ENGINEER ESTIMATE (EE)

Pagar Helow

Segmen 1
Panjang = 1.00 m
Tinggi = 1.00 m

V = 1.00 x 1.00
= 1.00 M3

Jumlah = 8.00 Segmen


= 8.00

Segmen 2
Panjang = 1.00 m
Tinggi = 1.00 m

V = 1.00 x 1.00
= 1.00 M2

Jumlah = 8.00 Segmen


= 8.00

Panjang = 0.50 m
Tinggi = 1.00 m

V = 0.50 x 1.00
= 0.50 M2

Jumlah = 8.00 Segmen


= 4.00

Segmen 3
Panjang = 1.00 m
Tinggi = 1.00 m

V = 1.00 x 1.00
= 1.00 M2

Jumlah = 8.00 Segmen


= 8.00

Segmen 4
Panjang = 1.00 m
Tinggi = 1.00 m

V = 1.00 x 1.00
= 1.00 M2

Jumlah = 8.00 Segmen


= 8.00

Panjang = 0.73 m
Tinggi = 1.00 m
V = 0.73 x 1.00
= 0.73 M2

Jumlah = 16.00 Segmen


= 11.60

Segmen 5
Panjang = 1.00 m
Tinggi = 1.00 m

V = 1.00 x 1.00
= 1.00 M2

Jumlah = 8.00 Segmen


= 8.00

Panjang = 0.73 m
Tinggi = 1.00 m

V = 0.73 x 1.00
= 0.73 M2

Jumlah = 8.00 Segmen


= 5.80

Segmen 6
Panjang = 1.00 m
Tinggi = 1.00 m

V = 1.00 x 1.00
= 1.00 M2

Jumlah = 8.00 Segmen


= 8.00

Panjang = 1.08 m
Tinggi = 1.00 m

V = 1.08 x 1.00
= 1.08 M2

Jumlah = 8.00 Segmen


= 8.60

Segmen 7
Panjang = 0.40 m
Tinggi = 1.00 m

V = 0.40 x 1.00
= 0.40 M2

Jumlah = 8.00 Segmen


= 3.20
V Total 81.20
ENGINEER ESTIMATE (EE)
PEKERJAAN PLESTERAN

PLESTERAN CIPRAT CAT PROFIL PLESTErAN BEtON

Segmen 1 Profil Beton Profil Beton


Panjang = 1.00 m Panjang = 568.48 m Panjang = 2.05 m
Tinggi = 1.00 m Tinggi = 0.22 m Tinggi = 0.50 m
Jumlah = 2.00 Bh
V1 = 1.00 x 1.00 V1 = 568.48 x 0.22 V1 = 2.05 x 0.50 x 2.00
= 1.00 M3 = 125.07 M3 = 2.05 M3

Jumlah = 44.00 Segmen Bagian Atas Bagian Atas


= 44.00 Panjang = 8.74 m Panjang = 8.74 m
Tinggi = 0.12 m Tinggi = 0.12 m

V1 = 8.74 x 0.12 V1 = 8.74 x 0.12


= 1.05 M3 = 1.05 M3
Panjang = 0.65 m segmen = 2.00 segmen = 28.00
Tinggi = 1.07 m Total = 2.10 M2 Total = 29.37 M2
0.20
V2 = 0.65 x 1.07 Pilar Pilar
= 0.70 M2 Panjang = 7.04 m Panjang = 7.04 m
Tinggi = 0.13 m Tinggi = 0.13 m
Jumlah = 2.00 Segmen Jumlah = 3.00 Bh Jumlah = 3.00 Bh
= 1.39 V1 = 7.04 x 0.13 x 3.00 V1 = 7.04 x 0.13 x 3.00
= 2.64 M3 = 2.64 M3
Volume Total = 44.00 + 1.39 x 2.00 Panjang = 0.20 m Panjang = 0.20 m
= 90.78 M2 Tinggi = 0.25 m Tinggi = 0.25 m
Jumlah = 6.00 Bh Jumlah = 6.00 Bh
V1 = 0.20 x 0.25 x 6.00 V1 = 0.20 x 0.25 x 6.00
= 0.30 M3 = 0.30 M3
Profil Tiang Panjang = 0.50 m Panjang = 0.50 m
Tinggi = 0.12 m Tinggi = 0.12 m
Segmen 1 Jumlah = 3.00 Bh Jumlah = 3.00 Bh
Panjang = 6.36 m V1 = 0.50 x 0.12 x 3.00 V1 = 0.50 x 0.12 x 3.00
= 0.18 M3 = 0.18 M3
V1 = 6.36 M Panjang = 1.85 m Panjang = 3.37 m
Tinggi = 0.25 m Tinggi = 0.15 m
Jumlah = 4.00 Segmen Jumlah = 2.00 Bh Jumlah = 2.00 Bh
Segmen = 22.00 Segmen V1 = 1.85 x 0.25 x 2.00 V1 = 3.37 x 0.15 x 2.00
= 559.68 = 0.93 M3 = 1.01 M2
Panjang = 3.37 m
Panjang = 0.40 m Tinggi = 0.15 m Panjang = 1.50 m
8.80 Jumlah = 2.00 Bh Tinggi = 2.06 m
V1 = 3.37 x 0.15 x 2.00 Jumlah = 4.00 Bh
= 568.48 = 1.01 M2 V1 = 1.50 x 2.06 x 4.00
= 12.36 M2

Panjang = 0.50 m
Volume 568.48
Tinggi = 0.50 m
Jumlah = 4.00 Bh
tu Alam Teras V1 = 0.50 x 0.50 x 4.00
Panjang = 1.38 m = 1.00 M2
Tinggi = 2.06 m
Jumlah = 4.00 Bh
V1 = 1.38 x 2.06 x 4.00 4.13 4.13
= 11.37 M2 segmen = 25.00 segmen = 25.00
Total = 103.28 M2 Total = 103.28 M2
Volume Total Volume Total
231.36 134.69
Plesteran Plesteran
ENGINEER ESTIMATE (EE)
PEKERJAAN TANAH DAN PASANGAN

PENGECATAN DINDING BATAKO

Panjang = 3.75 m
Tinggi = 2.80 m

V = 3.75 x 2.80
= 10.50 M3

Jumlah = 13.00 Segmen


= 136.50

Panjang = 2.50 m
Tinggi = 2.80 m

V = 2.50 x 2.80
= 7.00 M2

Volume = 143.50 x 2.00 Sisi


= 287.00 M2

Volume PENGECATAN DINDING BATAKO 287.00 M2


PENGECATAN TIANG

Lebar = 0.70 m
Tinggi = 2.80 m

V = 0.70 x 2.80
= 1.96 M2

Jumlah = 15.00 Tiang


= 29.40 M2

Volume PENGECATAN TIANG 29.40 M2

PENGECATAN Ring Balk

Lebar = 0.75 m
Tinggi = 55.00 m

V = 0.75 x 55.00
= 41.25 M2

Volume PENGECATAN Ring Balk 41.25 M2

PENGECATAN KAKI PONDASI

Lebar = 0.40 m
Tinggi = 55.00 m

V = 0.40 x 55.00
= 22.00 M2

Volume PENGECATAN KAKI PONDASI 44.00 M2


ENGINEER ESTIMATE (EE)
PEKERJAAN TANAH DAN PASANGAN

BESI HELLOW

Panjang = 1.10 m
Jumlah = 8.00 m

V1 = 1.10 x 8.00 x 2.00


= 17.60

Volume BESI HELLOW 17.60 M

Volume Pengecatan Besi Hellow 44.80 M2

Batu ALAM

Type
Lebar = 1.00 m
Tinggi = 0.40 m

V = 1.00 x 0.40
= 0.40 M2
Type2
Lebar = 1.12 m
Tinggi = 0.20 m

V = 1.12 x 0.20
= 0.22 M2

V.Total 0.62 M2
Jumlah = 4.00 Tiang
Segmen = 2.00 Segmen
= 4.99 M2

Volume Batu ALAM 4.99 M2


ENGINEER ESTIMATE (EE)
PEKERJAAN TANAH DAN PASANGAN

SLOOF 12/20

Panjang = 4.43 m
Lebar = 0.12 m
Tinggi = 0.20 m

V1 = 4.43 x 0.12 x 0.20


= 0.11 M3
mlah Segmen = 2.00
= 0.21 M3

Volume SLOOF 12/20 0.21 M3

KOLOM 12/12

Panjang = 0.12 m
Lebar = 0.12 m
Tinggi = 1.36 m

V = 0.12 x 0.12 x 1.36


= 0.02 M3

Jumlah = 2.00 Tiang


Segmen = 2.00 Segmen
= 0.08 M3

Volume KOLOM 12/12 0.08 M3

KOLOM 12/25

Panjang = 0.12 m
Lebar = 0.25 m
Tinggi = 1.36 m

V = 0.12 x 0.25 x 1.36


= 0.04 M3

Jumlah = 2.00 Tiang


Segmen = 2.00 Segmen
= 0.16 M3

Volume KOLOM 12/25 0.16 M3

KOLOM 25/66

Panjang = 0.25 m
Lebar = 0.66 m
Tinggi = 1.36 m

V = 0.25 x 0.66 x 1.36


= 0.22 M3

Jumlah = 25.00 Segmen


= 5.61 M3

Volume KOLOM 25/66 5.61 M3

Ring Balk 12/12

Panjang = 4.00 m
Lebar = 0.12 m
Tinggi = 0.12 m

V = 4.00 x 0.12 x 0.12


= 0.06 M3

Jumlah = 2.00 Segmen


= 0.12 M3

Volume Ring Balk 12/12 0.12 M3

Ring Balk Beton Tak Bertulang

Panjang = 0.20 m
Lebar = 0.25 m
Tinggi = 0.12 m

V = 0.20 x 0.25 x 0.12


= 0.01 M3

Jumlah = 2.00 Segmen


= 0.01 M3

Volume Ring Balk Beton Tak Bertulang 0.01 M3

Beton Tak Bertulang

Panjang = 0.20 m
Lebar = 0.12 m
Tinggi = 1.00 m

V = 0.20 x 0.12 x 1.00


= 0.02 M3

Jumlah = 2.00 Segmen


= 0.05 M3

Volume Beton Tak Bertulang 0.05 M3

Pilar

Panjang = 0.12 m
Lebar = 0.13 m
Tinggi = 4.20 m

V = 0.12 x 0.13 x 4.20


= 0.06 M3

Panjang = 0.25 m
Lebar = 0.12 m
Tinggi = 0.20 m

V = 0.25 x 0.12 x 0.20


= 0.01 M3

Jumlah' 0.07 M3
Jumlah 3.00 Pilar
Jumlah = 25.00 Segmen
= 5.18 M3

Panjang = 0.20 m
Lebar = 0.12 m
Tinggi = 2.06 m
Jumlah 4.00 Pilar
V = 0.20 x 0.12 x 2.06 x 4.00
= 0.20 M3

Volume Pilar 5.37 M3


ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE)
PEKERJAAN TANAH DAN PASANGAN PEK. PASANGAN PEKERJAAN BETON PEKERJAAN BETON PEKERJAAN BETON PEKERJAAN BETON PEKERJAAN BETON PEKERJAAN AKHIR PEKERJAAN AKHIR
Pek. Sloof Beton Bertulang 12/20
GALIAN TANAH Plesteran Ciprat Pek. Sloof Beton Bertulang 12/20 BESI HELLOW #REF! #REF! Pembersihan Akhir Pengecatan Pagar Besi Hollow
Panjang = 88.00 m Panjang = 1.00 m Pokok segmen 1 type 1 type 1 type 1 type 1 type 1
Lebar = 0.60 m Lebar = 1.00 m Panjang = 89.00 m Panjang = 87.00 m Panjang = 1.06 m Panjang = 1.12 m Panjang = 6.07 m Panjang = 197.04 m Panjang = 0.86 m
Tinggi = 0.50 m Jumlah Sisi = 2.00 m Koef Besi 10 = 0.617 m Lebar = 0.12 m Jumlah = 4.00 m Lebar = 0.20 m Lebar = 0.17 m Jumlah = 4.00 m
Jumlah = 4.00 m Tinggi = 0.20 m Segmen = 4.00
V1 = 88.00 x 0.60 x 0.50 V1 = 1.00 x 1.00 x 2.00 V1 = 1.06 x 4.00 V1 = 1.12 x 0.20 Sisi = 2.00 V1 = 197.04 x 0.17 V1 = 0.86 x 4.00
= 26.40 M3 = 2.00 M3 V1 = 89.00 x 0.62 x 4.00 V1 = 87.00 x 0.12 x 0.20 = 4.22 M = 0.22 M Volume = 48.56 m = 33.50 M = 3.42 M
= 219.47 Kg = 2.09 M3
segmen = 16.00 Begel Segmen = 4.00 Segmen = 16.00 Segmen = 4.00
Volume = 32.00 Panjang = 0.50 m Volume = 16.88 m Volume = 3.58 m bagian Atas profil Volume = 13.68 m
Model 2 Koef Besi 6 = 0.222 m type 2 type 2 type 2 type 2 0.86 type 2
Panjang = 1.09 m Jumlah = 580.00 m Panjang = 1.20 m Panjang = 0.86 m Panjang = 6.07 m Panjang = 12.17 m 0.92 Panjang = 1.00 m
Volume GALIAN TANAH 26.40 M3 Volume Pek. Sloof Beton Bertulang 12/20 2.09 M3
Lebar = 0.20 m Jumlah = 4.00 m Lebar = 0.40 m Lebar = 0.25 m 1.12 Jumlah = 4.00 m
Jumlah Sisi = 2.00 m V1 = 0.50 x 0.22 x 580.00 Segmen = 12.00 0.12
= 64.36 Kg V1 = 1.20 x 4.00 V1 = 0.86 x 0.40 Sisi = 2.00 V1 = 12.17 x 0.25 0.20 V1 = 1.00 x 4.00
PASANGAN BATU V1 = 1.09 x 0.20 x 2.00 #REF! = 4.80 M = 0.34 M Volume = 145.68 m = 3.04 M 0.35 = 4.00 M
= 0.44 M3
Volume Pek. Sloof Beton Bertulang 12/20 283.84 Kg
Segmen = 12.00 Segmen = 4.00 type 3 Segmen = 2.00 Segmen = 12.00
Panjang = 87.00 m segmen = 7.00 Panjang = 0.12 m Volume = 57.60 m Volume = 1.37 m Panjang = 0.20 m Volume = 6.09 m Volume = 48.00 m
Lebar = 0.45 m Volume = 3.05 #REF! Lebar = 0.12 m type 3 type 3
Tinggi = 0.60 m Tinggi = 1.36 m Panjang = 1.00 m Segmen = 7.00 Panjang = 9.30 m
Volume Plesteran Ciprat 35.05 M2
Pokok Lebar = 0.40 m Sisi = 2.00 Lebar = 0.25 m
V = 87.00 x 0.45 x 0.60 Panjang = 1.60 m V = 0.12 x 0.12 x 1.36 Volume = 2.80 m
Volume BESI HELLOW 74.48 M Panjang Besi 61.68
= 23.49 M3 Koef Besi 8 = 0.395 m = 0.02 M3 V1 = 1.00 x 0.40 V1 = 9.30 x 0.25
Plesteran Kaki Pondasi Jumlah = 4.00 m = 0.40 M = 2.33 M
Volume #REF! 197.04 M Lebar besi 0.16
Jumlah = 2.00 Tiang
V1 = 1.60 x 0.39 x 4.00 Segmen = 8.00 Segmen Segmen = 12.00 Segmen = 5.00
Volume Pengecatan Pagar Besi Hollow 9.87
Panjang = 87.00 m = 2.53 Kg = 0.31 M3 Volume = 4.80 m Volume = 11.63 m
Lebar = 0.30 m Begel type 4
Sisi = 2.00 bh Panjang = 0.34 m Panjang = 2.00 m Profil 51.21 M
Volume PASANGAN BATU 23.49 M3
Koef Besi 6 = 0.222 m Lebar = 2.00 m
Volume #REF! 0.31 M3
V = 87.00 x 0.30 x 2.00 Jumlah = 11.00 m Pilar MODEL 1
PAS. BATU KOSONG = 52.20 M2 V1 = 2.00 x 2.00 Type 1
V1 = 0.34 x 0.22 x 11.00 #REF! = 4.00 M Panjang = 4.62 m
Pengurangan = 24.00 = 0.83 Kg Lebar = 0.12 m
Panjang = 87.00 m Luas = 0.04 Segmen = 2.00
Lebar = 0.60 m Volume = 0.86 Jumlah = 2.00 Tiang Panjang = 0.12 m Volume = 8.00 m V1 = 4.62 x 0.12
Tinggi = 0.15 m Segmen = 8.00 Segmen Lebar = 0.25 m = 0.55 M
Plestera Volume #REF! 27.50 M
Volume n Kaki 51.34 m2
Pondasi = 53.68 kg Tinggi = 1.36 m
V = 87.00 x 0.60 x 0.15 Segmen = 8.00
= 7.83 M3 V = 0.12 x 0.25 x 1.36 jumlah = 3.00 pilar
Plesteran Beton = 0.04 M3 Volume = 13.31 m
Volume PAS. BATU KOSONG 7.83 M3 Volume #REF! 53.68 Kg

Depan Jumlah = 2.00 Tiang Type 2


Panjang = 2.06 m #REF! Segmen = 7.00 Segmen Panjang = 3.62 m
URUGAN PASIR Lebar = 0.12 m = 0.57 M3 Lebar = 0.20 m
Sisi = 2.00 bh Pokok
Panjang = 1.60 m V1 = 3.62 x 0.20
Volume #REF! 0.57 M3
Panjang = 87.00 m V = 2.06 x 0.12 x 2.00 Koef Besi 8 = 0.395 m = 0.72 M
Lebar = 0.60 m = 0.49 M2 Jumlah = 4.00 m
Tinggi = 0.05 m #REF! Segmen = 8.00
Segmen = 24.00 V1 = 1.60 x 0.39 x 4.00 jumlah = 3.00 pilar
V = 87.00 x 0.60 x 0.05 Volume = 11.87 M2 = 2.53 Kg sisi = 2.00
= 2.61 M3 Samping Begel Panjang = 0.25 m Volume = 34.75 m
Panjang = 1.76 m Panjang = 0.60 m Lebar = 0.66 m
Volume URUGAN PASIR 2.61 M3
Lebar = 0.50 m Koef Besi 6 = 0.222 m Tinggi = 1.36 m Pilar MODEL 2
Jumlah = 11.00 m Type 1
V = 1.76 x 0.50 V = 0.25 x 0.66 x 1.36 Panjang = 2.06 m
= 0.88 M2 V1 = 0.60 x 0.22 x 11.00 = 0.22 M3 Lebar = 0.25 m
= 1.46 Kg
Pengurangan = 0.44 Jumlah = 8.00 Segmen V1 = 2.06 x 0.25
Volume = 0.44 M2 Jumlah = 2.00 Tiang = 1.80 M3 = 0.52 M
Segmen = 7.00 Segmen
Segmen = 48.00 = 55.86 kg Segmen = 2.00
Volume #REF! 1.80 M3
Volume = 21.12 M2 jumlah = 2.00 pilar
Atas Volume = 2.06 m
Panjang = 0.50 m #REF!
Volume #REF! 55.86 Kg
Lebar = 0.12 m pilar 50.12 M
Sisi = 1.00 bh Tiang Besar
#REF! Panjang = 2.56 m Panjang = 2.00 m
V = 0.50 x 0.12 x 1.00 Lebar = 0.50 m Lebar = 2.06 m
= 0.06 M2 Pokok Tinggi = 0.50 m Tiang Besat = 2.00
Panjang = 1.85 m V1 = 2.00 x 2.06 x 2.00
Segmen = 24.00 Koef Besi 12 = 0.888 m V = 2.56 x 0.50 x 0.50 = 8.24 M
Volume = 1.44 M2 Jumlah = 12.00 m = 0.64 M3
Tiang pembatas Tiang Besar 10.24 M
Panjang = 1.56 m V1 = 1.85 x 0.89 x 12.00 Jumlah = 2.00 Segmen Plesteran Ciprat
Lebar = 0.12 m = 19.71 Kg = 1.28 M3
Sisi = 4.00 bh Begel Panjang = 1.00 m
Panjang = 1.74 m Lebar = 1.00 m
Volume #REF! 1.28 M3
V = 1.56 x 0.12 x 4.00 Koef Besi 6 = 0.222 m
= 0.75 M2 Jumlah = 11.00 m V1 = 1.00 x 1.00
#REF! = 1.00 M
Segmen = 8.00 V1 = 1.74 x 0.22 x 11.00
Volume = 5.99 M2 = 4.25 Kg Segmen = 16.00
Panjang = 0.86 m jumlah = 2.00 pilar
Plestera
Volume 40.42 M2
n Beton Jumlah = 1.00 Tiang Lebar = 0.12 m Volume = 32.00 m
Segmen = 8.00 Segmen Tinggi = 0.12 m
= 191.65 kg M 32.00 M
PASANGAN DINDING BATU BATA V = 0.86 x 0.12 x 0.12
Segmen 1 = 0.01 M3
Volume Pembersihan Akhir 143.56 M
Type 1
Volume #REF! 191.65 Kg
Lebar = 0.86 m Jumlah = 4.00 Segmen
Tinggi = 0.32 m = 0.05 M3
Sisi = 2.00 Bh #REF!
V1 = 0.86 x 0.32 x 2.00 Panjang = 1.00 m
= 0.55 M3 Pokok Lebar = 0.12 m
Panjang = 2.50 m Tinggi = 0.12 m
Lebar = 1.00 m Koef Besi 12 = 0.888 m
Tinggi = 1.24 m Jumlah = 12.00 m V = 1.00 x 0.12 x 0.12
Sisi = 2.00 = 0.01 M3
V2 = 1.00 x 1.24 x 2.00 V1 = 2.50 x 0.89 x 12.00
= 2.48 M3 = 26.63 Kg Jumlah = 28.00 Segmen
Begel = 0.40 M3
Panjang = 1.92 m
Volume Total = 0.55 + 2.48 Koef Besi 6 = 0.222 m
= 3.03 M2 Jumlah = 17.00 m

Volume #REF! 0.45 M3


Jumlah Total = 3.03 x 2.00 V1 = 1.92 x 0.22 x 17.00
= 6.05 M2 = 7.24 Kg
Beton Tak Bertulang
Type 2 Jumlah = 1.00 Tiang
Lebar = 1.00 m Segmen = 2.00 Segmen
Tinggi = 0.32 m = 67.75 kg Panjang = 0.20 m
Sisi = 2.00 Bh Lebar = 0.12 m
V1 = 1.00 x 0.32 x 2.00 Tinggi = 1.00 m
= 0.64 M3
Volume #REF! 67.75 Kg
V = 0.20 x 0.12 x 1.00
Lebar = 1.00 m = 0.02 M3
Tinggi = 1.24 m #REF!
Sisi = 2.00 Model 1 Jumlah = 7.00 Segmen
V2 = 1.00 x 1.24 x 2.00 Pokok = 0.17 M3
= 2.48 M3 Panjang = 1.30 m
Koef Besi 8 = 0.395 m
Volume Beton Tak Bertulang 0.17 M3
Jumlah = 4.00 m
Volume Total = 0.64 + 2.48 Pilar
= 3.12 M2 V1 = 1.30 x 0.39 x 4.00
= 2.05 Kg
Jumlah Total = 3.12 x 6.00 Begel Panjang = 0.12 m
= 18.72 M2 Panjang = 0.34 m Lebar = 0.13 m
Koef Besi 6 = 0.222 m Tinggi = 4.12 m
Jumlah = 7.00 m
PASANG
AN V = 0.12 x 0.13 x 4.12
Volume DINDING 24.77 M2 V1 = 0.34 x 0.22 x 7.00 = 0.06 M3
BATU = 0.53 Kg
BATA Panjang = 0.25 m
Jumlah = 2.00 Tiang Lebar = 0.12 m
Segmen = 14.00 Segmen Tinggi = 0.20 m
= 72.24 kg
V = 0.25 x 0.12 x 0.20
Model 2 = 0.01 M3
Pokok
Panjang = 1.15 m Jumlah' 0.07 M3
Koef Besi 8 = 0.395 m Jumlah 3.00 Pilar
Jumlah = 4.00 m Jumlah = 8.00 Segmen
= 1.63 M3
V1 = 1.15 x 0.39 x 4.00
= 1.81 Kg Panjang = 0.20 m
Begel Lebar = 0.12 m
Panjang = 0.34 m Tinggi = 2.06 m
Koef Besi 6 = 0.222 m Jumlah 2.00 Pilar
Jumlah = 6.00 m V = 0.20 x 0.12 x 2.06 x 2.00
= 0.10 M3
V1 = 0.34 x 0.22 x 6.00
= 0.45 Kg
Volume Pilar
1.73 M3
Jumlah = 2.00 Tiang
Segmen = 2.00 Segmen
= 9.07 kg

Volume #REF! 81.31 Kg

Volume Total Pembesian 734.09 Kg


ENGINEER ESTIMATE (EE)
PEKERJAAN AKHIR

Pengecatan Pagar Besi Hollow

M
ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE)
PEKERJAAN TANAH DAN PASANGAN PEK. PASANGAN PEKERJAAN BETON PEKERJAAN BETON PEKERJAAN BETON PEKERJAAN BETON PEKERJAAN BETON PEKERJAAN AKHIR PEKERJAAN AKHIR
Pek. Sloof Beton Bertulang 12/20
GALIAN TANAH Plesteran Ciprat Pek. Sloof Beton Bertulang 12/20 BESI HELLOW #REF! #REF! Pembersihan Akhir Pengecatan Pagar Besi Hollow
Panjang = 42.70 m Panjang = 1.00 m Pokok segmen 1 type 1 type 1 type 1 type 1 type 1
Lebar = 0.60 m Lebar = 1.00 m Panjang = 43.70 m Panjang = 41.70 m Panjang = 1.06 m Panjang = 1.12 m Panjang = 6.07 m Panjang = 197.04 m Panjang = 0.86 m
Tinggi = 0.50 m Jumlah Sisi = 2.00 m Koef Besi 10 = 0.617 m Lebar = 0.12 m Jumlah = 4.00 m Lebar = 0.20 m Lebar = 0.17 m Jumlah = 4.00 m
Jumlah = 4.00 m Tinggi = 0.20 m Segmen = 4.00
V1 = 42.70 x 0.60 x 0.50 V1 = 1.00 x 1.00 x 2.00 V1 = 1.06 x 4.00 V1 = 1.12 x 0.20 Sisi = 2.00 V1 = 197.04 x 0.17 V1 = 0.86 x 4.00
= 12.81 M3 = 2.00 M3 V1 = 43.70 x 0.62 x 4.00 V1 = 41.70 x 0.12 x 0.20 = 4.22 M = 0.22 M Volume = 48.56 m = 33.50 M = 3.42 M
= 107.76 Kg = 1.00 M3
segmen = 16.00 Begel Segmen = 4.00 Segmen = 16.00 Segmen = 4.00
Volume = 32.00 Panjang = 0.50 m Volume = 16.88 m Volume = 3.58 m bagian Atas profil Volume = 13.68 m
Model 2 Koef Besi 6 = 0.222 m type 2 type 2 type 2 type 2 0.86 type 2
Panjang = 1.09 m Jumlah = 278.00 m Panjang = 1.20 m Panjang = 0.86 m Panjang = 6.07 m Panjang = 12.17 m 0.92 Panjang = 1.00 m
Volume GALIAN TANAH 12.81 M3 Volume Pek. Sloof Beton Bertulang 12/20 1.00 M3
Lebar = 0.20 m Jumlah = 4.00 m Lebar = 0.40 m Lebar = 0.25 m 1.12 Jumlah = 4.00 m
Jumlah Sisi = 2.00 m V1 = 0.50 x 0.22 x 278.00 Segmen = 12.00 0.12
= 30.85 Kg V1 = 1.20 x 4.00 V1 = 0.86 x 0.40 Sisi = 2.00 V1 = 12.17 x 0.25 0.20 V1 = 1.00 x 4.00
PASANGAN BATU V1 = 1.09 x 0.20 x 2.00 #REF! = 4.80 M = 0.34 M Volume = 145.68 m = 3.04 M 0.35 = 4.00 M
= 0.44 M3
Volume Pek. Sloof Beton Bertulang 12/20 138.61 Kg
Segmen = 12.00 Segmen = 4.00 type 3 Segmen = 2.00 Segmen = 12.00
Panjang = 41.70 m segmen = 7.00 Panjang = 0.12 m Volume = 57.60 m Volume = 1.37 m Panjang = 0.20 m Volume = 6.09 m Volume = 48.00 m
Lebar = 0.45 m Volume = 3.05 #REF! Lebar = 0.12 m type 3 type 3
Tinggi = 0.60 m Tinggi = 1.36 m Panjang = 1.00 m Segmen = 7.00 Panjang = 9.30 m
Volume Plesteran Ciprat 35.05 M2
Pokok Lebar = 0.40 m Sisi = 2.00 Lebar = 0.25 m
V = 41.70 x 0.45 x 0.60 Panjang = 1.60 m V = 0.12 x 0.12 x 1.36 Volume = 2.80 m
Volume BESI HELLOW 74.48 M Panjang Besi 61.68
= 11.26 M3 Koef Besi 8 = 0.395 m = 0.02 M3 V1 = 1.00 x 0.40 V1 = 9.30 x 0.25
Plesteran Kaki Pondasi Jumlah = 4.00 m = 0.40 M = 2.33 M
Volume #REF! 197.04 M Lebar besi 0.16
Jumlah = 2.00 Tiang
V1 = 1.60 x 0.39 x 4.00 Segmen = 8.00 Segmen Segmen = 12.00 Segmen = 5.00
Volume Pengecatan Pagar Besi Hollow 9.87
Panjang = 41.70 m = 2.53 Kg = 0.31 M3 Volume = 4.80 m Volume = 11.63 m
Lebar = 0.30 m Begel type 4
Sisi = 2.00 bh Panjang = 0.34 m Panjang = 2.00 m Profil 51.21 M
Volume PASANGAN BATU 11.26 M3
Koef Besi 6 = 0.222 m Lebar = 2.00 m
Volume #REF! 0.31 M3
V = 41.70 x 0.30 x 2.00 Jumlah = 11.00 m Pilar MODEL 1
PAS. BATU KOSONG = 25.02 M2 V1 = 2.00 x 2.00 Type 1
V1 = 0.34 x 0.22 x 11.00 #REF! = 4.00 M Panjang = 4.62 m
Pengurangan = 24.00 = 0.83 Kg Lebar = 0.12 m
Panjang = 41.70 m Luas = 0.04 Segmen = 2.00
Lebar = 0.60 m Volume = 0.86 Jumlah = 2.00 Tiang Panjang = 0.12 m Volume = 8.00 m V1 = 4.62 x 0.12
Tinggi = 0.15 m Segmen = 8.00 Segmen Lebar = 0.25 m = 0.55 M
Plestera Volume #REF! 27.50 M
Volume n Kaki 24.16 m2
Pondasi = 53.68 kg Tinggi = 1.36 m
V = 41.70 x 0.60 x 0.15 Segmen = 8.00
= 3.75 M3 V = 0.12 x 0.25 x 1.36 jumlah = 3.00 pilar
Plesteran Beton = 0.04 M3 Volume = 13.31 m
Volume PAS. BATU KOSONG 3.75 M3 Volume #REF! 53.68 Kg

Depan Jumlah = 2.00 Tiang Type 2


Panjang = 2.06 m #REF! Segmen = 7.00 Segmen Panjang = 3.62 m
URUGAN PASIR Lebar = 0.12 m = 0.57 M3 Lebar = 0.20 m
Sisi = 2.00 bh Pokok
Panjang = 1.60 m V1 = 3.62 x 0.20
Volume #REF! 0.57 M3
Panjang = 41.70 m V = 2.06 x 0.12 x 2.00 Koef Besi 8 = 0.395 m = 0.72 M
Lebar = 0.60 m = 0.49 M2 Jumlah = 4.00 m
Tinggi = 0.05 m #REF! Segmen = 8.00
Segmen = 24.00 V1 = 1.60 x 0.39 x 4.00 jumlah = 3.00 pilar
V = 41.70 x 0.60 x 0.05 Volume = 11.87 M2 = 2.53 Kg sisi = 2.00
= 1.25 M3 Samping Begel Panjang = 0.25 m Volume = 34.75 m
Panjang = 1.76 m Panjang = 0.60 m Lebar = 0.66 m
Volume URUGAN PASIR 1.25 M3
Lebar = 0.50 m Koef Besi 6 = 0.222 m Tinggi = 1.36 m Pilar MODEL 2
Jumlah = 11.00 m Type 1
V = 1.76 x 0.50 V = 0.25 x 0.66 x 1.36 Panjang = 2.06 m
= 0.88 M2 V1 = 0.60 x 0.22 x 11.00 = 0.22 M3 Lebar = 0.25 m
= 1.46 Kg
Pengurangan = 0.44 Jumlah = 8.00 Segmen V1 = 2.06 x 0.25
Volume = 0.44 M2 Jumlah = 2.00 Tiang = 1.80 M3 = 0.52 M
Segmen = 7.00 Segmen
Segmen = 48.00 = 55.86 kg Segmen = 2.00
Volume #REF! 1.80 M3
Volume = 21.12 M2 jumlah = 2.00 pilar
Atas Volume = 2.06 m
Panjang = 0.50 m #REF!
Volume #REF! 55.86 Kg
Lebar = 0.12 m pilar 50.12 M
Sisi = 1.00 bh Tiang Besar
#REF! Panjang = 2.56 m Panjang = 2.00 m
V = 0.50 x 0.12 x 1.00 Lebar = 0.50 m Lebar = 2.06 m
= 0.06 M2 Pokok Tinggi = 0.50 m Tiang Besat = 2.00
Panjang = 1.85 m V1 = 2.00 x 2.06 x 2.00
Segmen = 24.00 Koef Besi 12 = 0.888 m V = 2.56 x 0.50 x 0.50 = 8.24 M
Volume = 1.44 M2 Jumlah = 12.00 m = 0.64 M3
Tiang pembatas Tiang Besar 10.24 M
Panjang = 1.56 m V1 = 1.85 x 0.89 x 12.00 Jumlah = 2.00 Segmen Plesteran Ciprat
Lebar = 0.12 m = 19.71 Kg = 1.28 M3
Sisi = 4.00 bh Begel Panjang = 1.00 m
Panjang = 1.74 m Lebar = 1.00 m
Volume #REF! 1.28 M3
V = 1.56 x 0.12 x 4.00 Koef Besi 6 = 0.222 m
= 0.75 M2 Jumlah = 11.00 m V1 = 1.00 x 1.00
#REF! = 1.00 M
Segmen = 8.00 V1 = 1.74 x 0.22 x 11.00
Volume = 5.99 M2 = 4.25 Kg Segmen = 16.00
Panjang = 0.86 m jumlah = 2.00 pilar
Plestera
Volume 40.42 M2
n Beton Jumlah = 1.00 Tiang Lebar = 0.12 m Volume = 32.00 m
Segmen = 8.00 Segmen Tinggi = 0.12 m
= 191.65 kg M 32.00 M
PASANGAN DINDING BATU BATA V = 0.86 x 0.12 x 0.12
Segmen 1 = 0.01 M3
Volume Pembersihan Akhir 143.56 M
Type 1
Volume #REF! 191.65 Kg
Lebar = 0.86 m Jumlah = 4.00 Segmen
Tinggi = 0.32 m = 0.05 M3
Sisi = 2.00 Bh #REF!
V1 = 0.86 x 0.32 x 2.00 Panjang = 1.00 m
= 0.55 M3 Pokok Lebar = 0.12 m
Panjang = 2.50 m Tinggi = 0.12 m
Lebar = 1.00 m Koef Besi 12 = 0.888 m
Tinggi = 1.24 m Jumlah = 12.00 m V = 1.00 x 0.12 x 0.12
Sisi = 2.00 = 0.01 M3
V2 = 1.00 x 1.24 x 2.00 V1 = 2.50 x 0.89 x 12.00
= 2.48 M3 = 26.63 Kg Jumlah = 28.00 Segmen
Begel = 0.40 M3
Panjang = 1.92 m
Volume Total = 0.55 + 2.48 Koef Besi 6 = 0.222 m
= 3.03 M2 Jumlah = 17.00 m

Volume #REF! 0.45 M3


Jumlah Total = 3.03 x 2.00 V1 = 1.92 x 0.22 x 17.00
= 6.05 M2 = 7.24 Kg
Beton Tak Bertulang
Type 2 Jumlah = 1.00 Tiang
Lebar = 1.00 m Segmen = 2.00 Segmen
Tinggi = 0.32 m = 67.75 kg Panjang = 0.20 m
Sisi = 2.00 Bh Lebar = 0.12 m
V1 = 1.00 x 0.32 x 2.00 Tinggi = 1.00 m
= 0.64 M3
Volume #REF! 67.75 Kg
V = 0.20 x 0.12 x 1.00
Lebar = 1.00 m = 0.02 M3
Tinggi = 1.24 m #REF!
Sisi = 2.00 Model 1 Jumlah = 7.00 Segmen
V2 = 1.00 x 1.24 x 2.00 Pokok = 0.17 M3
= 2.48 M3 Panjang = 1.30 m
Koef Besi 8 = 0.395 m
Volume Beton Tak Bertulang 0.17 M3
Jumlah = 4.00 m
Volume Total = 0.64 + 2.48 Pilar
= 3.12 M2 V1 = 1.30 x 0.39 x 4.00
= 2.05 Kg
Jumlah Total = 3.12 x 6.00 Begel Panjang = 0.12 m
= 18.72 M2 Panjang = 0.34 m Lebar = 0.13 m
Koef Besi 6 = 0.222 m Tinggi = 4.12 m
Jumlah = 7.00 m
PASANG
AN V = 0.12 x 0.13 x 4.12
Volume DINDING 24.77 M2 V1 = 0.34 x 0.22 x 7.00 = 0.06 M3
BATU = 0.53 Kg
BATA Panjang = 0.25 m
Jumlah = 2.00 Tiang Lebar = 0.12 m
Segmen = 14.00 Segmen Tinggi = 0.20 m
= 72.24 kg
V = 0.25 x 0.12 x 0.20
Model 2 = 0.01 M3
Pokok
Panjang = 1.15 m Jumlah' 0.07 M3
Koef Besi 8 = 0.395 m Jumlah 3.00 Pilar
Jumlah = 4.00 m Jumlah = 8.00 Segmen
= 1.63 M3
V1 = 1.15 x 0.39 x 4.00
= 1.81 Kg Panjang = 0.20 m
Begel Lebar = 0.12 m
Panjang = 0.34 m Tinggi = 2.06 m
Koef Besi 6 = 0.222 m Jumlah 2.00 Pilar
Jumlah = 6.00 m V = 0.20 x 0.12 x 2.06 x 2.00
= 0.10 M3
V1 = 0.34 x 0.22 x 6.00
= 0.45 Kg
Volume Pilar
1.73 M3
Jumlah = 2.00 Tiang
Segmen = 2.00 Segmen
= 9.07 kg

Volume #REF! 81.31 Kg

Volume Total Pembesian 588.87 Kg


ENGINEER ESTIMATE (EE)
PEKERJAAN AKHIR

Pengecatan Pagar Besi Hollow

M
ENGINEER ESTIMATE (EE)
DAFTAR KUANTITAS DAN HARGA

Pekerjaan : Perencanaan Pembangunan Pagar Kejaksaan Negeri Ampana


Lokasi : Kantor Kejaksaan negeri Ampana
Tahun Anggaran : 2014

Volume Papan
No. Uraian Pekerjaan segmen 2 SEGMEN 2 SEGMEN 3
segmen 1 nama

1 2 3
I PEKERJAAN PENDAHULUAN
1 Pembersihan Lapangan dan Peralatan 1.00
2 Pengukuran dan Pemasangan Bowplank 1.00
3 Papan Nama Proyek 1.00
Sub Total 1
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi 12.81 #REF! 4.0164
2 Pek. Urugan Tanah Kembali 3.20 #REF! 1.00
3 Pek. Urugan Pasir Dibawah Pondasi 1.25 #REF! 0.3482
### 0.4632
### 0.26055
Sub Total 2
III PEK. PASANGAN
1 Pas. Batu Kosong 3.75 #REF! 1.0446
2 Pas. Pondasi 1 : 5 11.26 #REF! 11.375043
3 Pas. Dinding Batu Bata 1/2 Bata Camp. 1 : 5 24.77 #REF! 0.5376
4 Pek. Plesteran Ciprat (Tekstur Kasar) Camp 1 : 2 35.05 #REF!
5 Pek. Plesteran Beton Camp 1 : 3 40.42 #REF! 34.521
6 Pek. Kaki Pondasi Camp. 1 : 3 24.16 #REF! 1.05
7 Pek. Acian Dinding, & Pondasi 1 Pc : 7 Kpr 64.57 #REF! 35.57
Sub Total 3
IV PEKERJAAN BETON & PEMBESIAN
1 Pek. Sloof Beton Bertulang 12/20 1.00 #REF! 0.24
2 Pek. Kolom Beton Bertulang 12/12 0.31 #REF!
3 Pek. Kolom Beton Bertulang 12/25 0.57 #REF! 0.12
4 Pek. Kolom Beton Bertulang 25/66 1.80 #REF!
5 Pek. Kolom Beton Bertulang 50/50 1.28 #REF!
6 Pek. Ring Balk Beton Bertulang 12/12 0.45 #REF! 0.09
7 Pek. Kolom Beton Tak Bertulang 12/20 0.17 #REF!
8 Pek. Cor Kolom Beton Camp. 1 : 2 : 3 (Pilar) 1.73 #REF!
9 Pek. Pembesian 588.87 #REF! 104.31
10 Pek. Pas Terali Besi Hellow 74.48 #REF! 9.60 11
11 Pek. Profil Beton 197.04 #REF! 3.12
12 Pek. Pas. Batu Alam 27.50 #REF!
Cor Lantai Alas Keramik 0.14
Sub Total 4
V PEKERJAAN PENGECATAN
1 Pengecetan Dinding 143.56 #REF! 30.391
2 Pengecatan Pagar Besi Hollow 9.87 #REF! 2.592
Sub Total 5
VI PEKERJAAN AKHIR
1 Pembersihan Akhir 1.00
2 Dokumentasi & Administrasi 1.00
Sub Total 6
ENGINEER ESTIMATE (EE)
REKAPITULASI

Program : Pengembangan Destinasi Pariwisata


Kegiatan : Pengembangan Daya Tarik Pariwisata
Pekerjaan : Perencanaan Pembangunan Pagar Kejaksaan Negeri Ampana
Lokasi : Kantor Kejaksaan negeri Ampana
Tahun Anggaran : 2014

No. URAIAN

1 PEKERJAAN PENDAHULUAN

2 PEKERJAAN TANAH DAN PASIR

3 PEK. PASANGAN

4 PEKERJAAN BETON & PEMBESIAN

5 PEKERJAAN PENGECATAN

6 PEKERJAAN AKHIR

JUMLAH

PPN 10 %

TOTAL

DIBULATKAN

TERBILANG : TIGA RATUS SATU JUTA SEMBILAN RATUS EM


Total

1.00
1.00
1.00
-
-
#REF!
#REF!
#REF!
0.46
0.26
-
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.14
-
-
#REF!
#REF!
-
-
1.00
1.00
-
ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE) ENGINEER ESTIMATE (EE)
PEKERJAAN TANAH DAN PASANGAN PEK. PASANGAN PEKERJAAN BETON PEKERJAAN BETON PEKERJAAN BETON PEKERJAAN BETON PEKERJAAN BETON PEKERJAAN AKHIR PEKERJAAN AKHIR
Pek. Sloof Beton Bertulang 12/20
GALIAN TANAH Pek. Sloof Beton Bertulang 12/20 BESI HELLOW #REF! #REF! Pembersihan Akhir Pengecatan Pagar Besi Hollow
Panjang = 6.38 m PASANGAN DINDING BATU BATA Pokok segmen 1 type 1 type 1 type 1 type 1 type 1
Lebar = 0.75 m Segmen 1 Panjang = 1.70 m Panjang = 1.70 m Panjang = 1.20 m Panjang = 0.80 m Panjang = 0.78 m Panjang = 6.38 m Panjang = 1.10 m
Tinggi = 0.50 m Type 1 Koef Besi 10 = 0.617 m Lebar = 0.12 m Jumlah = 4.00 m Lebar = 0.40 m Lebar = 2.40 m Jumlah = 4.00 m
Lebar = 0.84 m Jumlah = 4.00 m Tinggi = 0.20 m Segmen = 2.00
V1 = 6.38 x 0.75 x 0.50 Tinggi = 0.32 m V1 = 1.20 x 4.00 V1 = 0.80 x 0.40 Sisi = 2.00 V1 = 6.38 x 2.40 V1 = 1.10 x 4.00
= 2.39 M3 Sisi = 2.00 Bh V1 = 1.70 x 0.62 x 4.00 V1 = 1.70 x 0.12 x 0.20 = 4.80 M = 0.32 M Volume = 3.12 m = 15.31 M = 4.40 M
V1 = 0.84 x 0.32 x 2.00 = 4.19 Kg = 0.04 M3
= 0.54 M3 Begel Segmen = 2.00 Segmen = 4.00 Segmen = 6.00
Panjang = 5.59 m Panjang = 0.50 m Volume = 9.60 m Volume = 1.28 m #REF! Panjang = 6.38 m Volume = 26.40 m
Lebar = 0.40 m Koef Besi 6 = 0.222 m Panjang = 5.75 m Lebar = 2.05 m
Volume PASANGAN DINDING BATU BATA 0.54 M2
Tinggi = 0.40 m Jumlah = 12.00 m Panjang = 1.70 m
Volume #REF! 10.56 M
#REF! Lebar = 0.12 m lebar = 0.50 V1 = 6.38 x 2.05
V2 = 5.59 x 0.40 x 0.40 V1 = 0.50 x 0.22 x 12.00 Tinggi = 0.20 m Pengecatan Besi Hellow Tebal = 0.05 = 13.08 M
= 0.89 M3 Belakang = 1.33 Kg Panjang = 8.10 m Volume = 0.14 m
Panjang = 6.38 m V1 = 1.70 x 0.12 x 0.20 Jumlah = 0.16 m
Panjang = 0.75 m Lebar = 2.40 m Sisi = 5.52 x 2.00 = 0.04 M3 Panjang = 2.00 m
Lebar = 0.60 m Sisi = 1.00 bh = 11.05 Kg V1 = 8.10 x 0.16 Lebar = 0.50 m
Tinggi = 0.50 m = 1.30 M #REF!
Sisi = 2.00 Sisi V = 6.38 x 2.40 x 1.00 Panjang = 6.48 m Panjang = 5.75 m V1 = 2.00 x 0.50
V3 = 0.75 x 0.60 x 0.50 x 2.00 = 15.31 M2 Lebar = 0.12 m Segmen = 2.00 = 1.00 M
= 0.45 M3 Tinggi = 0.20 m Volume = 2.59 m lebar = 1.55 = 2.00
Depan
Panjang = 5.59 m Panjang = 6.38 m V1 = 6.48 x 0.12 x 0.20 Volume = 8.91 m
Lebar = 0.50 m Lebar = 2.05 m = 0.16 M3 type 1
30 m2
Tinggi = 0.10 m Sisi = 1.00 bh Pokok segmen 1 Panjang = 1.38 m
Volume #REF! 8.91 M
Panjang = 6.48 m Jumlah = 4.00 m
V1 = 5.59 x 0.50 x 0.10 V = 6.38 x 2.05 x 1.00 Koef Besi 10 = 0.617 m
= 0.28 M3 = 13.08 M2 Jumlah = 4.00 m V1 = 1.38 x 4.00
= 5.50 M
Samping V1 = 6.48 x 0.62 x 4.00
Panjang = 2.00 m = 15.98 Kg Segmen = 2.00 1.10
Lebar = 0.50 m Begel Volume = 11.00 m 0.92
Volume GALIAN TANAH 4.02 M3 Volume Pek. Sloof Beton Bertulang 12/20 0.24 M3
Sisi = 2.00 bh Panjang = 0.50 m 1.12
Koef Besi 6 = 0.222 m 0.12
V = 2.00 x 0.50 x 2.00 Jumlah = 44.00 m 0.20
PASANGAN BATU = 2.00 M2 #REF! 0.35
V1 = 0.50 x 0.22 x 44.00
Type 1 Atas batu Bata = 4.88 Kg Panjang = 2.00 m
Panjang = 6.38 m Panjang = 0.85 m Lebar = 0.12 m
Lebar = 0.75 m Lebar = 0.25 m Sisi = 20.86 x 1.00 Tinggi = 0.25 m
Tinggi = 0.70 m Sisi = 2.00 bh = 20.86 Kg J4mlah = 2.00
V1 = 2.00 x 0.12 x 0.25 x 2.00
V = 6.38 x 0.75 x 0.70 V = 0.85 x 0.25 x 2.00 = 0.12 M3
Volume BESI HELLOW 9.60 M Panjang Besi 26.40
= 3.35 M3 = 0.43 M2
Volume Pek. Sloof Beton Bertulang 12/20 31.91 Kg
Panjang = 1.56 m

Panjang = 6.38 m Pilar #REF! Lebar = 0.12 m


La = 0.25 m Panjang = 2.60 m Pokok segmen 1 Tinggi = 0.25 m
Lb = 0.75 m Lebar = 0.19 m Panjang = 2.00 m J4mlah = 2.00
L Rata2 = 0.50 m Sisi = 2.00 bh Koef Besi 10 = 0.617 m V1 = 1.56 x 0.12 x 0.25 x 2.00
Tinggi = 2.00 m Jumlah = 4.00 m = 0.09 M3
V = 2.60 x 0.19 x 2.00
V = 6.38 x 0.50 x 2.00 = 0.98 M2 V1 = 2.00 x 0.62 x 4.00
= 6.38 M3 Jumlah = 3 Pilar = 4.93 Kg
= 2.93 Begel
Type 2 Pilar Panjang = 0.50 m
Panjang = 5.59 m Panjang = 0.43 m Koef Besi 6 = 0.222 m
Lebar = 0.40 m Lebar = 0.20 m Jumlah = 13.33 m
Tinggi = 0.20 m Sisi = 2.00 bh
V1 = 0.50 x 0.22 x 13.33
V = 5.59 x 0.40 x 0.20 V = 0.43 x 0.20 x 2.00 = 1.48 Kg
= 0.45 M3 = 0.17 M2
Jumlah = 3 Pilar Sisi = 6.41 x 4.00
Panjang = 5.59 m = 0.51 = 25.65 Kg Lebar besi 0.16
La = 0.25 m Pilar
Lb = 0.40 m Panjang = 0.15 m
L Rata2 = 0.33 m Lebar = 0.30 m
Volume #REF! 25.65 Kg
Tinggi = 0.30 m Sisi = 2.00 bh

Volume #REF! 0.12 M3


V = 5.59 x 0.33 x 0.30 V = 0.15 x 0.30 x 2.00 #REF!
= 0.55 M3 = 0.09 M2 Pokok segmen 1
Jumlah = 3 Pilar Panjang = 6.48 m #REF!
Type 3 = 0.27 Koef Besi 10 = 0.617 m
Panjang = 0.75 m Volume #REF! 34.52 M2 Jumlah = 4.00 m Panjang = 6.48 m
La = 0.30 m Lebar = 0.12 m
Lb = 0.60 m V1 = 6.48 x 0.62 x 4.00 Tinggi = 0.12 m
L Rata2 = 0.45 m #REF! = 15.98 Kg J4mlah = 1.00
Tinggi = 0.60 m Begel V1 = 6.48 x 0.12 x 0.12 x 1.00
Sisi = 2.00 Sisi Samping Panjang = 0.50 m = 0.09 M3
V = 0.75 x 0.45 x 0.60 x 2.00 Panjang = 1.50 m Koef Besi 6 = 0.222 m
= 0.41 M3 Lebar = 0.35 m Jumlah = 44.00 m
Type 4 Sisi = 2.00 bh
Panjang = 5.59 m V1 = 0.50 x 0.22 x 44.00
L Rata2 = 0.50 m V = 1.50 x 0.35 x 2.00 = 4.88 Kg
Tinggi = 0.25 m = 1.05 M2
Volume #REF! 1.05 M2 Sisi = 20.86 x 1.00
Volume Pengecatan Pagar Besi Hollow 4.22
V = 5.59 x 0.50 x 0.25 = 20.86 Kg
= 0.70 M3 type 4

Volume #REF! 20.86 Kg


Panjang = 2.00 m 15.31 M
Volume PASANGAN BATU 11.83 M3
Lebar = 2.00 m
Pilar
PAS. BATU KOSONG Pokok segmen 1 V1 = 2.00 x 2.00
Panjang = 3.50 m = 4.00 M
Koef Besi 10 = 0.617 m
Panjang = 6.38 m Jumlah = 4.00 m Segmen = 2.00
Lebar = 0.60 m Volume = 8.00 m
Tinggi = 0.15 m V1 = 3.50 x 0.62 x 4.00
= 8.63 Kg
V = 6.38 x 0.60 x 0.15
= 0.57 M3

Panjang = 5.59 m
Volume #REF! 0.09 M3
Lebar = 0.40 m
Tinggi = 0.15 m

V = 5.59 x 0.40 x 0.15 pilar


= 0.34 M3 Sisi = 8.63 x 3.00
= 25.89 Kg Panjang = 0.19 m
Panjang = 0.75 m Lebar = 0.12 m
Lebar = 0.60 m Tinggi = 2.90 m
Tinggi = 0.15 m J4mlah = 3.00
Volume Pilar 25.89 Kg
V1 = 0.19 x 0.12 x 2.90 x 3.00
V = 0.75 x 0.60 x 0.15 = 0.20 M3
= 0.07 M3
Volume Total Pembesian 104.31 Kg
Panjang = 0.75 m
Lebar = 0.60 m
Tinggi = 0.15 m

V = 0.75 x 0.60 x 0.15


= 0.07 M3

Volume PAS. BATU KOSONG 1.04 M3

URUGAN PASIR

Panjang = 6.38 m
Lebar = 0.60 m
Tinggi = 0.05 m

V = 6.38 x 0.60 x 0.05


= 0.19 M3

Panjang = 5.59 m
Volume pilar 0.20 M3
Lebar = 0.40 m
Tinggi = 0.05 m

V = 5.59 x 0.40 x 0.05


= 0.11 M3

Panjang = 0.75 m
Lebar = 0.60 m
Tinggi = 0.05 m

V = 0.75 x 0.60 x 0.05


= 0.02 M3

Panjang = 0.75 m
Lebar = 0.60 m
Tinggi = 0.05 m

V = 0.75 x 0.60 x 0.05


= 0.02 M3

Volume URUGAN PASIR 0.35 M3

#REF!

Panjang = 5.79 m
Lebar = 0.40 m
Tinggi = 0.20 m

V = 5.79 x 0.40 x 0.20


= 0.46 M3

0.00 M
Volume #REF! 0.46 M3

#REF!

Panjang = 5.79 m
Lebar = 0.45 m
Tinggi = 0.10 m
0.00 M
V = 5.79 x 0.45 x 0.10
= 0.26 M3

Volume #REF! 0.26 M3

0.00 M
ENGINEER ESTIMATE (EE)
PEKERJAAN AKHIR

Pengecatan Pagar Besi Hollow

M
PEMBESIAN PEMBESIAN PEMBESIAN PEMBESIAN PEMBESIAN PEMBESIAN

SLOOF 12/20 KOLOM 12/12 KOLOM 12/25 KOLOM 25/66 Beton 50/50 RingBalk

Pokok segmen 1 Pokok segmen 1 Pokok segmen 1 Pokok segmen 1 Pokok segmen 1 Pokok segmen 1
Panjang = 119.35 m Panjang = 1.61 m Panjang = 1.61 m Panjang = 1.61 m Panjang = 2.60 m Panjang = 1.20 m
Koef Besi 10 = 0.617 m Koef Besi 8 = 0.395 m Koef Besi 8 = 0.395 m Koef Besi 12 = 0.888 m Koef Besi 12 = 0.888 m Koef Besi 8 = 0.395 m
Jumlah = 4.00 m Jumlah = 4.00 m Jumlah = 6.00 m Jumlah = 12.00 m Jumlah = 12.00 m Jumlah = 4.00 m

V1 = 119.35 x 0.62 x 4.00 V1 = 1.61 x 0.39 x 4.00 V1 = 1.61 x 0.39 x 6.00 V1 = 1.61 x 0.89 x 12.00 V1 = 2.60 x 0.89 x 12.00 V1 = 1.20 x 0.39 x 4.00
= 294.32 Kg = 2.54 Kg = 3.81 Kg = 17.15 Kg = 27.70 Kg = 1.89 Kg
Begel Begel Begel Begel Begel Begel
Panjang = 0.44 m Panjang = 0.38 m Panjang = 0.66 m Panjang = 1.76 m Panjang = 1.80 m Panjang = 1.80 m
Koef Besi 6 = 0.222 m Koef Besi 6 = 0.222 m Koef Besi 6 = 0.222 m Koef Besi 6 = 0.222 m Koef Besi 8 = 0.395 m Koef Besi 6 = 0.222 m
Jumlah = 796.00 m Jumlah = 11.00 m Jumlah = 11.00 m Jumlah = 11.00 m Jumlah = 17.00 m Jumlah = 7.00 m

V1 = 0.44 x 0.22 x 796.00 V1 = 0.38 x 0.22 x 11.00 V1 = 0.66 x 0.22 x 11.00 V1 = 1.76 x 0.22 x 11.00 V1 = 1.80 x 0.39 x 17.00 V1 = 1.80 x 0.22 x 7.00
= 77.73 Kg = 0.93 Kg = 1.61 Kg = 4.30 Kg = 12.07 Kg = 2.80 Kg

Jumlah = 2.00 Tiang Jumlah = 2.00 Tiang Jumlah = 25.00 Tiang Total = 39.77 Total = 4.69
Segmen = 2.00 Segmen Segmen = 2.00 Segmen = 536.21 M3 Jumlah = 4.00 Tiang Jumlah = 4.00 Tiang
= 13.87 M3 = 21.69 M3 Segmen = 0.00 Segmen Segmen = 2.00 Segmen
= 159.09 M3 = 37.52 M3

#REF! #REF! #REF!


Volume segmen 1 372.05 Kg Volume KOLOM 12/12 13.87 Kg Volume KOLOM 12/25 21.69 Kg Volume KOLOM 25/66 536.21 Kg Volume Beton 50/50 159.09 Kg Volume RingBalk 37.52 Kg
0.21 #REF! #REF! #REF!
### #REF!

Volume Total 1140.43 Kg


GAMBAR

P as. Batu
C or Beton
P lesteran

Siaran
30 cm 200 cm 30 cm
C oporan
10 cm
31 cm 30 cm
20 cm

50 cm

36 cm
80 cm 80 cm

P as. Batu U rugan T anah A sli


C or Beton
P lesteran U rugan T anah T imbunan
Siaran 30 cm 200 cm 30 cm

10 cm

20 cm

102 cm
100 cm

70 cm

80 cm

50 cm
80 cm 80 cm

JALAN RABAT BETON

Rabat
P L T J V
141.00 2.00 0.20 1.00 56.40 m3

Jumlah 56.40 M3

TALUD

Galian Tanah

STA 0-1 0-6 m


L T Ls1
0.80 0.50 0.40 M2

L T Ls2
0.80 0.80 0.64 M2
Ls1 Ls2 Lsr P J
0.40 0.64 0.52 6.00 2.00
Volume = 6.24 M3

STA 1-2 6 - 85 m
L T Ls1
0.80 0.80 0.64 M2

L T Ls2
0.80 0.80 0.64 M2

Ls1 Ls2 Lsr P J


0.64 0.64 0.64 80.15 2.00
Volume = 102.592 M3

STA 3 - 4 91 - 110 m
L T Ls1
0.80 0.80 0.64 M2

L T Ls2
0.80 0.80 0.64 M2

Ls1 Ls2 Lsr P J


0.64 0.64 0.64 20.15 2.00
Volume = 25.792 M3

STA 4 - 5 110 - 140 m


L T Ls1
0.80 0.80 0.64 M2

L T Ls2
0.80 0.80 0.64 M2

Ls1 Ls2 Lsr P J


0.64 0.64 0.64 30.00 2.00
Volume = 38.4 M3

STA 5 - 6 140 - 147 m


L T Ls1
0.80 0.80 0.64 M2

L T Ls2
0.80 0.50 0.40 M2

Ls1 Ls2 Lsr P J


0.64 0.40 0.52 7.00 2.00
Volume = 7.28 M3

Jumlah = 180.304 M3

Pas Coporan
STA 0-1 0-6 m
L T Ls1
0.80 0.50 0.40 M2

L T Ls2
0.80 0.80 0.64 M2

Ls1 Ls2 Lsr P J


0.40 0.64 0.52 6.00 2.00
Volume = 6.24 M3

STA 1-2 6 - 85 m
L T Ls1
0.80 0.80 0.64 M2

L T Ls2
0.80 0.80 0.64 M2

Ls1 Ls2 Lsr P J


0.64 0.64 0.64 80.15 2.00
Volume = 102.592 M3

STA 3 - 4 91- 110 m


L T Ls1
0.80 0.80 0.64 M2

L T Ls2
0.80 0.80 0.64 M2

Ls1 Ls2 Lsr P J


0.64 0.64 0.64 20.15 2.00
Volume = 25.792 M3

STA 4 - 5 110 - 140 m


L T Ls1
0.80 0.80 0.64 M2

L T Ls2
0.80 0.80 0.64 M2

Ls1 Ls2 Lsr P J


0.64 0.64 0.64 30.00 2.00
Volume = 38.4 M3

STA 5 - 6 140 - 147 m


L T Ls1
0.80 0.80 0.64 M2

L T Ls2
0.80 0.50 0.40 M2

Ls1 Ls2 Lsr P J


0.64 0.40 0.52 7.00 2.00
Volume = 7.28 M3

Jumlah = 180.304 M3
Pas Dinding Talud

STA 0-1 0 -6 m

La Lb Lr
0.30 0.36 0.33

Lr T Ls1
0.33 0.30 0.10

La Lb Lr
0.30 0.5 0.4

Lr T Ls2
0.40 1.00 0.40

Volume = Ls1 Ls2 Lsr P J


0.10 0.4 0.25 6.00 2.00
= 2.99 M3

STA 1-2 6 -85 m

La Lb Lr
0.30 0.5 0.4

Lr T Ls1
0.4 1.00 0.4

La Lb Lr
0.30 0.6 0.45

Lr T Ls2
0.45 1.50 0.675

Volume = Ls1 Ls2 Lsr P J


0.4 0.675 0.538 80.15 2.00
= 86.16 M3

STA 3 - 4 91-110 m

La Lb Lr
0.30 0.6 0.45

Lr T Ls1
0.45 1.5 0.68

La Lb Lr
0.30 0.5 0.40

Lr T Ls2
0.40 1.00 0.40

Volume = Ls1 Ls2 Lsr P J


0.68 0.40 0.54 20.15 2.00
= 10.83 M3

STA 4 -5 110-140 m

La Lb Lr
0.30 0.5 0.4

Lr T Ls1
0.4 1.00 0.4

La Lb Lr
0.30 0.5 0.4

Lr T Ls2
0.4 1.00 0.40

Volume = Ls1 Ls2 Lsr P J


0.4 0.4 0.40 30 2.00
= 24.00 M3

STA 5 - 6 140-147 m

La Lb Lr
0.30 0.5 0.4

Lr T Ls1
0.4 1.00 0.4

La Lb Lr
0.30 0.36 0.33

Lr T Ls2
0.33 0.30 0.10

Volume = Ls1 Ls2 Lsr P J


0.4 0.10 0.25 7.00 2.00
= 3.49 M3

Jumlah = 127.479 M3
Jumlah Total Pas. Talud = 307.783 M3

Plesteran
P L J Ls
143.3 0.40 2 114.64 M2

Siaran
T0 T1 T2 T3 T4 T5 T6
0.31 1.02 1.53 1.53 1.020 1.02 0.310
Tr = 0.96 m

Tr P J Ls
0.963 143.3 2.00 275.95 M2

Urugan Tanah Timbunan


STA 0-1 0-6 m
1/2 a x t
1/2 0.7 x 6
2.1 M2

Volume Ls P
2.1 2.00
4.2 M3

STA 1-2 6-85 m


T1 T2 Tr L Ls
0.7 1.2 0.95 79 75.05

Volume Ls P
75.05 2.00
150.1 M3

STA 3 - 4 91 -110 m
T1 T2 Tr L Ls
1.2 0.7 0.95 19 18.05

Volume Ls P
18.05 2.00
36.1 M3

STA 4 - 5 110-140 m
T1 T2 Tr L Ls
0.7 0.7 0.7 30 21

Volume Ls P
21 2.00
42 M3

STA 5 - 6 140-147 m
1/2 a x t
1/2 0.7 x 7
2.45 M2

Volume Ls P
2.45 2.00
4.9 M3

Jumlah = 237.3 M3
ANALISA HARGA UPAH DAN BAHAN

1 1 M2 Pengukuran dan Pemasangan Bouwplank


0.100 Org Pekerja Rp. 50,000.00 = Rp. 5,000.00
0.005 Org Mandor Rp. 0.00 = Rp. 0.00
0.100 Org Tukang Rp. 60,000.00 = Rp. 6,000.00
0.010 Org Kepala Tukang Rp. 70,000.00 = Rp. 700.00
0.012 M3 Kayu 5/7 Rp. 1,400,000.00 = Rp. 16,800.00
0.020 Kg Paku Biasa 2" - 5" Rp. 30,888.00 = Rp. 617.76
0.007 M3 Kayu Papan 3/20 Rp. 1,400,000.00 = Rp. 9,800.00
Rp. 38,917.76

2 1 m3 Galian Tanah Biasa sedalam 1 meter


0.400 Org/ Hr Pekerja Rp. 50,000.00 = Rp. 20,000.00
0.040 Org/ Hr Mandor Rp. 0.00 = Rp. 0.00
Rp. 20,000.00

3 1 m3 Urugan Tanah
0.300 Org/ Hr Pekerja Rp. 50,000.00 = Rp. 15,000.00
0.010 Org/ Hr Mandor Rp. 0.00 = Rp. 0.00
1.200 m3 Tanah Urug Rp. 100,000.00 = Rp. 120,000.00
Rp. 135,000.00

4 1 M3 Pasangan Batu Kali / Belah Camp. 1 : 4


1.500 Org Pekerja Rp. 50,000.00 = Rp. 75,000.00
0.075 Org Mandor Rp. 0.00 = Rp. 0.00
0.600 Org Tukang Rp. 60,000.00 = Rp. 36,000.00
0.060 Org Kepala Tukang Rp. 70,000.00 = Rp. 4,200.00
1.100 M3 Batu Kali / Belah Rp. 180,000.00 = Rp. 198,000.00
3.260 Zak Semen Portland Rp. 120,000.00 = Rp. 391,200.00
0.520 M3 Pasir Pasang Rp. 180,000.00 = Rp. 93,600.00
Rp. 798,000.00

5 1 m2 Plesteran Tebal 15 mm, Camp. 1 : 2


0.200 Org Pekerja Rp. 50,000.00 = Rp. 10,000.00
0.010 Org Mandor Rp. 0.00 = Rp. 0.00
0.150 Org Tukang Batu Rp. 60,000.00 = Rp. 9,000.00
0.015 Org Kepala Tukang Rp. 70,000.00 = Rp. 1,050.00
0.170 Zak Semen Portland Rp. 120,000.00 = Rp. 20,448.00
0.017 m3 Pasir Pasang Rp. 180,000.00 = Rp. 3,060.00
Rp. 43,558.00

6 1 m2 Siaran Tebal 15 mm, Camp. 1 : 2


0.200 Org Pekerja Rp. 50,000.00 = Rp. 10,000.00
0.010 Org Mandor Rp. 0.00 = Rp. 0.00
0.150 Org Tukang Batu Rp. 60,000.00 = Rp. 9,000.00
0.015 Org Kepala Tukang Rp. 70,000.00 = Rp. 1,050.00
0.170 Zak Semen Portland Rp. 120,000.00 = Rp. 20,448.00
0.017 m3 Pasir Pasang Rp. 180,000.00 = Rp. 3,060.00
Rp. 43,558.00

7 1 m3 Membuat Beton Tumbuk, 1 Pc : 3 Psr : 5 Krkl


1.650 Org Pekerja Rp. 50,000.00 = Rp. 82,500.00
0.080 Org Mandor Rp. 0.00 = Rp. 0.00
0.250 Org Tukang Batu Rp. 60,000.00 = Rp. 15,000.00
0.025 Org Kepala Tukang Rp. 70,000.00 = Rp. 1,750.00
4.360 Zak Semen Portland Rp. 120,000.00 = Rp. 523,200.00
0.520 m3 Pasir Beton Rp. 180,000.00 = Rp. 93,600.00
0.8700 m3 Kerikil Beton Rp. 180,000.00 = Rp. 156,600.00
Rp. 872,650.00
ENGINEER ESTIMATE (EE)
DAFTAR KUANTITAS DAN HARGA

Pekerjaan Pembuatan Tanggul dan jalan Rabat beton


Lokasi Lembanato
Tahun Anggaran 2016

No. Uraian Pekerjaan Volume Harga Satuan Jumlah

1 2 3 4 5
I PEKERJAAN PENDAHULUAN
1 Pemasangan Papan Proyek 1.00 Ls Rp 150,000.00 Rp 150,000.00
2 Pembersihan Lapangan Dan Peralatan 1.00 Ls Rp 600,000.00 Rp 600,000.00
3 Pengukuran Dan pemasangan Bouwplank 1.00 Ls Rp 600,000.00 Rp 600,000.00
Sub Total 1 Rp 1,350,000.00
II PEKERJAAN TANAH ###
1 Pek. Galian Tanah Pondasi 180.30 M³ Rp 20,000.00 Rp 3,606,080.00
2 Pek. Urugan Tanah 237.30 M³ Rp 135,000.00 Rp 32,035,500.00
Sub Total 2 Rp 35,641,580.00
III PEK. PASANGAN Demobilisasi
1 Pek. Pasangan Batu 1 : 4 307.78 M³ Rp 798,000.00 Rp 245,610,734.25
2 Pek. Plesteran Camp 1 : 2 114.64 M2 Rp 43,558.00 Rp 4,993,489.12
3 Pek. Siaran 1 : 2 275.95 M2 Rp 43,558.00 Rp 12,020,041.67
Sub Total 3 Rp 262,624,265.04
IV PEKERJAAN BETON
1 Pek. Pondasi Cor Latai Beton 56.40 M³ Rp 872,650.00 Rp 49,217,460.00
Sub Total 4 Rp 49,217,460.00
V PEKERJAAN AKHIR ###
1 Pekerjaan Prasasti 1.00 Ls Rp 750,000.00 Rp 750,000.00
2 Pembersihan Akhir 1.00 Ls Rp 500,000.00 Rp 500,000.00
Sub Total 5 Rp 1,250,000.00
Sub Total 6 Rp 350,083,305.04
###
REKAPITULASI

Pekerjaan Pembuatan Tanggul dan jalan Rabat beton


Lokasi Lembanato
Tahun Anggaran 2016

JUMLAH HARGA
No. URAIAN
(Rp)

A Pembuatan Tanggul dan jalan Rabat beton


1 PEKERJAAN PENDAHULUAN Rp 1,350,000.00

2 PEKERJAAN TANAH Rp 35,641,580.00

3 PEK. PASANGAN Rp 262,624,265.04

4 PEKERJAAN BETON Rp 49,217,460.00

5 PEKERJAAN AKHIR Rp 1,250,000.00

JUMLAH Rp 350,083,305.04

TERBILANG : ###

Ampana, Februari 2016

Di Periksa Oleh Dibuat


Pendamping Desa Kec.Togean Tenaga Teknis

FAHMI BADJEBER,ST WAHYUDI NUSI


PD
Disetujui Oleh,
Aparatur Desa

SAHRIL L BURA
Kepala Desa
ENGINEER ESTIMATE (EE) ###

HARGA SATUAN BAHAN & UPAH


###

Pekerjaan Pembuatan Tanggul dan jalan Rabat beton


Lokasi Lembanato
Tahun Anggaran ###

No. Jenis Upah / Bahan Satuan Harga Satuan Keterangan

1 2 3 4 5

I. UPAH KERJA
1 Pekerja orang/hari Rp 50,000.00
2 Mandor orang/hari Rp -
3 Tukang Batu/Kayu/Besi/Cat/Listrik orang/hari Rp 60,000.00
4 Kepala Tukang orang/hari Rp 70,000.00

II. BAHAN-BAHAN
1 Batu Kali/Batu Gunung m³ Rp 180,000.00 ###
2 Kerikil m³ Rp 180,000.00
3 Pasir Pasang m³ Rp 180,000.00
4 Pasir Cor m³ Rp 180,000.00
5 Pasir Urug m³ Rp 180,000.00
6 Tanah Timbunan m³ Rp 100,000.00
7 Pasir Plesteran m³ Rp 180,000.00
8 Batu Bata bh Rp 1,825.00
9 Kapur kg Rp 67,500.00 ###
10 Semen / PC. kg Rp 120,000.00 ###
11 Semen Warna kg Rp 30,063.00 ###
12 Kayu Klas I m³ Rp 3,088,750.00
13 Kayu Klas II m³ Rp 2,000,000.00 ###
14 Kayu Kelas III Campuran m³ Rp 1,400,000.00 ###
15 Triplek 3mm lbr Rp 74,175.00
16 Besi Beton SNI Dia. 6 kg Rp 53,425.00 ###
17 Besi Beton SNI Dia. 12 kg Rp 143,775.00
18 Besi Beton SNI Dia. 16 kg Rp 258,525.00
19 Besi Beton SNI Dia. 10 kg Rp 104,425.00
20 Bendrat kg Rp 38,475.00 ###
21 Paku Biasa kg Rp 30,888.00 ###
22 Paku Triplek kg Rp 34,075.00 ###
23 Paku Seng kg Rp 40,450.00 ###
24 Cat Tembok I kg Rp 161,575.00
25 Cat Tembok II kg Rp 46,825.00
26 Cat Genteng kg Rp 35,669.00
27 Minyak Cat kg Rp 45,000.00
28 Kayu Dolken Btg Rp 15,000.00
29 many Kayu Rp 43,638.00
30 Pipa PVC Dia. 3" Btg Rp 129,925.00

###
Dibuat
Tenaga Teknis

WAHYUDI NUSI