Appr.
CABLE BUS
D D
Date
MCB1, 1000A
INTERRUPTOR PRINCIPAL DE CIRCUITO
SWITCHBOARD "MSB1" CONTACTO AUX., VER NOTA 5
K
KIRK KEY, N.C.
TABLERO DE INTERRUPTORES "MSB1" MAIN CIRCUIT BREAKER AUX CONTACT, KIRK KEY, N.C.
1200A 480V, 3Ø, 3W, 60HZ 100KA NEMA 1 CONNECT TO B&V PLC CONTROL SYSTEM
CONT.
Description
CONT.
E-602
TRANSFORMADOR PANEL CFV BOMBA DE BAJA PRESION PARA PANEL CFV BOMBA DE AGUA CRYOQUIP, PANEL CFV BOMBA CRIOGENICA DE ALTA PRESION
GND P1005 P1006 P1011 P1013 GNL - GP STRATEGIES, CONECTADO A MSB1 P1015 P1017 PARA GNL CRYOQUIP, CONECTADO A MSB1 Y MSB2
SURGE "EL-T" CONECTADO A MSB1 Y MSB2
Mark
DEVICE 1/0 GND INSULATION CONNECTEDTOMSB1 CONNECTEDTOMSB1ANDMSB2 CONNECTEDTOMSB1ANDMSB2
480V-208/120V
SEE NOTE 5 P1007
LIGHTING CONTACTOR PANEL 3Ø 60HZ
NFE-V-07-BAJA-PICHILINGUE
CONTACTOR POLE, NEMA 1 600A MB 480V-208/120V
DE
SEE NOTE 2 VER NOTA 2 SEE NOTE 2 VER NOTA 2 2, 20 2, 20 2, 20
208/120V, 3Ø, 3Ø 60HZ
ILUMINACION 42 POLOS,
P1082 P1064 P1062 P1060
208/120V, EN NEMA 1 ~ ~ ~ ~
CASA P1080 P1063 P1061
ELECTRICA
~ ~ ~ ~
C VER E-521 C
P1075 P1057 P1058 P1012 C1101 GND P1014 C1102 GND P1016 C1103 GND P1018 C1104 GND
P1076
P1077
P1078
P1079
P1083 PANEL PANEL PANEL PANEL
by DAUCOIN
P1084 PLC PLC PLC PLC
PLC PANEL PLC PANEL PLC PANEL PLC PANEL
B00
CAJA DE CAJA DE
1:1 (Metric D)
PANEL "OPS-L", J-BOX W/ CONEXION
Rev.
PANEL "CNTRL-L" J-BOX W/ CONEXION
; Saved:7/12/2019 6:25 PM
3
225A MB, 225A MB, AIR GAP C/CAMARA AIR GAP C/CAMARA
9212-28
208/120V. 3Ø,
JAN. 9, 2019
208/120V 3Ø,
Drawing Scale:
Drawing code:
42 POLOS, NEMA 1 42 POLOS, NEMA 1
1 2
Plot scale:
PANEL "CNTRL-L" 225A MB, PANEL "OPS-L" 225A MB,
Date:
208/120V 3Ø, 42 POLE, NEMA 1 208/120V 3Ø, 42 POLE, NEMA 1 90HP 90HP 150HP 125KW
HACIA EHSB-H,
CONTINUA EN
CGC
GABRIEL PERDOMO
MOFFATT & NICHOL
Ckd by:
PN.E-604
HACIA (EDIFICIO DE CONTROL) (EDIFICIO DE OPERACIONES) MODULO DEL PROVEEDOR MODULO DEL PROVEEDOR 20-PM-0001B MODULO DEL PROVEEDOR 10-PM-1002A MODULO DEL PROVEEDOR 10-PM-1001A
TO EHSB-H
by AUCOIN, DAVID
ML/DMS/DA
ILUMINACION (CONTROL BUILDING) (OPERATIONS BUILDING) 20-PM-0001A BOMBA DE BAJA PRESION PARA GNL, 90HP BOMBA DE AGUA 1, 150HP BOMBA DE ALTA PRESION PARA GNL 1, 125kW
CONTINUED ON
Submitted by:
Reviewed by:
Designed by:
BOMBA DE BAJA PRESION VENDOR SKID 20-P-0001B VENDOR SKID 10-PM-1002A VENDOR SKID 10-PM-1001A
DS/DA
DWG.E-604 DE PLANTA -
DJS
Dwn by:
VER PLANOS PARA GNL 1, 90HP LP LNG PUMP, 90HP WATER PUMP 1, 150HP HP LNG PUMP 1, 125kW
B GENERALES VENDOR SKID 20-P-0001A B
TO SITE LIGHTING, REFER LP LNG PUMP 1, 90HP
TO ENLARGED LAYOUTS NOTES 11. PROVIDE UL LISTED DISCONNECT, SIZE, AND RATING AS NOTED. PROVIDE
; Plotted:7/15/2019 12:38 PM
NOTES INSTALADOR DE LOS PANELES PLCS/SIS PARA INFORMACION ADICIONAL Y OTROS REQUISITOS. MOUNTING.
TAMPA, FL 33602
1. SUMINISTRAR TODOS LOS EQUIPOS ELECTRICOS QUE SE MUESTRAN A MENOS QUE SE INDIQUE 2. RECEIVE VFD FROM OWNER AND INSTALL IN EHOUSE. PROVIDE HARDWARE,
813-258-8818
DE OTRA MANERA. 11. SUMINISTRAR UN DESCONECTADOR QUE CUMPLA CON LA NORMAS UL 1449, DEL TAMAÑO Y LA PROGRAMING, AND ALL FINAL CONNECTIONS TO VFD AND MOTOR. 12. MAKE ALL FINAL CONNECTIONS TO OWNER FURNISHED EQUIPMENT.
CAPACIDAD DESCRITAS. A MENOS QUE SE INDIQUE LO CONTRARIO SUMINISTRAR SOPORTE DE COORDINATE WITH VFD SUPPLIER/INSTALLER FOR ADDITIONAL INFORMATION
2. RECIBIR EL CFV DEL PROPIETARIO E INSTALARLO EN LA SALA ELECTRICA. SUMINISTRAR MONTAJE . COORDINAR CON EL PROPIETARIO LA LOCALIZACION EXACTA ANTES DEL MONTAJE. AND EXACT REQUIREMENTS. 13. PROVIDE ELECTRONIC PROGRAMMABLE TIME CLOCK IN ELECTRICAL ROOM TO
HARDWARE, PROGRAMACION Y TODAS LAS CONEXIONES FINALES AL CFV Y MOTOR. COORDINAR CONTROL SECURITY SITE LIGHTING CIRCUITS. PROVIDE LIGHTING CONTACTOR
DESDE LV-SWGR-01
(POR PROENERGY)
TIE BREAKER
Appr.
CABLE BUS P1002
KIRK KEY CABLE BUS
INTERRUPTOR
D D
Date
DE CIRCUITO
KIRK KEY MCB2, 1000A
INTERRUPTOR PRINCIPAL DE CIRCUITO
K
KIRK KEY, N.C.
K
CONTACTO AUX., VER NOTA 5 SWITCHBOARD "MSB2"
SWITCHBOARD "MSB1" CONTINUED KIRK KEY
KIRK KEY KIRK KEY, N.C. MAIN CIRCUIT BREAKER AUX CONTACT, TABLERO DE INTERRUPTORES "MSB2"
TABLERO DE INTERRUPTORES "MSB1" N.O. 1000A CONNECT TO B&V PLC CONTROL SYSTEM 1200A 480V, 3Ø, 3W, 60HZ 100KA NEMA 1
Description
CONT.
CONT. INTERRUPTOR DE INTERRUPTOR DE CIRCUITO
LINEA DE EMPALME - VER E-601
MSB1 Y MSB2
Mark
PROTECTIVE CRYOQUIPWATERPUMPVFDPANEL,
DEVICE
CRYOQUIPWATERPUMPVFDPANEL,
CONNECTEDTOMSB1ANDMSB2 CONNECTEDTOMSB1ANDMSB2
GND GND
VFD CFV VFD CFV
(BY CRYOQUIP) (CRYOQUIP) (BY CRYOQUIP) (CRYOQUIP)
SEE NOTE 2, 20 VER NOTA SEE NOTE 2, 20 VER NOTA
~ 2, 20 ~ 2, 20
by DAUCOIN
~ PANEL PANEL ~
PLC PLC
PLC PANEL PLC PANEL
B00
1:1 (Metric D)
8
Rev.
; Saved:7/12/2019 6:26 PM
P1010 C1335 P1009 C1336
5 7
9212-28
LOCAL PANEL
JAN. 9, 2019
Drawing Scale:
Drawing code:
Plot scale:
PLC GND GND
Date:
PANEL
40HP
PLC PANEL 125KW 150HP 40HP PLC PANEL
PLC PANEL
CGC
GABRIEL PERDOMO
MOFFATT & NICHOL
Ckd by:
by AUCOIN, DAVID
ML/DMS/DA
MODULO DEL PROVEEDOR MODULO DEL PROVEEDOR MODULO DEL PROVEEDOR MODULO DEL PROVEEDOR GND PAQUETE DE HACIA CENTRO
Submitted by:
Reviewed by:
Designed by:
10-BM-1001A 10-PM-1001B 10-PM-1002B 10-BM-1001B DE CONTROL DE
DS/DA
AIRE COMPRIMIDO
DJS
VENTILADOR DE RESPALDO PARA BOMBA DE ALTA PRESION BOMBA DE AGUA 2, 150HP VENTILADOR DE RESPALDO PARA MOTORES "MCC1"
Dwn by:
30-PK-0001, 350 HP
B VAPORIZADOR 1, 40HP PARA GNL 2, 125kW VENDOR SKID 10-PM-1002B VAPORIZADOR 2, 40HP COMPRESSED AIR PACKAGE VER PN. E-603 B
VENDOR SKID 10-BM-1001A VENDOR SKID 10-PM-1001B WATER PUMP 2 VENDOR SKID 10-BM-1001B 30-PK-0001 TO MOTOR
BACKUP VAPORIZER BLOWER 1, 40HP HP LNG PUMP 2 150HP BACKUP VAPORIZER BLOWER 2 350 HP CONTROL CENTER
; Plotted:7/15/2019 12:38 PM
40HP
SEE DWG. E-603
TAMPA, FL 33602
813-258-8818
Sheet
100% PLANOS PARA LICITACION Reference No.
EMITIDO: 2019-07-15 E-602
NO APTO PARA CONSTRUCCION
INDEX: 276 OF 305
1 2 3 4 5
DRAWING SCALES SHOWN BASED ON 22"x34" DRAWING