2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
1. Cement
1.1 Ordinary Portland Cement, 50 kg bag Bag 60 Del 20.33 20.33 20.33 19.67 19.67 19.67 19.67 19.67 19.67 19.47 19.47 19.47
1.2 Ordinary Portland Cement in Bulk MT 60 Del 383.33 383.33 383.33 383.33 383.33 383.33 383.33 383.33 383.33 383.33 383.33 383.33
2. Aggregate
2.1 Granite Aggregate 3/4" MT 60 Del 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00
3. Sand
3.1 Normal River Sand- Ex MT 30 Ex 40.67 40.67 40.67 40.67 40.67 40.67 40.67 40.67 40.67 40.67 40.67 40.67
3.2 Fine River Sand for Plastering -Ex MT 30 Ex 43.33 43.33 43.33 43.33 43.33 43.33 43.33 43.33 43.33 43.33 43.33 43.33
3.3 Normal Mining Sand MT 30 Ex 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
3.4 Fine Mining Sand for Plastering MT 30 Ex 42.33 42.33 42.33 42.33 42.33 42.33 42.33 42.33 42.33 42.33 42.33 42.33
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 1/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
4. Steel Reinforcement
4.1 Mild Steel Round Bar R10, MS146 MT 60 Del 3,031.00 2,800.00 2,763.33 2,710.00 2,602.00 2,522.00 2,650.00 3,130.00 3,130.00 2,880.00 2,910.00 3,160.00
4.2 Mild Steel Round Bar R12, MS146 MT 60 Del 3,031.00 2,905.00 2,853.33 2,783.33 2,670.00 2,590.00 2,695.00 3,180.00 3,180.00 2,930.00 2,960.00 3,210.00
4.3 Mild Steel Round Bar R16, MS146 MT 60 Del 3,031.00 2,905.00 2,853.33 2,783.33 2,670.00 2,590.00 2,695.00 3,180.00 3,180.00 2,930.00 2,960.00 3,210.00
4.4 High Tensile Deformed Bar-Y10, MS146 MT 60 Del 2,922.33 2,800.00 2,763.33 2,710.00 2,602.00 2,522.00 2,650.00 3,130.00 3,130.00 2,880.00 2,910.00 3,160.00
4.5 High Tensile Deformed Bar-Y12, MS146 MT 60 Del 2,922.33 2,800.00 2,763.33 2,710.00 2,602.00 2,522.00 2,650.00 3,130.00 3,130.00 2,880.00 2,910.00 3,160.00
4.6 High Tensile Deformed Bar-Y16, MS146 MT 60 Del 2,922.33 2,730.00 2,686.67 2,630.00 2,530.00 2,460.00 2,570.00 2,980.00 2,980.00 2,780.00 2,780.00 3,010.00
4.7 High Tensile Deformed Bar-Y20, MS146 MT 60 Del 2,922.33 2,730.00 2,686.67 2,630.00 2,530.00 2,460.00 2,570.00 2,980.00 2,980.00 2,780.00 2,780.00 3,010.00
4.8 High Tensile Deformed Bar-Y25, MS146 MT 60 Del 2,922.33 2,730.00 2,686.67 2,630.00 2,530.00 2,460.00 2,570.00 2,980.00 2,980.00 2,780.00 2,780.00 3,010.00
4.9 High Tensile Deformed Bar-Y32, MS146 MT 60 Del 2,922.33 2,730.00 2,686.67 2,630.00 2,530.00 2,460.00 2,570.00 2,980.00 2,980.00 2,780.00 2,780.00 3,010.00
4.10 BRC A6, MS145 m2 30 Del 7.50 7.50 7.35 7.35 7.23 7.23 7.23 7.93 7.93 7.50 7.50 7.80
4.11 BRC A7, MS145 m2 30 Del 9.67 9.67 9.50 9.50 9.23 9.23 9.23 10.83 10.83 10.10 10.10 10.40
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 2/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
4.12 BRC A8, MS145 m2 30 Del 22.33 20.17 18.17 16.37 14.87 14.87 14.87 14.87 14.87 13.80 13.80 14.00
4.13 BRC A9, MS145 m2 30 Del 16.67 16.67 16.20 16.20 15.93 15.93 15.93 17.33 17.33 16.15 16.15 17.15
4.14 BRC A10, MS145 m2 30 Del 21.67 21.67 20.67 20.17 20.10 20.10 20.10 21.33 21.33 19.80 19.80 20.80
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 3/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
5.1 Ready Mix Concrete - Normal Mix - Grade15, Granite m3 30 Del 256.67 256.67 256.67 256.67 256.67 256.67 256.67 256.67 256.67 256.67 256.67 256.67
5.2 Ready Mix Concrete - Normal Mix - Grade 20, Granite m3 30 Del 256.67 256.67 256.67 256.67 256.67 256.67 256.67 256.67 256.67 256.67 256.67 256.67
5.3 Ready Mix Concrete - Normal Mix - Grade25, Granite m3 30 Del 286.67 286.67 286.67 286.67 286.67 286.67 286.67 286.67 286.67 286.67 286.67 286.67
5.4 Ready Mix Concrete - Normal Mix - Grade 30, Granite m3 30 Del 286.67 286.67 286.67 286.67 286.67 286.67 286.67 286.67 286.67 286.67 286.67 286.67
5.5 Ready Mix Concrete - Normal Mix - Grade 35, Granite m3 30 Del 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00
5.6 Ready Mix Concrete - Normal Mix - Grade 40, Granite m3 60 Del - - - - - - - - - - - -
5.7 Ready Mix Concrete - Pump Mix - Grade 30, Granite m3 60 Del - - - - - - - - - - - -
5.8 Ready Mix Concrete - Pump Mix - Grade 35, Granite m3 60 Del - - - - - - - - - - - -
5.9 Ready Mix Concrete - Pump Mix - Grade 40, Granite m3 60 Del - - - - - - - - - - - -
6. Bricks
6.1 Common Clay Bricks - Pallet Piece 30 Del 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 4/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
6.2 Cement Sand Bricks - Pallet Piece 30 Del 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38
6.3 Smooth Face Facing Brick, Red Piece 30 Del 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
6.4 AAC, Light Weight Block - 100mm x 200mm x 600mm Piece 60 Del - - - - - - - - - - - -
6.5 AAC, Light Weight Block - 125mm x 200mm x 600mm Piece Piece - - - - - - - - - - - -
6.6 AAC, Light Weight Block - 150mm x 200mm x 600mm Piece Piece - - - - - - - - - - - -
6.7 AAC, Light Weight Block - 200mm x 200mm x 600mm Piece Piece - - - - - - - - - - - -
7. Roofing
7.1 Interlocking Concrete Tiles - Standard Duotone Colour 420mm x 330mm piece 60 Del 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20
7.2 MS Decking - Step Roofing M350 G24, 0.53mm TCT, Clean Colourbond m2 30 Del 70.33 70.33 70.33 70.33 70.33 70.33 70.33 70.33 70.33 70.33 70.33 70.33
MS Decking - Ajiya Euro Step Roofing M350 G28, 0.40mm TCT, Clean
7.5 m2 60 Del 48.33 48.33 48.33 48.33 48.33 48.33 48.33 48.33 48.33 48.33 48.33 48.33
Colourbond
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 5/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
MS Decking - Ajiya Euro Step Roofing M350 G26, 0.47mm TCT, Clean
7.6 m2 60 Del 58.33 58.33 58.33 58.33 58.33 58.33 58.33 58.33 58.33 58.33 58.33 58.33
Colourbond
7.8 MS Decking-Lysaght Colourbond-Spandex Hi- Ten 0.47mm TCT m2 60 Del 63.33 63.33 63.33 63.33 63.33 63.33 63.33 63.33 63.33 63.33 63.33 63.33
7.9 MS Decking-Lysaght Colourbond-Trimdex Hi-Ten 0.47mm TCT m2 60 Del 46.67 46.67 46.67 46.67 46.67 46.67 46.67 46.67 46.67 46.67 46.67 46.67
7.10 MS Decking-Lysaght Colourbond-Kliplok Hi-Ten 0.53mm TCT m2 60 Del 61.67 61.67 61.67 61.67 61.67 61.67 61.67 61.67 61.67 61.67 61.67 61.67
MS Decking - Ajiya Euro Step Roofing M350 G26, 0.53mm TCT, Clean
7.16 m2 60 Del - - - - - - - - - - - -
Colourbond
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 6/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
8.7 Porcelain Tiles, Standard Colour, 300mm x 600mm x 9mm Piece 60 Del - - - - - - - - - - - -
8.8 Porcelain Tiles, Standard Colour, 600mm x 600mm x 9mm Piece 60 Del - - - - - - - - - - - -
9. Ceiling Board
Page 7/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
9.3 Plain Gysum Board, 610mm x 1220mm x 9.5mm, (Boral/Armstrong) Sheet 60 Del 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33 8.33
9.4 Plain Gypsum Ceiling Board, 1220mm x 2440mm x 12mm (Hume) Sheet 60 Del - - - - - - - - - - - -
9.5 Plain Gypsum Ceiling Board, 1220mm x 2440mm x 9mm (Hume) Sheet 60 Del - - - - - - - - - - - -
10.1 Galvanised Iron Pipes, Class A 20mm Diameter (Maruichi), MS863 6m run 60 Del 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67
10.2 Galvanised Iron Pipes, Class B 25mm Diameter (Maruichi), MS863 6m run 60 Del 83.33 83.33 83.33 83.33 83.33 83.33 83.33 83.33 83.33 83.33 83.33 83.33
10.3 Galvanised Iron Pipes, Class C 25mm Diameter (Maruichi), MS863 6m run 60 Del 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00 85.00
Page 8/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
10.7 HDPE Pipe PN 16 - 25mm Diameter, MS 1058 100m roll 60 Del 316.67 316.67 316.67 316.67 316.67 316.67 316.67 316.67 316.67 316.67 316.67 316.67
10.8 HDPE Pipe PN 16 - 50mm Diameter, MS 1058 100m roll 60 Del 1,233.33 1,233.33 1,233.33 1,233.33 1,233.33 1,233.33 1,233.33 1,233.33 1,233.33 1,233.33 1,233.33 1,233.33
10.9 ABS Pipe PN 15 Class E - 20mm, MS1419 5.8m run 60 Del 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
10.10 ABS Pipe PN 15 Class E - 25mm, MS1419 5.8m run 60 Del 26.67 26.67 26.67 26.67 26.67 26.67 26.67 26.67 26.67 26.67 26.67 26.67
Page 9/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Urinal Bowl, santana 320 c/w hanger, flange, ceramic waste & cleaning
11.7 Iitem 60 Del 526.67 526.67 526.67 526.67 526.67 526.67 526.67 526.67 526.67 526.67 526.67 526.67
set, johnson-suisse
12. Paints
12.1 Paint-ICI dulux standard colour-Undercoat speed 5 Litres 60 Del 112.67 112.67 112.67 112.67 112.67 112.67 112.67 112.67 112.67 112.67 112.67 112.67
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
12.5 Paint-ICI dulux standard colour-timber/wood, timbertone, clear glossy 5 Litres 60 Del 88.33 88.33 88.33 88.33 88.33 88.33 88.33 88.33 88.33 88.33 88.33 88.33
12.6 Paint-Nippon standard colour-undercoat, 9000 undercoat 5 Litres 60 Del 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67
12.7 Paint-Nippon standard colour-timber/wood, timber finish 5 Litres 60 Del 91.67 91.67 91.67 91.67 91.67 91.67 91.67 91.67 91.67 91.67 91.67 91.67
12.8 Paint-Nippon standard colour-gloss oil based, 9000 gloss finish 5 Litres 60 Del 96.67 96.67 96.67 96.67 96.67 96.67 96.67 96.67 96.67 96.67 96.67 96.67
12.11 Paint-Nippon standard colour-external acrylic emulsion, weatherbond 5 Litres 60 Del 126.67 126.67 126.67 126.67 126.67 126.67 126.67 126.67 126.67 126.67 126.67 126.67
12.12 Paint - ICI Dulux Standard Colour Gloss Oilbased, Gloss Finish (5L) 5 Litres 60 Del 111.67 111.67 111.67 111.67 111.67 111.67 111.67 111.67 111.67 111.67 111.67 111.67
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
12.19 Paint - ICI Dulux Standard Colour - Undercoat, Speed 20 Litres 60 Del - - - - - - - - - - - -
13.4 Universal beams-102mm x 102mm x 8.76mm (19.35kg/m) MT 60 Del 3,200.00 3,200.00 3,200.00 3,200.00 3,200.00 3,200.00 3,200.00 3,200.00 3,200.00 3,200.00 3,200.00 3,200.00
13.5 Universal beams-400mm x 400mm (2.17kg/m) MT 60 Del 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00
13.6 Equal angles-38mm x 38mm x 3.8mm (2.17kg/m) MT 60 Del 2,766.67 2,766.67 2,766.67 2,766.67 2,766.67 2,766.67 2,766.67 2,766.67 2,766.67 2,766.67 2,766.67 2,766.67
13.7 Equal angles-50mm x 50mm x 4mm (3.06kg/m) MT 60 Del 2,933.33 2,933.33 2,933.33 2,933.33 2,933.33 2,933.33 2,933.33 2,933.33 2,933.33 2,933.33 2,933.33 2,933.33
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 12/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
14. Plywood
14.1 Plywood-shuttering board, 4 x 8 x 12 mm Piece - 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67 76.67
14.2 Mixed Medium Hardword Papan Plank (GMS) 1" x 6" MT - 1,633.33 1,633.33 1,633.33 1,633.33 1,633.33 1,633.33 1,633.33 1,633.33 1,633.33 1,633.33 1,633.33 1,633.33
14.3 Marine Plywood - 18mm x 4' x 8' (Local Grade) 7 ply Piece 60 Del - - - - - - - - - - - -
14.4 Marine Plywood - 12mm x 4' x 8' (Local Grade) 5 ply Piece 60 Del - - - - - - - - - - - -
14.5 Tego Film Single Sided - 18mm x 4' x 8' (Local Grade) 7 ply Piece 60 Del - - - - - - - - - - - -
Page 13/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
14.8 Tego Film Single Sided - 12mm x 4' x 8' (Local Grade) 5 ply Piece 60 Del - - - - - - - - - - - -
14.9 Shuttering Board - 18mm x 4' x 8' (Local Grade) 9 ply Piece 60 Del - - - - - - - - - - - -
14.10 Shuttering Board - 18mm x 4' x 8' (Local Grade) 7 ply Piece 60 Del - - - - - - - - - - - -
14.12 Shuttering Board - 12mm x 4' x 8' (Local Grade) 5 ply Piece 60 Del - - - - - - - - - - - -
15. Timber
15.1 GMS Heavy Hardwood, Balau 1 MT - 2,333.33 2,333.33 2,333.33 2,333.33 2,333.33 2,333.33 2,333.33 2,333.33 2,333.33 2,333.33 2,333.33 2,333.33
15.2 GMS light Hardword, Dark Red Meranti MT - 3,316.67 3,316.67 3,316.67 3,316.67 3,316.67 3,316.67 3,316.67 3,316.67 3,316.67 3,316.67 3,316.67 3,316.67
15.3 GMS Medium Hardword, Kapur MT - 2,700.00 2,700.00 2,700.00 2,700.00 2,700.00 2,700.00 2,700.00 2,700.00 2,700.00 2,700.00 2,700.00 2,700.00
15.4 Scantling Medium Hardword, Kapur MT - 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33 2,683.33
15.5 Scantling Mixed Medium Hardwood MT - 1,438.33 1,438.33 1,438.33 1,438.33 1,438.33 1,438.33 1,438.33 1,438.33 1,438.33 1,438.33 1,438.33 1,438.33
15.6 GMS Heavy Hardwood, Balau 2 MT - 3,683.33 3,683.33 3,683.33 3,683.33 3,683.33 3,683.33 3,683.33 3,683.33 3,683.33 3,683.33 3,683.33 3,683.33
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 14/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 15/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
16. Glass
16.1 Clear Float Glass 5mm Thk, Local/Imported m2 - 51.33 51.33 51.33 51.33 51.33 51.33 51.33 51.33 51.33 51.33 51.33 51.33
16.2 Figure/Obscured Glass 5mm Thk, Local/Imported, Inclusive Cutting m2 - 57.33 57.33 57.33 57.33 57.33 57.33 57.33 57.33 57.33 57.33 57.33 57.33
16.3 Tinted Float Glass 6mm Thk, Local / Imported, Inclusive of Cutting m2 - 76.00 76.00 76.00 76.00 76.00 76.00 76.00 76.00 76.00 76.00 76.00 76.00
17. Ironmongery
17.4 Concorde 102mm x 76mm x 2.0mm SS hinge SUS 304 Pair 60 Del 45.33 45.33 41.00 41.00 41.00 41.00 41.00 41.00 41.00 41.00 41.00 41.00
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 16/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
18.1 Single Sided Woven Aluminium Foil (W118) - 1.25m x 48m m2 60 Del - - - - - - - - - - - -
18.4 Rockwool Thermal Rock B50, 1200mm (W) x 5000mm (L) x 50mm thick Roll 60 Del - - - - - - - - - - - -
18.5 Double Sided Woven Foil (W228 FR) - 1.25m x 48m m2 60 Del - - - - - - - - - - - -
18.6 Rockwool Thermal Rock B40, 1200mm (W) x 5000mm (L) x 75mm thick Roll 60 Del - - - - - - - - - - - -
18.7 Rockwool Thermal Rock B40, 1200mm (W) x 5000mm (L) x 50mm thick Roll 60 Del - - - - - - - - - - - -
19.1 RC Square Pile, 150mm x 150mm x 6m - starter with cast iron shoe Piece 60 Del - - - - - - - - - - - -
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 17/18
2017 BUILDING MATERIAL PRICES SARAWAK - MIRI
2017(RM)
Pay
No. Category of Material Unit
Terms
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
19.5 RC Square Pile, 200mm x 200mm x 12m - starter with cast iron shoe Piece 60 Del - - - - - - - - - - - -
19.7 RC Square Pile, 200mm x 200mm x 6m - starter with cast iron shoe Piece 60 Del - - - - - - - - - - - -
19.8 RC Square Pile, 150mm x 150mm x 12m - starter with cast iron shoe Piece 60 Del - - - - - - - - - - - -
* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.