Anda di halaman 1dari 2

92 B 110

Cutting of
reinforcement
bars for the 112 H 124
diaphragm 124 L 136
Putting
94 18 112 reinforcement Putting forms on
bars on the the diaphragm
diaphragm
92 C 112 124 12 136
112 12 124
Cutting of forms
for the diaphragm

92 20 112

0 A 92 D 98 112 M 122
92
Embankment Setting of cranes
98 I 112 Putting of steel
Operation on the work place Girder launching reinforcement for
the section of pier
0 92 92 141 14 155
135 6 141
155 10 165

92 E 110
Cutting of forms 110 J 122
122 N 134
for the backwall Putting
reinforcement Putting forms on
117 18.6 135 the backwall
7 bars on the
92 F 110 backwall
147 12 159
Cutting of
135 12 147
reinforcement
bars for the
backwall

117 18 135
136 O 165
Concrete pouring
on the diaphragm

136 29.3 165

165 Q 165
Finished

134 P 140
Concrete pouring
on the backwall

159 6 165

92 G 98 98 K 116
Removing forms of Finishing the
the pier surface of the pier

141 6 147 147 18 165