Target Produksi Listrik CFK #1 & #2 kWh 71,721,000.00 20,083,500.00 23,692,500.00 27,945,000.00
Target Produksi Listrik CFK #3 kWh 101,700,000.00 33,500,000.00 34,700,000.00 33,500,000.00
Prediksi Kebutuhan Batubara CFK #1 & #2 Ton 77,228.52 23,083.84 24,942.15 29,202.53
Prediksi Kebutuhan Batubara CFK #3 Ton 91,902.73 32,568.73 29,145.00 30,189.00
Kebutuhan Rutin
1 Masker Kain Ktk Rp12,000.00 43 Rp516,000.00 1 12 9 1 1 8 6 1 1 1 1 1 Untuk keperluan SI
2 Masker Medical Ktk Rp49,500.00 9 Rp445,500.00 3 3 3
3 Cangkul + Gagang Set Rp80,000.00 2 Rp160,000.00 2
4 Sarung Tangan kain lusin Rp31,500.00 55 Rp1,732,500.00 5 12 9 1 5 8 6 1 5 1 1 1 Untuk keperluan SI
5 Kanebo Pcs Rp90,000.00 3 Rp270,000.00 1 1 1
6 Trisodium Phosphate kg 450 Rp0.00 150 150 150
7 Oxygen Scavenger kg 450 Rp0.00 150 150 150
8 Neutralizing Amine kg 210 Rp0.00 70 70 70
9 Coagulant kg 1350 Rp0.00 450 450 450
10 Floculant kg 10 Rp0.00 3 3 4
11 Natrium Hydroxida 98 % Flakes (Clean Wat kg 300 Rp0.00 100 100 100
12 Natrium Hydroxida 98 % Flakes (Regeneras kg 6750 Rp0.00 2250 2250 2250
13 HCL (32%) kg 6000 Rp0.00 2000 2000 2000
Spare peralatan air minum isi
14 Carbon active untuk air minum kg Rp72,000.00 25 Rp1,800,000.00 25 ulang
Stok minimal 10 drum (top up
15 Oil Sheel Turbo 32 Drum 6 Rp0.00 3 3 pasca SI)
9 Gorden biru 1.5x2m set Rp300,000.00 1 Rp300,000.00 1 Sekat ruang istirahat di ruang ETS
10 Swing roll hydrant
11 Cat tembok biru galon Rp1,200,000.00 10 Rp12,000,000.00 5 5 Pengecatan main building outdoor
12 Cat tembok putih galon Rp1,200,000.00 10 Rp12,000,000.00 5 5 Pengecatan main building indoor
Untuk tag name Demin Tank,
13 Cat pylox hitam pcs Rp30,000.00 6 Rp180,000.00 6 Limestone
14 Cat platone biru klg Rp350,000.00 20 Rp7,000,000.00 6 6 6 2
15 Cat platone kuning klg Rp350,000.00 2 Rp700,000.00 2
16 Cat platone hijau klg Rp350,000.00 7 Rp2,450,000.00 2 5
17 Cat meny klg Rp300,000.00 4 Rp1,200,000.00 4
18 Cat tembok putih klg Rp350,000.00 5 Rp1,750,000.00 5
19 Roll refill pcs Rp80,000.00 2 Rp160,000.00 2
20 Training leadership Orang Rp7,700,000.00 25 Rp192,500,000.00 3 7 3 6 6 Pelaksanaan menyesuaikan
dengan jadwal dan tenaga
21 Kapi plat 2" pcs Rp20,000.00 6 Rp120,000.00 6 penyelenggara pelatihan serta
jadwal kerja peserta
22 Catridge filter air minum 10micron pcs 60 Rp0.00 60
23 Jaring futsal mesh 1.5cm Meter Rp85,000.00 50 Rp4,250,000.00 50 Spare water gate intake
MANAJER PRODUKSI
RUDANGI