KELISTRIKAN NUSA
TENGGARA BARAT
GI 150 kV AMPENAN
MW DM = 290 MW
2x30 MVA + 1x
60MVA GI 150 kV MANTANG
PLTD
PAOK MOTONG
BP = 234.9 MW
PLTD 1x30 MVA + 1x60 MVA 1. GI 150 kV
AMPENAN Pringgabaya CD = 56,1 MW
1. PLTU JERANJANG 3x25 (1x30MVA)
GI 150 kV
MW
Sengkol
2. MOBILE POWER PLANT
2x30 MVA 1. GI 150 kV
(MPP) 2x25 MW
PAOKMOTONG
GI 150 kV JERANJANG (1x30 + 1x60 MVA)
(2x30 MVA)
www.pln.co.id |
KONDISI INTERKONEKSI SUMBAWA – BIMA *per 30 Juni 2019
ULPLTD LABUHAN ULPLTD BIMA (+NIU & SAPE)
D. MAMPU KIT : 3.370 kW D. MAMPU KIT : 8.420 kW
D. TERPASANG : 13.420 kW SISTEM BIMA D.TERPASANG : 14.313 kW
D
D D
D
D
D
D
D
SISTEM ISOLATED LUNYUK SISTEM ISOLATED KLAWIS SISTEM ISOLATED LEBIN SISTEM ISOLATED NGGELU SISTEM ISOLATED BAJO PULO
D. MAMPU : 1930 kW D. MAMPU : 195 Kw D. MAMPU : 350 kW D. MAMPU : 113 kW D. MAMPU : 195 kW
B. PUNCAK : 1394 kW B. PUNCAK : 107 kW B. PUNCAK : 230 kW B. PUNCAK : 63 Kw B. PUNCAK : 82 kW
CADANGAN : 536 kW CADANGAN : 88 kW CADANGAN : 120 kW CADANGAN : 50 kW CADANGAN : 113 kW
STATUS NORMAL STATUS NORMAL
STATUS SIAGA STATUS SIAGA STATUS NORMAL
www.pln.co.id | 03
TOPOLOGI MERCUSUAR UIW NTB
Kondisi Mercusuar (sebelum interkoneksi)
No Sistem Jumlah
3 User Mercusuar di UIW NTB :
1 Lombok 1
2 Sumbawa 1
3 Bima 1
4 Isolated 10
Interkoneksi 30 Juni 2019
www.pln.co.id |
KENDALA
1. Skema mercusuar NTB setelah interkoneksi Sumbawa – Bima
2. Bagaimana mekanisme penambahan sistem baru di mercusuar
www.pln.co.id |
TERIMA KASIH