Anda di halaman 1dari 7

VALIDASI KONDISI

KELISTRIKAN NUSA
TENGGARA BARAT

Bogor, 21 Agustus 2019


KONDISI SISTEM LOMBOK
GI 150 kV TANJUNG
(1x30 MVA)
SUTT BAYAN - TANJUNG
SUTT SAMBELIA - BAYAN
TOTAL ASET BEROPERASI
GI 150 kV 8 GARDU INDUK 150 KV
SUTT 150 kV SAMBELIA
MENINTING-
TANJUNG GI 150 kV BAYAN
(1x20 MVA) IPP PLTU
LED
14 TRAFO 150/20 KV
(1x30 MVA) (2X25 MW)
500 MVA
SKTT 150 kV AMPENAN SUTT
- MENINTING ; PRINGGABAYA-
SAMBELIA
292 KMS
AMPENAN – PLTG
PEAKER
GI 150 kV PLTD Cogindo
LOMBOK MATARAM 2X60 Pringgabaya Sistem Kelistrikan Lombok
PEAKER 150 MVA

GI 150 kV AMPENAN
MW DM = 290 MW
2x30 MVA + 1x
60MVA GI 150 kV MANTANG
PLTD
PAOK MOTONG
BP = 234.9 MW
PLTD 1x30 MVA + 1x60 MVA 1. GI 150 kV
AMPENAN Pringgabaya CD = 56,1 MW
1. PLTU JERANJANG 3x25 (1x30MVA)
GI 150 kV
MW
Sengkol
2. MOBILE POWER PLANT
2x30 MVA 1. GI 150 kV
(MPP) 2x25 MW
PAOKMOTONG
GI 150 kV JERANJANG (1x30 + 1x60 MVA)
(2x30 MVA)

SUTT SUTT SENGKOL-


JERANJANG- PAOKMOTONG
GI 150 kV SENGKOL
SEKOTONG
1x30 MVA SUTT
SENGKOL-
KUTA Rencana
GI 150 kV Existing
KUTA
1x30 MVA

www.pln.co.id |
KONDISI INTERKONEKSI SUMBAWA – BIMA *per 30 Juni 2019
ULPLTD LABUHAN ULPLTD BIMA (+NIU & SAPE)
D. MAMPU KIT : 3.370 kW D. MAMPU KIT : 8.420 kW
D. TERPASANG : 13.420 kW SISTEM BIMA D.TERPASANG : 14.313 kW

PLTMG SUMBAWA PLTMG BONTO


SISTEM SUMBAWA GI Bonto
: 51.867 D. MAMPU KIT : 51.867 kW
D. MAMPU KIT PLTMG Sumbawa ACSR OSTRICH
kW 11.5 kms D. TERPASANG : 53.070 kW
G ACSR HAWK
: 53.070 GI Sumbawa 15.9603 kms
D. TERPASANG
kW D PLTD Lab uhan
GI Woha GI Bima
ULTG BIMA
GI Alas ACSR OSTRICH GI Dompu
GI Labuhan
PLTU SUMBAWA BARAT 69.75 kms
ACSR OSTRICH
ACSR OSTRICH BAY LINE : 70 kV
27.773 kms
25.183 kms
D. MAMPU KIT : 14.000 kW ACSR OSTRICH BAY LINE : 150 kV
31.45 kms
D. TERPASANG : 17.000 kW ACSR HAWK
PLTU Sumbawa Barat 79.79 kms
ACSR HAWK ULPLTD DOMPU
U 77.5 kms
ULPLTD TALIWANG (+ALAS) D PLTD Taliwang D. MAMPU KIT : 1.554 kW
GI PLTU
D. MAMPU KIT : 2.050 kW
ACSR GI Taliwang
GI Empang
D. TERPASANG : 2.506 kW
OSTRICH
3.808
D. TERPASANG : 6.809 Kw kms

Titik Interkoneksi di Bay kopel SISTEM *30 DAYA MAMPU


GI Empang (150kV) Juni 2019
PEMBANGKIT
BIMA 54.100 kW
SUMBAWA 78.650 kW
Sistem Interkoneksi Sumbawa - Bima
TOTAL 132.750 kW
DM = 132.75 MW
BP = 96.71 MW
CD = 36.04 MW www.pln.co.id |
KONDISI SISTEM ISOLATED
STATUS PEMBANGKIT
*per 30 Juni 2019 7 NORMAL
3 SIAGA
SISTEM ISOLATED PEKAT

Kondisi Sistem Isolated


SISTEM ISOLATED LANTUNG SISTEM ISOLATED MEDANG SISTEM ISOLATED LABUAN AJI SISTEM ISOLATED SEBOTOK
D. MAMPU : 230 kW D. MAMPU : 320 Kw D. MAMPU : 178 Kw D. MAMPU : 207 kW D. MAMPU
: 1845 kW
B. PUNCAK : 148 kW B. PUNCAK : 138 kW B. PUNCAK : 71 kW (PLN+SEWA)
B. PUNCAK : 76 kW
CADANGAN : 82 kW CADANGAN : 182 kW CADANGAN : 107 kW B. PUNCAK : 1740 kW
CADANGAN : 131 kW
STATUS NORMAL STATUS NORMAL STATUS NORMAL CADANGAN : 105 kW
STATUS NORMAL
STATUS SIAGA

D
D D
D

D
D
D
D

SISTEM ISOLATED LUNYUK SISTEM ISOLATED KLAWIS SISTEM ISOLATED LEBIN SISTEM ISOLATED NGGELU SISTEM ISOLATED BAJO PULO
D. MAMPU : 1930 kW D. MAMPU : 195 Kw D. MAMPU : 350 kW D. MAMPU : 113 kW D. MAMPU : 195 kW
B. PUNCAK : 1394 kW B. PUNCAK : 107 kW B. PUNCAK : 230 kW B. PUNCAK : 63 Kw B. PUNCAK : 82 kW
CADANGAN : 536 kW CADANGAN : 88 kW CADANGAN : 120 kW CADANGAN : 50 kW CADANGAN : 113 kW
STATUS NORMAL STATUS NORMAL
STATUS SIAGA STATUS SIAGA STATUS NORMAL
www.pln.co.id | 03
TOPOLOGI MERCUSUAR UIW NTB
Kondisi Mercusuar (sebelum interkoneksi)

No Sistem Jumlah
3 User Mercusuar di UIW NTB :
1 Lombok 1
2 Sumbawa 1
3 Bima 1
4 Isolated 10
Interkoneksi 30 Juni 2019

Kondisi Mercusuar (setelah interkoneksi) Upload Data Upload Data Release


Sistem Sistem data
No Sistem Jumlah
Lombok Sumbawa,
1 Lombok 1 • user UIW NTB
2 Sumbawa - Bima 1 • user UP3B Bima, Isolated
3 Taliwang-Labuhan- 1 Mataram • user UPK Tambora
Empang
4 Bima 1
5 Isolated 10

www.pln.co.id |
KENDALA
1. Skema mercusuar NTB setelah interkoneksi Sumbawa – Bima
2. Bagaimana mekanisme penambahan sistem baru di mercusuar

www.pln.co.id |
TERIMA KASIH

Anda mungkin juga menyukai