PEKERJAAN PERSIAPAN
PEKERJAAN PELESTERAN
An 15 1.0000 m² Plesteran Batu kali 1pc : 4pc, Tebal 15mm
0.1300 Zak PC @ Rp 55,000.00 7,150.00
0.0200 m³ Pasir Pasang @ Rp 100,000.00 2,000.00
0.1500 Org Tukang Batu @ Rp 50,000.00 7,500.00
0.2000 Org Pekerja @ Rp 35,000.00 7,000.00
0.0100 Org Mandor @ Rp 75,000.00 750.00
JUMLAH ( BELUM PPN) 15,250.00 9,150.00 24,400.00