IRIGASI BANGUNAN AIR I

B. MENGHITUNG DEBIT RENCANA SALURAN KUARTER


Diketahui :
No petak Abruto Anetto
1 A1 14.36 12.92
2 A2 14.36 12.92
3 A3 14.36 12.92
4 A4 14.36 12.92
5 A5 14.36 12.92
6 A6 14.36 12.92
Jumlah 86.16 77.54

NFR = 2 lt/det
e= 0.8

Penyelasaian : Rumus yang digunakan, ialah :

NFR x Anetto
Q =
e

Maka :

NFR x Anetto
Q1 =
e

2 x 12.92
=
0.8

25.85
=
0.8

= 32.31 L/dtk

NFR x Anetto
Q2 =
e

2 x 12.92
=
0.8

25.85
=
0.8

= 32.31 L/dtk

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I

NFR x Anetto
Q3 =
e

= 2 x 12.92
0.8

= 25.85
0.8

= 32.31 L/dtk

NFR x Anetto
Q4 =
e

2 x 12.92
=
0.8

25.84656
=
0.8

= 32.31 L/dtk

NFR x Anetto
Q5 =
e

2 x 12.92
=
0.8

25.84656
=
0.8

= 32.31 L/dtk

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I

NFR x Anetto
Q6 =
e

2 x 12.92
=
0.8

25.84656
=
0.8

= 32.31 L/dtk

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I
CONTOH PERHITUNGAN DIMENSI SALURAN KUARTER
I. Saluran Kuarter T1-a1
a. Daerah yang dialiri Anetto
A netto = Abruto x 0.9
= 14.36 x 0.9
= 12.92 Ha
NFR = 2 lt/dt
= 17.28 mm/hari
dimana :
Abruto : Luasan petak kuarter bruto

b. Debit Rencana (Q)


NFR x A
Q=
e x 8.64

17.28 x 12.92
=
0.8 x 8.64

223.31
=
6.912
= 32.31 lt/dt
= 0.032 m3/dtk

c. Panjang Saluran, L (T1-a1)


L= 19.3 x 2000
100
= 386 m

d. Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS)


Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS) ditentukan langsung
dari garis-garis kontur peta berdasarkan elevasi medan. Apabila ujung hilir atau
udik saluran terletak diantara kontur maka penentuan elevasinya diperoleh
dengan cara interpolasi linier

EHS = 18.94 m
EUS = 19.86 m

e. Elevasi muka air sesuai medan (MAHr dan MAUm)


MAHr = EHS + 0.1 + 0.05
= 18.94 + 0.1 + 0.05
= 19.09 m
MAUm = EUS + 0.1 + 0.05
= 19.86 + 0.1 + 0.05
= 20.01 m

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I

f. Kemiringan medan yang ada (Im)


MAUm - MAHr - ∆H1
Im =
L

20.01 - 19.09 - 0
Im =
386
Im = 0.0024
g. Kemiringan rencana (Ir)

Dari gambar grafik perencanaan untuk saluran tanpa pasangan dengan k =


30
Q = 32.31 lt/dtk dan Im = 0,0023
Ir = 0.0023

h. Menentukan lebar saluran (b)

Dipilih lebar dasar saluran yang terletak disebelah kanan dari titik plot Q
Sesuai tabel A.1.2 lebar dasar minimum yaitu : b = 0,30 m

i. Menghitung nilai F
Q
F =
Ir½
0.032
=
0.048
= 0.67

j. Menentukan Tinggi Saluran (h)


Nilai h didapat dengan interpolasi Dari Tabel dimensi saluran, maka :
h = 0,192 m

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I
Nilai h didapat dengan interpolasi Dari Tabel dimensi saluran, maka :
h = 0,192 m

k. Menentukan tinggi jagaan (w)


w = b + 0.25 x h
= 0.3 + 0.25 x 0.20
= 0.35 m

l. Menghitung Nilai n
n = b
h
= 1.49

m. Menghitung Luas penampang basah (A)


A = b.h + m.h²
= 0.0603 + 0.040
= 0.10 m²

n. Menghitung keliling basah (P)


P = b + 2h 1 + m1/²
= 0.30 + 2 x 0,19 1 + 11/²
= 0.30 + 0.402 2
= 0.87 m
`
o. Menghitung jari-jari hidrolis (R)
A
R =
P
0.10
=
0.87
= 0.12 m

p. Menghitung kecepatan rencana aliran (Vr)


Vr = k x R⅔ x Ir½
= 30 x 0.238 x 0.05
= 0.342 m/det

q. Menghitung muka air udik rencana (MAUr)


MAUr = MAHr + Ir.L + ∆H1
= 19.09 + 0.772 + 0
= 19.862 m

r. Menghitung kehilangan tinggi energi dibangunan petak tersier (∆H2)


∆H2 = MAUr - MAHr - ( Ir.L ) - ∆H1
= 19.86 -19.1 -0.772 - 0
= 0

Syarat : Vmin ≤ Vr ≤ Vmaks

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I
0,200 m/dtk ≤ 0,326 m/dtk ≤ 0,47 m/dtk

s. skema bentuk Saluran Tersier

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I
CONTOH PERHITUNGAN DIMENSI SALURAN TERSIER
I. Saluran Tersier T1 - T3
a. Daerah yang dialiri Anetto
A netto = Abruto x 0.9 =(Saluran Kuarter A1 + B1)
= 28.72 x 0.9 = 14.90 + 14.90
= 25.847 Ha = 29.80 Ha
NFR = 2 lt/dt
= 17.28 mm/hr
dimana :
Abruto : Luasan petak kuarter bruto

b. Debit Rencana (Q)


NFR x A
Q=
e x 8.64

17.28 x 25.84656
=
0.8 x 8.64

446.6286
=
6.912
= 64.62 lt/dtk
= 0.06 m3/dtk

c. Panjang Saluran, L (T1-T3)


L= 19.3 x 2000
100
= 386 m

d. Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS)


Elevasi Hilir Saluran (EHS) dan Elevasi Udik Saluran (EUS) ditentukan langsung dari garis-
garis kontur peta berdasarkan elevasi medan. Apabila ujung hilir atau udik saluran
terletak diantara kontur maka penentuan elevasinya diperoleh dengan cara interpolasi
linier

EHS = 18.94 m
EUS = 19.860 m (Elevasi di Box T1)

e. Elevasi muka air sesuai medan (MAHr dan MAUm


MAUr = a1 = 19.97 Lt/dt
b1 = 19.09 Lt/dt

MAHr = MAUr tertinggi dibagian hilir box yang dilayani + 0,10


= 19.97 + 0.1
= 20.07 m
MAUm = EUS + 0.1 + 0.05
= 19.86 + 0.1 + 0.05
= 20.01 m

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I

f. Kemiringan medan yang ada (Im)


MAUm - MAHr - ∆H1
Im =
L

20.01 - 20.07 - 0
Im =
386
Im = -0.0002
g. Kemiringan rencana (Ir)

Dari gambar grafik perencanaan untuk saluran pasangan beton talud saja dengan k = 35
Q =67.05 Lt/dtk dan Im = -0,0002. karena Im berada di bawah batas garis Vmin maka
titik Im dinaikkan, Ir = 0.00065.

h. Menentukan lebar saluran (b)

Dipilih lebar dasar saluran yang terletak disebelah kanan dari titik plot Q
Sesuai tabel A.1.1 lebar dasar yaitu : b = 0,45 m

i. Menghitung nilai F
Q
F =
Ir½
0.065
=
0.014
= 4.57

j. Menentukan Tinggi Saluran (h)


Nilai h didapat pada grafik 6, karena titik plot berada di bawah garis Vmin (Im =
0.0002) maka titik plot di naikkan sampaipas pada garis dengan interpolasi h =
0,34m dan b = 0.35m
NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059
IRIGASI BANGUNAN AIR I
Nilai h didapat pada grafik 6, karena titik plot berada di bawah garis Vmin (Im =
0.0002) maka titik plot di naikkan sampaipas pada garis dengan interpolasi h =
0,34m dan b = 0.35m

k. Menentukan tinggi jagaan (w)


w = b + 0.25 x h
= 0.35 + 0.25 x 0.34
= 0.435 m

l. Menghitung Nilai n
n = b
h
= 1.03

m. Menghitung Luas penampang basah (A)


A = b.h + m.h²
= 0.119 + 0.1156
= 0.23 m²

n. Menghitung keliling basah (P)


P = b + 2h 1 + m1/²
= 0.35 + 2 x 0,35 1 + 11/²
= 0.35 + 0.68 2
= 1.31 m
`
o. Menghitung jari-jari hidrolis (R)
A
R =
P
0.23
=
1.31
= 0.18 m

p. Menghitung kecepatan rencana aliran (Vr)


Vr = k x R⅔ x Ir½
= 35 x 0.317 x 0.014
= 0.157

q. Menghitung muka air udik rencana (MAUr)


MAUr = MAHr + ( Ir.L ) + ∆H1
= 20.07 + 0.2509 + 0
= 20.32 m

r. Menghitung kehilangan tinggi energi dibangunan petak tersier (∆H2)


∆H2 = MAUr - MAHr - ( Ir.L ) - ∆H1
= 20.3209 -20.07 -0.2509 - 0
= 0

Syarat : Vmin ≤ Vr ≤ Vmaks

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I
0,200 m/dtk ≤ 0,287 m/dtk ≤ 0,47 m/dtk

s. skema bentuk Saluran Tersier

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I
* PERHITUNGAN LUASAN
1. KUARTER A1
a. Daerah yang dialiri Anetto
A netto = Abruto x 0.9
= 14.36 x 0.9
= 12.92 Ha
NFR = 2 lt/dt
= 17.28 mm/hr
dimana :
Abruto : Luasan petak kuarter bruto

2. KUARTER A2
a. Daerah yang dialiri Anetto
A netto = Abruto x 0.9
= 14.36 x 0.9
= 12.92 Ha
NFR = 2 lt/dt = 17.28 mm/hari
dimana :
Abruto : Luasan petak kuarter bruto

3. KUARTER A3
a. Daerah yang dialiri Anetto
A netto = Abruto x 0.9
= 14.36 x 0.9
= 12.92 Ha
NFR = 2 lt/dt = 17.28 mm/hari
dimana :
Abruto : Luasan petak kuarter bruto

4. KUARTER A4
a. Daerah yang dialiri Anetto
A netto = Abruto x 0.9
= 14.36 x 0.9
= 12.92 Ha
NFR = 2 lt/dt = 17.28 mm/hari
dimana :
Abruto : Luasan petak kuarter bruto

DIMANA PANJANG TIAP SALURAN ADALAH = ( panjang mistar x Skala Peta )


L = 19.3 x 2000
100
386 m

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I

* PERHITUNGAN DEBIT PETAK KUARTER


1. KUARTER A1
Debit Rencana (Q)
Q= NFR x A
e x 8.64

= 17.28 x 12.92
0.8 x 8.64
= 223.31
6.912
= 32.31 lt/dt
= 0.032 m3/dtt

2. KUARTER A2
Debit Rencana (Q)
NFR x A
Q=
e x 8.64

17.28 x 12.92
=
0.8 x 8.64
223.31
=
6.912
= 32.31 lt/dt
= 0.032 m3/dtt
3. KUARTER A3
Debit Rencana (Q)
NFR x A
Q=
e x 8.64

17.28 x 12.92
=
0.8 x 8.64
223.31
=
6.912
= 32.31 lt/dt
= 0.032 m3/dtt
4. KUARTER A4
Debit Rencana (Q)
NFR x A
Q=
e x 8.64

17.28 x 12.92
=
0.8 x 8.64
223.31
=
6.912
= 32.31 lt/dt
= 0.032 m3/dtt

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I

Tabel Perhitungan Luasan Petak (A) & Debit Rencana (Q)

No Petak Abruto (m2) Anetto (m2) Debit Rencana,


Q (lt/det)
1 A1 14.90 13.41 32.31
2 A2 14.90 13.41 32.31
3 A3 14.90 13.41 32.31
4 A4 14.90 13.41 32.31
5 A5 14.90 13.41 32.31
6 A6 14.90 13.41 32.31
Σ 89.40 80.46 193.85

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I
5. KUARTER A5
a. Daerah yang dialiri Anetto
A netto = Abruto x 0.9
= 14.36 x 0.9
= 12.92 Ha
NFR = 2 lt/dt
= 17.28 mm/hr
dimana :
Abruto : Luasan petak kuarter bruto

6. KUARTER A6
a. Daerah yang dialiri Anetto
A netto = Abruto x 0.9
= 14.36 x 0.9
= 12.92 Ha
NFR = 2 lt/dt
= 17.28 mm/hr
dimana :
Abruto : Luasan petak kuarter bruto

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I

5. KUARTER A5
Debit Rencana (Q)
Q= NFR x A
e x 8.64

= 17.28 x 12.92
0.8 x 8.64
= 223.31
6.912
= 32.31 lt/dt
= 0.032 m3/dtt

6. KUARTER A6
Debit Rencana (Q)
Q= NFR x A
e x 8.64

= 17.28 x 12.92
0.8 x 8.64
= 223.31
6.912
= 32.31 lt/dt
= 0.032 m3/dtt

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


IRIGASI BANGUNAN AIR I
MAUm = EUS + 0.1 + 0.05
= 18.04 + 0.1 + 0.05
= 18.19

MAUm = EUS + 0.1 + 0.05


= 18.06 + 0.1 + 0.05
= 18.21

MAUm = EUS + 0.1 + 0.05


= 18.92 + 0.1 + 0.05
= 19.07

MAUm = EUS + 0.1 + 0.05


= 18.94 + 0.1 + 0.05
= 19.09

MAUm = EUS + 0.1 + 0.05


= 19.82 + 0.1 + 0.05
= 19.97

MAUm = EUS + 0.1 + 0.05


= 19.86 + 0.1 + 0.05
= 20.01

NASRUDIN ADIPRATAMA KAMBEA / F 111 16 059


Perhitungan Muka Air dan Kapasitas Rencana Saluran Irigasi di Petak Tersier
== SALURAN KUARTER ==

Luas Petak Tersier (A) = 86.16 Ha Kemiringan dinding Saluran (m) = 1


Kebutuhan Air Bersih di Sawa (NFR) = 2 lt/dt Efesiensi dipetak Tersier (e) = 0.8
= contoh perhitungan Harga K Untuk Saluran Kuarter tanpa Pasangan = 30

Sal Abruto Anetto NFR QR L EHS EUS MAHr MAUm ∆H1 b F h w A P R Vr Maur ∆H2 Vmin Vmax
Im Ir n Ket
kuarter Ha Ha lt/dt L/dtk m m m m m m m m m m m2 m m m/det m m m/dtk m/dtk
T1 - a1 14.36 12.92 2.00 32.31 386.00 18.94 19.86 19.09 20.01 0.00 0.0024 0.0024 0.30 0.66 0.192 0.35 1.56 0.09 0.84 0.11 0.34 20.02 0.00 0.20 0.45
T2 - a6 14.36 12.92 2.00 32.31 386.00 18.92 19.82 19.07 19.97 0.00 0.0023 0.0023 0.30 0.67 0.193 0.35 1.55 0.10 0.85 0.11 0.34 19.97 0.00 0.20 0.45
T3 - a2 14.36 12.92 2.00 32.31 386.00 18.06 18.94 18.21 19.09 0.00 0.0023 0.0023 0.30 0.68 0.195 0.35 1.54 0.10 0.85 0.11 0.34 19.09 0.00 0.20 0.45
T4 - a5 14.36 12.92 2.00 32.31 386.00 18.04 18.92 18.19 19.07 0.00 0.0023 0.0023 0.30 0.67 0.193 0.35 1.55 0.10 0.85 0.11 0.34 19.08 0.00 0.20 0.45
K1 - a3 14.36 12.92 2.00 32.31 386.00 17.16 18.06 17.31 18.21 0.00 0.0023 0.0020 0.30 0.72 0.201 0.35 1.49 0.10 0.87 0.12 0.32 18.08 0.00 0.20 0.45
K2 - a4 14.36 12.92 2.00 32.31 386.00 17.10 18.04 17.25 18.19 0.00 0.0024 0.0020 0.30 0.72 0.201 0.35 1.49 0.10 0.87 0.12 0.32 18.02 0.00 0.20 0.45

Qsk = NFR x A / 0.8 h (dari tabel 5 b = 0.3 m) V = k x R2/3 x Ir1/2

MAHr = EHS + 0,1 + 0,05 w = 0,20 + 0,25h MAUr = MAHr + Ir x L + ΔH1

MAUm = EUS + 0,1 + 0,05 n = b/h ΔH2 = MAUr – Ir. L – ΔH1 - MAHr

Im = (MAUm – MAHr – ΔH1)/ L A = bh + mh2


..
Ir & b dari grafik P = b + 2h(1 + m2)1/2 .

F = Q / Ir1/2 R=A/P
TABEL PERHITUNGAN MUKA AIR DAN KAPASITAS RENCANA SALURAN IRIGASI DI PETAK TERSIER

SALURAN TERSIER

Nama Petak Tersier : P.T Peta 3 Kebutuhan air bersih NFR = 2.00 lt/dt/ha m = 1.00
Luas Petak Tersier : 86.16 Ha Efisiensi di petak tersier ept = 0.80 kt.pas = 35.00 m1/3/dt

Sal. Abruto Anetto M.A.Ur Sal. Abruto Anetto Qst L M.A.Hr M.A.Um ΔH1 Im Ir b F h w n A P R V IrxL ΔH1 M.A.Ur ΔH2 Ket.
Kuart. Ha Ha l/det Ters. Ha Ha l/det m m m m m \ m m m2 m m m/det m m m
1 2 2 3 4 5 2 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
a4 14.36 12.92 18.02
a5 14.36 12.92 19.08
a6 14.36 12.92 19.97
T1-T2 38.77 43.08 96.92 386.00 18.12 18.21 0.00 0.0002 0.0005 0.45 4.33 0.40 0.55 1.13 0.34 1.58 0.22 0.28 0.19 0 18.32 0.00

a3 14.36 12.92 18.08


a2 14.36 12.92 19.09
a1 14.36 12.92 20.02
BS-T1 38.77 77.54 96.92 386.00 18.42 19.97 0.00 0.0040 0.0004 0.45 4.85 0.40 0.55 1.13 0.34 1.58 0.22 0.25 0.15 0 18.57 0.00

Qsk = (NFR x A) / e h = Dari tabel 8 , b = 0.45 V = k x R2/3 X I1/2


MAHr = MAUr + 0.1 w = 0.2 + 0.25.h MAUr = MAHr + Ir x L + ΔH1
MAUm = EUS + 0.1 + 0.05 n = b/h ΔH2 = MAUr - Ir . L - ΔH1 - MAHr
Im = (MAUm - MAHr - ΔH1)/L A = bh + mh²
Ir = Dari grafik P = b + 2h (1+m²)1/2
F = Q / Ir1/2 R = A/P
JARAK ELEVASI TANAH ELEVASI TANGGUL ELEVASI MUKA ELEVASI DASAR
PATOK JARAK (m) LANGSUNG ASLI (m) (m) AIR (m) SALURAN (m)

T1 19.860 21.14 20.83 20.39


50 50
P1 19.734 21.04 20.73 20.28
MAHr a1 = 19.07
50 100
MAUr T2 -a1 = 19.97
P2 19.609 20.93 20.62 20.18
50 150
P3 19.483 20.82 20.51 20.07
50 200
P4 19.357 20.72 20.41 19.97
50 250
P5 19.232 20.61 20.30 19.86 Tersier T3
50 300
ELEVASI MUKA AIR ELEVASI DASAR
P6 19.106 20.51 20.20 19.76 ELEVASI TANGGUL (m) (m) SALURAN (m)
66 366
T3 18.940 20.37 20.06 19.62 20.26 19.96 19.56
50 416
P8 18.819 20.15 19.85 19.45
50 466
P9 18.698 20.05 19.75 19.35
50 516
P10 18.577 19.94 19.64 19.24
50 566
P11 18.456 19.84 19.54 19.13
50 616
W ( T1) = 0.31
P12 18.336 19.73 19.43 19.03 Kuarter K1
W ( T3) = 0.30
50 666
W ( K1) = 0.35
P13 18.215 19.63 19.33 18.92 ELEVASI TANGGUL (m) ELEVASI MUKA AIR ELEVASI DASAR
(m) SALURAN (m) h (T1) = 0.44
64 730
h ( T3) = 0.40
K1 18.060 19.49 19.19 18.79 18.43 18.08 17.88
h ( K1) = 0.20
50 780
P15 17.940 18.33 17.98 17.78
50 830
P16 17.819 18.22 17.87 17.67
50 880
P17 17.699 18.12 17.77 17.57
50 930
P18 17.579 18.02 17.67 17.47
50 980
P19 17.458 17.92 17.57 17.36
50 1030
P20 17.338 17.81 17.46 17.26
74 1104
P21 17.16 17.66 17.31 17.11

X Y X Y X Y
0 19.86 366 18.940 730 18.06
366 18.940 730 18.060 1104 17.16
50 19.734 466 18.698 780 17.940
X Y
366 18.940 X Y X Y X Y
730 18.060 0 19.86 386 17.872 730 18.06
666 18.215 366 18.940 730 17.699037 1104 17.16
100 19.609 516 17.807 830 17.819

X Y X Y X Y
0 19.86 386 17.872 730 18.06
366 18.940 730 17.699037 1104 17.16
150 19.483 566 17.781 880 17.699

X Y X Y X Y
0 19.86 386 17.872 730 18.06
366 18.940 730 17.699037 1104 17.16
200 19.357 616 17.756 930 17.579

X Y X Y X Y
0 19.86 386 17.872 730 18.06
366 18.940 730 17.699037 1104 17.16
250 19.232 666 17.731 980 17.458

X Y X Y X Y
0 19.86 386 17.872 730 18.06
366 18.940 730 17.699037 1104 17.16
300 19.106 730 17.699 1030 17.338

X Y X Y X Y
0 19.86 386 17.872 0 19.86
416 18.940 880 17.699037 880 17.699037
366 19.051 780 17.734 0 19.860

X Y X Y X Y
366 18.94 386 17.872 0 19.86
730 18.060 880 17.699037 880 17.699037
416 18.819 830 17.717 0 19.860
1. Perhitungan Timbunan Patok T1 ( T1-T3)

KOORDINAT Xn (yn + 1) Yn(Xn + 1)


NAMA TITIK
No SUMBU X SUMBU Y
1 1 0.000 19.860 0.000 19.860
2 2 1.179 21.140 26.103 46.064
3 3 1.679 21.140 37.173 56.634
4 4 2.360 20.390 50.480 68.510
5 5 2.810 20.390 60.106 77.686
6 6 3.491 21.140 77.291 94.940
7 7 4.991 21.140 110.501 126.650
8 8 6.169 19.860 128.685 142.376
∑ 490.339 632.720

A= n(Xn + 1) - Xn (yn + 1) " /2


"∑Y

A= 71.191 m2

4. Perhitungan Timbunan Patok T3 ( T3-K1)

KOORDINAT Xn (yn + 1) Yn(Xn + 1)


NAMA TITIK
No SUMBU X SUMBU Y
1 1 0.000 18.940 0.000 18.940
2 2 1.111 20.260 23.620 42.769
3 3 1.611 20.260 34.250 52.899
4 4 2.292 19.560 47.124 64.392
5 5 2.742 19.560 56.376 73.194
6 6 3.423 20.260 72.773 89.610
7 7 4.923 20.260 104.663 120.000
8 8 6.035 18.940 120.338 133.243
∑ 459.143 595.046

A= n(Xn + 1) - Xn (yn + 1) " /2


"∑Y

A= 67.952 m2

7. Perhitungan Timbunan & Galian Patok K1 ( K1-a3)


Timbunan Segmen 1
KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
1 1 0.000 18.060 0.000 18.060
2 2 0.525 18.430 10.201 28.106
3 3 1.025 18.430 19.916 37.321
4 4 1.550 18.060 29.543 46.053
∑ 59.660 129.540

A= n(Xn + 1) - Xn (yn + 1) " /2


"∑Y

A= 34.940 m2

Galian Segmen 2
KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
1 4 1.550 18.060 29.543 46.053
2 5 1.706 17.880 32.209 48.383
3 6 2.312 18.060 44.067 59.815
4 7 2.156 17.880 40.705 56.429
∑ 146.524 210.680

A= n(Xn + 1) - Xn (yn + 1) " /2


"∑Y

A= 32.078 m2

Timbunan Segmen 3
KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
1 6 2.156 18.060 41.093 56.997
2 8 2.837 18.430 55.123 70.716
3 9 4.337 18.430 84.268 98.361
4 10 4.862 18.060 92.670 105.868
∑ 273.154 331.942

A= n(Xn + 1) - Xn (yn + 1) " /2


"∑Y

A= 29.394 m2
2. Perhitungan Timbunan Patok P1 (T1-T3)

Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)


NAMA TITIK
No SUMBU X SUMBU Y
19.860 1 1 0.000 19.734 0.000 19.734
46.064 2 2 1.298 21.040 28.608 48.350
56.634 3 3 1.798 21.040 39.628 58.870
68.510 4 4 2.479 20.280 52.753 70.554
77.686 5 5 2.929 20.280 62.329 79.680
94.940 6 6 3.61 21.040 79.564 96.994
126.650 7 7 5.110 21.040 112.624 128.554
142.376 8 8 6.411 19.734 132.926 146.249
632.720 ∑ 508.433 648.986

"∑Yn(Xn + 1) - Xn (yn + 1) " /2


A=

A= 70.277 m2

5. Perhitungan Timbunan Patok P11 ( T3-K1)

Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)


NAMA TITIK
No SUMBU X SUMBU Y
18.940 1 1 0.000 18.456 0.000 18.456
42.769 2 2 1.165 19.840 24.279 42.954
52.899 3 3 1.665 19.840 34.699 52.874
64.392 4 4 2.346 19.130 47.225 64.009
73.194 5 5 2.796 19.130 56.283 72.617
89.610 6 6 3.477 19.840 72.461 88.824
120.000 7 7 4.977 19.840 103.721 118.584
133.243 8 8 6.142 18.456 119.499 131.813
595.046 ∑ 458.166 590.130

"∑Yn(Xn + 1) - Xn (yn + 1) " /2


A=

A= 65.982 m2

8. Perhitungan Timbunan & Galian Patok K1 ( K1-a3)


Timbunan Segmen 1
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
18.060 1 1 0.000 18.060 0.000 18.060
28.106 2 2 0.525 18.430 10.201 28.106
37.321 3 3 1.025 18.430 19.916 37.321
46.053 4 4 1.550 18.060 29.543 46.053
129.540 ∑ 59.660 129.540

"∑Yn(Xn + 1) - Xn (yn + 1) " /2


A=

A= 34.940 m2

Galian Segmen 2
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
46.053 1 4 1.550 18.060 29.543 46.053
48.383 2 5 1.706 17.880 32.209 48.383
59.815 3 6 2.312 18.060 44.067 59.815
56.429 4 7 2.156 17.880 40.705 56.429
210.680 ∑ 146.524 210.680

"∑Yn(Xn + 1) - Xn (yn + 1) " /2


A=

A= 32.078 m2

Timbunan Segmen 3
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
56.997 1 6 2.156 18.060 41.093 56.997
70.716 2 8 2.837 18.430 55.123 70.716
98.361 3 9 4.337 18.430 84.268 98.361
105.868 4 10 4.862 18.060 92.670 105.868
331.942 ∑ 273.154 331.942

"∑Yn(Xn + 1) - Xn (yn + 1) " /2


A=

A= 29.394 m2
3. Perhitungan Timbunan Patok P2 (T1-T3)

Yn(Xn + 1) KOORDINAT Xn (yn + 1)


NAMA TITIK
No SUMBU X SUMBU Y
19.734 1 1 0.000 19.609 0.000
48.350 2 2 1.437 20.930 31.513
58.870 3 3 1.937 20.930 42.478
70.554 4 4 2.619 20.180 55.470
79.680 5 5 3.069 20.180 65.001
96.994 6 6 3.750 20.930 82.238
128.554 7 7 5.250 20.930 115.133
146.249 8 8 6.691 19.609 137.895
648.986 ∑ 529.728

"∑Yn(Xn + 1) - Xn (yn + 1) " /2


A=

A= 69.273 m2

6. Perhitungan Timbunan Patok P12 ( T3-K1)

Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)


NAMA TITIK
No SUMBU X SUMBU Y
18.456 1 1 0.000 18.336 0.000 18.336
42.954 2 2 1.174 19.730 24.337 42.893
52.874 3 3 1.674 19.730 34.702 52.758
64.009 4 4 2.348 19.030 47.030 63.712
72.617 5 5 2.798 19.030 56.044 72.276
88.824 6 6 3.479 19.730 72.120 88.371
118.584 7 7 4.979 19.730 103.215 117.966
131.813 8 8 6.153 18.336 118.974 131.157
590.130 ∑ 456.422 587.469

"∑Yn(Xn + 1) - Xn (yn + 1) " /2


A=

A= 65.524 m2

9. Perhitungan Timbunan & Galian Patok P15 ( K1-a3)


Timbunan Segmen 1
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
18.060 1 1 0.000 17.819 0.000 17.819
28.106 2 2 0.497 18.220 9.552 27.275
37.321 3 3 0.997 18.220 19.162 36.385
46.053 4 4 1.493 17.819 28.097 44.423
129.540 ∑ 56.811 125.902

"∑Yn(Xn + 1) - Xn (yn + 1) " /2


A=

A= 34.546 m2

Galian Segmen 2
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
46.053 1 4 1.493 17.819 28.097 44.423
48.383 2 5 1.678 17.670 31.328 47.320
59.815 3 6 2.312 17.819 43.510 59.017
56.429 4 7 2.128 17.670 39.730 55.272
210.680 ∑ 142.664 206.031

"∑Yn(Xn + 1) - Xn (yn + 1) " /2


A=

A= 31.684 m2

Timbunan Segmen 3
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
56.997 1 6 2.312 17.819 43.510 59.017
70.716 2 8 2.809 18.220 53.989 69.400
98.361 3 9 4.309 18.220 82.819 96.730
105.868 4 10 4.805 17.819 90.425 103.439
331.942 ∑ 270.743 328.586

"∑Yn(Xn + 1) - Xn (yn + 1) " /2


A=

A= 28.922 m2
Yn(Xn + 1)

19.609
51.006
61.471
73.031
82.112
99.418
130.813
150.813
668.273

Yn(Xn + 1)

18.336
42.893
52.758
63.712
72.276
88.371
117.966
131.157
587.469

10. Perhitungan Timbunan & Galian Patok P21 ( K1-a3)


Timbunan Segmen 1
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
17.819 1 1 0.000 17.160 0.000 17.160
27.275 2 2 0.619 17.660 11.551 28.592
36.385 3 3 1.119 17.660 20.881 37.422
44.423 4 4 1.738 17.160 31.562 46.984
125.902 ∑ 63.993 130.157

"∑Yn(Xn + 1) - Xn (yn + 1) " /2


A=

A= 33.082 m2

Galian Segmen 2
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
44.423 1 4 1.738 17.160 31.562 46.984
47.320 2 5 1.8 17.110 32.598 47.908
59.017 3 6 2.312 17.160 41.986 56.834
55.272 4 7 2.250 17.110 40.748 55.608
206.031 ∑ 146.894 207.334

"∑Yn(Xn + 1) - Xn (yn + 1) " /2


A=

A= 30.220 m2

Timbunan Segmen 3
Yn(Xn + 1) KOORDINAT Xn (yn + 1) Yn(Xn + 1)
NAMA TITIK
No SUMBU X SUMBU Y
59.017 1 6 2.312 18.060 44.067 59.815
69.400 2 8 2.931 18.430 56.949 72.448
96.730 3 9 4.431 18.430 86.094 100.093
103.439 4 10 5.050 18.060 96.253 109.263
328.586 ∑ 283.363 341.619

"∑Yn(Xn + 1) - Xn (yn + 1) " /2


A=

A= 29.128 m2
Yn(Xn + 1)

17.160
28.592
37.422
46.984
130.157

Yn(Xn + 1)

46.984
47.908
56.834
55.608
207.334

Yn(Xn + 1)

59.815
72.448
100.093
109.263
341.619
TABEL PERHITUNGAN MUKA AIR DAN KAPASITAS RENCANA SALURAN IRIGASI

SALURAN TERSIER

Nama Petak Tersier : P.T Peta 3 Kebutuhan air bersih NF


Luas Petak Tersier : 86.16 Ha Efisiensi di petak tersier ep

Sal. Apk M.A.Ur Sal. Apt Qst L M.A.Hr


Kuart (Ha) (m) Tersier (Ha) (l/det) (m) (m)
1 2 3 4 5 6 7 8

a4 12.92 18.022
T4-K2 12.92 32.31 386 18.12
a5 12.92 19.08

T2-t4 25.85 64.62 386 18.42

a6 12.92 19.97
T1-T4 45.82 114.54 386 20.07
a3 12.92 18.08
T3-K1 58.74 146.85 386 20.56

a2 12.92 19.09
T1-T3 77.83 194.57 386 19.19

a1 12.92 20.02
BS-T1 97.85 244.62 386 20.06

Qsk = (NFR x A) / e h
MAHr = MAUr + 0.1 w
MAUm = EUS + 0.1 + 0.05 n
Im = (MAUm - MAHr - ΔH1)/L A
Ir = Dari grafik P
F = Q / Ir1/2 R
ANA SALURAN IRIGASI DI PETAK TERSIER

Kebutuhan air bersih NFR = 2.00 lt/dt/ha m = 1.00


Efisiensi di petak tersier ept = 0.80 kt.pas = 35.00

M.A.Um ∆H1 b h w A
Im Ir F n
(m) (m) (m) (m) (m) (m2)
9 10 11 12 13 14 15 16 17 18

18.19 0 0.0002 0.0005 0.30 1.44 0.251 0.26 1.20 0.14

19.07 0 0.0017 0.0017 0.40 1.57 0.248 0.26 1.61 0.16

19.97 0 -0.0003 0.001 0.40 3.62 0.383 0.30 1.04 0.30

18.21 0 -0.0061 0.002 0.40 3.28 0.364 0.29 1.10 0.28

19.09 0 -0.0003 0.002 0.45 4.35 0.403 0.30 1.12 0.34

20.01 0 -0.0001 0.002 0.50 5.47 0.441 0.31 1.13 0.41

= Dari tabel 8 , b = 0.45 V = k x R2/3 X I1/2


= 0.2 + 0.25.h MAUr = MAHr + Ir x L + ΔH1
= b/h ΔH2 = MAUr - Ir . L - ΔH1 - MAHr
= bh + mh²
= b + 2h (1+m²)1/2
= A/P
m1/3/dt

P R V Ir x L ∆H1 M.A.Ur ∆H2 Ket


(m) (m) (m/det) (m) (m) (m)
19 20 21 22 23 24 25

0.80 0.17 0.24 0.19 0 18.32 0

0.90 0.18 0.46 0.66 0 19.07 0

1.17 0.26 0.45 0.39 0 20.46 0

1.13 0.25 0.62 0.77 0 21.33

1.26 0.27 0.66 0.77 0 19.96 0

1.38 0.30 0.70 0.77 0 20.83 0


Perhitungan Muka

Luas Petak Tersier (A) = 18.00 Ha


Kebutuhan Air Bersih di Sawah (NFR) = 3.7 lt/dt
= contoh perhitungan Harga K Untuk Salur

Sal Abruto Anetto NFR QR L EHS EUS MAHr


Tersier Ha Ha lt/dt L/dtk m m m m
Intake - T1 9.00 8.10 3.70 37.46 300.00 19.71 19.79 19.81
T1 - T2 9.00 8.10 3.70 37.46 300.00 19.64 19.71 19.74
T2 - T3 9.00 8.10 3.70 37.46 300.00 19.84 19.64 19.94
T1 - T4 9.00 8.10 3.70 37.46 300.00 18.84 19.71 18.94
T2 - T5 9.00 8.10 3.70 37.46 300.00 18.68 19.64 18.78
T3 - T6 9.00 8.10 3.70 37.46 300.00 18.06 19.84 18.16
Perhitungan Muka

Luas Petak Tersier (A) = 27.00 Ha


Kebutuhan Air Bersih di Sawah (NFR) = 3.7 lt/dt
= contoh perhitungan Harga K Untuk Salur

Sal Abruto Anetto NFR QR L EHS EUS MAHr


Kuarter Ha Ha lt/dt L/dtk m m m m
T4 - K1 9.00 8.10 3.70 37.46 300.00 17.69 18.84 17.84
T5 - K2 9.00 8.10 3.70 37.46 300.00 17.06 18.68 17.21
T6 - K3 9.00 8.10 3.70 37.46 300.00 16.40 18.06 16.55

Rumus Saluran Kuarter :

Q = NFR x A h (dari tabel) V = k x R2/3 x Ir1/2

MAHr = EHS + 0,1 + 0,05 w = b + 0,25 h MAUr = MAHr + Ir x L + Δ

MAUm = EUS + 0,1 + 0,05 n = b/h ΔH2 = MAUr – Ir. L – ΔH1

Im = (MAUm – MAHr – ΔH1)/ L A = bh + mh2

Ir & b dari grafik P = b + 2h(1 + m2)1/2

F = Q / Ir1/2 R=A/P
Im = (MAUm – MAHr – ΔH1)/ L A = bh + mh

Ir & b dari grafik P = b + 2h(1 + m2)1/2

F = Q / Ir1/2 R=A/P
Perhitungan Muka Air dan Kapasitas Rencana Saluran Irigasi di
== SALURAN TERSIER ==

Kemiringan dinding Saluran (m) = 1


Efesiensi dipetak Tersier (e) = 0.8
Harga K Untuk Saluran Kuarter tanpa Pasangan = 35

MAUm ∆H1 b F h w A P
Im Ir
m m m m m m m2 m
19.94 0.00 0.0004 0.0004 0.30 1.80 0.49 0.42 0.39 1.69
19.86 0.00 0.0004 0.0004 0.30 1.87 0.30 0.38 0.18 1.15
19.79 0.00 -0.0005 0.0005 0.30 1.68 1.30 0.63 2.08 3.98
19.86 0.00 0.0031 0.0031 0.30 0.68 2.30 0.88 5.98 6.81
19.79 0.00 0.0034 0.0034 0.30 0.65 3.30 1.13 11.88 9.63
19.99 0.00 0.0061 0.0061 1.30 0.48 4.30 2.38 24.08 13.46
Perhitungan Muka Air dan Kapasitas Rencana Saluran Irigasi di
== SALURAN KUARTER ==

Kemiringan dinding Saluran (m) = 1


Efesiensi dipetak Tersier (e) = 0.8
Harga K Untuk Saluran Kuarter tanpa Pasangan = 30

MAUm ∆H1 b F h w A P
Im Ir
m m m m m m m2 m
18.99 0.00 0.0038 0.0038 0.30 0.61 0.19 0.35 0.09 0.84
18.83 0.00 0.0054 0.0054 0.30 0.51 1.19 0.60 1.77 3.67
18.21 0.00 0.0055 0.0055 0.30 0.50 2.19 0.85 5.45 6.49

Rumus Saluran Tersier :

V = k x R2/3 x Ir1/2 Q = NFR x A h (dari tabel)

MAUr = MAHr + Ir x L + ΔH1 MAHr = EHS + 0,1 w = b + 0,25 h

ΔH2 = MAUr – Ir. L – ΔH1 - MAHr MAUm = EUS + 0,1 n = b/h

Im = (MAUm – MAHr – ΔH1)/ L A = bh + mh2

Ir & b dari grafik P = b + 2h(1 + m

F = Q / Ir1/2 R=A/P
Im = (MAUm – MAHr – ΔH1)/ L A = bh + mh

Ir & b dari grafik P = b + 2h(1 + m

F = Q / Ir1/2 R=A/P
R Vr Maur ∆H2 Vmin Vmax
Ket
m m/det m m m/dtk m/dtk
0.23 0.27 19.94 0.00 0.20 0.60
0.16 0.20 19.86 0.00 0.20 0.60
0.52 0.51 20.09 0.00 0.20 0.60
0.88 1.78 19.86 0.00 0.20 0.60
1.23 2.34 19.79 0.00 0.20 0.60
1.79 4.03 19.99 0.00 0.20 0.60

R Vr Maur ∆H2 Vmin Vmax


Ket
m m/det m m m/dtk m/dtk
0.11 0.43 18.99 0.00 0.20 0.50
0.48 1.36 18.83 0.00 0.20 0.50
0.84 1.99 18.21 0.00 0.20 0.50

h (dari tabel) V = k x R2/3 x Ir1/2

w = b + 0,25 h MAUr = MAHr + Ir x L + ΔH1

n = b/h ΔH2 = MAUr – Ir. L – ΔH1 - MAHr

H1)/ L A = bh + mh2

P = b + 2h(1 + m2)1/2

R=A/P
H1)/ L A = bh + mh

P = b + 2h(1 + m2)1/2

R=A/P