 Pekerjaan Daun pintu panil kaca rangka kayu Merbau Oven (P3) - 1 unit
PKY1 7 Pekerjaan Kusen pintu kayu Merbau Oven 6/12 (P4) - 2 unit
PKY2 8 Pekerjaan Daun pintu panil kaca rangka kayu Merbau Oven (P4) - 2 unit
PKY1 9 Pekerjaan Kusen pintu kayu Merbau Oven 6/12 (P7) - 1 unit
PKY2 10 Pekerjaan Daun pintu panil kaca rangka kayu Merbau Oven (P7) - 1 unit
PKY1 11 Pekerjaan Kusen pintu kayu Merbau Oven 6/12 (P5) - 3 unit
PKY2 12 Pekerjaan Daun pintu panil kayu Merbau Oven (P5) - 3 unit
PKY1 13 Pekerjaan Kusen pintu kayu Merbau Oven 6/12 (P6) - 5 unit
PKY2 14 Pekerjaan Daun pintu panil kayu Merbau Oven (P6) - 5 unit
PKY1 15 Pekerjaan Kusen pintu jendela kayu Merbau Oven 6/12 (PJ1) - 1 unit
PKY2 16 Pekerjaan Daun pintu panil kayu Merbau Oven (PJ1) - 1 unit
PKY3 17 Pekerjaan Daun jendela panil kaca kayu Merbau Oven (PJ1) - 1 unit
PKY1 18 Pekerjaan Kusen pintu jendela kayu Merbau Oven 6/12 (PJ2a) - 1 unit
PKY2 19 Pekerjaan Daun pintu panil kayu Merbau Oven (PJ2a) - 1 unit
PKY3 20 Pekerjaan Daun jendela panil kaca kayu Merbau Oven (PJ2a) - 1 set
PKY1 21 Pekerjaan Kusen pintu jendela kayu Merbau Oven 6/12 (PJ2b) - 1 unit
PKY2 22 Pekerjaan Daun pintu panil kayu Merbau Oven (PJ2b) - 1 unit
PKY3 23 Pekerjaan Daun jendela panil kaca kayu Merbau Oven (PJ2b) - 1 set
PKY1 24 Pekerjaan Kusen jendela kayu Merbau Oven 6/12 (J1) - 8 unit
PKY3 25 Pekerjaan Daun jendela panil kaca, rangka kayu Merbau Oven (J1) - 8 unit
PKY1 26 Pekerjaan Kusen jendela kayu Merbau Oven 6/12 (J2) - 1 unit
PKY3 27 Pekerjaan Daun jendela panil kaca, rangka kayu Merbau Oven (J2) - 1 unit
PKY1 28 Pekerjaan Kusen jendela kayu Merbau Oven 6/12 (J3) - 2 unit
PKY3 29 Pekerjaan Daun jendela panil kaca, rangka kayu Merbau Oven (J3) - 2 set
PKY1 30 Pekerjaan Kusen jendela kayu Merbau Oven 6/12 (J5) - 1 unit
PKY3 31 Pekerjaan Daun jendela panil kaca, rangka kayu Merbau Oven (J5) - 1 set
PBS4 32 Rangka jendela hollow lingkaran 4/4 (J6) - 1 unit
PKY1 33 Pekerjaan Kusen jendela bulat kayu Merbau Oven Kaca Mati 6/12 (J4) - 2 unit
PKY1 34 Pekerjaan Kusen boven kayu Merbau Oven 6/12 (bv1) - 1 unit
PKY3 35 Pekerjaan Daun boven panil kaca, rangka kayu Merbau Oven (bv1) - 1 set
PKY1 36 Pekerjaan Kusen boven kayu Merbau Oven 6/12 (bv2) - 1 unit
PKY3 37 Pekerjaan Daun boven panil kaca, rangka kayu Merbau Oven (bv2) - 1 set
PKY1 38 Pekerjaan Kusen boven kayu Merbau Oven 6/12 (bv3) - 1 unit
PKY3 39 Pekerjaan Daun boven panil kaca, rangka kayu Merbau Oven (bv3) - 1 set
PBS1 40 Pintu Garasi RollingDoor Alumunium Brown dua pintu, 4.79 x 2.9 m (P8)
PBT34 41 Kaca Bening 5mm
PBT35 42 Kaca es 5 mm
KODE NO. JENIS KEGIATAN
1 2 3
JUMLAH VI
VII PEKERJAAN KUNCI DAN PENGGANTUNG
PPG1 1 Pasang Kunci Pintu Tanam
PPG3 2 Pasang Kunci Pintu Tanam Pelor
PPG2 3 Pasang Kunci Pintu Tanam Kamar Mandi
PPG4 4 Pasang Engsel Pintu
PPG5 5 Pasang Engsel Jendela dan Boven
PPG6 6 Pasang Spring knip
PPG7 7 Pasang Kait angin
PPG9 8 Engsel angin
PPG8 9 Pasang handle pintu
PPG10 10 Pasang Slot Jendela
PPG11 11 Pasang handle Jendela
PPG12 11 Grendel Pintu Tanam
JUMLAH VII
VIII PEKERJAAN PENUTUP LANTAI DAN DINDING
PPL7 1 Pasangan Keramik Lantai Dasar A (Ruang Tamu) 60x60
PPL4 2 Pasangan Keramik Lantai Dasar B (Dapur) 40x40 berglasir
PPL5 3 Pasangan Keramik Lantai Dasar C (Garasi) 40x40 berglasir
PPL1 4 Pasangan Keramik Lantai Dasar D (Laundry) 20x20 berglasir
PPL1 5 Pasangan Keramik Lantai Dasar E (Lantai Kamar Mandi) 20x20 berglasir
PPL2 6 Pasangan Keramik Lantai Dasar F (Dinding Kamar Mandi) 20x25
PPL8 7 Pasangan Keramik Lantai Dasar G (Teras), batu alam serpih
PPL6 8 Pasangan Keramik Lantai Dasar H (Lantai Selasar Depan) 40x40 berglasir
PPL7 9 Pasangan Keramik Lantai 2 A 60x60
KODE NO. JENIS KEGIATAN
1 2 3
PPL8 10 Pasangan Keramik Lantai 2 B (Balkon), batu alam serpih
PPL1 11 Pasangan Keramik Lantai 2 C (Lantai Kamar mandi) 20x20 berglasir
PPL2 12 Pasangan Keramik Lantai 2 D (Dinding Kamar Mandi) 20x25
PPL7 13 Pasangan Keramik Lantai 2 E (Lantai Tangga) 60x60
PPL3 14 Stepnosing keramik 8 x 30
JUMLAH VIII
IX PEKERJAAN SANITAIR
1 Septictank fiber biofil 1200x1600 vertikal
2 Resapan
3 Sumur Bor
PSN1 4 Kloset Duduk TOTO CW702J
5 Jet Shower
PSN14 6 Floor Drain
PSN15 7 Shower dan Kran tanam
PSN13 8 Kran Air 3/4"
PSN6 9 Pipa air bersih PVC AW 3/4"
PSN12 10 Pipa drainasi air kotor PVC 4"
PSN11 11 Pipa drainasi air kotor PVC 3"
PSN10 12 Pipa drainasi air kotor PVC 2 1/2"
13 Bak tower air fiberglass 550 liter
PSN2 14 Wastafel TOTO
JUMLAH IX
X PEKERJAAN PENGECATAN
PPC1 1 Pengecatan Dinding Tembok Baru ( Coating)
PPC2 2 Pengecatan Plafond
PPC3 3 Pengecatan Daun pintu dan Kusen Kayu Baru ( Woodstain Mowilex )
JUMLAH X
XI PEKERJAAN MEKANIKAL & ELEKTRIKAL
PPG1 1 Penyambungan Daya Listrik PLN 2200 kwh
PPG2 2 Box Panel MCB
PPG3 3 Gruping + MCB
PPG4 4 Instalasi Titik lampu
PPG5 5 Instalasi Titik Stop kontak
PPG6 6 Instalasi Antena TV
PPG7 7 Instalasi Jaringan Telepon/Internet
PPG8 8 Instalasi Radar Tower air
PPG9 9 Instalasi Stop kontak Pompa Air
PPG10 10 Instalasi Pembumian/gronding
PPG11 11 Pompa Air
PPG12 12 Lampu
JUMLAH XI
JUMLAH HARGA A - PEKERJAAN BANGUANAN RUMAH
KODE NO. JENIS KEGIATAN
1 2 3
B PEKERJAAN PAGAR RUMAH
I PEKERJAAN PERSIAPAN
PPS1 1 Uitzet dan bowplank
JUMLAH I
II PEKERJAAN TANAH
PTN1 1 Galian tanah Pondasi batu kali
PTN3 2 Urugan kembali
PTN4 3 Urugan Pasir Bawah Pondasi
JUMLAH II
III PEKERJAAN PASANGAN DAN PLESTERAN
PPD2 1 Pasangan bata merah pagar (expose) 1/2 bata, 1 Pc : 5 Ps
PPL8 2 Pasang batu tempel
PPO1 3 Pasangan pondasi batu kali 1 Pc : 6 Ps
JUMLAH III
IV PEKERJAAN BESI DAN KAYU
1 Pintu Gerbang Kayu Rangka Besi
2 Pipa Besi Galvanis D 2.5"
JUMLAH IV
V PEKERJAAN PENGECATAN
PPC2 1 Pengecatan Dinding Tembok Baru ( Coating)
JUMLAH V
JUMLAH HARGA B - PEKERJAAN PAGAR RUMAH
RUMAH TINGGAL DUA LANTAI
4 5 6 7= 4x 6
PEKERJAAN BANGUNAN RUMAH
4 5 6 7= 4x 6
2.15 m3 Rp 6,642,528.05 Rp 14,281,435.30
3.15 m3 Rp 5,286,873.88 Rp 16,653,652.73
4.73 m3 Rp 4,665,590.53 Rp 22,068,243.21
1.16 m3 Rp 5,769,281.53 Rp 6,692,366.58
7.65 m3 Rp 1,804,907.67 Rp 13,807,543.65
1.64 m3 Rp 5,189,618.10 Rp 8,510,973.69
0.38 m3 Rp 5,701,496.55 Rp 2,166,568.69
0.31 m3 Rp 6,867,945.69 Rp 2,129,063.16
1.15 m3 Rp 4,451,048.10 Rp 5,118,705.32
75.72 m2 Rp 500,000.00 Rp 37,857,750.00
1.22 m3 Rp 6,867,945.69 Rp 8,378,893.74
1.44 m3 Rp 884,850.00 Rp 1,271,087.03
JUMLAH IV Rp 180,388,795.60
4 5 6 7= 4x 6
4 5 6 7= 4x 6
JUMLAH VI Rp 119,404,200.00
4 5 6 7= 4x 6
9.00 m2 Rp 265,960.00 Rp 2,393,640.00
5.70 m2 Rp 216,460.00 Rp 1,233,822.00
23.50 m2 Rp 240,562.50 Rp 5,653,218.75
7.90 m2 Rp 573,196.11 Rp 4,528,249.28
7.90 m1 Rp 66,618.00 Rp 526,282.20
JUMLAH VIII Rp 103,353,500.63
4 5 6 7= 4x 6
PEKERJAAN PAGAR RUMAH
HARGA
KODE SATUAN MACAM PEKERJAAN
UPAH
PEKERJAAN KERAMIK
PPL1 1 M2 Pasang tegel keramik uk. 20/20 102,200
PPL2 1 M2 Pasang keramik dinding 20/25 101,110
PPL3 1 M2 Pasang keramik stepnosing 8/30 15,625
PPL4 1 M2 Pasang lantai keramik dapur uk. 40/40 102,200
PPL5 1 M2 Pasang lantai keramik garasi uk. 40/40 102,200
PPL6 1 M2 Pasang lantai keramik selasar uk. 40/40 102,200
PPL7 1 M2 Pasang lantai keramik uk. 60/60 102,200
PPL8 1 M2 Pasang lantai batu alam serpih 102,200
HARGA SATUAN
BAHAN TOTAL
70,440 90,590
- 14,000
- 66,500
- 81,450
- 22,163
336,000 362,600
180,000 206,600
557,955 776,955
88,910 127,160
119,273 164,573
324,925 363,175
215,888 272,238
122,353 160,603
858,900 1,035,700
708,050 884,850
907,175 1,087,025
- 340,000
14,000 1,496,250
8,100 9,511
9,150 10,561
80,950 117,750
58,975 95,775
HARGA SATUAN
BAHAN TOTAL
37,700 75,660
42,075 80,035
111,300 159,480
116,550 164,730
151,300 199,480
151,300 199,480
102,400 150,580
42,910 65,860
48,083 85,978
2,790,397 3,516,735
3,187,090 4,037,527
3,907,982 4,852,550
3,907,043 4,902,829
3,810,026 4,763,665
3,666,127 4,664,053
HARGA SATUAN
BAHAN TOTAL
4,760,999 6,039,493
4,215,356 5,349,311
4,123,512 5,214,875
5,179,274 6,642,528
4,150,914 5,286,874
3,712,953 4,665,591
4,493,838 5,769,282
3,341,541 4,361,143
1,481,940 1,804,908
4,088,915 5,189,618
4,460,810 5,701,497
5,361,288 6,867,946
3,350,345 4,451,048
500,000 500,000
5,361,288 6,867,946
15,300 59,100
14,408 58,208
4,469 33,669
14,805 73,205
1,350 11,349
114,260 216,460
139,453 240,563
50,993 66,618
111,968 214,168
117,698 219,898
117,698 219,898
470,996 573,196
163,760 265,960
260,000 285,000
1,360,000 1,385,000
245,000 265,000
HARGA SATUAN
BAHAN TOTAL
6,110,000 6,110,000
1,250,000 1,250,000
450,000 450,000
350,000 350,000
38,972 53,572
37,800 49,890
24,200 62,450
445,000 543,275
86,600 122,379
132,500
HARGA SATUAN
BAHAN TOTAL
17,500
17,500
20,000
175,000
175,000
265,000
700,000
150,000
145,000
17,500
445,000 543,275
86,600 122,379
30,000 30,000
55,200 55,200
550,000 550,000
110,000 110,000
85,000 85,000
27,650 36,618
8,550 15,867
19,550 47,155
3,612,960 4,021,170
822,570 1,097,070
329,575 510,555
490,015 764,535
8,323 18,241
11,703 21,621
16,224 26,142
17,196 27,114
21,886 36,797
29,406 39,324
69,713 96,093
118,300 144,680
200,375 212,875
200,000 212,500
1,500,000 1,509,050
HARGA SATUAN
BAHAN TOTAL
- 9,050
250,000 322,030
200,000 251,250
300,000 351,003
40,000 58,008
26,000 38,500
19,000 37,008
12,000 30,008
200,000 224,010
30,000 55,000
65,000 89,010
50,000 74,010
100,000 124,010
159,500 177,508
165,000 183,008
HARGA SATUAN
BAHAN TOTAL
2,100,000 2,100,000
165,000 240,000
70,000 120,000
200,000 250,000
220,000 270,000
175,000 250,000
200,000 275,000
300,000 350,000
200,000 250,000
210,000 360,000
1,500,000 1,575,000
55,000 55,000
ANALISA HARGA SATUAN
PEKERJAAN PERSIAPAN
PPS2 1 M' Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
Kayu meranti balok 0.0120 m3 X Rp. 3,500,000.00
Paku reng 55 x 3,1 mm 0.0200 kg X Rp. 22,000.00
Kayu meranti papan 0.0070 m3 X Rp. 4,000,000.00
Tukang kayu 0.1000 OH X Rp. 100,000.00 10,000.00
Kepala tukang 0.0100 OH X Rp. 110,000.00 1,100.00
Pekerja 0.1000 OH X Rp. 85,000.00 8,500.00
Mandor 0.0050 OH X Rp. 110,000.00 550.00
JUMLAH 20,150.00
PEKERJAAN TANAH
PTN10 1 m3 Urug kembali bekas galian (dihitung 1/3 kali galian tanah)
Pekerja 0.2500 org X Rp. 85,000.00 21,250.00
Mandor 0.0083 org X Rp. 110,000.00 913.00
JUMLAH 22,163.00
PEKERJAAN PASANGAN
Pasangan pondasi
Pasangan Dinding
PBT3 1 M3 Beton mutu f’'c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Portland Cement (PC) 247.000 kg X Rp. 1,375.00
Pasir beton 0.621 m3 X Rp. 300,000.00
Split D 1 - 2 cm 0.740 m3 X Rp. 300,000.00
Pekerja 1.650 OH X Rp. 85,000.00 140,250.00
Tukang Batu 0.275 OH X Rp. 100,000.00 27,500.00
Kepala Tukang 0.028 OH X Rp. 110,000.00 3,025.00
Mandor 0.083 OH X Rp. 110,000.00 9,075.00
JUMLAH 179,850.00
KODE Macam Pekerjaan Upah
(1) (2) (3)
PBT4 1 M3 Beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
Portland Cement (PC) 276.000 kg X Rp. 1,375.00
Pasir beton 0.591 m3 X Rp. 300,000.00
Split D 1 - 2 cm 0.750 m3 X Rp. 300,000.00
Pekerja 1.650 OH X Rp. 85,000.00 140,250.00
Tukang Batu 0.275 OH X Rp. 100,000.00 27,500.00
Kepala Tukang 0.028 OH X Rp. 110,000.00 3,025.00
Mandor 0.083 OH X Rp. 110,000.00 9,075.00
JUMLAH 179,850.00
PBT5 1 M3 Beton mutu f’'c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
Portland Cement (PC) 299.000 kg X Rp. 1,375.00
Pasir beton 0.571 m3 X Rp. 300,000.00
Split D 1 - 2 cm 0.753 m3 X Rp. 300,000.00
Pekerja 1.650 OH X Rp. 85,000.00 140,250.00
Tukang Batu 0.275 OH X Rp. 100,000.00 27,500.00
Kepala Tukang 0.028 OH X Rp. 110,000.00 3,025.00
Mandor 0.083 OH X Rp. 110,000.00 9,075.00
JUMLAH 179,850.00
PBT6 1 M3 Lantai kerja Beton mutu f’'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,87
Portland Cement (PC) 230.000 kg X Rp. 1,375.00
Pasir beton 0.638 m3 X Rp. 300,000.00
Split D 1 - 2 cm 0.761 m3 X Rp. 300,000.00
Pekerja 1.200 OH X Rp. 85,000.00 102,000.00
Tukang Batu 0.200 OH X Rp. 100,000.00 20,000.00
Kepala Tukang 0.020 OH X Rp. 110,000.00 2,200.00
Mandor 0.060 OH X Rp. 110,000.00 6,600.00
JUMLAH 130,800.00
PBT7 1 M3 Beton mutu f’'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Portland Cement (PC) 326.000 kg X Rp. 1,375.00
Pasir beton 0.543 m3 X Rp. 300,000.00
Split D 1 - 2 cm 0.762 m3 X Rp. 300,000.00
Pekerja 1.650 OH X Rp. 85,000.00 140,250.00
Tukang Batu 0.275 OH X Rp. 100,000.00 27,500.00
Kepala Tukang 0.028 OH X Rp. 110,000.00 3,025.00
Mandor 0.083 OH X Rp. 110,000.00 9,075.00
JUMLAH 179,850.00
PBT8 1 M3 Beton mutu f’'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
Portland Cement (PC) 352.000 kg X Rp. 1,375.00
Pasir beton 0.522 m3 X Rp. 300,000.00
Split D 1 - 2 cm 0.764 m3 X Rp. 300,000.00
Pekerja 1.650 OH X Rp. 85,000.00 140,250.00
Tukang Batu 0.275 OH X Rp. 100,000.00 27,500.00
Kepala Tukang 0.028 OH X Rp. 110,000.00 3,025.00
Mandor 0.083 OH X Rp. 110,000.00 9,075.00
JUMLAH 179,850.00
KODE Macam Pekerjaan Upah
(1) (2) (3)
PBT9 1 M3 Beton mutu f’'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Portland Cement (PC) 371.000 kg X Rp. 1,375.00
Pasir beton 0.499 m3 X Rp. 300,000.00
Split D 1 - 2 cm 0.776 m3 X Rp. 300,000.00
Pekerja 1.650 OH X Rp. 85,000.00 140,250.00
Tukang Batu 0.275 OH X Rp. 100,000.00 27,500.00
Kepala Tukang 0.028 OH X Rp. 110,000.00 3,025.00
Mandor 0.083 OH X Rp. 110,000.00 9,075.00
JUMLAH 179,850.00
KODE Macam Pekerjaan Upah
(1) (2) (3)
PBT10 1 M3 Beton mutu f’'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
Portland Cement (PC) 384.000 kg X Rp. 1,375.00
Pasir beton 0.494 m3 X Rp. 300,000.00
Split D 1 - 2 cm 0.770 m3 X Rp. 300,000.00
Pekerja 1.650 OH X Rp. 85,000.00 140,250.00
Tukang Batu 0.275 OH X Rp. 100,000.00 27,500.00
Kepala Tukang 0.028 OH X Rp. 110,000.00 3,025.00
Mandor 0.083 OH X Rp. 110,000.00 9,075.00
JUMLAH 179,850.00
PBT49 1 m3 Ring Balok (balok kuda-kuda) (BKK) 15x20 beton bertulang 1:2:3
Beton 1:2:3 1.00 m3
Upah X Rp. 176,800.00 176,800.00
Bahan X Rp. 858,900.00
Besi polos 208.46 kg
Upah X Rp. 1,410.50 294,037.53
Bahan X Rp. 8,100.00
Bekisting 16.70 m2
Upah X Rp. 48,180.00 804,606.00
Bahan X Rp. 116,550.00
JUMLAH ###
PPT16 1 m2 Acian
Portland Cement (PC) 3.2500 kg X Rp. 1,375.00
Tukang Batu 0.1000 org X Rp. 100,000.00 10,000.00
Kepala Tukang 0.0100 org X Rp. 110,000.00 1,100.00
Pekerja 0.2000 org X Rp. 85,000.00 17,000.00
Mandor 0.0100 org X Rp. 110,000.00 1,100.00
JUMLAH 29,200.00
PPT20 1 m1 sponengan
Portland Cement (PC) 0.5000 kg X Rp. 1,580.00
Pasir Pasang 0.0020 m3 X Rp. 280,000.00
Tukang batu 0.0380 org X Rp. 77,000.00 2,926.00
Kepala Tukang 0.0380 org X Rp. 82,500.00 3,135.00
Pekerja 0.0570 org X Rp. 66,000.00 3,762.00
Mandor 0.0020 org X Rp. 88,000.00 176.00
JUMLAH 9,999.00
PEKERJAAN KAYU
PKY23 1 m2 Membuat dan memasang daun jendela panil kaca Merbau Oven
Ram jendela kayu Merbau Oven 3/10 1.0000 m3 X Rp. 245,000.00
Ongkos pasang 1.0000 m2 X Rp. 20,000.00 20,000.00
JUMLAH 20,000.00
PEKERJAAN ATAP
PEKERJAAN PENGECATAN
PPC17 1 m2 Melamin
Mowilex woodstain 0.2000 kg X Rp. 97,000.00
Kuas ukuran 3,5" 0.0150 bh X Rp. 10,000.00
Pekerja 0.2000 org X Rp. 85,000.00 17,000.00
Tukang cat 0.1000 org X Rp. 100,000.00 10,000.00
Kepala Tukang 0.0050 org X Rp. 110,000.00 550.00
Mandor 0.0005 org X Rp. 110,000.00 55.00
JUMLAH 27,605.00
PEKERJAAN SANITASI
PSI15 1 bh Memasang bak kontrol pasangan batu bata ukuran (60 x 60) cm, tingg 65 cm
Bata merah 10x20x5cm 222.0000 bh X Rp. 900.00
Portland Cement (PC) 114.0000 kg X Rp. 1,375.00
Pasir Pasang 0.1840 m 3
X Rp. 280,000.00
Krikil beton 0.0330 m 3
X Rp. 290,000.00
Besi beton polos 4.8500 kg X Rp. 7,500.00
Pasir beton 0.1200 m 3
X Rp. 300,000.00
Tukang batu 0.7200 org X Rp. 100,000.00 72,000.00
Kepala tukang 0.0720 org X Rp. 110,000.00 7,920.00
Pekerja 2.1600 org X Rp. 85,000.00 183,600.00
Mandor 0.1000 org X Rp. 110,000.00 11,000.00
JUMLAH 274,520.00
Bahan Jumlah
(4) (5)
PEKERJAAN PERSIAPAN
42,000.00
440.00
28,000.00
70,440.00 90,590.00
0.00 14,000.00
PEKERJAAN TANAH
0.00 66,500.00
0.00 81,450.00
0.00 96,620.00
48,000.00
22,163.00
Bahan Jumlah
(4) (5)
336,000.00
336,000.00 362,600.00
180,000.00
180,000.00 206,600.00
Bahan Jumlah
(4) (5)
0.00
0.00 14,400.00
PEKERJAAN PASANGAN
Pasangan pondasi
216,000.00
120,960.00
336,960.00 450,840.00
240,000.00
160,875.00
157,080.00
557,955.00 776,955.00
Pasangan Dinding
63,000.00
11,440.00
13,720.00
88,160.00 126,410.00
63,000.00
13,310.00
12,600.00
Bahan Jumlah
(4) (5)
88,910.00 127,160.00
94,500.00
15,812.50
12,040.00
122,352.50 160,602.50
Bahan Jumlah
(4) (5)
300,000.00
15,125.00
9,800.00
324,925.00 363,175.00
94,500.00
15,812.50
8,960.00
119,272.50 164,572.50
187,500.00
17,187.50
11,200.00
215,887.50 272,237.50
PEKERJAAN BETON
462,000.00
162,000.00
234,900.00
858,900.00 ###
299,750.00
156,000.00
252,300.00
Bahan Jumlah
(4) (5)
708,050.00 884,850.00
339,625.00
186,214.29
222,000.00
747,839.29 927,689.29
Bahan Jumlah
(4) (5)
379,500.00
177,428.57
224,888.89
781,817.46 961,667.46
411,125.00
171,214.29
226,000.00
808,339.29 988,189.29
316,250.00
191,357.14
228,222.22
735,829.37 866,629.37
448,250.00
162,857.14
228,666.67
839,773.81 ###
484,000.00
156,642.86
229,111.11
869,753.97 ###
Bahan Jumlah
(4) (5)
510,125.00
149,571.43
232,666.67
892,363.10 ###
Bahan Jumlah
(4) (5)
528,000.00
148,285.71
230,888.89
907,174.60 ###
0.00 340,000.00
14,000.00
14,000.00 ###
7,875.00
225.00
8,100.00 9,510.50
8,925.00
225.00
9,150.00 10,560.50
59,500.00
96,000.00
6,400.00
Bahan Jumlah
(4) (5)
161,900.00 235,500.00
80,950.00 117,750.00
59,500.00
52,050.00
6,400.00
117,950.00 191,550.00
58,975.00 95,775.00
Bahan Jumlah
(4) (5)
70,000.00
4,800.00
600.00
75,400.00 151,320.00
37,700.00 75,660.00
78,750.00
4,800.00
600.00
84,150.00 160,070.00
42,075.00 80,035.00
70,000.00
6,400.00
1,200.00
52,500.00
52,500.00
40,000.00
222,600.00 318,960.00
111,300.00 159,480.00
70,000.00
6,400.00
1,200.00
63,000.00
52,500.00
40,000.00
233,100.00 329,460.00
116,550.00 164,730.00
Bahan Jumlah
(4) (5)
70,000.00
6,400.00
1,200.00
52,500.00
52,500.00
120,000.00
302,600.00 398,960.00
151,300.00 199,480.00
52,500.00
6,400.00
1,200.00
70,000.00
52,500.00
60,000.00
60,000.00
302,600.00 398,960.00
151,300.00 199,480.00
52,500.00
6,400.00
900.00
52,500.00
52,500.00
40,000.00
204,800.00 301,160.00
102,400.00 150,580.00
3,500.00
160.00
22,500.00
6,750.00
5,500.00
Bahan Jumlah
(4) (5)
1,800.00
2,700.00
42,910.00 65,860.00
5,250.00
320.00
27,000.00
750.00
7,562.50
2,700.00
4,500.00
48,082.50 85,977.50
Bahan Jumlah
(4) (5)
1,035,700.00
858,900.00
1,840,754.99
1,594,896.85
640,280.00
336,600.00
### ###
1,035,700.00
858,900.00
2,201,477.03
1,907,439.50
800,350.00
420,750.00
### ###
1,087,024.60
907,174.60
2,118,225.09
1,835,307.00
1,647,300.00
1,165,500.00
### ###
1,087,024.60
907,174.60
1,888,463.81
1,636,233.50
1,927,341.00
1,363,635.00
### ###
1,087,024.60
Bahan Jumlah
(4) (5)
907,174.60
1,897,555.90
1,644,111.21
1,779,084.00
1,258,740.00
### ###
Bahan Jumlah
(4) (5)
1,087,024.60
907,174.60
1,435,538.05
1,243,802.20
2,141,490.00
1,515,150.00
### ###
1,087,024.60
907,174.60
2,201,477.03
1,907,439.50
2,750,991.00
1,946,385.00
### ###
1,087,024.60
907,174.60
1,840,754.99
1,594,896.85
2,421,531.00
1,713,285.00
### ###
1,087,024.60
907,174.60
1,990,818.52
1,724,917.33
2,137,032.00
1,491,420.00
4,123,511.94 ###
1,035,700.00
Bahan Jumlah
(4) (5)
858,900.00
2,417,228.05
2,094,374.00
3,189,600.00
2,226,000.00
### ###
Bahan Jumlah
(4) (5)
1,035,700.00
858,900.00
2,114,141.88
1,800,594.00
2,137,032.00
1,491,420.00
### ###
1,035,700.00
858,900.00
1,982,590.53
1,688,553.00
1,647,300.00
1,165,500.00
### ###
1,035,700.00
858,900.00
1,982,590.53
1,688,553.00
2,750,991.00
1,946,385.00
### ###
1,035,700.00
858,900.00
2,252,974.05
1,918,836.00
1,072,469.00
563,805.00
### ###
1,035,700.00
Bahan Jumlah
(4) (5)
858,900.00
678,415.67
577,800.00
90,792.00
45,240.00
### ###
Bahan Jumlah
(4) (5)
1,087,024.60
907,174.60
751,329.50
639,900.00
3,351,264.00
2,541,840.00
### ###
1,035,700.00
858,900.00
676,196.55
575,910.00
3,989,600.00
3,026,000.00
### ###
1,035,700.00
858,900.00
845,245.69
719,887.50
4,987,000.00
3,782,500.00
### ###
1,087,024.60
907,174.60
834,279.50
722,850.00
2,529,744.00
1,720,320.00
### ###
1,035,700.00
Bahan Jumlah
(4) (5)
858,900.00
845,245.69
719,887.50
4,987,000.00
3,782,500.00
### ###
500,000.00
500,000.00
500,000.00 500,000.00
Bahan Jumlah
(4) (5)
EKERJAAN PELESTERAN
10,692.00
6,440.00
17,132.00 60,932.00
8,580.00
6,720.00
15,300.00 59,100.00
7,128.00
7,280.00
14,408.00 58,208.00
6,072.00
7,560.00
13,632.00 57,432.00
4,273.50
4,273.50 26,173.50
8,717.50
Bahan Jumlah
(4) (5)
3,360.00
12,077.50 55,877.50
4,468.75
4,468.75 33,668.75
8,952.63
5,852.00
14,804.63 73,204.63
790.00
560.00
1,350.00 11,349.00
8,580.00
6,720.00
15,300.00 59,100.00
82,500.00
14,300.00
Bahan Jumlah
(4) (5)
12,600.00
4,860.00
114,260.00 216,460.00
80,208.33
14,300.00
12,600.00
4,860.00
111,968.33 214,168.33
85,937.50
14,300.00
12,600.00
4,860.00
117,697.50 219,897.50
Bahan Jumlah
(4) (5)
85,937.50
14,300.00
12,600.00
4,860.00
117,697.50 219,897.50
439,236.11
14,300.00
12,600.00
4,860.00
470,996.11 573,196.11
132,000.00
14,300.00
12,600.00
4,860.00
163,760.00 265,960.00
93,500.00
12,787.50
5,040.00
28,125.00
139,452.50 240,562.50
50,000.00
561.00
252.00
180.00
Bahan Jumlah
(4) (5)
50,993.00 66,618.00
PEKERJAAN KAYU
260,000.00
260,000.00 285,000.00
Bahan Jumlah
(4) (5)
1,360,000.00
### ###
245,000.00
245,000.00 265,000.00
400,000.00
400,000.00 611,860.00
PEKERJAAN ATAP
35,672.00
3,300.00
38,972.00 53,572.00
37,800.00
0.00
37,800.00 49,890.00
24,200.00
24,200.00 62,450.00
Bahan Jumlah
(4) (5)
105,000.00
70,000.00
270,000.00
445,000.00 543,275.00
Bahan Jumlah
(4) (5)
1,600.00
85,000.00
86,600.00 122,378.75
EKERJAAN PENGECATAN
27,500.00
150.00
27,650.00 36,618.00
19,400.00
150.00
19,550.00 47,155.00
8,400.00
150.00
8,550.00 15,867.00
PEKERJAAN SANITASI
3,600,000.00
12,960.00
### ###
Bahan Jumlah
(4) (5)
800,000.00
11,520.00
8,250.00
2,800.00
822,570.00 ###
Bahan Jumlah
(4) (5)
135,000.00
105,875.00
36,400.00
5,800.00
19,500.00
27,000.00
329,575.00 510,555.00
199,800.00
156,750.00
51,520.00
9,570.00
36,375.00
36,000.00
490,015.00 764,535.00
5,910.00
2,413.25
8,323.25 18,241.25
8,310.00
3,393.25
11,703.25 21,621.25
11,520.00
4,704.00
Bahan Jumlah
(4) (5)
16,224.00 26,142.00
12,210.00
4,985.75
17,195.75 27,113.75
Bahan Jumlah
(4) (5)
15,540.00
6,345.50
21,885.50 36,796.50
20,880.00
8,526.00
29,406.00 39,324.00
49,500.00
20,212.50
69,712.50 96,092.50
84,000.00
34,300.00
118,300.00 144,680.00
200,000.00
375.00
200,375.00 212,875.00
200,000.00
Bahan Jumlah
(4) (5)
200,000.00 212,500.00
1,500,000.00
### ###
0.00
0.00 9,050.00
Bahan Jumlah
(4) (5)
KERJAAN KUNCI DAN KACA
250,000.00
250,000.00 322,030.00
200,000.00
200,000.00 251,250.00
300,000.00
300,000.00 351,002.50
40,000.00
40,000.00 58,007.50
26,000.00
26,000.00 38,500.00
30,000.00
30,000.00 55,000.00
Bahan Jumlah
(4) (5)
19,000.00
19,000.00 37,007.50
12,000.00
12,000.00 30,007.50
Bahan Jumlah
(4) (5)
35,000.00
35,000.00 95,025.00
65,000.00
65,000.00 89,010.00
100,000.00
100,000.00 124,010.00
200,000.00
200,000.00 224,010.00
50,000.00
50,000.00 74,010.00
25,000.00
25,000.00 85,025.00
10,000.00
Bahan Jumlah
(4) (5)
10,000.00 22,005.00
159,500.00
159,500.00 177,507.50
Bahan Jumlah
(4) (5)
165,000.00
165,000.00 183,007.50
DAFTAR UPAH DAN BAHAN
BAHAN
ATP 1 Genteng Mantili Natural 1m2 isi 22bj bh
ATP 2 GRC 6mm bh
BBM 3 Minyak bekisting ltr
BSI 4 Besi beton polos kg
BSI 5 Besi profil kg
BSI 6 Besi beton ulir kg
BSI 7 Kawat beton / bindrat kg
BSI 8 Baja ringan m2
BTU 9 Batu kali m3
ATP 10 Atap polykarbonat m2
BTU 11 Bata Expose 10x20x5cm bh
BTU 12 Bata merah 10x20x5cm bh
BTU 13 Pasir urug darat m3
BTU 14 Batu Belah m3
BTU 15 Pasir beton m3
BTU 16 Pasir pasang m3
BTU 17 Krikil beton m3
BTU 18 Split D 1 - 2 cm m3
BTU 19 Tanah urug m3
BTU 20 Terawang / roster 20x20 cm (terakota) bh
BTU 21 Formite/penjaga jarak bekisting/spacer bh
BTU 22 Bahan & Pemasangan Keraton m2
CAT 23 Kuas ukuran 3,5" bh
CAT 24 Cat penutup kg
CAT 25 Mowilex woodstain kg
CAT 26 Coating batu alam kg
KCA 27 Kaca Bening 5 mm m2
KCA 28 Kaca Es m2
KCI 29 Engsel pintu bh
KCI 30 Grendel pintu tanam ps
KCI 31 Handle Pintu ps
KCI 32 Handle Jendela bh
KCI 33 Kunci tanam set
KODE NO. NAMA BARANG / BAHAN / TENAGA SATUAN
HARGA SATUAN
(Rp.)
BAHAN
1,100.00
98,000.00
6,000.00
7,500.00
10,000.00
8,500.00
15,000.00
85,000.00
180,000.00
100,000.00
1,350.00
900.00
280,000.00
200,000.00
300,000.00
280,000.00
290,000.00
300,000.00
150,000.00
15,000.00
15,000.00
500,000.00
10,000.00
28,000.00
97,000.00
55,000.00
145,000.00
150,000.00
40,000.00
100,000.00
200,000.00
50,000.00
250,000.00
HARGA SATUAN
(Rp.)
200,000.00
65,000.00
300,000.00
25,000.00
35,000.00
26,000.00
30,000.00
20,000.00
25,000.00
10,000.00
-
36,000.00
HARGA SATUAN
(Rp.)
150,000.00
260,000.00
245,000.00
1,360,000.00
3,500,000.00
400,000.00
4,000,000.00
1,750,000.00
20,000.00
70,000.00
75,000.00
575,000.00
75,000.00
30,000.00
85,000.00
120,000.00
30,000.00
30,000.00
16,000.00
22,000.00
19,700.00
27,700.00
38,400.00
40,700.00
51,800.00
69,600.00
165,000.00
280,000.00
1,375.00
18,750.00
3,000.00
1,500,000.00
200,000.00
15,000.00
200,000.00
-
3,600,000.00
800,000.00
-
UPAH
100,000.00
82,000.00
HARGA SATUAN
(Rp.)
110,000.00
85,000.00
110,000.00
100,000.00
110,000.00
100,000.00
80,000.00
100,000.00
PERHITUNGAN VOLUME BESI BETON
SLOOF S1
LEBAR BALOK (a) TINGGI BALOK (b) Volume 1 m¹ Balok m3 © Panjang 1m3 Balok m¹ (d) Volume Begesting ( e )
a b c=a x b x 1m d=1m/c e=a x 2 x d
0.15 0.25 0.0375 26.67 8
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 5 Ø 12 5 27.00 135.00 0.892
BEGEL 0.125 Ø8 0.11 0.21 0.64 213.33 214 136.53 0.395
.
Ø 12
Ø8
0.25
0.15
PERHITUNGAN VOLUME BESI BETON
SLOOF S2
LEBAR BALOK (a) TINGGI BALOK (b) Volume 1 m¹ Balok m3 © Panjang 1m3 Balok m¹ (d) Volume Begesting ( e )
a b c=a x b x 1m d=1m/c e=a x 2 x d
0.15 0.2 0.03 33.33 10
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 5 Ø 12 5 34.00 170.00 0.892
BEGEL 0.125 Ø8 0.11 0.16 0.54 266.67 267 144.00 0.395
.
Ø 12
Ø8
0.2
0.15
PERHITUNGAN VOLUME BESI BETON
BALOK INDUK B1
LEBAR BALOK (a) TINGGI BALOK (b) Volume 1 m¹ Balok m3 © Panjang 1m3 Balok m¹ (d) Volume Begesting ( e )
a b c=a x b x 1m d=1m/c e=((a x 2)+ b)x d
0.2 0.4 0.08 12.50 10
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 7 Ø 16 7 13.00 91.00 1.583
BEGEL 0.125 Ø8 0.16 0.36 1.04 100.00 100 104.00 0.395
T.PNGG 2 Ø 10 2 12.50 25.00 0.617
.
Ø 16
Ø 10
0.4
Ø8
0.2
PERHITUNGAN VOLUME BESI BETON
BALOK INDUK B2
LEBAR BALOK (a) TINGGI BALOK (b) Volume 1 m¹ Balok m3 © Panjang 1m3 Balok m¹ (d) Volume Begesting ( e )
a b c=a x b x 1m d=1m/c e=((a x 2)+ b)x d
0.2 0.3 0.06 16.67 11.6666666667
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 5 Ø 16 5 17.00 85.00 1.583
BEGEL 0.125 Ø8 0.16 0.26 0.84 133.33 134 112.00 0.395
T.PNGG 0 Ø 10 0 17.00 0.00 0.617
.
Ø 16
0.3
Ø8
0.2
PERHITUNGAN VOLUME BESI BETON
BALOK INDUK B3
LEBAR BALOK (a) TINGGI BALOK (b) Volume 1 m¹ Balok m3 © Panjang 1m3 Balok m¹ (d) Volume Begesting ( e )
a b c=a x b x 1m d=1m/c e=((a x 2)+ b)x d
0.2 0.35 0.07 14.29 10.7142857143
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 5 Ø 16 5 15.00 75.00 1.583
BEGEL 0.125 Ø8 0.16 0.31 0.94 114.29 115 107.43 0.395
T.PNGG 2 Ø 10 2 15.00 30.00 0.617
.
Ø 16
Ø 10
0.35
Ø8
0.2
PERHITUNGAN VOLUME BESI BETON
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 5 Ø 12 5 20.00 100.00 0.892
BEGEL 0.125 Ø8 0.16 0.21 0.74 160.00 160 118.40 0.395
T.PNGG 0 Ø 10 0 20.00 0.00 0.617
.
Ø 12
0.25
Ø8
0.2
PERHITUNGAN VOLUME BESI BETON
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 5 Ø 12 5 34.00 170.00 0.892
BEGEL 0.125 Ø8 0.11 0.16 0.54 266.67 267 144.00 0.395
T.PNGG 0 Ø 10 0 34.00 0.00 0.617
.
Ø 12
0.2
Ø8
0.15
PERHITUNGAN VOLUME BESI BETON
BALOK TANGGA
LEBAR BALOK (a) TINGGI BALOK (b) Volume 1 m¹ Balok m3 © Panjang 1m3 Balok m¹ (d) Volume Begesting ( e )
a b c=a x b x 1m d=1m/c e=((a x 2)+ b)x d
0.15 0.25 0.0375 26.67 14.6666666667
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 5 Ø 12 5 27.00 135.00 0.892
BEGEL 0.125 Ø8 0.11 0.21 0.64 213.33 214 136.53 0.395
T.PNGG 0 Ø 10 0 27.00 0.00 0.617
.
Ø 12
0.25
Ø8
0.15
PERHITUNGAN VOLUME BESI BETON
PLAT LANTAI KM
LEBAR PLAT LANTAI TINGGI PLAT LANTAI Volume 1 m¹ Balok (m3) Panjang 1m3 Balok (m¹) Volume Begesting ( e )
a b c=a x b x 1m 1m/c
1 0.12 0.12 8.33 8.33
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b c=axb d
ARAH X 12 Ø8 12.00 8.33 100.00 0.395
ARAH Y 12 Ø8 12.00 8.33 100.00 0.395
. 200.00
16.67
0.12
Ø8
Ø8
1
PERHITUNGAN VOLUME BESI BETON
KOLOM K1
LEBAR BALOK (a) TINGGI BALOK (b) Volume 1 m¹ Balok m3 © Panjang 1m3 Balok m¹ (d) Volume Begesting ( e )
a b c=a x b x 1m d=1m/c e=((a + b)x 2 X d
0.3 0.3 0.09 11.11 13.3333333333
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 8 Ø 16 8 12.00 96.00 1.583
BEGEL 0.125 Ø8 0.26 0.26 1.04 88.89 89 92.44 0.395
T.PNGG 0
.
Ø8
Ø 16
0.3
Ø 16
0.3
PERHITUNGAN VOLUME BESI BETON
KOLOM K2
LEBAR BALOK (a) TINGGI BALOK (b) Volume 1 m¹ Balok m3 © Panjang 1m3 Balok m¹ (d) Volume Begesting ( e )
a b c=a x b x 1m d=1m/c e=((a + b)x 2 X d
0.2 0.2 0.04 25.00 20
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 8 Ø 12 8 25.00 200.00 0.892
BEGEL 0.125 Ø8 0.16 0.16 0.64 200.00 200 128.00 0.395
T.PNGG
.
Ø8
Ø 12
0.2
Ø 12
0.2
PERHITUNGAN VOLUME BESI BETON
KOLOM PRAKTIS KP
LEBAR BALOK (a) TINGGI BALOK (b) Volume 1 m¹ Balok m3 © Panjang 1m3 Balok m¹ (d) Volume Begesting ( e )
a b c=a x b x 1m d=1m/c e=((a + b)x d
0.15 0.15 0.0225 44.44 13.3333333333
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 4 Ø 12 4 45.00 180.00 0.892
BEGEL 0.125 Ø8 0.11 0.11 0.44 355.56 356 156.44 0.395
T.PNGG
.
Ø 12
0.15
Ø8
0.15
PERHITUNGAN VOLUME BESI BETON
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 5 Ø 12 5 34.00 170.00 0.892
BEGEL 0.125 Ø8 0.11 0.16 0.54 266.67 267 144.00 0.395
.
Ø 12
Ø8
0.2
0.15
PERHITUNGAN VOLUME BESI BETON
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 5 Ø 12 5 34.00 170.00 0.892
BEGEL 0.125 Ø8 0.11 0.16 0.54 266.67 267 144.00 0.395
.
Ø 12
Ø8
0.2
0.15
PERHITUNGAN VOLUME BESI BETON
BALOK LATEI
LEBAR BALOK (a) TINGGI BALOK (b) Volume 1 m¹ Balok m3 © Panjang 1m3 Balok m¹ (d) Volume Begesting ( e )
a b c=a x b x 1m d=1m/c e=a x 2 x d
0.1 0.15 0.015 66.67 13.3333333333
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b b c=axb d
POKOK 4 Ø 10 4 67.00 268.00 0.617
BEGEL 0.125 Ø8 0.06 0.11 0.34 533.33 534 181.33 0.395
.
Ø 10
Ø8
0.15
0.1
PERHITUNGAN VOLUME BESI BETON
PONDASI FOOTPLAT
LEBAR PLAT LANTAI TINGGI PLAT LANTAI Volume 1 m¹ Balok (m3) Panjang 1m3 Balok (m¹) Volume Begesting ( e )
a b c=a x b x 1m 1m/c
1.2 0.25 0.3 3.33 1.20
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b c=axb d
ARAH X 12 Ø 12 12.00 3.33 40.00 0.892
ARAH Y 12 Ø 12 12.00 3.33 40.00 0.892
. 80.00
6.67
0.25
Ø 12
Ø 12
1.2
PERHITUNGAN VOLUME BESI BETON
PLAT ATAP
LEBAR PLAT LANTAI TINGGI PLAT LANTAI Volume 1 m¹ Balok (m3) Panjang 1m3 Balok (m¹) Volume Begesting ( e )
a b c=a x b x 1m 1m/c
1 0.1 0.1 10.00 10.00
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b c=axb d
ARAH X 9 Ø8 9.00 10.00 90.00 0.395
ARAH Y 9 Ø8 9.00 10.00 90.00 0.395
. 180.00
15.00
0.1
Ø8
Ø8
1
PERHITUNGAN VOLUME BESI BETON
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b c=axb d
ARAH X 9 Ø8 9.00 12.50 112.50 0.395
ARAH Y 9 Ø8 9.00 12.50 112.50 0.395
. 225.00
18.75
0.08
Ø8
Ø8
1
PERHITUNGAN VOLUME BESI BETON
PLAT TANGGA
LEBAR PLAT LANTAI TINGGI PLAT LANTAI Volume 1 m¹ Balok (m3) Panjang 1m3 Balok (m¹) Volume Begesting ( e )
a b c=a x b x 1m 1m/c
1 0.12 0.12 8.33 8.33
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b c=axb d
ARAH X 12 Ø8 12.00 8.33 100.00 0.395
ARAH Y 12 Ø8 12.00 8.33 100.00 0.395
. 200.00
16.67
0.12
Ø8
Ø8
1
PERHITUNGAN VOLUME BESI BETON
Ket. Jml Btg/Jrk BGL Ø Besi(mm) Lebar (m¹) Tinggi (m¹) pjg /keliling(m¹) Jml. Batang Jml. Panjang Pjg Jumlah (m¹) Koef Berat (Kg/m¹)
a b c=axb d
ARAH X 9 Ø8 9.00 12.50 112.50 0.395
ARAH Y 9 Ø8 9.00 12.50 112.50 0.395
. 225.00
18.75
0.08
Ø8
Ø8
1
RHITUNGAN VOLUME BESI BETON
SLOOF S1
8.00
SLOOF S2
10.00
BALOK INDUK B1
10.00
BALOK INDUK B2
11.70
BALOK INDUK B3
10.80
13.00
16.70
BALOK TANGGA
14.70
PLAT LANTAI KM
8.40
KOLOM K1
13.40
188.52
RHITUNGAN VOLUME BESI BETON
KOLOM K2
20.00
228.89
RHITUNGAN VOLUME BESI BETON
KOLOM PRAKTIS KP
13.40
222.30
RHITUNGAN VOLUME BESI BETON
10.00
16.70
BALOK LATEI
13.40
PONDASI FOOTPLAT
1.20
PLAT ATAP
10.00
12.50
PLAT TANGGA
8.40
12.50
Juta
Ribu
Terbilang :
Delapan Ratus Enam Juta Empat Ratus Dua belas Ribu Rupiah
REKAP-RAB1
806,412,000.00
0
0
806
412
0
Delapan Ratus
Empat Ratus
Enam
Dua belas
Rupiah