NO URAIAN VOLUME
1 Bollard + Angkur Baut 1.00
4 Spunpile Ø35 cm P = 15 m 5
75.00
5 Pembesian Poer
dia (mm) panjang(m) jumlah btg Panjang total (m) berat (kg/m)
tul Beugel
Ø16 4.79 13 62.27 1.580 98.39
Sengkang
Ø16 0.90 20 18.00 1.580 28.44
Ø16 1.26 20 25.20 1.580 39.82
Ø16 1.40 30 42.00 1.580 66.36
134.62
tul pokok
Ø19 7.75 6 46.50 2.230 103.70
Ø19 7.46 4 29.84 2.230 66.54
Ø19 6.74 4 26.96 2.230 60.12
230.36
6 Beton isi tiang pancang luas penampang (m) Tinggi (m) jumlah tiang
autoCad 0.0284 1.5 5 0.213
JU
AGA
SATUAN HARGA SATUAN (Rp) TOTAL HARGA (Rp)
bh
bh
m3
btg
m1
Kg
+
Kg
+
Kg
m3
Kg
Kg
4 Spunpile Ø35 cm P = 15 m 5
75.00
5 Pembesian Poer
dia (mm) panjang(m) jumlah btg Panjang total (m) berat (kg/m)
tul Beugel
Ø12 4.79 13 62.27 0.888 55.30
sengkang
Ø16 1.4 30 42.00 1.580 66.36
Ø16 0.9 20 18.00 1.580 28.44
94.80
tul pokok
Ø16 7.75 6 46.50 1.580 73.47
Ø16 6.92 4 27.68 1.580 43.73
117.20
6 Beton isi tiang pancang luas penampang (m) Tinggi (m) jumlah tiang
autoCad 0.0284 1.5 5 0.213
JU
AGA
SATUAN HARGA SATUAN (Rp) TOTAL HARGA (Rp)
bh
bh
m3
btg
m1
Kg
+
Kg
+
Kg
m3
Kg
Kg