Pekerjaan persiapan
1
a peralatan 3 Alat
b Material 4 Material
c pengukuran 784 m2
5 Pengecoran 73 m3
6 pembongkaran bekisting 5 oh
Jumlah
harga satuan jumlah harga bobot
2500 675000
0.22
305666800 100.00
TIME SCHEDUL
September
9 10 11 12 13 14 15 16 17 18 19 20 21 22
7.39 7.39 7.39 8.35 8.35 8.35 4.37 4.37 4.37 4.37 4.37 0.08 0.08 0.08
100.00
37.86 45.25 52.64 60.99 69.33 77.68 82.05 86.42 90.79 95.16 99.53 99.62 99.70 99.78
7.39 7.39 7.39 8.35 8.35 8.35 3.64 3.64 3.64 3.64 3.64 3.72 0.08 0.08
100.00
37.86 45.25 52.64 60.99 69.33 77.68 81.32 84.97 88.61 92.25 95.89 99.62 99.70 99.78
0.00 0.00 0.00 0.00 0.00 0.00 -0.73 -1.46 -2.19 -2.91 -3.64 0.00 0.00 0.00
23 24 25 26 27 28 29 30
0.11 0.11
0.11 0.11
0.11 0.11
99.89 100.00
0.11 0.11
99.89 100.00
0.00 0.00