Case
Case
Elemen -
1. Manufacturing Cost
a. Prod.-A ($/Unit) 25
b. Prod.-B ($/Unit) 10
2. Komposisi
a. Prod.-A
Material 60% ($/Unit) 15.00 -
Labor 25% ($/Unit) 6.25 -
Utilities 15% ($/Unit) 3.75 -
Total -
b. Prod.-B
Material 50% ($/Unit) 5.00 -
Labor 30% ($/Unit) 3.00 -
Utilities 20% ($/Unit) 2.00 -
Total -
Grand Total -
4. Rencana Harga Jual
a. Prod.-A ($/Unit) 40
b. Prod.-B ($/Unit) 22
3. Komisi Jasa Distributor
a. Prod.-A 10% ($/Unit) 4.00 -
b. Prod.-B 10% ($/Unit) 2.20 -
Total -
4. Advertensi
a. Prod.-A 5% ($/Unit) 2.00 -
b. Prod.-B 5% ($/Unit) 1.10 -
Total -
Advertensi Perseroan 60% ($/Unit) -
Advertensi Distributor 40% ($/Unit) -
5. Factory Overhead Cost ($/Unit) -
6. Biaya Umum di Luar Pabrik ($/Unit) -
7. Tunjangan Akhir Tahun 1 bulan -
1 2 3 4 5 6 7 8
Tahun
1 2 3 4
Uraian
1. Kapasitas Produksi
a. Prod.-A 50,000 50,000 50,000 50,000
b. Prod.-B 100,000 100,000 100,000 100,000
2. Hari Kerja 300 300 300 300
3. Pentahapan Kapasitas 60% 75% 90% 90%
4. Persediaan Awal
a. Prod.-A - 1,400 1,750 2,100
b. Prod.-B - 2,800 3,500 4,200
5. Rencana Produksi (unit)
a. Prod.-A 30,000 37,500 45,000 45,000
b. Prod.-B 60,000 75,000 90,000 90,000
6. Persediaan Akhir (unit 14 hari
a. Prod.-A 1,400 1,750 2,100 2,100
b. Prod.-B 2,800 3,500 4,200 4,200
7. Rencana Penjualan
a. Prod.-A 28,600 37,150 44,650 45,000
b. Prod.-B 57,200 74,300 89,300 90,000
8. Rencana Harga Jual
a. Prod.-A 40 40 40 40
b. Prod.-B 22 22 22 22
9. Nilai Persediaan Awal
a. Prod.-A - 56,000 70,000 84,000
b. Prod.-B - 61,600 77,000 92,400
Jumlah - 117,600 147,000 176,400
10. Nilai Penjualan
a. Prod.-A 1,144,000 1,486,000 1,786,000 1,800,000
b. Prod.-B 1,258,400 1,634,600 1,964,600 1,980,000
Jumlah 2,402,400 3,120,600 3,750,600 3,780,000
11. Nilai Persediaan Akhir ($)
a. Prod.-A 21,000 26,250 31,500 31,500
b. Prod.-B 14,000 17,500 21,000 21,000
Jumlah 35,000 43,750 52,500 52,500
12. Pembelian Bahan Baku
a. Prod.-A 15 ($/Unit) 450,000 562,500 675,000 675,000
b. Prod.-B 5 ($/Unit) 300,000 378,500 453,500 450,000
Jumlah 750,000 941,000 1,128,500 1,125,000
Biaya Bahan Baku
a. Prod.-A ($/Unit) 450,000 562,500 675,000 675,000
b. Prod.-B ($/Unit) 300,000 375,000 450,000 450,000
Jumlah 750,000 937,500 1,125,000 1,125,000
Persediaan Bahan Baku Akhir (S) 0 3,500 3,500 0
Tahun
5 6 7 8
40 40 40 40
22 22 22 22
1 2 3 4 5 6
Bahan Baku:
Persediaan Bahan Baku Awal - 35,000 43,750 52,500 52,500 52,500
Pembelian
Prod.-A 15.00 ($/Unit) 450,000 562,500 675,000 675,000 675,000 675,000
Prod.-B 5.00 ($/Unit) 300,000 378,500 453,500 450,000 450,000 450,000
Jumlah Persediaan Bahan Baku Awal 750,000 976,000 1,172,250 1,177,500 1,177,500 1,177,500
Persediaan Bahan Baku Akhir 35,000 43,750 52,500 52,500 52,500 52,500
Overhead Pabrik
Utilities
Prod.-A 3.75 ($/Unit) 112,500 140,625 168,750 168,750 168,750 168,750
Prod.-B 2.00 ($/Unit) 120,000 150,000 180,000 180,000 180,000 180,000
Penyusutan 123,500 123,500 123,500 123,500 123,500 107,500
Biaya Tak Langsung di Pabrik 120,000 120,000 120,000 120,000 120,000 120,000
Jumlah Overhead Pabrik 476,000 534,125 592,250 592,250 592,250 576,250
52,500 52,500
675,000 675,000
450,000 450,000
1,177,500 1,177,500
52,500 52,500
1,125,000 1,125,000
281,250 281,250
270,000 270,000
551,250 551,250
168,750 168,750
180,000 180,000
107,500 107,500
120,000 120,000
576,250 576,250
2,252,500 2,252,500
Rencana Jadwal Investasi
87,500 50,000
35.00% 20.00%
6.73% 3.85%
32,000 16,000
40.00% 20.00%
2.46% 1.23%
120,000 60,000
40.00% 20.00%
9.23% 4.62%
168,000 84,000
40.00% 20.00%
12.92% 6.46%
407,500 210,000
31% 16%
31.35% 16.15%
1,090,000 1,300,000
83.85% 100.00%
83.85% 100.00%
Rencana Modal Kerja Awal Rencana Penarikan K
Jumlah Uraian
Uraian
(Rp.'000)
1. Rencana Modal Kerja
A. Aktiva Lancar 2. Rencana Penarikan K
1. Piutang Dagang 14 hari 112,112 3. Saldo Awal KMK
2. Panjar Pembelian Material 14 hari 35,000 4. Rencana Pencicilan K
3. Persediaan Produk Jadi 7 hari 56,056 5. Total Bunga
4. Spare Part Mesin & Peralatan 2.50% 10,500 6. Bunga Dikapitalisir
5. Cadangan Kas Minimum (5% dari 1 s/d 4) 10,683 7. Bunga Dibayar
Jumlah Aktiva Lancar 224,351 8. Saldo Akhir KMK
B. PASSIVA LANCAR
1. Hutang Dagang 7.00 hari 25,258
2. Hutang Lain-Lain -
Jumlah Passiva Lancar 25,258
No. Uraian 0 1 2 3
1. Total Penjualan Bersih - 2,402,400 3,120,600 3,750,600
a. Prod.-A - 1,144,000 1,486,000 1,786,000
b. Prod.-B - 1,258,400 1,634,600 1,964,600
2. Harga Pokok Penjualan
a. Material - 715,000 932,250 1,119,750
b. Labor - 367,500 459,375 551,250
c. Utilitas - 232,500 290,625 348,750
d. Penyusutan - 123,500 123,500 123,500
e. Biaya Tak Langsung di Pabrik - 120,000 120,000 120,000
Jumlah - 1,558,500 1,925,750 2,263,250
Laba (rugi) Kotor 843,900 1,194,850 1,487,350
3. Biaya - biaya di Luar Pabrik
- Biaya Umum - 150,000 150,000 150,000
- Tunjangan Karyawan 30,625 38,281 45,938
- Biaya Advertensi 5% - 72,072 93,618 112,518
Total Biaya diluar Pabrik 252,697 281,899 308,456
4. Laba (rugi) Usaha - 591,203 912,951 1,178,895
5. Biaya Bank
a. Bunga KI 87,444 154,493 154,493 142,906
b. Bunga KMK - - - -
c. Profisi Bank 0,5% x Kredit 6,000 - - -
Jumlah Biaya Bank 93,444 154,493 154,493 142,906
LABA (RUGI) SEBELUM PPh (93,444) 436,710 758,458 1,035,988
6. Pajak Penghasilan 25% - 109,177 189,614 258,997
7. Laba Bersih (93,444) 327,532 568,843 776,991
4 5 6 7 8
3,780,000 3,780,000 3,780,000 3,780,000 3,780,000
1,800,000 1,800,000 1,800,000 1,800,000 1,800,000
1,980,000 1,980,000 1,980,000 1,980,000 1,980,000
Uraian 0 1 2
A. Saldo Kas Awal - 194,000 607,098
B. Kas Masuk
1. Penjualan - 2,290,288 2,974,972
Penerimaan Piutang Dagang - 112,112
2. Kredit Bank 1,200,000 - -
3. Setoran Pesero 300,000 - -
4. Kontribusi Distributor
5. Penjualan Asset - - -
6. Lain - lain - - -
Total Kas Masuk 1,500,000 2,290,288 3,087,084
Total Kas Awal dan Kas Masuk 1,500,000 2,484,288 3,694,182
C. Kas Keluar
1. Biaya Masa Konstruksi (Pra Operasi)
- Studi Kelayakan, desain, dan Perizinan 100,000 - -
- Pengadaan Lahan 150,000 - -
- Bangunan 250,000 - -
- Mesin - mesin Pengolahan 420,000 - -
- Pembangkit Listrik 300,000 - -
- Furniture, Office Equipment 80,000 - -
2. Biaya di Kantor Pusat
- Gaji/Upah, Listrik, Air, dll di Kantor Pusat - 150,000 150,000
- Bunga Kredit 6,000 154,493 154,493
- Cicilan Kredit - - 96,558
- Pelunasan Pajak - - 109,177
- Biaya Advertensi - 72,072 93,618
- Modal Kerja (Cadangan Bahan Baku)
4 Biaya - biaya di Pabrik -
- Material - 750,000 941,000
- Tenaga Kerja - 367,500 459,375
- Utilitas - 232,500 290,625
- Biaya Tak Langsung - 120,000 120,000
- Tunjangan Akhir Tahun Karyawan - 30,625 38,281
5 Total Kas Keluar 1,306,000 1,877,190 2,453,128
6 Saldo 194,000 607,098 1,241,054
3 4 5 6 7 8
1,241,054 2,044,033 2,820,939 3,544,477 4,290,224 5,198,695
- - - - - -
- - - - - -
3,721,200 3,778,628 3,780,000 3,780,000 3,780,000 3,780,000
4,962,254 5,822,661 6,600,939 7,324,477 8,070,224 8,978,695
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
Uraian 0 1
A. Aktiva
1. Aktiva Lancar
a. Bank 194,000 607,098
b. Persediaan - 35,000
c. Piutang Usaha - 112,112
Total Aktiva Lancar 194,000 754,210
2. Aktiva Tetap
a. Lahan 150,000 150,000
b. Bangunan 250,000 250,000
Penyusutan - 12,500
c. Pembangkit Listrik 300,000 300,000
Penyusutan - 30,000
d. Mesin - mesin 420,000 420,000
Penyusutan - 52,500
e. Furniture 80,000 80,000
Penyusutan - 16,000
f. Studi Kelayakan, Desain, Perizinan 100,000 100,000
Penyusutan - 12,500
Total Aktiva Tetap 1,300,000 1,176,500
Total Aktiva 1,494,000 1,930,710
B. Passiva
1. Hutang - hutang
a. Hutang Jangka Pendek
PPh Terhutang - 109,177
b. Hutang Jangka Panjang
Hutang KI & IDC 1,287,444 1,287,444
Jumlah Hutang 1,287,444 1,396,621
2. Modal
a. Modal Disetor/Equity 300,000 300,000
b. Laba Ditahan - (93,444)
c. Laba Periode Berjalan (93,444) 327,532
Jumlah Modal 206,556 534,089
Total Passiva 1,494,000 1,930,710
ballance - -
2 3 4 5 6 7 8
- - - - - - -
V. WACC
Asumsi
We Ekuitas 20%
Wd Debt 80%
Interest Rate 12%
Rf Risk free rate 20.4%
Specific Risk 2.0%
Tax Rate 15%
Rp Risk Premium 8.60%
Kalkulasi
D/E 400%
β Beta 1.72
Ce Cost of Equity 37.19%
Cd Cost of Debt 12%
WACC 16% Df
Uraian 0 1 2 3
1. Laba Bersih Stlh Pajak (Rp.'000) (93,444) 327,532 568,843 776,991
2. Penyusutan & Amortis (Rp.'000) - 123,500 123,500 123,500
Total Cash Proceed (Rp.'000) (93,444) 451,032 692,343 900,491
3. Cash Outlay (Rp.'000) 1,300,000 - - -
4. Increase/Dec. in NWC (Rp.'000) - 0 0 0
Total Cash Outlay (Rp.'000) 1,300,000 0 0 0
5. Net Cash Proceed (Rp.'000) (1,393,444) 451,032 692,343 900,491
6. Kum. Net Cash Procee (Rp.'000) (1,393,444) 451,032 692,343 900,491