MBI 630 Fall 2010

Feasibility Analysis Matrix

Feasibility Criteria ( Low , Medium and High) Weightage


Operational Feasibility 30%
1) To partner with painting professionals and bring them
onboard: Feasibility is Moderate as company can leverage
its existing contactor and bring them onboard 2) To
develop a IT infrasture to support application development,
monitoring and assistance: Feasibility is High with easy
availaibility of platform for IT development

Technical Feasibility 20%


Development Cost: Avg cost of building AI based
application =1500000
Economic Analysis: A3:C11
Pay Back Period
NPV
Economic Feasibility 30%
Development Cost:
Economic Analysis:
Pay Back Period
NPV
Schedule Feasibility 10%
How long does it take to develop the candidate system

Total Points 100%


Ranking

09/19/2019 ©Toru Sakaguchi


Feasibility Criteria ( Low , Medium and High)
Operational Feasibility

Technical Feasibility

Economic Feasibility

Schedule Feasibility

Total Points
riteria ( Low , Medium and High) Weightage
Feasibility 30%
1) To partner with painting professionals and bring them
onboard: Feasibility is Moderate as company can leverage its
existing contactor and bring them onboard 2) To develop a IT
infrasture to support application development, monitoring and
assistance: Feasibility is High with easy availaibility of
platform for IT development

asibility 20%
Medium Feasibility: Various cloud based platfrom could be
leveraged for building of AI based application. High cost of
building IT infrastructure and probablity of It attack results in
medium feasibility
easibility 30%
Development Cost: Avg cost of building application=
15,00,000. Avg cost of Hiring IT professional for Monitoring
processes: 30 person * 1000000 per annum= 3 cr. Rest other
overhead cost which includes onborading process,
advertising process = 4 cr Thus, total cost will be about = 7.15
cr.
Current Revenue of Berger: 5200 cr approx. Considering that
above strategy would result in increase in market share of
berger paints by 1%. Increase in revenue would be about 50 cr.
Thus it is highly economically feasible

asibility 10%
High schedule feasivility due to increase in efficiency in
processess and continous monitoring
100%