QF-DGN-01

TITLE: DOCUMENT/DRAWING APPROVAL/COMMENT TRANSMITTAL

Project : Design, Supply, Installation, Testing & Commissioning of Aminbazar 400/230 kV


Substation on Turnkey Basis.

Contract Number : PGCB/ADB/400kV/Amin-SS; Date: 30/09/2018


Document Submittal Ref : HYO-PGCB-AMIN-GEN-172; Date: 30/06/2019

Subject : Boundary Wall Borehole Layout Plan for Soil Investigation.

Copy to
To
Project Director Managing Director, PGCB
A-M-M 400kV TL Project
Executive Director (P & D), PGCB
Power Grid Company of Bangladesh Limited (PGCB) √
NLDC Complex, Aftabnagar, Rampura, Dhaka-1212.
Chief Engineer (P & D/Project), PGCB

HYOSUNG Corporation

Kind Attn :

Dear Sir Executive Engr. (Civil Design), PGCB



We are pleased to enclose the following documents for the purpose indicated Intec Gopa International Energy Consultant
below: √

√ Master File
In case of any modification other than those desired are carried out, the same
shall be highlighted clearly in the Drawing/Document with full justification Issued by:
thereof and resubmitted for approval.
(Engr. Md. Delowar Hossain)
Approval/Comments/Information conveyed herein neither relieves the
Superintending Engineer
contractor of his contractual obligation and his responsibilities for correctness Civil Design, P&D.
of dimensions, material of constructions, weight, quantities, design details,
assemble fits, performance particulars and conformity of the supplies with Our Ref: 27.21.0000.412.49.001.19.476
the Statutory Laws of Bangladesh as may be applicable, nor does it limit the
Employer’s right under the contract. Date: 07/07/2019

Item Description of Document Drawing Number Revision Status Enclosed


No Drawing/ Documents Number

Approved (A)
Yes
01 Boundary Wall - PGCB-AMIN-C-01-BW-01 00 Approved with
Comment /
Borehole Layout Sheet:1/1 Correction (C)

Request for re- No


Submission (RR)

For information
(FI)

Please acknowledge receipt of documents:


Received by Date