NFR = 2 lt/det
e= 0.8
NFR x Anetto
Q =
e
Maka :
NFR x Anetto
Q1 =
e
2 x 12.92
=
0.8
25.85
=
0.8
= 32.31 L/dtk
NFR x Anetto
Q2 =
e
2 x 12.92
=
0.8
25.85
=
0.8
= 32.31 L/dtk
NFR x Anetto
Q3 =
e
= 2 x 12.92
0.8
= 25.85
0.8
= 32.31 L/dtk
NFR x Anetto
Q4 =
e
2 x 12.92
=
0.8
25.84656
=
0.8
= 32.31 L/dtk
NFR x Anetto
Q5 =
e
2 x 12.92
=
0.8
25.84656
=
0.8
= 32.31 L/dtk
NFR x Anetto
Q6 =
e
2 x 12.92
=
0.8
25.84656
=
0.8
= 32.31 L/dtk
17.28 x 12.92
=
0.8 x 8.64
223.31
=
6.912
= 32.31 lt/dt
= 0.032 m3/dtk
EHS = 18.94 m
EUS = 19.86 m
20.01 - 19.09 - 0
Im =
386
Im = 0.0024
g. Kemiringan rencana (Ir)
Dipilih lebar dasar saluran yang terletak disebelah kanan dari titik plot Q
Sesuai tabel A.1.2 lebar dasar minimum yaitu : b = 0,30 m
i. Menghitung nilai F
Q
F =
Ir½
0.032
=
0.048
= 0.67
l. Menghitung Nilai n
n = b
h
= 1.49
17.28 x 25.84656
=
0.8 x 8.64
446.6286
=
6.912
= 64.62 lt/dtk
= 0.06 m3/dtk
EHS = 18.94 m
EUS = 19.860 m (Elevasi di Box T1)
20.01 - 20.07 - 0
Im =
386
Im = -0.0002
g. Kemiringan rencana (Ir)
Dari gambar grafik perencanaan untuk saluran pasangan beton talud saja dengan k = 35
Q =67.05 Lt/dtk dan Im = -0,0002. karena Im berada di bawah batas garis Vmin maka
titik Im dinaikkan, Ir = 0.00065.
Dipilih lebar dasar saluran yang terletak disebelah kanan dari titik plot Q
Sesuai tabel A.1.1 lebar dasar yaitu : b = 0,45 m
i. Menghitung nilai F
Q
F =
Ir½
0.065
=
0.014
= 4.57
l. Menghitung Nilai n
n = b
h
= 1.03
2. KUARTER A2
a. Daerah yang dialiri Anetto
A netto = Abruto x 0.9
= 14.36 x 0.9
= 12.92 Ha
NFR = 2 lt/dt = 17.28 mm/hari
dimana :
Abruto : Luasan petak kuarter bruto
3. KUARTER A3
a. Daerah yang dialiri Anetto
A netto = Abruto x 0.9
= 14.36 x 0.9
= 12.92 Ha
NFR = 2 lt/dt = 17.28 mm/hari
dimana :
Abruto : Luasan petak kuarter bruto
4. KUARTER A4
a. Daerah yang dialiri Anetto
A netto = Abruto x 0.9
= 14.36 x 0.9
= 12.92 Ha
NFR = 2 lt/dt = 17.28 mm/hari
dimana :
Abruto : Luasan petak kuarter bruto
= 17.28 x 12.92
0.8 x 8.64
= 223.31
6.912
= 32.31 lt/dt
= 0.032 m3/dtt
2. KUARTER A2
Debit Rencana (Q)
NFR x A
Q=
e x 8.64
17.28 x 12.92
=
0.8 x 8.64
223.31
=
6.912
= 32.31 lt/dt
= 0.032 m3/dtt
3. KUARTER A3
Debit Rencana (Q)
NFR x A
Q=
e x 8.64
17.28 x 12.92
=
0.8 x 8.64
223.31
=
6.912
= 32.31 lt/dt
= 0.032 m3/dtt
4. KUARTER A4
Debit Rencana (Q)
NFR x A
Q=
e x 8.64
17.28 x 12.92
=
0.8 x 8.64
223.31
=
6.912
= 32.31 lt/dt
= 0.032 m3/dtt
6. KUARTER A6
a. Daerah yang dialiri Anetto
A netto = Abruto x 0.9
= 14.36 x 0.9
= 12.92 Ha
NFR = 2 lt/dt
= 17.28 mm/hr
dimana :
Abruto : Luasan petak kuarter bruto
5. KUARTER A5
Debit Rencana (Q)
Q= NFR x A
e x 8.64
= 17.28 x 12.92
0.8 x 8.64
= 223.31
6.912
= 32.31 lt/dt
= 0.032 m3/dtt
6. KUARTER A6
Debit Rencana (Q)
Q= NFR x A
e x 8.64
= 17.28 x 12.92
0.8 x 8.64
= 223.31
6.912
= 32.31 lt/dt
= 0.032 m3/dtt
Sal Abruto Anetto NFR QR L EHS EUS MAHr MAUm ∆H1 b F h w A P R Vr Maur ∆H2 Vmin Vmax
Im Ir n Ket
kuarter Ha Ha lt/dt L/dtk m m m m m m m m m m m2 m m m/det m m m/dtk m/dtk
T1 - a1 14.36 12.92 2.00 32.31 386.00 18.94 19.86 19.09 20.01 0.00 0.0024 0.0024 0.30 0.66 0.192 0.35 1.56 0.09 0.84 0.11 0.34 20.02 0.00 0.20 0.45
T2 - a6 14.36 12.92 2.00 32.31 386.00 18.92 19.82 19.07 19.97 0.00 0.0023 0.0023 0.30 0.67 0.193 0.35 1.55 0.10 0.85 0.11 0.34 19.97 0.00 0.20 0.45
T3 - a2 14.36 12.92 2.00 32.31 386.00 18.06 18.94 18.21 19.09 0.00 0.0023 0.0023 0.30 0.68 0.195 0.35 1.54 0.10 0.85 0.11 0.34 19.09 0.00 0.20 0.45
T4 - a5 14.36 12.92 2.00 32.31 386.00 18.04 18.92 18.19 19.07 0.00 0.0023 0.0023 0.30 0.67 0.193 0.35 1.55 0.10 0.85 0.11 0.34 19.08 0.00 0.20 0.45
K1 - a3 14.36 12.92 2.00 32.31 386.00 17.16 18.06 17.31 18.21 0.00 0.0023 0.0020 0.30 0.72 0.201 0.35 1.49 0.10 0.87 0.12 0.32 18.08 0.00 0.20 0.45
K2 - a4 14.36 12.92 2.00 32.31 386.00 17.10 18.04 17.25 18.19 0.00 0.0024 0.0020 0.30 0.72 0.201 0.35 1.49 0.10 0.87 0.12 0.32 18.02 0.00 0.20 0.45
MAUm = EUS + 0,1 + 0,05 n = b/h ΔH2 = MAUr – Ir. L – ΔH1 - MAHr
F = Q / Ir1/2 R=A/P
TABEL PERHITUNGAN MUKA AIR DAN KAPASITAS RENCANA SALURAN IRIGASI DI PETAK TERSIER
SALURAN TERSIER
Nama Petak Tersier : P.T Peta 3 Kebutuhan air bersih NFR = 2.00 lt/dt/ha m = 1.00
Luas Petak Tersier : 86.16 Ha Efisiensi di petak tersier ept = 0.80 kt.pas = 35.00 m1/3/dt
Sal. Abruto Anetto M.A.Ur Sal. Abruto Anetto Qst L M.A.Hr M.A.Um ΔH1 Im Ir b F h w n A P R V IrxL ΔH1 M.A.Ur ΔH2 Ket.
Kuart. Ha Ha l/det Ters. Ha Ha l/det m m m m m \ m m m2 m m m/det m m m
1 2 2 3 4 5 2 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
a4 14.36 12.92 18.02
a5 14.36 12.92 19.08
a6 14.36 12.92 19.97
T1-T2 38.77 43.08 96.92 386.00 18.12 18.21 0.00 0.0002 0.0005 0.45 4.33 0.40 0.55 1.13 0.34 1.58 0.22 0.28 0.19 0 18.32 0.00
X Y X Y X Y
0 19.86 366 18.940 730 18.06
366 18.940 730 18.060 1104 17.16
50 19.734 466 18.698 780 17.940
X Y
366 18.940 X Y X Y X Y
730 18.060 0 19.86 386 17.872 730 18.06
666 18.215 366 18.940 730 17.699037 1104 17.16
100 19.609 516 17.807 830 17.819
X Y X Y X Y
0 19.86 386 17.872 730 18.06
366 18.940 730 17.699037 1104 17.16
150 19.483 566 17.781 880 17.699
X Y X Y X Y
0 19.86 386 17.872 730 18.06
366 18.940 730 17.699037 1104 17.16
200 19.357 616 17.756 930 17.579
X Y X Y X Y
0 19.86 386 17.872 730 18.06
366 18.940 730 17.699037 1104 17.16
250 19.232 666 17.731 980 17.458
X Y X Y X Y
0 19.86 386 17.872 730 18.06
366 18.940 730 17.699037 1104 17.16
300 19.106 730 17.699 1030 17.338
X Y X Y X Y
0 19.86 386 17.872 0 19.86
416 18.940 880 17.699037 880 17.699037
366 19.051 780 17.734 0 19.860
X Y X Y X Y
366 18.94 386 17.872 0 19.86
730 18.060 880 17.699037 880 17.699037
416 18.819 830 17.717 0 19.860
1. Perhitungan Timbunan Patok T1 ( T1-T3)
A= 71.191 m2
A= 67.952 m2
A= 34.940 m2
Galian Segmen 2
KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
1 4 1.550 18.060 29.543 46.053
2 5 1.706 17.880 32.209 48.383
3 6 2.312 18.060 44.067 59.815
4 7 2.156 17.880 40.705 56.429
∑ 146.524 210.680
A= 32.078 m2
Timbunan Segmen 3
KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
1 6 2.156 18.060 41.093 56.997
2 8 2.837 18.430 55.123 70.716
3 9 4.337 18.430 84.268 98.361
4 10 4.862 18.060 92.670 105.868
∑ 273.154 331.942
A= 29.394 m2
2. Perhitungan Timbunan Patok P1 (T1-T3)
A= 70.277 m2
A= 65.982 m2
A= 34.940 m2
Galian Segmen 2
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
46.053 1 4 1.550 18.060 29.543 46.053
48.383 2 5 1.706 17.880 32.209 48.383
59.815 3 6 2.312 18.060 44.067 59.815
56.429 4 7 2.156 17.880 40.705 56.429
210.680 ∑ 146.524 210.680
A= 32.078 m2
Timbunan Segmen 3
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
56.997 1 6 2.156 18.060 41.093 56.997
70.716 2 8 2.837 18.430 55.123 70.716
98.361 3 9 4.337 18.430 84.268 98.361
105.868 4 10 4.862 18.060 92.670 105.868
331.942 ∑ 273.154 331.942
A= 29.394 m2
3. Perhitungan Timbunan Patok P2 (T1-T3)
A= 69.273 m2
A= 65.524 m2
A= 34.546 m2
Galian Segmen 2
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
46.053 1 4 1.493 17.819 28.097 44.423
48.383 2 5 1.678 17.670 31.328 47.320
59.815 3 6 2.312 17.819 43.510 59.017
56.429 4 7 2.128 17.670 39.730 55.272
210.680 ∑ 142.664 206.031
A= 31.684 m2
Timbunan Segmen 3
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
56.997 1 6 2.312 17.819 43.510 59.017
70.716 2 8 2.809 18.220 53.989 69.400
98.361 3 9 4.309 18.220 82.819 96.730
105.868 4 10 4.805 17.819 90.425 103.439
331.942 ∑ 270.743 328.586
A= 28.922 m2
Yn(Xn + 1)
19.609
51.006
61.471
73.031
82.112
99.418
130.813
150.813
668.273
Yn(Xn + 1)
18.336
42.893
52.758
63.712
72.276
88.371
117.966
131.157
587.469
A= 33.082 m2
Galian Segmen 2
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
44.423 1 4 1.738 17.160 31.562 46.984
47.320 2 5 1.8 17.110 32.598 47.908
59.017 3 6 2.312 17.160 41.986 56.834
55.272 4 7 2.250 17.110 40.748 55.608
206.031 ∑ 146.894 207.334
A= 30.220 m2
Timbunan Segmen 3
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
59.017 1 6 2.312 18.060 44.067 59.815
69.400 2 8 2.931 18.430 56.949 72.448
96.730 3 9 4.431 18.430 86.094 100.093
103.439 4 10 5.050 18.060 96.253 109.263
328.586 ∑ 283.363 341.619
A= 29.128 m2
Yn(Xn + 1)
17.160
28.592
37.422
46.984
130.157
Yn(Xn + 1)
46.984
47.908
56.834
55.608
207.334
Yn(Xn + 1)
59.815
72.448
100.093
109.263
341.619
TABEL PERHITUNGAN MUKA AIR DAN KAPASITAS RENCANA SALURAN IRIGASI
SALURAN TERSIER
a4 12.92 18.022
T4-K2 12.92 32.31 386 18.12
a5 12.92 19.08
a6 12.92 19.97
T1-T4 45.82 114.54 386 20.07
a3 12.92 18.08
T3-K1 58.74 146.85 386 20.56
a2 12.92 19.09
T1-T3 77.83 194.57 386 19.19
a1 12.92 20.02
BS-T1 97.85 244.62 386 20.06
Qsk = (NFR x A) / e h
MAHr = MAUr + 0.1 w
MAUm = EUS + 0.1 + 0.05 n
Im = (MAUm - MAHr - ΔH1)/L A
Ir = Dari grafik P
F = Q / Ir1/2 R
ANA SALURAN IRIGASI DI PETAK TERSIER
M.A.Um ∆H1 b h w A
Im Ir F n
(m) (m) (m) (m) (m) (m2)
9 10 11 12 13 14 15 16 17 18
F = Q / Ir1/2 R=A/P
Im = (MAUm – MAHr – ΔH1)/ L A = bh + mh
F = Q / Ir1/2 R=A/P
Perhitungan Muka Air dan Kapasitas Rencana Saluran Irigasi di
== SALURAN TERSIER ==
MAUm ∆H1 b F h w A P
Im Ir
m m m m m m m2 m
19.94 0.00 0.0004 0.0004 0.30 1.80 0.49 0.42 0.39 1.69
19.86 0.00 0.0004 0.0004 0.30 1.87 0.30 0.38 0.18 1.15
19.79 0.00 -0.0005 0.0005 0.30 1.68 1.30 0.63 2.08 3.98
19.86 0.00 0.0031 0.0031 0.30 0.68 2.30 0.88 5.98 6.81
19.79 0.00 0.0034 0.0034 0.30 0.65 3.30 1.13 11.88 9.63
19.99 0.00 0.0061 0.0061 1.30 0.48 4.30 2.38 24.08 13.46
Perhitungan Muka Air dan Kapasitas Rencana Saluran Irigasi di
== SALURAN KUARTER ==
MAUm ∆H1 b F h w A P
Im Ir
m m m m m m m2 m
18.99 0.00 0.0038 0.0038 0.30 0.61 0.19 0.35 0.09 0.84
18.83 0.00 0.0054 0.0054 0.30 0.51 1.19 0.60 1.77 3.67
18.21 0.00 0.0055 0.0055 0.30 0.50 2.19 0.85 5.45 6.49
F = Q / Ir1/2 R=A/P
Im = (MAUm – MAHr – ΔH1)/ L A = bh + mh
F = Q / Ir1/2 R=A/P
R Vr Maur ∆H2 Vmin Vmax
Ket
m m/det m m m/dtk m/dtk
0.23 0.27 19.94 0.00 0.20 0.60
0.16 0.20 19.86 0.00 0.20 0.60
0.52 0.51 20.09 0.00 0.20 0.60
0.88 1.78 19.86 0.00 0.20 0.60
1.23 2.34 19.79 0.00 0.20 0.60
1.79 4.03 19.99 0.00 0.20 0.60
H1)/ L A = bh + mh2
P = b + 2h(1 + m2)1/2
R=A/P
H1)/ L A = bh + mh
P = b + 2h(1 + m2)1/2
R=A/P