Anda di halaman 1dari 159

Analisa Harga Satuan Pekerjaan Persiapan

Diposkan : 31 Mei 2014


Oleh : Endang Kusman

No. URAIAN SATUAN VOLUME

A-01 1 M' Pagar Sementara Dari Kayu Tinggi 2 m


- Dolken Kayu Ø 8-10 / 400 cm Btg 1.25
- Semen Portland Kg 2.5
- Pasir beton M3 0.005
- Koral Beton 2/3 M3 0.009
- Kayu balok terentang M3 0.072
- Paku Biasa 2" - 5" Kg 0.06
- Residu Kg 0.4
- Pekerja Oh 0.4
- Tukang Kayu Oh 0.2
- Kepala Tukang Oh 0.02
- Mandor Oh 0.02
Jumlah
Dibulatkan
A-02 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m
- Dolken Kayu Ø 8-10 / 400 cm Btg 1.25
- Semen Portland Kg 2.5
- Seng Gelombang BJLS-30 Lbr 1.2
- Pasir beton M3 0.005
- Koral Beton 2/3 M3 0.009
- Kayu balok terentang M3 0.072
- Paku Biasa 2" - 5" Kg 0.06
- Meni Besi Kg 0.45
- Pekerja Oh 0.4
- Tukang Kayu Oh 0.2
- Kepala Tukang Oh 0.02
- Mandor Oh 0.02
Jumlah
Dibulatkan
A-03 1 M' Pagar SementaraKawat Duri Tinggi 1,80 m
- Dolken Kayu Ø 8-10 / 400 cm Btg 1
- Semen Portland Kg 2
- Kawat Duri Kg 2.5
- Pasir beton M3 0.005
- Koral Beton 2/3 M3 0.009
- Paku Biasa 2" - 5" Kg 0.06
- Pekerja Oh 0.3
- Tukang Kayu Oh 0.2
- Kepala Tukang Oh 0.02
- Mandor Oh 0.02
Jumlah
Dibulatkan
A-04 1 M2 Pengukuran Dan Pasang Bouwplank
- Kayu kaso 5/7 M3 0.012
- Paku Biasa 2" - 5" Kg 0.02
- Kayu papan albasia M3 0.007
- Pekerja Oh 0.1
- Tukang Kayu Oh 0.1
- Kepala Tukang Oh 0.01
- Mandor Oh 0.005
Jumlah
Dibulatkan

A-05 1 M2 Pembuatan Kantor Sementara dgn Lantai Diplester


- Dolken Kayu Ø 8-10 / 400 cm Btg 1.25
- Kayu Balok terentang M3 0.18
- Paku Biasa Kg 0.85
- Besi Strip Kg 1.1
- Semen Portland Kg 35
- Pasir Pasang M3 0.15
- Pasir beton M3 0.1
- Koral Beton2/3 M3 0.15
- Bata Merah Bh 30
- Seng Plat m' 0.25
- Kawat harmonika M2 2
- Kaca Polos 3mm M2 0.08
- Kunci Tanam Bh 0.15
- Plywood 120 x 240 x 0,4 cm Lbr 0.06
- Pekerja Oh 2
- Tukang Kayu Oh 2
- Tukang Batu Oh 1
- Kepala Tukang Oh 0.3
- Mandor Oh 0.05
Jumlah
Dibulatkan
A-06 1 M2 Pembuatan Gudang Semen dan Alat-alat
- Dolken Kayu Ø 8-10 / 400 cm Btg 1.7
- Kayu balok terentang M3 0.21
- Paku Biasa Kg 0.3
- Semen Portland Kg 10.5
- Pasir Beton M3 0.03
- Koral Beton 2/3 M3 0.05
- Seng Gelombang BJLS 30 Lbr 1.5
- Pekerja Oh 1
- Tukang Kayu Oh 2
- Kepala Tukang Oh 0.2
- Mandor Oh 0.05
Jumlah
Dibulatkan
A-07 1 M2 Pembuatan Bedeng Buruh
- Dolken Kayu Ø 8-10 / 400 cm Btg 1.25
- Kayu balok terentang M3 0.186
- Paku Biasa Kg 0.3
- Semen Portland Kg 18
- Pasir Beton M3 0.03
- Koral Beton 2/3 M3 0.05
- Seng Gelombang BJLS 30 Lbr 1.5
- Pekerja Oh 1
- Tukang Kayu Oh 2
- Kepala Tukang Oh 0.2
- Mandor Oh 0.05
Jumlah
Dibulatkan
A-08 1 M2 Membersihkan Lapangan dan Perataan
- Pekerja Oh 0.1
- Mandor Oh 0.05
Jumlah
Dibulatkan
A-09 1M2 Pembuatan Jalan Sementara
- Batu Belah 15/20 M3 0.15
- Batu Pecah 5/7 M3 0.09
- Pasir Pasang M3 0.01
- Pekerja Oh 1
- Mandor Oh 0.05
Jumlah
Dibulatkan
A-10 1 M3 Bongkaran Beton Bertulang
- Pekerja Oh 6.667
- Mandor Oh 0.333
Dib Jumlah
ulat
kan
A-11 1 M3 Bongkaran Dinding Tembok Bata Merah
- Pekerja Oh 6.667
- Mandor Oh 0.033
Jumlah
Dibulatkan
A-12 1 M¹ Pagar beton Pracetak ( 5 x 50 x 213 ) cm
- Panel Beton Pracetak Lbr 0.986
- Kolom Beton Pracetak Btg 0.525
- Pasir Beton M3 0.074
- Koral 2/3 M3 0.146
- Semen abu - abu Kg 45
- Pekerja Oh 0.375
- Tukang Batu Oh 0.125
- Kepala Tukang Oh 0.012
- Mandor Oh 0.019
Jumlah
Dibulatkan
A-13 1 M¹ Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'
- Kawat ram ayam Lbr 0.434
- Besi siku L 50.50.5 Kg 6.786
- Besi pelat (1,2 x 3) mm Kg 0.0424
- Baut bh 4
- Semen Portland Kg 2.5
- Pasir beton M3 0.005
- Koral Beton 2/3 M3 0.009
- Pekerja Oh 0.375
- Tukang Batu Oh 0.125
- Kepala Tukang Oh 0.012
- Mandor Oh 0.019
Jumlah
Dibulatkan
A-14 1 M2 Pagar BRC lengkap dengan tiang
- BRC lengkap dengan tiang Lbr 0.434
- Semen Portland Kg 2
- Kawat Duri Kg 2.5
- Pasir beton M3 0.005
- Koral Beton 2/3 M3 0.009
- Pekerja Oh 0.375
- Tukang Batu Oh 0.125
- Kepala Tukang Oh 0.012
- Mandor Oh 0.019
Jumlah
Dibulatkan
A-15 1 M2 Steiger Werk / perancah dari Bambu
- Bambu Ø 6 - 10 (600) cm btng 1
- Tali ijuk kg 0.25
- Pekerja org 0.25
- Tukang kayu org 0.017
- Kepala tukang org 0.002
- Mandor org 0.013
Jumlah
Dibulatkan
A-16 1 M' Cerucuk Bambu
- Bambu Ø 7 -10 (400) cm btng 1.25
- Pekerja org 0.5
- Mandor org 0.025
Jumlah
Dibulatkan
Kembali ke Analisa AHS SNI
HARGA SATUAN HARGA
(Rp) (Rp)

28,000.00 35,000.00
1,406.00 3,515.00
255,400.00 1,277.00
211,100.00 1,899.90
2,640,000.00 190,080.00
23,400.00 1,404.00
8,100.00 3,240.00
42,000.00 16,800.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 1,600.00
269,315.90
269,316.00

28,000.00 35,000.00
1,406.00 3,515.00
62,900.00 75,480.00
255,400.00 1,277.00
211,100.00 1,899.90
2,640,000.00 190,080.00
23,400.00 1,404.00
30,400.00 13,680.00
42,000.00 16,800.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 1,600.00
355,235.90
355,236.00

28,000.00 28,000.00
1,406.00 2,812.00
63,500.00 158,750.00
255,400.00 1,277.00
211,100.00 1,899.90
23,400.00 1,404.00
42,000.00 12,600.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 1,600.00
222,842.90
222,843.00

1,870,500.00 22,446.00
23,400.00 468
2,071,700.00 14,501.90
42,000.00 4,200.00
65,000.00 6,500.00
75,000.00 750
80,000.00 400
49,265.90
49,266.00

28,000.00 35,000.00
2,640,000.00 475,200.00
23,400.00 19,890.00
26,800.00 29,480.00
1,406.00 49,210.00
233,400.00 35,010.00
255,400.00 25,540.00
211,100.00 31,665.00
775 23,250.00
15,815.00 3,953.75
35,900.00 71,800.00
87,400.00 6,992.00
94,500.00 14,175.00
140,000.00 8,400.00
42,000.00 84,000.00
65,000.00 130,000.00
65,000.00 65,000.00
75,000.00 22,500.00
80,000.00 4,000.00
1,135,065.75
1,135,066.00

28,000.00 47,600.00
2,640,000.00 554,400.00
23,400.00 7,020.00
1,406.00 14,763.00
255,400.00 7,662.00
211,100.00 10,555.00
62,900.00 94,350.00
42,000.00 42,000.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 4,000.00
927,350.00
927,350.00

28,000.00 35,000.00
2,640,000.00 491,040.00
23,400.00 7,020.00
1,406.00 25,308.00
255,400.00 7,662.00
211,100.00 10,555.00
62,900.00 94,350.00
42,000.00 42,000.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 4,000.00
861,935.00
861,935.00

42,000.00 4,200.00
80,000.00 4,000.00
8,200.00
8,200.00

205,500.00 30,825.00
196,000.00 17,640.00
233,400.00 2,334.00
42,000.00 42,000.00
80,000.00 4,000.00
96,799.00
96,799.00

42,000.00 280,014.00
80,000.00 26,640.00
306,654.00
306,654.00

42,000.00 280,014.00
80,000.00 2,640.00
282,654.00
282,654.00

199,200.00 196,411.20
264,000.00 138,600.00
255,400.00 18,899.60
211,100.00 30,820.60
1,406.00 63,270.00
42,000.00 15,750.00
65,000.00 8,125.00
75,000.00 900
80,000.00 1,520.00
474,296.40
474,296.00

14,900.00 6,466.60
18,300.00 124,183.80
18,300.00 775.92
600 2,400.00
1,406.00 3,515.00
255,400.00 1,277.00
211,100.00 1,899.90
42,000.00 15,750.00
65,000.00 8,125.00
75,000.00 900
80,000.00 1,520.00
166,813.22
166,813.00

171,300.00 74,344.20
1,406.00 2,812.00
63,500.00 158,750.00
255,400.00 1,277.00
211,100.00 1,899.90
42,000.00 15,750.00
65,000.00 8,125.00
75,000.00 900
80,000.00 1,520.00
265,378.10
265,378.00

25,000.00 25,000.00
23,400.00 5,850.00
42,000.00 10,500.00
65,000.00 1,105.00
75,000.00 150
80,000.00 1,040.00
43,645.00
43,645.00

25,000.00 31,250.00
42,000.00 21,000.00
80,000.00 2,000.00
54,250.00
54,250.00
Analisa Harga Satuan Pekerjaan Tanah

Berkut ini adalah contoh Analisa Harga Satuan (AHS) SNI tahun 2011 untuk pekerjaan tanah yang sering digunakan
B. ANALISA HARGA SATUAN PEKERJAAN TANAH

No. URAIAN SATUAN VOLUME HARGA SATUAN HARGA


(Rp) (Rp)
B-01 1 M3 Galian Tanah Biasa sedalam 1 m
- Pekerja Oh 0.4 42,000.00 16,800.00
- Mandor Oh 0.04 80,000.00 3,200.00
Jumlah 20,000.00
Dibulatkan 20,000.00
B-02 1 M3 Galian Tanah Biasa Sedalam 2 m
- Pekerja Oh 0.526 42,000.00 22,092.00
- Mandor Oh 0.052 80,000.00 4,160.00
Jumlah 26,252.00
Dibulatkan 26,252.00
B-03 1 M3 Galian Tanah Biasa Sedalam 3 m
- Pekerja Oh 0.735 42,000.00 30,870.00
- Mandor Oh 0.073 80,000.00 5,840.00
Jumlah 36,710.00
Dibulatkan 36,710.00
B-04 1 M3 Galian Tanah Keras Sedalam 1 m
- Pekerja Oh 0.625 42,000.00 26,250.00
- Mandor Oh 0.062 80,000.00 4,960.00
Jumlah 31,210.00
Dibulatkan 31,210.00
B-05 1 M3 Galian Tanah Lumpur Sedalam 1 m
- Pekerja Oh 0.823 42,000.00 34,566.00
- Mandor Oh 0.083 80,000.00 6,640.00
Jumlah 41,206.00
Materi
Terkait Dibulatkan 41,206.00
:
yang sering digunakan untuk pekerjaan bangunan rumah.
Analisa Harga Satuan Pekerjaan Pondasi (AHS SNI 2011)

C. ANALISA HARGA SATUAN PEKERJAAN PONDASI

No. URAIAN SATUAN VOLUME HARGA SATUAN HARGA


(Rp) (Rp)
C-01 1 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps
- Batu Belah M3 1.1 205,500.00 226,050.00
- Semen Portland Kg 202 1,406.00 284,012.00
- Pasir Pasang M3 0.485 233,400.00 113,199.00
- Pekerja Oh 1.5 42,000.00 63,000.00
- Tukang Batu Oh 0.6 65,000.00 39,000.00
- Kepala Tukang Oh 0.06 75,000.00 4,500.00
- Mandor Oh 0.075 80,000.00 6,000.00
Jumlah 735,761.00
Dibulatkan 735,761.00
C-02 1 M3 Pasang Pondasi Batu kali adk 1pc : 4ps
- Batu Belah M3 1.1 205,500.00 226,050.00
- Semen Portland Kg 163 1,406.00 229,178.00
- Pasir Pasang M3 0.52 233,400.00 121,368.00
- Pekerja Oh 1.5 42,000.00 63,000.00
- Tukang Batu Oh 0.6 65,000.00 39,000.00
- Kepala Tukang Oh 0.06 75,000.00 4,500.00
- Mandor Oh 0.075 80,000.00 6,000.00
Jumlah 689,096.00
Dibulatkan 689,096.00
C-03 1 M3 Pasang Pondasi Batu kali adk 1pc : 5ps
- Batu Belah M3 1.1 205,500.00 226,050.00
- Semen Portland Kg 136 1,406.00 191,216.00
- Pasir Pasang M3 0.544 233,400.00 126,969.60
- Pekerja Oh 1.5 42,000.00 63,000.00
- Tukang Batu Oh 0.6 65,000.00 39,000.00
- Kepala Tukang Oh 0.06 75,000.00 4,500.00
- Mandor Oh 0.075 80,000.00 6,000.00
Jumlah 656,735.60
Dibulatkan 656,736.00
C-04 1 M3 Pasang Pondasi Batu Kosong (aanstamping)
- Batu Belah M3 1.2 205,500.00 246,600.00
- Pasir Urug M3 0.3 175,300.00 52,590.00
- Pekerja Oh 0.78 42,000.00 32,760.00
- Tukang Batu Oh 0.39 65,000.00 25,350.00
- Kepala Tukang Oh 0.039 75,000.00 2,925.00
- Mandor Oh 0.039 80,000.00 3,120.00
Jumlah 363,345.00
Dibulatkan 363,345.00
Materi Terkait :
NI 2011)
Analisa Harga Satuan Pekerjaan Beton
NO URAIAN SAT VOLUME HRG.SAT
D-17r2 1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15
Kayu papan terentang M3 0.27 2,850,000
Paku Biasa 2" - 5" Kg 2 23,400
Besi Beton Kg 180 16,500
Kawat Beton Kg 3 27,700
Semen Portland Kg 323 1,200
Pasir Beton M3 0.52 225,000
Koral Beton 2/3 M3 0.78 200,000
Pekerja Oh 4.85 55,000
Tukang Batu Oh 0.35 70,000
Tukang Kayu Oh 1.56 70,000
Tukang Besi Oh 1.4 70,000
Kepala Tukang Oh 0.331 80,000
Mandor Oh 0.17 85,000
Jumlah
Dibulatkan

1 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12 8-15


Kayu papan terentang M3 0.4 2,850,000
Paku Biasa 2" - 5" Kg 4 23,400
Minyak Bekisting Ltr 40,500
Besi Beton Kg 180 16,500
Kawat Beton Kg 1.8 27,700
Semen Portland Kg 323 1,200
Pasir Beton M3 0.52 225,000
Koral Beton 2/3 M3 0.78 200,000
Kayu Balok Terentang M3 0.15 2,640,000
Dolken Ø-8-10/4m Btg 20 15,000
Pekerja Oh 7.3 55,000
Tukang Batu Oh 0.35 70,000
Tukang Kayu Oh 3.3 70,000
Tukang Besi Oh 2.1 70,000
Kepala Tukang Oh 0.57 80,000
Mandor Oh 0.25 85,000
Jumlah
Dibulatkan

1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk + balok poratl (180 kg besi + bekisting) 4dia. 12, 8-15
Kayu papan terentang M3 0.32 2,850,000
Paku Biasa 2" - 5" Kg 3.2 23,400
Besi Beton Kg 180 16,500
Kawat Beton Kg 2.25 27,700
Semen Portland Kg 323 1,200
Pasir Beton M3 0.52 225,000
Koral Beton 2/3 M3 0.78 200,000
Kayu Balok Terentang M3 0.14 2,640,000
Dolken Ø-8-10/4m Btg 16 15,000
Pekerja Oh 5.96 55,000
Tukang Batu Oh 0.35 70,000
Tukang Kayu Oh 2.8 70,000
Tukang Besi Oh 1.4 70,000
Kepala Tukang Oh 0.455 80,000
Mandor Oh 0.208 85,000
Jumlah
Dibulatkan
D-29 1 M3 Tangga Beton Tulang (90 kg besi + bekisting)
Kayu papan terentang M3 0.25 2,850,000
Paku Biasa 2" - 5" Kg 3 23,400
Minyak Bekisting Ltr 1.2 40,500
Besi Beton Kg 90 16,500
Kawat Beton Kg 3 27,700
Semen Portland Kg 323 1,200
Pasir Beton M3 0.52 225,000
Koral Beton 2/3 M3 0.78 200,000
Kayu Balok Terentang M3 0.105 2,640,000
Dolken Ø-8-10/4m Btg 14 15,000
Pekerja Oh 5.6 55,000
Tukang Batu Oh 0.35 70,000
Tukang Kayu Oh 2.3 70,000
Tukang Besi Oh 1.4 70,000
Kepala Tukang Oh 0.405 80,000
Mandor Oh 0.202 85,000
Jumlah
Dibulatkan
3 1 M3 Membuat Plat Lantai Tb. 10 Cm Beton Bertulang ( 90 Kg Besi + Bekisting )
Kayu Terentang M3 0.4 2,850,000
Paku Biasa 2" - 5" Kg 4 23,400
Minyak Bekisting Ltr 2 40,500
Besi Beton Polos Kg 90 16,500
Kawat Beton Kg 3 27,700
Kayu Balok Terentang M3 0.105 151,100
Plywood Tebal 9 mm Lbr 3.5 151,100
Dolken kayu Galam o - 8-10/4 m Btg 60 15,000
Semen Portland Kg 323 1,200
Pasir Beton M3 0.52 225,000
Koral Beton 2/3 M3 0.78 200,000
Pekerja Oh 5.2 55,000
Tukang Batu Oh 0.35 70,000
Tukang Kayu Oh 3.3 70,000
Kepala Tukang Oh 0.365 80,000
Mandor Oh 1.06 85,000
Jumlah
Dibulatkan
Materi Terkait :
JUMLAH

769,500
46,800
2,970,000
83,100
387,600
117,000
156,000
266,750
24,500
109,200
98,000
26,480
14,450
5,069,380
5,069,380

1,140,000
93,600
-
2,970,000
49,860
387,600
117,000
156,000
396,000
300,000
401,500
24,500
231,000
147,000
45,600
21,250
6.480.910
6.481.000

bekisting) 4dia. 12, 8-15


912,000
74,880
2,970,000
62,325
387,600
117,000
156,000
369,600
240,000
327,800
24,500
196,000
98,000
36,400
17,680
6.412.865
6,413,000

712,500
70,200
48,600
1,485,000
83,100
387,600
117,000
156,000
277,200
210,000
308,000
24,500
161,000
98,000
32,400
17,170
4,188,720
4,189,000

1,140,000
93,600
81,000
1,485,000
83,100
15,866
528,850
900,000
387,600
117,000
156,000
286,000
24,500
231,000
29,200
90,100
5,648,816
5,649,000
Analisa Harga Satuan Pekerjaan Dinding (AHS-SNI 2011)

E. ANALISA HARGA SATUAN PEKERJAAN DINDING


No. URAIAN SATUAN VOLUME HARGA SATUAN
(Rp)

E-01 1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps


- Bata Merah Bh 140 775
- Semen Portland Kg 32.95 1,406.00
- Pasir Pasang M3 0.091 233,400.00
- Pekerja Oh 0.65 42,000.00
- Tukang Batu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.03 80,000.00
Jumlah
Dibulatkan
E-02 1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 4ps
- Bata Merah Bh 140 775
- Semen Portland Kg 26.55 1,406.00
- Pasir Pasang M3 0.093 233,400.00
- Pekerja Oh 0.65 42,000.00
- Tukang Batu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.03 80,000.00
Jumlah
Dibulatkan
E-03 1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps
- Bata Merah Bh 140 775
- Semen Portland Kg 22.2 1,406.00
- Pasir Pasang M3 0.102 233,400.00
- Pekerja Oh 0.65 42,000.00
- Tukang Batu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.03 80,000.00
Jumlah
Dibulatkan

E-04 1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps


- Bata Merah Bh 70 775
- Semen Portland Kg 14.37 1,406.00
- Pasir Pasang M3 0.04 233,400.00
- Pekerja Oh 0.32 42,000.00
- Tukang Batu Oh 0.1 65,000.00
- Kepala Tukang Oh 0.01 75,000.00
- Mandor Oh 0.015 80,000.00
Jumlah
Dibulatkan

E-05 1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps


- Bata Merah Bh 70 775
- Semen Portland Kg 11.5 1,406.00
- Pasir Pasang M3 0.043 233,400.00
- Pekerja Oh 0.32 42,000.00
- Tukang Batu Oh 0.1 65,000.00
- Kepala Tukang Oh 0.01 75,000.00
- Mandor Oh 0.015 80,000.00
Jumlah
Dibulatkan

E-06 1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps


- Bata Merah Bh 70 775
- Semen Portland Kg 9.68 1,406.00
- Pasir Pasang M3 0.045 233,400.00
- Pekerja Oh 0.32 42,000.00
- Tukang Batu Oh 0.1 65,000.00
- Kepala Tukang Oh 0.01 75,000.00
- Mandor Oh 0.015 80,000.00
Jumlah
Dibulatkan
Materi Terkait :
S-SNI 2011)

HARGA
(Rp)

108,500.00
46,327.70
21,239.40
27,300.00
13,000.00
1,500.00
2,400.00
220,267.10
220,267.00

108,500.00
37,329.30
21,706.20
27,300.00
13,000.00
1,500.00
2,400.00
211,735.50
211,736.00

108,500.00
31,213.20
23,806.80
27,300.00
13,000.00
1,500.00
2,400.00
207,720.00
207,720.00

54,250.00
20,204.22
9,336.00
13,440.00
6,500.00
750
1,200.00
105,680.22
105,680.00

54,250.00
16,169.00
10,036.20
13,440.00
6,500.00
750
1,200.00
102,345.20
102,345.00

54,250.00
13,610.08
10,503.00
13,440.00
6,500.00
750
1,200.00
100,253.08
100,253.00
Analisa Harga Satuan Pekerjaan Plesteran (AHS SNI 2011)

F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN


No. URAIAN SATUAN VOLUME HARGA SATUAN
(Rp)
F-01 1 M2 Plesteran adk. 1pc : 2ps Tebal 15 mm
- Semen Portland Kg 8.52 1,406.00
- Pasir Pasang M3 0.017 233,400.00
- Pekerja Oh 0.2 42,000.00
- Tukang Batu Oh 0.15 65,000.00
- Kepala Tukang Oh 0.015 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan
F-02 1 M2 Plesteran adk. 1pc : 3ps Tebal 15 mm
- Semen Portland Kg 6.48 1,406.00
- Pasir Pasang M3 0.019 233,400.00
- Pekerja Oh 0.2 42,000.00
- Tukang Batu Oh 0.15 65,000.00
- Kepala Tukang Oh 0.015 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan
F-03 1 M2 Plesteran adk. 1pc : 4ps Tebal 15 mm
- Semen Portland Kg 5.2 1,406.00
- Pasir Pasang M3 0.02 233,400.00
- Pekerja Oh 0.2 42,000.00
- Tukang Batu Oh 0.15 65,000.00
- Kepala Tukang Oh 0.015 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan
F-04 1 M2 Plesteran adk. 1pc : 3ps Tebal 20 mm
- Semen Portland Kg 10.8 1,406.00
- Pasir Pasang M3 0.026 233,400.00
- Pekerja Oh 0.25 42,000.00
- Tukang Batu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan
F-05 1 M2 Plesteran adk. 1pc : 4ps Tebal 20 mm
- Semen Portland Kg 8.68 1,406.00
- Pasir Pasang M3 0.028 233,400.00
- Pekerja Oh 0.25 42,000.00
- Tukang Batu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan
F-06 1 M2 Plesteran adk. 1pc:5ps tebal 20 mm
- Semen Portland Kg 7.29 1,406.00
- Pasir Pasang M3 0.026 233,400.00
- Pekerja Oh 0.25 42,000.00
- Tukang Batu Oh 0.2 65,000.00
- Kepala Tukang Oh 0.02 75,000.00
- Mandor Oh 0.0125 80,000.00
Jumlah
Dibulatkan
F-11 1 M2 Acian Plesteran
- Semen Portland Kg 4 1,406.00
- Pekerja Oh 0.143 42,000.00
- Tukang batu Oh 0.107 65,000.00
- Kepala Tukang Oh 0.0105 75,000.00
- Mandor Oh 0.0105 80,000.00
Jumlah
Dibulatkan
Materi Terkait :
HARGA
(Rp)

11,979.12
3,967.80
8,400.00
9,750.00
1,125.00
800
36,021.92
36,022.00

9,110.88
4,434.60
8,400.00
9,750.00
1,125.00
800
33,620.48
33,620.00

7,311.20
4,668.00
8,400.00
9,750.00
1,125.00
800
32,054.20
32,054.00

15,184.80
6,068.40
10,500.00
13,000.00
1,500.00
1,000.00
47,253.20
47,253.00

12,204.08
6,535.20
10,500.00
13,000.00
1,500.00
1,000.00
44,739.28
44,739.00

10,249.74
6,068.40
10,500.00
13,000.00
1,500.00
1,000.00
42,318.14
42,318.00

5,624.00
6,006.00
6,955.00
787.5
840
20,212.50
20,213.00
Penggalan Analisa Harga Satuan Penutup Atap (AHS SNI 2011)

G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP


No. URAIAN SATUAN VOLUME HARGA SATUAN
(Rp)
G-01 1 M2 Pasang Atap Genteng Palentong
- Genteng palentong Bh 25 1,900.00
- Pekerja Oh 0.15 42,000.00
- Tukang kayu Oh 0.075 65,000.00
- Kepala tukang Oh 0.008 75,000.00
- Mandor Oh 0.008 80,000.00
Jumlah
Dibulatkan

G-02 1 M2 Pasang Genteng Bubung Palentong


- Genteng bubung palentong Bh 5 6,000.00
- Semen Portland Kg 8 1,406.00
- Pasir pasang M3 0.032 233,400.00
- Pekerja Oh 0.4 42,000.00
- Tukang kayu Oh 0.2 65,000.00
- Kepala tukang Oh 0.02 75,000.00
- Mandor Oh 0.002 80,000.00
Jumlah
Dibulatkan

G-03 1 M2 Pasang Roof Light Fibreglass ( 180 x 90 ) cm


- Roof light fibreglass Lbr 0.6 100,000.00
- Paku biasa ½" - 1" Kg 0.05 23,800.00
- Pekerja Oh 0.14 42,000.00
- Tukang kayu Oh 0.067 65,000.00
- Kepala tukang Oh 0.007 75,000.00
- Mandor Oh 0.007 80,000.00
Jumlah
Dibulatkan

G-04 1 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,


- Asbes gelombang Lbr 0.35 80,000.00
- Paku seng Kg 0.12 23,800.00
- Pekerja Oh 0.14 42,000.00
- Tukang kayu Oh 0.07 65,000.00
- Kepala tukang Oh 0.007 75,000.00
- Mandor Oh 0.007 80,000.00
Jumlah
Dibulatkan

G-05 1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm


- Asbes gelombang Lbr 0.42 73,300.00
- Paku seng Kg 0.12 23,800.00
- Pekerja Oh 0.14 42,000.00
- Tukang kayu Oh 0.07 65,000.00
- Kepala tukang Oh 0.007 75,000.00
- Mandor Oh 0.007 80,000.00
Jumlah
Dibulatkan

G-06 1 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,


- Asbes gelombang Lbr 0.44 65,900.00
- Paku seng Kg 0.12 23,800.00
- Pekerja Oh 0.14 42,000.00
- Tukang kayu Oh 0.067 65,000.00
- Kepala tukang Oh 0.007 75,000.00
- Mandor Oh 0.007 80,000.00
Jumlah
Dibulatkan
G-07 1 M2 Pasang Atap Asbes Gelombang ( 2,10 x 1,05 m ) x 4 mm
- Asbes gelombang Lbr 0.51 58,500.00
- Paku seng Kg 0.12 23,800.00
- Pekerja Oh 0.14 42,000.00
- Tukang kayu Oh 0.067 65,000.00
- Kepala tukang Oh 0.007 75,000.00
- Mandor Oh 0.007 80,000.00
Jumlah
Dibulatkan

G-08 1 M2 Pasang Atap Asbes Gelombang ( 1,50 x 1,


- Asbes gelombang Lbr 0.8 42,300.00
- Paku seng Kg 0.12 23,800.00
- Pekerja Oh 0.14 42,000.00
- Tukang kayu Oh 0.067 65,000.00
- Kepala tukang Oh 0.007 75,000.00
- Mandor Oh 0.007 80,000.00
Jumlah
Dibulatkan
G-09 1 M¹ Pasang Nok Stel Gelombang 1,05 m
- Nok stel gelombang Lbr 2.1 38,100.00
- Paku sekrup 3,5" Bh 6 800
- Pekerja Oh 0.084 42,000.00
- Tukang kayu Oh 0.125 65,000.00
- Kepala tukang Oh 0.013 75,000.00
- Mandor Oh 0.004 80,000.00
Jumlah
Dibulatkan

G-10 1 M2 Pasang Atap Genteng Beton


- Genteng beton bh 11 8,500.00
- Paku biasa 2" - 5" Kg 0.03 23,400.00
- Pekerja Oh 0.2 42,000.00
- Tukang kayu Oh 0.1 65,000.00
- Kepala tukang Oh 0.01 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan

G-11 1 M2 Pasang Atap Genteng Murando Natural


- Genteng murando natural bh 18 2,700.00
- Pekerja Oh 0.15 42,000.00
- Tukang kayu Oh 0.075 65,000.00
- Kepala tukang Oh 0.008 75,000.00
- Mandor Oh 0.008 80,000.00
Jumlah
Dibulatkan

G-12 1 M2 Pasang Atap Genteng Murando Glazur


- Genteng murando glazur bh 18 4,000.00
- Pekerja Oh 0.15 42,000.00
- Tukang kayu Oh 0.075 65,000.00
- Kepala tukang Oh 0.008 75,000.00
- Mandor Oh 0.008 80,000.00
Jumlah
Dibulatkan
Materi Terkait :
p (AHS SNI 2011)

HARGA
(Rp)

47,500.00
6,300.00
4,875.00
600
640
59,915.00
59,915.00

30,000.00
11,248.00
7,468.80
16,800.00
13,000.00
1,500.00
160
80,176.80
80,177.00

60,000.00
1,190.00
5,880.00
4,355.00
525
560
72,510.00
72,510.00

28,000.00
2,856.00
5,880.00
4,550.00
525
560
42,371.00
42,371.00

30,786.00
2,856.00
5,880.00
4,550.00
525
560
45,157.00
45,157.00

28,996.00
2,856.00
5,880.00
4,355.00
525
560
43,172.00
43,172.00

29,835.00
2,856.00
5,880.00
4,355.00
525
560
44,011.00
44,011.00

33,840.00
2,856.00
5,880.00
4,355.00
525
560
48,016.00
48,016.00
80,010.00
4,800.00
3,528.00
8,125.00
975
320
97,758.00
97,758.00

93,500.00
702
8,400.00
6,500.00
750
800
110,652.00
110,652.00

48,600.00
6,300.00
4,875.00
600
640
61,015.00
61,015.00

72,000.00
6,300.00
4,875.00
600
640
84,415.00
84,415.00
rjaan Penutup Langit-langit (AHS SNI 2011)

H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGIT


No. URAIAN SATUAN VOLUME

H-01 1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 5 mm


- Pelat asbes tebal 4 mm m2 1.1
- Paku seng Kg 0.01
- Pekerja Oh 0.03
- Tukang kayu Oh 0.07
- Kepala tukang Oh 0.007
- Mandor Oh 0.0015
Jumlah
Dibulatkan

H-02 1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 3,5 mm


- Pelat asbes tebal 3,5 mm Lbr 1.1
- Paku seng Kg 0.01
- Pekerja Oh 0.03
- Tukang kayu Oh 0.07
- Kepala tukang Oh 0.007
- Mandor Oh 0.0015
Jumlah
Dibulatkan

H-03 1 M2 Langit-langit Akustik ( 60 x 120 ) cm


- Akustik 600 x 1200 Lbr 1.5
- Paku Kg 0.05
- Pekerja Oh 0.06
- Tukang kayu Oh 0.1
- Kepala tukang Oh 0.01
- Mandor Oh 0.003
Jumlah
Dibulatkan

H-04 1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium


- Profil Alluminium "T" M¹ 3.6
- Kawat f 4 mm Kg 0.15
- Ramset / dina bolt Bh 1.05
- Akustik 600 x 1200 Lbr 1.5
- Pekerja Oh 0.15
- Tukang kayu Oh 0.5
- Kepala tukang Oh 0.05
- Mandor Oh 0.0075
Jumlah
Dibulatkan

H-05 1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super
- Kayu Balok Borneo Super M3 0.023
- Paku biasa 2" - 5" Kg 0.06
- Teakwood 120 cm x 240 cm x 0,4 cm Lbr 0.39
- Pekerja Oh 0.27
- Tukang kayu Oh 0.4
- Kepala tukang Oh 0.04
- Mandor Oh 0.0135
Jumlah
Dibulatkan

H-06 1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu Borneo Super


- Kayu Balok Borneo Super M3 0.023
- Paku biasa 2" - 5" Kg 0.06
- Teakwood (120 x 240x 0,3) cm Lbr 0.39
- Pekerja Oh 0.27
- Tukang kayu Oh 0.4
- Kepala tukang Oh 0.04
- Mandor Oh 0.0135
Jumlah
Dibulatkan

H-07 1 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo Super


- Kayu Balok Borneo Super M3 0.023
- Paku biasa 2" - 5" Kg 0.06
- Triplek 120 cm x 240 cm x 0,4 cm Lbr 0.39
- Pekerja Oh 0.27
- Tukang kayu Oh 0.4
- Kepala tukang Oh 0.04
- Mandor Oh 0.0135
Jumlah
Dibulatkan

H-08 1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow


- Hollow 4/4 Zincromate Btg 0.415
- Hollow 2/4 Zincromate Btg 0.15
- Gypsum board ( 120 x 240 x 9 ) mm Lbr 0.364
- Paku gypsum kg 0.11
- Ramset / dina bolt Bh 4
- Cotton plaster Bh 0.072
- Compoun Zak 0.125
- Pekerja Oh 0.1
- Tukang kayu Oh 0.05
- Kepala tukang Oh 0.005
- Mandor Oh 0.005
Jumlah
Dibulatkan

H-09 1 M2 Langit-langit GRC t = 4 mm + rangka besi hollow


- Hollow 4/4 Zincromate Btg 0.415
- Hollow 2/4 Zincromate Btg 0.15
- GRC ( 120 x 240 x 4 ) mm Lbr 0.364
- Paku GRC kg 0.11
- Ramset / dina bolt Bh 4
- Cotton plaster Bh 0.072
- Compoun Zak 0.125
- Pekerja Oh 0.1
- Tukang kayu Oh 0.05
- Kepala tukang Oh 0.005
- Mandor Oh 0.005
Jumlah
Dibulatkan

H-10 1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu Borneo Super


- Kayu Balok Borneo Super M3 0.023
- Paku biasa 2" - 5" Kg 0.06
- Gypsum board ( 120 x 240 x 9 ) mm Lbr 0.39
- Paku sekrup kg 0.11
- Pekerja Oh 0.27
- Tukang kayu Oh 0.4
- Kepala tukang Oh 0.04
- Mandor Oh 0.0135
Jumlah
Dibulatkan

H-11 1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu Borneo Super


- Kayu Balok Borneo Super M3 0.023
- Paku biasa 2" - 5" Kg 0.06
- GRC ( 120 x 240 x 4 ) mm Lbr 0.39
- Paku GRC kg 0.11
- Pekerja Oh 0.27
- Tukang kayu Oh 0.4
- Kepala tukang Oh 0.04
- Mandor Oh 0.0135
Jumlah
Dibulatkan

H-12 1 M¹ List Langit-langit Kayu Profil 10 cm


- List Kayu profil M¹ 1.05
- Paku Kg 0.01
- Pekerja Oh 0.05
- Tukang kayu Oh 0.05
- Kepala tukang Oh 0.005
- Mandor Oh 0.003
Jumlah
Dibulatkan

H-13 1 M¹ List Langit-langit Gypsum 10 cm


- List gypsum M¹ 1.05
- Tepung gypsum Kg 0.15
- Pekerja Oh 0.05
- Tukang kayu Oh 0.05
- Kepala tukang Oh 0.005
- Mandor Oh 0.003
Jumlah
Dibulatkan
Materi Terkait :
HARGA SATUAN HARGA
(Rp) (Rp)
(Rp) (Rp)

22,500.00 24,750.00
23,800.00 238
42,000.00 1,260.00
65,000.00 4,550.00
75,000.00 525
80,000.00 120
31,443.00
31,443.00

19,500.00 21,450.00
23,800.00 238
42,000.00 1,260.00
65,000.00 4,550.00
75,000.00 525
80,000.00 120
28,143.00
28,143.00

132,800.00 199,200.00
23,800.00 1,190.00
42,000.00 2,520.00
65,000.00 6,500.00
75,000.00 750
80,000.00 240
210,400.00
210,400.00

12,200.00 43,920.00
28,200.00 4,230.00
7,200.00 7,560.00
132,800.00 199,200.00
42,000.00 6,300.00
65,000.00 32,500.00
75,000.00 3,750.00
80,000.00 600
298,060.00
298,060.00

2,640,000.00 60,720.00
23,400.00 1,404.00
131,700.00 51,363.00
42,000.00 11,340.00
65,000.00 26,000.00
75,000.00 3,000.00
80,000.00 1,080.00
154,907.00
154,907.00

2,640,000.00 60,720.00
23,400.00 1,404.00
129,100.00 50,349.00
42,000.00 11,340.00
65,000.00 26,000.00
75,000.00 3,000.00
80,000.00 1,080.00
153,893.00
153,893.00

2,640,000.00 60,720.00
23,800.00 1,428.00
64,400.00 25,116.00
42,000.00 11,340.00
65,000.00 26,000.00
75,000.00 3,000.00
80,000.00 1,080.00
128,684.00
128,684.00

29,200.00 12,118.00
22,600.00 3,390.00
79,800.00 29,047.20
17,500.00 1,925.00
7,200.00 28,800.00
15,000.00 1,080.00
75,000.00 9,375.00
42,000.00 4,200.00
65,000.00 3,250.00
75,000.00 375
80,000.00 400
93,960.20
93,960.00

29,200.00 12,118.00
22,600.00 3,390.00
67,500.00 24,570.00
35,000.00 3,850.00
7,200.00 28,800.00
15,000.00 1,080.00
75,000.00 9,375.00
42,000.00 4,200.00
65,000.00 3,250.00
75,000.00 375
80,000.00 400
91,408.00
91,408.00

2,640,000.00 60,720.00
23,800.00 1,428.00
79,800.00 31,122.00
17,500.00 1,925.00
42,000.00 11,340.00
65,000.00 26,000.00
75,000.00 3,000.00
80,000.00 1,080.00
136,615.00
136,615.00

2,640,000.00 60,720.00
23,800.00 1,428.00
67,500.00 26,325.00
35,000.00 3,850.00
42,000.00 11,340.00
65,000.00 26,000.00
75,000.00 3,000.00
80,000.00 1,080.00
133,743.00
133,743.00

29,400.00 30,870.00
23,800.00 238
42,000.00 2,100.00
65,000.00 3,250.00
75,000.00 375
80,000.00 240
37,073.00
37,073.00

8,500.00 8,925.00
12,500.00 1,875.00
42,000.00 2,100.00
65,000.00 3,250.00
75,000.00 375
80,000.00 240
16,765.00
16,765.00
Analisa Harga Satuan Pekerjaan Penutup Lantai dan Dinding (AHS

No. URAIAN SATUAN VOLUME

I-01 1 M2 Lantai Ubin Granito ukuran 40 x 40 cm Setara Essenza


- Granito 40 x 40 cm m2 1.05
- Semen portland Kg 9.8
- Pasir pasang M3 0.0215
- Semen warna Kg 1.3
- Pekerja Oh 0.25
- Tukang batu Oh 0.12
- Kepala tukang Oh 0.012
- Mandor Oh 0.0125
Jumlah
Dibulatkan

I-02 1 M2 Lantai Ubin Granito ukuran 30 x 30 cm Setara Essenza


- Granito 30 x 30 cm m2 1.05
- Semen portland Kg 10
- Pasir pasang M3 0.0215
- Semen warna Kg 1.5
- Pekerja Oh 0.26
- Tukang batu Oh 0.125
- Kepala tukang Oh 0.0125
- Mandor Oh 0.013
Jumlah
Dibulatkan

I-03 1 M¹ Plint Ubin Granito ukuran 10 x 40 cm Setara Essenza


- Plint granito 10 x 40 cm Bh 2.65
- Semen portland Kg 1.2
- Pasir pasang M3 0.003
- Semen warna Kg 0.1
- Pekerja Oh 0.06
- Tukang batu Oh 0.03
- Kepala tukang Oh 0.003
- Mandor Oh 0.003
Jumlah
Dibulatkan

I-04 1 M¹ Plint Ubin Granito ukuran 10 x 30 cm Setara Essenza


- Plint granito 10 x 30 cm Bh 3.33
- Semen portland Kg 1.65
- Pasir pasang M3 0.0032
- Semen warna Kg 0.1
- Pekerja Oh 0.09
- Tukang batu Oh 0.09
- Kepala tukang Oh 0.009
- Mandor Oh 0.0045
Jumlah
Dibulatkan

I-05 1 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia


- Keramik corak 10 x 20 cm m2 1
- Semen portland Kg 8
- Pasir pasang M3 0.0215
- Semen warna Kg 0.013
- Pekerja Oh 0.25
- Tukang batu Oh 0.12
- Kepala tukang Oh 0.012
- Mandor Oh 0.0125
Jumlah
Dibulatkan

I-06 1 M2 Lantai Keramik corak 20 x 20 cm setara Mulia


- Keramik corak 20 x 20 cm m2 1
- Semen portland Kg 8
- Pasir pasang M3 0.0215
- Semen warna Kg 0.013
- Pekerja Oh 0.25
- Tukang batu Oh 0.12
- Kepala tukang Oh 0.012
- Mandor Oh 0.0125
Jumlah
Dibulatkan

I-07 1 M2 Lantai Keramik polos 30 x 30 cm setara Mulia


- Keramik polos 30 x 30 cm m2 1
- Semen portland Kg 8
- Pasir pasang M3 0.0215
- Semen warna Kg 0.013
- Pekerja Oh 0.25
- Tukang batu Oh 0.12
- Kepala tukang Oh 0.012
- Mandor Oh 0.0125
Jumlah
Dibulatkan

I-08 1 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia


- Keramik corak 30 x 30 cm m2 1
- Semen portland Kg 8
- Pasir pasang M3 0.0215
- Semen warna Kg 0.013
- Pekerja Oh 0.25
- Tukang batu Oh 0.12
- Kepala tukang Oh 0.012
- Mandor Oh 0.0125
Jumlah
Dibulatkan

I-09 1 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia


- Keramik polos 40 x 40 cm m2 1
- Semen portland Kg 8
- Pasir pasang M3 0.0215
- Semen warna Kg 0.013
- Pekerja Oh 0.25
- Tukang batu Oh 0.12
- Kepala tukang Oh 0.012
- Mandor Oh 0.0125
Jumlah
Dibulatkan

I-10 1 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia


- Keramik corak 40 x 40 cm m2 1
- Semen portland Kg 8
- Pasir pasang M3 0.0215
- Semen warna Kg 0.013
- Pekerja Oh 0.25
- Tukang batu Oh 0.12
- Kepala tukang Oh 0.012
- Mandor Oh 0.0125
Jumlah
Dibulatkan

I-11 1 M2 Lantai Keramik Corak 10 x 20 cm setara Roman


- Keramik corak 10 x 20 cm m2 1
- Semen portland Kg 8
- Pasir pasang M3 0.0215
- Semen warna Kg 0.013
- Pekerja Oh 0.25
- Tukang batu Oh 0.12
- Kepala tukang Oh 0.012
- Mandor Oh 0.0125
Jumlah
Dibulatkan

I-12 1 M2 Lantai Keramik corak 20 x 20 cm setara Roman


- Keramik corak 20 x 20 cm m2 1
- Semen portland Kg 8
- Pasir pasang M3 0.0215
- Semen warna Kg 0.013
- Pekerja Oh 0.25
- Tukang batu Oh 0.12
- Kepala tukang Oh 0.012
- Mandor Oh 0.0125
Jumlah
Dibulatkan

I-13 1 M2 Lantai Keramik polos 30 x 30 cm setara Roman


- Keramik polos 30 x 30 cm m2 1
- Semen portland Kg 8
- Pasir pasang M3 0.0215
- Semen warna Kg 0.013
- Pekerja Oh 0.25
- Tukang batu Oh 0.12
- Kepala tukang Oh 0.012
- Mandor Oh 0.0125
Jumlah
Dibulatkan
I-14 1 M2 Lantai Keramik corak 30 x 30 cm Setara Roman
- Keramik corak 30 x 30 cm M2 1
- Semen portland Kg 8
- Pasir pasang M3 0.0215
- Semen warna Kg 0.013
- Pekerja Oh 0.25
- Tukang batu Oh 0.12
- Kepala tukang Oh 0.012
- Mandor Oh 0.0125
Jumlah
Dibulatkan

I-15 1 M2 Lantai Keramik polos 40 x 40 cm setara Roman


- Keramik polos 40 x 40 cm m2 1
- Semen portland Kg 8
- Pasir pasang M3 0.0215
- Semen warna Kg 0.013
- Pekerja Oh 0.25
- Tukang batu Oh 0.12
- Kepala tukang Oh 0.012
- Mandor Oh 0.0125
Jumlah
Dibulatkan

I-16 1 M2 Lantai Keramik corak 40 x 40 cm Setara Roman


- Keramik corak 40 x 40 cm m2 1
- Semen portland Kg 8
- Pasir pasang M3 0.0215
- Semen warna Kg 0.013
- Pekerja Oh 0.25
- Tukang batu Oh 0.12
- Kepala tukang Oh 0.012
- Mandor Oh 0.0125
Jumlah
Dibulatkan

I-17 1 M2 Lantai Marmer


- Marmer m2 1.06
- Semen portland Kg 8.19
- Pasir pasang M3 0.045
- Semen warna Kg 0.65
- Pekerja Oh 0.7
- Tukang batu Oh 0.35
- Kepala tukang Oh 0.035
- Mandor Oh 0.035
Jumlah
Dibulatkan

I-18 1 M2 Lantai Parquet Jati


- Parquet jati M2 1.05
- Lem vinyl Kg 0.6
- Pekerja Oh 0.65
- Tukang Oh 0.35
- Kepala tukang Oh 0.035
- Mandor Oh 0.0325
Jumlah
Dibulatkan
Materi Terkait :
dan Dinding (AHS SNI 2011)

HARGA SATUAN HARGA


(Rp) (Rp)

345,000.00 362,250.00
1,406.00 13,778.80
233,400.00 5,018.10
15,700.00 20,410.00
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
421,656.90
421,657.00

322,800.00 338,940.00
1,406.00 14,060.00
233,400.00 5,018.10
15,700.00 23,550.00
42,000.00 10,920.00
65,000.00 8,125.00
75,000.00 937.5
80,000.00 1,040.00
402,590.60
402,591.00

27,600.00 73,140.00
1,406.00 1,687.20
233,400.00 700.2
15,700.00 1,570.00
42,000.00 2,520.00
65,000.00 1,950.00
75,000.00 225
80,000.00 240
82,032.40
82,032.00

25,900.00 86,247.00
1,406.00 2,319.90
233,400.00 746.88
15,700.00 1,570.00
42,000.00 3,780.00
65,000.00 5,850.00
75,000.00 675
80,000.00 360
101,548.78
101,549.00

56,000.00 56,000.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
92,670.20
92,670.00

62,500.00 62,500.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
99,170.20
99,170.00
53,000.00 53,000.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
89,670.20
89,670.00

58,000.00 58,000.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
94,670.20
94,670.00

56,800.00 56,800.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
93,470.20
93,470.00

65,500.00 65,500.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
102,170.20
102,170.00

72,200.00 72,200.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
108,870.20
108,870.00

75,200.00 75,200.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
111,870.20
111,870.00

68,900.00 68,900.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
105,570.20
105,570.00
76,600.00 76,600.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
113,270.20
113,270.00

72,500.00 72,500.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
109,170.20
109,170.00

77,000.00 77,000.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
113,670.20
113,670.00

550,000.00 583,000.00
1,406.00 11,515.14
233,400.00 10,503.00
15,700.00 10,205.00
42,000.00 29,400.00
65,000.00 22,750.00
75,000.00 2,625.00
80,000.00 2,800.00
672,798.14
672,798.00

375,400.00 394,170.00
44,000.00 26,400.00
42,000.00 27,300.00
65,000.00 22,750.00
75,000.00 2,625.00
80,000.00 2,600.00
475,845.00
475,845.00
Analisa Harga Satuan Pekerjaan Kayu - AHS SNI 2011

J. ANALISA HARGA SATUAN PEKERJAAN KAYU


No. URAIAN SATUAN VOLUME

J-01 1 M3 Kusen Pintu & jendela kayu Kamper Samarinda


- Kayu Balok Kamper Samarinda m3 1.2
- Pekerja Oh 6
- Tukang Kayu Oh 18
- Kepala Tukang Oh 2
- Mandor Oh 0.3
Jumlah
Dibulatkan
J-02 1 M3 Kusen Pintu & jendela kayu Kamper Medan/Kruing
- Kayu Balok Kamper Medan M3 1.2
- Pekerja Oh 6
- Tukang Kayu Oh 18
- Kepala Tukang Oh 2
- Mandor Oh 0.3
Jumlah
Dibulatkan
J-03 1 M3 Kusen Pintu & jendela kayu Borneo Super
- Kayu Borneo Balok Super M3 1.2
- Pekerja Oh 6
- Tukang Kayu Oh 18
- Kepala Tukang Oh 2
- Mandor Oh 0.3
Jumlah
Dibulatkan

J-04 1 M2 Pintu Panel Kayu Kamper Samarinda


- Kayu Papan Kamper Samarinda M3 0.04
- Paku Biasa 2" - 5" Kg 0.05
- Pekerja Oh 1
- Tukang Kayu Oh 2.5
- Kepala Tukang Oh 0.25
- Mandor Oh 0.05
Jumlah
Dibulatkan

J-05 1 M2 Pintu Panel Kayu Kamper Medan/Kruing


- Kayu Papan Kamper Medan M3 0.04
- Paku Biasa 2" - 5" Kg 0.05
- Pekerja Oh 1
- Tukang Kayu Oh 2.5
- Kepala Tukang Oh 0.25
- Mandor Oh 0.05
Jumlah
Dibulatkan

J-06 1 M2 Pintu & Jendela Kaca Kayu Kamper Medan


- Kayu Papan Kamper Medan M3 0.035
- Pekerja Oh 0.8
- Tukang Kayu Oh 2
- Kepala Tukang Oh 0.2
- Mandor Oh 0.04
Jumlah
Dibulatkan
J-07 1 M2 Pintu & Jendela Kaca Kayu Borneo
- Kayu Papan Borneo Super M3 0.035
- Pekerja Oh 0.8
- Tukang Kayu Oh 2
- Kepala Tukang Oh 0.2
- Mandor Oh 0.04
Jumlah
Dibulatkan
J-08 1 M2 Pintu & Jendela Jalusi Kayu Kamper Medan
- Kayu Papan Kamper Medan M3 0.064
- Pekerja Oh 1
- Tukang Kayu Oh 3
- Kepala Tukang Oh 0.3
- Mandor Oh 0.5
Jumlah
Dibulatkan
J-09 1 M2 Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan
- Kayu Papan Kamper Medan M3 0.0196
- Paku Biasa ½" - 1" Kg 0.03
- Lem Kayu Ltr 0.3
- Triplek 120 x 240 x 0,4 cm Lbr 1
- Pekerja Oh 0.6
- Tukang Kayu Oh 2
- Kepala Tukang Oh 0.2
- Mandor Oh 0.03
Jumlah
Dibulatkan

J-10 1 M2 Jalusi Mati Kusen Kayu kamper Medan


- Kayu Papan Kamper Medan M3 0.06
- Paku Biasa ½" - 1" Kg 0.15
- Pekerja Oh 0.5
- Tukang Kayu Oh 2
- Kepala Tukang Oh 0.2
- Mandor Oh 0.025
Jumlah
Dibulatkan

J-11 1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super


- Kayu Papan Borneo Super M3 0.0196
- Paku Biasa ½" - 1" Kg 0.03
- Lem Kayu Ltr 0.3
- Triplek 120 x 240 x 0,4 cm Lbr 1
- Pekerja Oh 0.6
- Tukang Kayu Oh 2
- Kepala Tukang Oh 0.2
- Mandor Oh 0.03
Jumlah
Dibulatkan
J-12 1 M2 Pintu Teakwood Rangkap, rangka Kayu Kamper Medan
- Kayu Papan Kamper Medan M3 0.0196
- Paku Biasa ½" - 1" Kg 0.3
- Lem Kayu Ltr 0.3
- Teakwood 4 mm Lbr 1
- Pekerja Oh 0.6
- Tukang Kayu Oh 2
- Kepala Tukang Oh 0.2
- Mandor Oh 0.03
Jumlah
Dibulatkan
J-13 1 M2 Pintu Triplek & Formika, Rangka Kayu Kamper Medan
- Kayu Papan Kamper Medan M3 0.0196
- Paku Biasa ½" - 1" Kg 0.3
- Lem Kayu Ltr 0.8
- Triplek 120 x 240 x 0,4 cm Lbr 1
- Formica 3" x 6" Lbr 0.5
- Pekerja Oh 0.8
- Tukang Kayu Oh 2.5
- Kepala Tukang Oh 0.25
- Mandor Oh 0.04
Jumlah
Dibulatkan
J-14 1 M2 Pintu Teakwood & Formika, Rangka Kayu Kamper Medan (dipolitur)
- Kayu Papan Kamper Medan M3 0.0196
- Paku Biasa ½" - 1" Kg 0.3
- Lem Kayu Ltr 0.8
- Teakwood 120 x 240 x 0,4 cm Lbr 1
- Formica 4" x 8" Lbr 0.5
- Pekerja Oh 0.8
- Tukang Kayu Oh 2.5
- Kepala Tukang Oh 0.25
- Mandor Oh 0.04
Jumlah
Dibulatkan

J-15 1 M3 Kuda-kuda Kayu Kamper Medan


- Kayu Balok Kamper Medan M3 1.1
- Besi Strip Kg 15
- Paku Biasa 2" - 5" Kg 0.8
- Pekerja Oh 4
- Tukang Kayu Oh 12
- Kepala Tukang Oh 1.2
- Mandor Oh 0.2
Jumlah
Dibulatkan
J-16 1 M3 Kuda-kuda Kayu Borneo Super
- Kayu balok Borneo super M3 1.1
- Besi Strip Kg 15
- Paku Biasa 2" - 5" Kg 0.8
- Pekerja Oh 4
- Tukang Kayu Oh 12
- Kepala Tukang Oh 1.2
- Mandor Oh 0.2
Jumlah
Dibulatkan
J-17 1 M2 Kaso + Reng Genteng Plentong Kayu Borneo Super
- Kayu balok Borneo super m3 0.012
- Paku Biasa 2" - 5" Kg 0.15
- Pekerja Oh 0.1
- Tukang Kayu Oh 0.1
- Kepala Tukang Oh 0.01
- Mandor Oh 0.005
Jumlah
Dibulatkan
J-18 1 M2 Kaso + Reng Genteng Beton Kayu Borneo Super
- Kayu balok Borneo super M3 0.014
- Paku Biasa 2" - 5" Kg 0.15
- Pekerja Oh 0.1
- Tukang Kayu Oh 0.1
- Kepala Tukang Oh 0.01
- Mandor Oh 0.005
Jumlah
Dibulatkan
J-19 1 M' Lisplang uk (3x20)cm, Kayu Kamper Medan
- Kayu Papan Kamper Medan M3 0.0072
- Paku Biasa 2" - 5" Kg 0.05
- Pekerja Oh 0.1
- Tukang Kayu Oh 0.2
- Kepala Tukang Oh 0.02
- Mandor Oh 0.005
Jumlah
Dibulatkan

J-20 1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan


- Kayu Papan Kamper Medan M3 0.011
- Paku Biasa 2" - 5" Kg 0.05
- Pekerja Oh 0.11
- Tukang Kayu Oh 0.22
- Kepala Tukang Oh 0.022
- Mandor Oh 0.005
Jumlah
Dibulatkan

J-21 1 M¹ List Plafond + kayu Profil 10 cm


- Kayu Profil 10 cm M' 1.05
- Pekerja Oh 0.021
- Tukang Kayu Oh 0.021
- Kepala Tukang Oh 0.002
- Mandor Oh 0.001
Jumlah
Dibulatkan
Materi Terkait :
HARGA SATUAN HARGA

8,633,700.00 10,360,440.00
42,000.00 252,000.00
65,000.00 1,170,000.00
75,000.00 150,000.00
80,000.00 24,000.00
11,956,440.00
11,956,440.00

5,692,600.00 6,831,120.00
42,000.00 252,000.00
65,000.00 1,170,000.00
75,000.00 150,000.00
80,000.00 24,000.00
8,427,120.00
8,427,120.00

5,280,000.00 6,336,000.00
42,000.00 252,000.00
65,000.00 1,170,000.00
75,000.00 150,000.00
80,000.00 24,000.00
7,932,000.00
7,932,000.00

8,633,700.00 345,348.00
23,400.00 1,170.00
42,000.00 42,000.00
65,000.00 162,500.00
75,000.00 18,750.00
80,000.00 4,000.00
573,768.00
573,768.00

5,692,600.00 227,704.00
23,400.00 1,170.00
42,000.00 42,000.00
65,000.00 162,500.00
75,000.00 18,750.00
80,000.00 4,000.00
456,124.00
456,124.00

5,692,600.00 199,241.00
42,000.00 33,600.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 3,200.00
381,041.00
381,041.00

5,595,800.00 195,853.00
42,000.00 33,600.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 3,200.00
377,653.00
377,653.00

5,692,600.00 364,326.40
42,000.00 42,000.00
65,000.00 195,000.00
75,000.00 22,500.00
80,000.00 40,000.00
663,826.40
663,826.00

5,692,600.00 111,574.96
23,800.00 714
23,900.00 7,170.00
64,400.00 64,400.00
42,000.00 25,200.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 2,400.00
356,458.96
356,459.00
5,692,600.00 341,556.00
23,800.00 3,570.00
42,000.00 21,000.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 2,000.00
513,126.00
513,126.00

5,595,800.00 109,677.68
23,800.00 714
23,900.00 7,170.00
64,400.00 64,400.00
42,000.00 25,200.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 2,400.00
354,561.68
354,562.00

5,692,600.00 111,574.96
23,800.00 7,140.00
23,900.00 7,170.00
131,700.00 131,700.00
42,000.00 25,200.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 2,400.00
430,184.96
430,185.00

5,692,600.00 111,574.96
23,800.00 7,140.00
23,900.00 19,120.00
64,400.00 64,400.00
132,900.00 66,450.00
42,000.00 33,600.00
65,000.00 162,500.00
75,000.00 18,750.00
80,000.00 3,200.00
486,734.96
486,735.00

5,692,600.00 111,574.96
23,800.00 7,140.00
23,900.00 19,120.00
131,700.00 131,700.00
238,100.00 119,050.00
42,000.00 33,600.00
65,000.00 162,500.00
75,000.00 18,750.00
80,000.00 3,200.00
606,634.96
606,635.00

5,692,600.00 6,261,860.00
26,800.00 402,000.00
23,800.00 19,040.00
42,000.00 168,000.00
65,000.00 780,000.00
75,000.00 90,000.00
80,000.00 16,000.00
7,736,900.00
7,736,900.00

5,280,000.00 5,808,000.00
26,800.00 402,000.00
23,800.00 19,040.00
42,000.00 168,000.00
65,000.00 780,000.00
75,000.00 90,000.00
80,000.00 16,000.00
7,283,040.00
7,283,040.00

5,280,000.00 63,360.00
23,800.00 3,570.00
42,000.00 4,200.00
65,000.00 6,500.00
75,000.00 750
80,000.00 400
78,780.00
78,780.00

5,280,000.00 73,920.00
23,800.00 3,570.00
42,000.00 4,200.00
65,000.00 6,500.00
75,000.00 750
80,000.00 400
89,340.00
89,340.00

5,823,400.00 41,928.48
23,800.00 1,190.00
42,000.00 4,200.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 400
62,218.48
62,218.00

5,692,600.00 62,618.60
23,800.00 1,190.00
42,000.00 4,620.00
65,000.00 14,300.00
75,000.00 1,650.00
80,000.00 400
84,778.60
84,779.00

29,400.00 30,870.00
42,000.00 882
65,000.00 1,365.00
75,000.00 150
80,000.00 80
33,347.00
33,347.00
Analisa Harga Satuan Pekerjaan Penutup Besi dan Aluminium
Diposkan : 01 Juni 2014
Oleh : Endang Kusman

No. URAIAN SATVOLUME HARGA SAT


(Rp)
K-01 1 Kg Besi profil
- Besi profil WF Kg 1.1 24,000.00
- Meni besi Kg 0.08 30,400.00
- Pekerja Oh 0.06 42,000.00
- Tukang besi Oh 0.006 65,000.00
- Kepala tukang Oh 0.006 75,000.00
- Mandor Oh 0.0003 80,000.00
Jumlah
Dibulatkan
K-02 1 Kg Perakitan baja
- Solar m' 0.01 7,150.00
- Minyak pelumas m' 0.001 55,000.00
- Sewa alat jam 0.008 100,000.00
- Pekerja Oh 0.001 42,000.00
- Tukang besi Oh 0.00001 65,000.00
- Kepala tukang Oh 0.00001 75,000.00
- Mandor Oh 0.00005 80,000.00
Jumlah
Dibulatkan

K-03 1 Cm Pengelasan dengan las listrik


- kawat las kg 0.04 23,600.00
- Solar ltr 0.03 7,150.00
- Minyak pelumas ltr 0.004 55,000.00
- Sewa alat jam 0.017 100,000.00
- Pekerja org 0.004 42,000.00
- Tukang org 0.002 65,000.00
- Kepala Tukang org 0.0002 75,000.00
- Mandor org 0.0002 80,000.00
Jumlah
Dibulatkan

K-04 1 m2 Pintu Rolling Door


- Rolling door M2 1 306,600.00
- Pekerja Oh 1.05 42,000.00
- Tukang besi Oh 1.5 65,000.00
- Kepala tukang Oh 0.105 75,000.00
- Mandor Oh 0.0052 80,000.00
Jumlah
Dibulatkan

K-05 1 m2 Pintu Alluminium Natural


- Pintu alluminium natural m2 1 211,800.00
- Pekerja Oh 1.05 42,000.00
- Tukang besi Oh 1.05 65,000.00
- Kepala tukang Oh 0.105 75,000.00
- Mandor Oh 0.0052 80,000.00
Jumlah
Dibulatkan
K-06 1 m2 Terali Besi
- Besi strip 2 x 3 m' 11.5 5,500.00
- Pekerja Oh 1.2 42,000.00
- Tukang las Oh 1.2 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.0006 80,000.00
Jumlah
Dibulatkan

K-07 1 m2 Kawat Harmonika 4 cm


- Kawat harmonika M2 1.1 35,900.00
- Paku biasa ½" - 1" kg 0.02 23,800.00
- Papan kayu kamper M2 0.0018 5,692,600.00
- Pekerja Oh 0.1 42,000.00
- Tukang kayu Oh 0.1 65,000.00
- Kepala tukang Oh 0.01 75,000.00
- Mandor Oh 0.005 80,000.00
Jumlah
Dibulatkan

K-08 1 m' Talang Datar, Seng BJLS 28 lebar 90 cm


- Seng plat 3' x 6' BJLS 30 m' 1.05 20,801.00
- Paku biasa ½" - 1" Kg 0.015 23,800.00
- Kayu papan borneo super M3 0.0096 5,595,800.00
- Flincote / meni besi Kg 0.25 30,400.00
- Pekerja Oh 0.15 42,000.00
- Tukang kayu Oh 0.4 65,000.00
- Kepala tukang Oh 0.025 75,000.00
- Mandor Oh 0.0013 80,000.00
Jumlah
Dibulatkan

K-09 1 m' Talang Miring, Seng BJLS 28 lebar 90 cm


- Seng plat 3' x 6' BJLS 30 m' 1.05 20,801.00
- Paku biasa ½" - 1" Kg 0.015 23,800.00
- Kayu papan borneo super M3 0.019 5,595,800.00
- Flincote / meni besi Kg 0.3 30,400.00
- Pekerja Oh 0.2 42,000.00
- Tukang kayu Oh 0.4 65,000.00
- Kepala tukang Oh 0.025 75,000.00
- Mandor Oh 0.0013 80,000.00
Jumlah
Dibulatkan

K-10 1 m' Talang 1/2 lingkaran D-15 cm, seng pela


- Seng plat 3' x 6' BJLS 30 m' 1.05 20,801.00
- Paku biasa ½" - 1" Kg 0.1 23,800.00
- Kayu papan borneo super kg 0.019 5,595,800.00
- Besi strip Kg 0.5 26,800.00
- Pekerja Oh 0.15 42,000.00
- Tukang kayu Oh 0.3 65,000.00
- Kepala tukang Oh 0.03 75,000.00
- Mandor Oh 0.008 80,000.00
Jumlah
Dibulatkan

K-11 1 m' Pasang kusen pintu/jendela alluminium na


- Alumunium profil natural 4" m' 1.1 151,100.00
- Skrup fixer bh 2 250
- Sealant m' 1 7,500.00
- Pekerja Oh 0.043 42,000.00
- Tukang kayu Oh 0.043 65,000.00
- Kepala tukang Oh 0.0043 75,000.00
- Mandor Oh 0.0021 80,000.00
Jumlah
Dibulatkan

K-12 1 m' Pasang kusen pintu/jendela alluminium w


- Alumunium profil warna 4" m' 1.1 163,000.00
- Skrup fixer bh 2 250
- Sealant m' 1 7,500.00
- Pekerja Oh 0.043 42,000.00
- Tukang kayu Oh 0.043 65,000.00
- Kepala tukang Oh 0.0043 75,000.00
- Mandor Oh 0.0021 80,000.00
Jumlah
Dibulatkan

K-13 1 m' Pasang kusen pintu/jendela alluminium na


- Alumunium profil natural 3" m' 1.1 81,000.00
- Skrup fixer bh 2 250
- Sealant m' 1 7,500.00
- Pekerja Oh 0.043 42,000.00
- Tukang kayu Oh 0.043 65,000.00
- Kepala tukang Oh 0.0043 75,000.00
- Mandor Oh 0.0021 80,000.00
Jumlah
Dibulatkan

K-14 1 m' Pasang kusen pintu/jendela alluminium w


- Alumunium profil warna 3" m' 1.1 102,000.00
- Skrup fixer bh 2 250
- Sealant m' 1 7,500.00
- Pekerja Oh 0.043 42,000.00
- Tukang kayu Oh 0.043 65,000.00
- Kepala tukang Oh 0.0043 75,000.00
- Mandor Oh 0.0021 80,000.00
Jumlah
Dibulatkan

K-15 1 m2 Pintu alluminium strip lebar 8 cm


- Alumunium profil 4" natural m' 4.4 151,100.00
- Alumunium strip 6mm m2 1.05 171,800.00
- Pekerja Oh 0.085 42,000.00
- Tukang kayu Oh 0.085 65,000.00
- Kepala tukang Oh 0.0085 75,000.00
- Mandor Oh 0.0042 80,000.00
Jumlah
Dibulatkan
K-16 1 m2 Pintu/jendela kaca rangka alluminium nat
- Alumunium profil natural 4" m' 4.4 151,100.00
- Profil alluminium T m' 4.5 12,200.00
- Sealant tube 0.27 7,500.00
- Pekerja Oh 0.085 42,000.00
- Tukang kayu Oh 0.085 65,000.00
- Kepala tukang Oh 0.0085 75,000.00
- Mandor Oh 0.005 80,000.00
Jumlah
Dibulatkan

K-17 1 m2 Pintu/jendela kaca rangka alluminium wa


- Alumunium profil warna 4" m' 4.4 163,000.00
- Profil alluminium T m' 4.5 12,200.00
- Sealant tube 0.27 7,500.00
- Pekerja Oh 0.085 42,000.00
- Tukang kayu Oh 0.085 65,000.00
- Kepala tukang Oh 0.0085 75,000.00
- Mandor Oh 0.005 80,000.00
Jumlah
Dibulatkan

K-18 1 m2 Jendela nako & teralis (10 klips)


- Jendela nako (rangka + kaca 5 mm) m2 1.1 300,000.00
- Paku skrup 1cm - 2,5cm bh 10 250
- Besi strip m' 7 5,500.00
- Pekerja Oh 0.2 42,000.00
- Tukang kayu Oh 0.2 65,000.00
- Kepala tukang Oh 0.02 75,000.00
- Mandor Oh 0.001 80,000.00
Jumlah
Dibulatkan

K-19 1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku
- Besi siku L 30.30.3 Kg 15 24,000.00
- Baja pelat Kg 32.8 24,000.00
- kawat las Kg 0.05 23,600.00
- Pekerja Oh 0.2 42,000.00
- Tukang kayu Oh 0.2 65,000.00
- Kepala tukang Oh 0.02 75,000.00
- Mandor Oh 0.001 80,000.00
Jumlah
Dibulatkan

K-20 1 m2 Rangka jendela besi square tube (5 x 5)


- Besi square tube M 4.76 7,300.00
- Besi lis kaca (1 x 1) cm Kg 4.522 24,000.00
- Pengelasan Cm 20 2,464.00
- Pekerja Oh 0.65 42,000.00
- Tukang kayu Oh 0.65 65,000.00
- Kepala tukang Oh 0.065 75,000.00
- Mandor Oh 0.032 80,000.00
Jumlah
Dibulatkan

K-21 1 m2 Pintu lipat (folding door) bahan besi


- Pintu lipat M2 1 501,700.00
- Pekerja Oh 1.05 42,000.00
- Tukang kayu Oh 1.05 65,000.00
- Kepala tukang Oh 0.105 75,000.00
- Mandor Oh 0.0052 80,000.00
Jumlah
Dibulatkan

K-22 1 m2 Tirai (venetions blinds and vertical blinds


- Tirai M2 1 537,300.00
- Pekerja Oh 0.35 42,000.00
- Tukang kayu Oh 0.35 65,000.00
- Kepala tukang Oh 0.035 75,000.00
- Mandor Oh 0.0018 80,000.00
Jumlah
Dibulatkan
Kembali Ke Analisa AHS SNI
dan Aluminium

HARGA
(Rp)

26,400.00
2,432.00
2,520.00
390
450
24
32,216.00
32,216.00

71.5
55
800
42
0.65
0.75
4
973.9
974

944
214.5
220
1,700.00
168
130
15
16
2,463.50
2,464.00

306,600.00
44,100.00
97,500.00
7,875.00
416
456,491.00
456,491.00

211,800.00
44,100.00
68,250.00
7,875.00
416
332,441.00
332,441.00

63,250.00
50,400.00
78,000.00
900
48
192,598.00
192,598.00

39,490.00
476
10,246.68
4,200.00
6,500.00
750
400
62,062.68
62,063.00

21,841.05
357
53,719.68
7,600.00
6,300.00
26,000.00
1,875.00
104
117,796.73
117,797.00

21,841.05
357
106,320.20
9,120.00
8,400.00
26,000.00
1,875.00
100
174,013.25
174,013.00

21,841.05
2,380.00
106,320.20
13,400.00
6,300.00
19,500.00
2,250.00
640
172,631.25
172,631.00

166,210.00
500
7,500.00
1,806.00
2,795.00
322.5
168
179,301.50
179,302.00

179,300.00
500
7,500.00
1,806.00
2,795.00
322.5
168
192,391.50
192,392.00

89,100.00
500
7,500.00
1,806.00
2,795.00
322.5
168
102,191.50
102,192.00

112,200.00
500
7,500.00
1,806.00
2,795.00
322.5
168
125,291.50
125,292.00

664,840.00
180,390.00
3,570.00
5,525.00
637.5
336
855,298.50
855,299.00
664,840.00
54,900.00
2,025.00
3,570.00
5,525.00
637.5
400
731,897.50
731,898.00

717,200.00
54,900.00
2,025.00
3,570.00
5,525.00
637.5
400
784,257.50
784,258.00

330,000.00
2,500.00
38,500.00
8,400.00
13,000.00
1,500.00
80
393,980.00
393,980.00

360,000.00
787,200.00
1,180.00
8,400.00
13,000.00
1,500.00
80
1,171,360.00
1,171,360.00

34,748.00
108,528.00
49,280.00
27,300.00
42,250.00
4,875.00
2,560.00
269,541.00
269,541.00

501,700.00
44,100.00
68,250.00
7,875.00
416
622,341.00
622,341.00

537,300.00
14,700.00
22,750.00
2,625.00
144
577,519.00
577,519.00
Analisa Harga Satuan Pekerjaan Penanaman Pohon
Diposkan : o6 Juni2014
Oleh : Endang Kusman

NO. URAIAN KOEF


O-01 1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m
Pupuk kandang 0.08
Furadan 0.001
Pohon pelindung 1
Pekerja 0.025
Mandor 0.0025
Jumlah
Dibulatkan
O-02 1 Lubang (70x70x70) cm, tanam bambu krisik/jepang
Pupuk kandang 0.08
Furadan 0.001
Bambu krisik/jepang 1
Pekerja 0.025
Mandor 0.0025
Jumlah
Dibulatkan
O-03 1 Lubang (40x40x40) cm, tanam pohon perdu (polibag)
Pupuk kandang 0.04
Furadan 0.001
Pohon perdu 1
Pekerja 0.02
Mandor 0.002
Jumlah
Dibulatkan
O-04 1 M2 Tanam rumput gajah (silang papan catur)
Pupuk kandang 0.04
Rumput gajah mini 0.5
Pekerja 0.04
Mandor 0.004
Jumlah
Dibulatkan
Kembali ke AHA-SNI
SAT. HARGA SAT. (Rp) HARGA (Rp)

krg 25,000.00 2,000.00


kg 24,000.00 24
btng 25,000.00 25,000.00
org 42,000.00 1,050.00
org 80,000.00 200
28,274.00
28,274.00

krg 25,000.00 2,000.00


kg 24,000.00 24
btng 50,000.00 50,000.00
org 42,000.00 1,050.00
org 80,000.00 200
53,274.00
53,274.00

krg 25,000.00 1,000.00


kg 24,000.00 24
btng 10,000.00 10,000.00
org 42,000.00 840
org 80,000.00 160
12,024.00
12,024.00

krg 25,000.00 1,000.00


m2 15,000.00 7,500.00
org 42,000.00 1,680.00
org 80,000.00 320
10,500.00
10,500.00
Analisa Harga Satuan Pekerjaan Pengecatan
Diposkan : 05 Juni 2014
Oleh : Endang Kusman

No. URAIAN SATVOLUME HARGA SAT

N-01 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama


- Soda api Kg 0.05 35,600.00
- Pekerja Oh 0.15 42,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
N-02 1 M2 Mendempul Dan Menggosok Kayu
- Dempul Kg 0.08 35,800.00
- Minyak cat Kg 0.02 38,400.00
- Batu apung Kg 0.01 29,600.00
- Pekerja Oh 0.04 42,000.00
- Tukang cat Oh 0.04 65,000.00
- Kepala tukang Oh 0.004 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan

N-03 1 M2 Pengecatan Bidang Kayu Lama Setara Sieve


- Plamir Kg 0.15 25,000.00
- Cat dasar Kg 0.17 30,000.00
- Cat penutup setara sieve 2x Kg 0.17 41,700.00
- Pekerja Oh 0.07 42,000.00
- Tukang cat Oh 0.075 65,000.00
- Kepala tukang Oh 0.0075 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan

N-04 1 M2 Pengecatan Bidang Kayu Baru Setara Sieve


- Cat meni Kg 0.2 30,400.00
- Plamir Kg 0.15 25,000.00
- Cat dasar Kg 0.17 30,000.00
- Cat penutup 3x setara sieve Kg 0.35 41,700.00
- Pekerja Oh 0.07 42,000.00
- Tukang cat Oh 0.105 65,000.00
- Kepala tukang Oh 0.004 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan

N-05 1 M2 Pelaburan Bidang Kayu dengan Politur


- Politur Ltr 0.15 48,000.00
- Politur jadi Ltr 0.372 112,700.00
- Ampelas Lbr 2 5,000.00
- Tukang cat Oh 0.06 65,000.00
- Kepala tukang Oh 0.016 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
N-06 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
- Residu atau ter Ltr 0.35 8,100.00
- Pekerja Oh 0.1 42,000.00
- Mandor Oh 0.006 80,000.00
Jumlah
Dibulatkan

N-07 1 M2 Pengecatan Tembok Baru Setara ICI


- Plamir tembok Kg 0.1 25,000.00
- Cat dasar Kg 0.1 30,000.00
- Cat penutup 2x setara ICI Kg 0.26 75,000.00
- Pekerja Oh 0.02 42,000.00
- Tukang cat Oh 0.063 65,000.00
- Kepala tukang Oh 0.0063 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
N-08 1 M2 Pengecatan Tembok Lama Setara ICI
- Cat dasar Kg 0.12 30,000.00
- Cat penutup 2 x Kg 0.18 75,000.00
- Pekerja Oh 0.028 42,000.00
- Tukang cat Oh 0.042 65,000.00
- Kepala tukang Oh 0.0042 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
N-09 1 M2 Pengecatan Plafond ( 3x ) Setara ICI
- Cat tembok setara ICI Kg 0.2 75,000.00
- Plamir tembok Kg 0.16 25,000.00
- Rol cat Bh 0.01 32,500.00
- Steger werk Ls 1 1,000.00
- Ampelas Lbr 0.5 5,000.00
- Pekerja Oh 0.2 42,000.00
- Tukang cat Oh 0.3 65,000.00
- Kepala tukang Oh 0.03 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan
N-10 1 M2 Pengecatan Plafond ( 3x ) Setara Vinilex
- Cat tembok setara Vinilex Kg 0.2 25,000.00
- Plamir tembok Kg 0.16 25,000.00
- Rol cat Bh 0.01 32,500.00
- Steger werk Ls 1 1,000.00
- Ampelas Lbr 0.5 5,000.00
- Pekerja Oh 0.2 42,000.00
- Tukang cat Oh 0.3 65,000.00
- Kepala tukang Oh 0.03 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan
N-10-r' 1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex
- Cat tembok setara Vinilex Kg 0.13 25,000.00
- Plamir tembok Kg 0.11 25,000.00
- Rol cat Bh 0.1 32,500.00
- Steger werk Ls 0.67 1,000.00
- Ampelas Lbr 0.33 5,000.00
- Pekerja Oh 0.13 42,000.00
- Tukang cat Oh 0.2 65,000.00
- Kepala tukang Oh 0.02 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan
N-11 1 M2 Memasang Wallpaper
- Wallpaper m2 1.2 55,700.00
- Lem Perekat Kg 0.25 35,700.00
- Pekerja Oh 0.35 42,000.00
- Tukang cat Oh 0.175 65,000.00
- Kepala tukang Oh 0.017 75,000.00
- Mandor Oh 0.0017 80,000.00
Jumlah
Dibulatkan
N-12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi
- Meni besi Kg 0.1 30,400.00
- Kuas 3" Bh 0.01 16,000.00
- Pekerja Oh 0.02 42,000.00
- Tukang cat Oh 0.2 65,000.00
- Kepala tukang Oh 0.02 75,000.00
- Mandor Oh 0.01 80,000.00
Jumlah
Dibulatkan

N-13 1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah


- Meni besi Kg 0.1 30,400.00
- Kuas 3" Bh 0.01 16,000.00
- Kayu perancah m3 0.002 2,069,800.00
- Pekerja Oh 0.25 42,000.00
- Tukang cat Oh 0.225 65,000.00
- Kepala tukang Oh 0.0225 75,000.00
- Mandor Oh 0.0075 80,000.00
Jumlah
Dibulatkan

N-14 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
- Cat besi setara ICI Kg 0.3 67,700.00
- Pekerja Oh 0.006 42,000.00
- Tukang cat Oh 0.06 65,000.00
- Kepala tukang Oh 0.012 75,000.00
- Mandor Oh 0.006 80,000.00
Jumlah
Dibulatkan

N-15 1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)


- Plamir tembok Kg 0.1 25,000.00
- Cat dasar Kg 0.1 30,000.00
- Cat penutup 2x setara vinilex Kg 0.26 25,000.00
- Pekerja Oh 0.02 42,000.00
- Tukang cat Oh 0.063 65,000.00
- Kepala tukang Oh 0.0063 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan

N-15r' 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)


- Plamir tembok Kg 0.1 25,000.00
- Cat dasar Kg 0.1 30,000.00
- Cat penutup 3x setara vinilex Kg 0.39 25,000.00
- Pekerja Oh 0.03 42,000.00
- Tukang cat Oh 0.0945 65,000.00
- Kepala tukang Oh 0.0095 75,000.00
- Mandor Oh 0.0038 80,000.00
Jumlah
Dibulatkan
N-16 1 M2 Pengecatan Tembok Lama Setara Vinilex
- Cat dasar Kg 0.12 30,000.00
- Cat penutup 2 x Kg 0.18 25,000.00
- Pekerja Oh 0.028 42,000.00
- Tukang cat Oh 0.042 65,000.00
- Kepala tukang Oh 0.0042 75,000.00
- Mandor Oh 0.0025 80,000.00
Jumlah
Dibulatkan
Kembali ke AHS-SNI
HARGA

1,780.00
6,300.00
200
8,280.00
8,280.00

2,864.00
768
296
1,680.00
2,600.00
300
200
8,708.00
8,708.00

3,750.00
5,100.00
7,089.00
2,940.00
4,875.00
562.5
200
24,516.50
24,517.00

6,080.00
3,750.00
5,100.00
14,595.00
2,940.00
6,825.00
300
200
39,790.00
39,790.00

7,200.00
41,924.40
10,000.00
3,900.00
1,200.00
200
64,424.40
64,424.00

2,835.00
4,200.00
480
7,515.00
7,515.00

2,500.00
3,000.00
19,500.00
840
4,095.00
472.5
200
30,607.50
30,608.00

3,600.00
13,500.00
1,176.00
2,730.00
315
200
21,521.00
21,521.00

15,000.00
4,000.00
325
1,000.00
2,500.00
8,400.00
19,500.00
2,250.00
800
53,775.00
53,775.00

5,000.00
4,000.00
325
1,000.00
2,500.00
8,400.00
19,500.00
2,250.00
800
43,775.00
43,775.00

3,250.00
2,750.00
3,250.00
670
1,650.00
5,460.00
13,000.00
1,500.00
800
32,330.00
32,330.00

66,840.00
8,925.00
14,700.00
11,375.00
1,275.00
136
103,251.00
103,251.00

3,040.00
160
840
13,000.00
1,500.00
800
19,340.00
19,340.00

3,040.00
160
4,139.60
10,500.00
14,625.00
1,687.50
600
34,752.10
34,752.00

s cat 2 um
20,310.00
252
3,900.00
900
480
25,842.00
25,842.00

2,500.00
3,000.00
6,500.00
840
4,095.00
472.5
200
17,607.50
17,608.00

2,500.00
3,000.00
9,750.00
1,260.00
6,142.50
712.5
304
23,669.00
23,669.00

3,600.00
4,500.00
1,176.00
2,730.00
315
200
12,521.00
12,521.00
Analisa Harga Satuan Pekerjaan Sanitasi
Diposkan : 04 Juni 2014
Oleh : Endang Kusman

No. URAIAN SAT VOLUME HARGA SAT


(Rp)
M-01 1 Buah Closet jongkok Porselen Standar
Closet jongkok bh 1 188,200.00
P.C (50 gk) Kg 6 1,406.00
Pasir pasang m3 0.01 233,400.00
Pekerja org 1 42,000.00
Tukang batu org 1.5 65,000.00
Kepala Tukang org 1.5 75,000.00
Mandor org 0.16 80,000.00
Jumlah
Dibulatkan
M-02 1 Buah Urinoir
Urinoir bh 1 1,773,400.00
P.C (50 gk) Kg 6 1,406.00
Pasir pasang m3 0.01 233,400.00
Pekerja org 1 42,000.00
Tukang batu org 1 65,000.00
Kepala Tukang org 0.1 75,000.00
Mandor org 0.001 80,000.00
Perlengkapan 30 % harga urinoir lot 0.3 1,773,400.00
Jumlah
Dibulatkan
M-03 1 Buah Wastafel
wastafel standar unit 1 1,012,700.00
P.C (50 gk) Kg 6 1,406.00
Pasir pasang m3 0.01 233,400.00
Pekerja org 1.2 42,000.00
Tukang batu org 1.45 65,000.00
Kepala Tukang org 0.15 75,000.00
Mandor org 0.1 80,000.00
Perlengkapan 12 % harga wastafel lot 0.12 1,773,400.00
Jumlah
Dibulatkan
M-04 1 Buah bak Mandi Fibreglass Volume 0,30 m3
Bak fibreglass 0.60m x 0.60m bh 1 255,300.00
Pekerja org 1.8 42,000.00
Tukang batu org 2.7 65,000.00
Kepala Tukang org 0.54 75,000.00
Mandor org 0.11 80,000.00
Perlengkapan 18 % harga bak lot 0.18 255,300.00
Jumlah
Dibulatkan

M-05 1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm


Buis beton Ø 30 cm bh 1.1 61,700.00
Bata merah bh 25 775
P.C (50 gk) Kg 10.3 1,406.00
Pasir pasang m3 0.061 233,400.00
Pasir urug m3 0.069 175,300.00
Pekerja org 0.38 42,000.00
Tukang batu org 0.19 65,000.00
Kepala Tukang org 0.019 75,000.00
Mandor org 0.019 80,000.00
Jumlah
Dibulatkan

M-06 1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm


Bata merah bh 186 775
P.C (50 gk) Kg 114 1,406.00
Pasir pasang m3 0.184 233,400.00
Batu pecah 2/3 m3 0.033 211,100.00
Besi beton m3 4.85 16,500.00
Pasir beton m3 0.12 255,400.00
Pekerja org 2.16 42,000.00
Tukang batu org 0.72 65,000.00
Kepala Tukang org 0.072 75,000.00
Mandor org 0.108 80,000.00
Tukang gali org 0.1 42,000.00
Jumlah
Dibulatkan

M-07 1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm


Bata merah bh 53 775
P.C (50 gk) Kg 44 1,406.00
Pasir pasang m3 0.07 233,400.00
Batu pecah 2/3 m3 0.07 211,100.00
Besi beton m3 1.6 16,500.00
Pasir beton m3 0.06 255,400.00
Pekerja org 3.2 42,000.00
Tukang batu org 1.015 65,000.00
Kepala Tukang org 0.0015 75,000.00
Mandor org 0.016 80,000.00
Jumlah
Dibulatkan
M-08 1 M' Pipa PVC Ø 1/2" (AW)
Pipa pvc Ø 1/2" m' 1.2 10,025.00
Pekerja org 0.036 42,000.00
Tukang batu org 0.06 65,000.00
Kepala Tukang org 0.006 75,000.00
Mandor org 0.0018 80,000.00
Perlengkapan 35 % harga pipa lot 0.35 12,030.00
Jumlah
Dibulatkan
M-09 1 M' Pipa PVC Ø 1" (AW)
Pipa pvc Ø 1" m' 1.2 15,800.00
Pekerja org 0.036 42,000.00
Tukang batu org 0.06 65,000.00
Kepala Tukang org 0.006 75,000.00
Mandor org 0.0018 80,000.00
Perlengkapan 35 % harga pipa lot 0.35 18,960.00
Jumlah
Dibulatkan
M-10 1 M' Pipa PVC Ø 11/2" (AW)
Pipa pvc Ø 11/2" m' 1.2 26,475.00
Pekerja org 0.036 42,000.00
Tukang batu org 0.06 65,000.00
Kepala Tukang org 0.006 75,000.00
Mandor org 0.0018 80,000.00
Perlengkapan 35 % harga pipa lot 0.35 31,770.00
Jumlah
Dibulatkan
M-11 1 M' Pipa PVC Ø 2" (AW)
Pipa pvc Ø 2" m' 1.2 27,675.00
Pekerja org 0.036 42,000.00
Tukang batu org 0.06 65,000.00
Kepala Tukang org 0.006 75,000.00
Mandor org 0.0018 80,000.00
Perlengkapan 35 % harga pipa lot 0.35 31,770.00
Jumlah
Dibulatkan
M-12 1 M' Pipa PVC Ø 4" (AW)
Pipa pvc Ø 4" m' 1.2 86,975.00
Pekerja org 0.081 42,000.00
Tukang batu org 0.135 65,000.00
Kepala Tukang org 0.0135 75,000.00
Mandor org 0.0041 80,000.00
Perlengkapan 35 % harga pipa lot 0.35 104,370.00
Jumlah
Dibulatkan
M-13 1 M' Pipa PVC Ø 3/4" (AW)
Pipa pvc Ø 3/4" m' 1.2 13,050.00
Pekerja org 0.081 42,000.00
Tukang batu org 0.135 65,000.00
Kepala Tukang org 0.0135 75,000.00
Mandor org 0.0041 80,000.00
Perlengkapan 35 % harga pipa lot 0.35 15,660.00
Jumlah
Dibulatkan
M-14 1 Buah Bak Cuci piring Stainless steel
Bak cuci stainless steel + asesoris len bh 1 397,800.00
Pekerja org 0.03 42,000.00
Tukang batu org 0.3 65,000.00
Kepala Tukang org 0.03 75,000.00
Mandor org 0.0015 80,000.00
Jumlah
Dibulatkan
M-15 1 Buah Kran Ø 1/2" - 3/4"
Kran air bh 1 40,900.00
Seal tape bh 0.025 4,200.00
Pekerja org 0.01 42,000.00
Tukang batu org 0.1 65,000.00
Kepala Tukang org 0.01 75,000.00
Mandor org 0.005 80,000.00
Jumlah
Dibulatkan
M-16 1 Buah Floor Drain
Floor drain bh 1 66,600.00
Pekerja org 0.01 42,000.00
Tukang batu org 0.1 65,000.00
Kepala Tukang org 0.01 75,000.00
Mandor org 0.005 80,000.00
Jumlah
Dibulatkan

M-17 1 M' Grafel beton U 20 cm -60 cm


Pipa beton U bh 1.1 44,300.00
Bata merah bh 12 775
P.C (50 gk) zak 0.103 1,406.00
Pasir pasang m3 0.0305 233,400.00
Pasir urug m3 0.0345 175,300.00
Pekerja org 0.01 42,000.00
Tukang batu org 0.1 65,000.00
Kepala Tukang org 0.01 75,000.00
Mandor org 0.005 80,000.00
Jumlah
Dibulatkan
M-18 1 M' Pasang Talang Plastik PVC U 15 cm (AW)
Talang plastik PVC m' 1.05 60,000.00
Perlengkapan 35 % harga talang lot 0.35 63,000.00
Pekerja org 0.15 42,000.00
Tukang batu org 0.4 65,000.00
Kepala Tukang org 0.025 75,000.00
Mandor org 0.0013 80,000.00
Jumlah
Dibulatkan

M-19 1 M' Saluran Air Limbah Buis Beton Ø 60 cm


Buis beton Ø 60 cm bh 1.1 130,900.00
Bata merah bh 25 775
P.C (50 gk) zak 0.206 1,406.00
Pasir pasang m3 0.061 233,400.00
Pasir urug m3 0.069 175,300.00
Pekerja org 0.38 42,000.00
Tukang batu org 0.19 65,000.00
Kepala Tukang org 0.019 75,000.00
Mandor org 0.019 80,000.00
Jumlah
Dibulatkan
M-20 1 M' Pasang Talang Seng Datar
Seng pelat 3" x 6" lbr 0.5 20,801.00
Paku kg 0.015 23,400.00
Kayu kelas II m3 0.0096 2,850,000.00
Meni besi kg 0.25 30,400.00
Pekerja org 0.15 42,000.00
Tukang batu org 0.4 65,000.00
Kepala Tukang org 0.025 75,000.00
Mandor org 0.0013 80,000.00
Jumlah
Dibulatkan
M-21 1 Buah Closet Duduk
Closet duduk bh 1 1,724,700.00
Pekerja org 3.3 42,000.00
Tukang batu org 1.1 65,000.00
Kepala Tukang org 0.001 75,000.00
Mandor org 0.16 80,000.00
Perlengkapan 6 % harga closet lot 0.06 1,724,700.00
Jumlah
Dibulatkan
M-22 1 Buah Tangki Air fibreglass Volume 1 m3
Bak fibreglass kapasitas 1 m3 bh 1 1,316,400.00
Pekerja org 3.3 42,000.00
Tukang batu org 1.1 65,000.00
Kepala Tukang org 0.001 75,000.00
Mandor org 0.16 80,000.00
Perlengkapan 6 % harga bak lot 0.06 1,316,400.00
Jumlah
Dibulatkan
M-23 1 Unit Septictank 2x1,50x1,50 m + Rembesan
Galian tanah m3 4.5 26,252.00
Pasir urug m3 0.214 175,300.00
lantai kerja m3 2.25 716,798.00
Pas bata adk 1pc : 3ps m2 15 220,267.10
Pelat beton K-225 m3 0.3 6,438,864.00
Plesteran adk 1pc : 3ps m2 15 41,301.82
Pipa PVC 4" jenis AW m' 5.4 256,800.00
Pipa GIP 1 1/2" m' 5 46,750.00
Galian tanah untuk rembesan m3 3.375 20,000.00
Pas ijuk kg 5.4 23,400.00
Urugan kerikil 3/5 m3 1.05 205,000.00
Pipa PVC 4" berlubang jenis AW m' 9 36,700.00
Urugan dan perataan tanah m3 1.125 34,584.00
Jumlah
Dibulatkan
M-24 1 Unit Septictank 1x1,50x1,50 m + Rembesan
Galian tanah m3 2.25 20,000.00
Pasir urug m3 0.107 175,300.00
lantai kerja m3 1.125 716,798.00
Pas bata adk 1pc : 3ps m2 7.5 220,267.10
Pelat beton K-225 m3 0.15 6,438,864.00
Plesteran adk 1pc : 3ps m2 7.5 41,301.82
Pipa PVC 4" jenis AW m' 9 256,800.00
Pipa GIP 1 1/2" m' 2.5 46,750.00
Galian tanah untuk rembesan m3 1.688 20,000.00
Pas ijuk kg 2.7 23,400.00
Urugan kerikil 3/5 m3 0.525 205,000.00
Pipa PVC 4" berlubang jenis AW m' 9 36,700.00
Urugan dan perataan tanah m3 0.563 34,584.00
Jumlah
Dibulatkan
Kembali ke Analisa SNI
HARGA
(Rp)

188,200.00
8,436.00
2,334.00
42,000.00
97,500.00
112,500.00
12,800.00
463,770.00
463,770.00

1,773,400.00
8,436.00
2,334.00
42,000.00
65,000.00
7,500.00
80
532,020.00
2,430,770.00
2,430,770.00

1,012,700.00
8,436.00
2,334.00
50,400.00
94,250.00
11,250.00
8,000.00
212,808.00
1,400,178.00
1,400,178.00

255,300.00
75,600.00
175,500.00
40,500.00
8,800.00
45,954.00
601,654.00
601,654.00

67,870.00
19,375.00
14,481.80
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
159,314.90
159,315.00

144,150.00
160,284.00
42,945.60
6,966.30
80,025.00
30,648.00
90,720.00
46,800.00
5,400.00
8,640.00
4,200.00
620,778.90
620,779.00

41,075.00
61,864.00
16,338.00
14,777.00
26,400.00
15,324.00
134,400.00
65,975.00
112.5
1,280.00
377,545.50
377,546.00
12,030.00
1,512.00
3,900.00
450
144
4,210.50
22,246.50
22,247.00

18,960.00
1,512.00
3,900.00
450
144
6,636.00
31,602.00
31,602.00

31,770.00
1,512.00
3,900.00
450
144
11,119.50
48,895.50
48,896.00

33,210.00
1,512.00
3,900.00
450
144
11,119.50
50,335.50
50,336.00

104,370.00
3,402.00
8,775.00
1,012.50
328
36,529.50
154,417.00
154,417.00
15,660.00
3,402.00
8,775.00
1,012.50
328
5,481.00
34,658.50
34,659.00

397,800.00
1,260.00
19,500.00
2,250.00
120
420,930.00
420,930.00

40,900.00
105
420
6,500.00
750
400
49,075.00
49,075.00

66,600.00
420
6,500.00
750
400
74,670.00
74,670.00

48,730.00
9,300.00
144.82
7,118.70
6,047.85
420
6,500.00
750
400
79,411.37
79,411.00

63,000.00
22,050.00
6,300.00
26,000.00
1,875.00
100
119,325.00
119,325.00

143,990.00
19,375.00
289.64
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
221,242.74
221,243.00

10,400.50
351
27,360.00
7,600.00
6,300.00
26,000.00
1,875.00
100
79,986.50
79,987.00

1,724,700.00
138,600.00
71,500.00
75
12,800.00
103,482.00
2,051,157.00
2,051,157.00
1,316,400.00
138,600.00
71,500.00
75
12,800.00
78,984.00
1,618,359.00
1,618,359.00

118,134.00
37,514.20
1,612,795.50
3,304,006.50
1,931,659.20
619,527.30
1,386,720.00
233,750.00
67,500.00
126,360.00
215,250.00
330,300.00
38,907.00
10,022,423.70
10,022,424.00

45,000.00
18,757.10
806,397.75
1,652,003.25
965,829.60
309,763.65
2,311,200.00
116,875.00
33,760.00
63,180.00
107,625.00
330,300.00
19,470.79
6,780,162.14
6,780,162.00
Harga Satuan Bahan Bangunan - AHS 2011

NO MATERIAL SAT

A. AGREGAT KASAR,BAHAN PEREKAT & BAHAN JADINYA

1 Pasir Urug m3
2 Tanah Urug Pilihan m3
3 Sirtu m3
4 Pasir Teras m3
5 Pasir Pasang Kali m3
6 Pasir Beton m3
7 Abu Batu m3
8 Batu Gosok ( Apung ) kg
9 Batu Pecah Mesin 1/2 m3
10 Batu Pecah Mesin 2/3 m3
11 Batu Pecah Mesin 3/5 m3
12 Batu Pecah Mesin 5/7 m3
13 Batu Belah Pondasi m3
14 Batu Bronjol ( Untuk Bronjong ) m3
15 Batu Koral Beton Kali m3
16 Batu Tempel Hitam m3
17 Batu Pinggir Beton 10 x 20 x 35 bh
18 Batu Pinggir Beton 15 x 35 x 50 ( K-225 ) bh
19 Batu Telor m3
20 Batako Kecil 8 x 10 x 20 bh
21 Batako Besar 8 x 20 x 30 bh
22 Con Blok 8 x 20 x 40 bh
23 Bata Merah Bakar kelas I bh
24 Bata Merah Bakar kelas II bh
25 Bata Merah Oven ( Klingker ) bh
26 Roster Beton 20 x 20 bh
27 Roster Beton 30 x 30 bh
28 Grass Blok 20 x 20 bh
29 Grass Blok 30 x 30 bh
30 Paving Blok Natural 8 cm m2
31 Paving Blok Warna 8 cm m2
32 Paving Blok Natural 6 cm m2
33 Paving Blok Warna 6 cm m2
34 Canstin Paving Blok m1
35 Semen PC /50 kg zak

36 Semen Putih zak


37 Kanstin Jalan Ukuran Besar ( Bina Marga ) 1bh =60cm bh
38 Readymix Beton K500, Tanpa Pompa ( Selang ) m3
39 Readymix Beton K400, Tanpa Pompa ( Selang ) m3
40 Readymix Beton K350, Tanpa Pompa ( Selang ) m3
41 Readymix Beton K300, Tanpa Pompa ( Selang ) m3
42 Readymix Beton K225, Tanpa Pompa ( Selang ) m3
43 Readymix Beton K175, Tanpa Pompa ( Selang ) m3
44 Kapur Pasang / Kapur Tembok m3
45 Kapur Sirih kg
46 Semen Warna kg
47 Tanah liat m3
48 Air ltr
49 Formite/spacer bh
50 Hollow/Con Blok 8 x 20 x 40 bh
51 Hollow/Con Blok 8 x 15 x 40 bh
52 Hollow/Con Blok 8 x 10 x 40 bh

B LABURAN,PENGISI DAN ALATNYA


1 Plamir Tembok kg
2 Cat Tembok ICI Eksterior ( Beton ) lt
3 Cat Tembok ICI Interior ( Plafon Dan Dinding ) lt
4 Cat Tembok Vinilex kg
5 Cat Dasar ICI untuk Interior ( 2 Pelapis ) lt
6 Cat Tembok Sanlek kg
7 Cat Dasar kg
8 Cat Tahan Asam lt
9 Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) kg
10 Cat Marka / Spotlight kg
11 Water Profing Emulsion ml
12 Water Profing Membrance bh
13 Rool Cat Tembok bh
14 Kape Tembok bh
15 Kape Kayu 5 lt
16 Soligneum 1 Blek kg
17 Plincote m3
18 Penawetan Kayu m3
19 Pegopenan Kayu bh
20 Kwas 3" bh
21 Oker bks
22 Oyan bks
23 Oten ( Pewarna Plitur ) lt
24 Spirtus kg
25 Bahan Pelitur Kripik ( Sirlak India ) kg
26 Dempul Lilin kg
27 Dempul Plitur kg
28 Dempul Halus / Imfra ( Wood Filler ) lt
29 Dempul Jadi kg
30 Politur lt
31 Politur Jadi lt
32 Terpentin kg
33 Tiner A kg
34 Tiner B kg
35 Kumpon lbr
36 Melamik kg
37 Dempul Plastik kg
38 Dempul Duco kg
39 Ampelas lbr
40 Dempul Kayu Cap Kucing kg
41 Meni Kayu / Besi kg
42 Sincromat kg
43 Cat Kayu Sieve lt
44 Cat Besi lt
45 Cat Besi Duco Danaglos / ICI bh
46 Cat Bron kg
47 Karet lis bh
48 Minyak cat kg
49 Glass beet kg
50 Residu lt

C BAHAN KAYU BERIKUT BAHAN JADINYA


1 Bambu 5 s.d 7 bt
2 Bambu 7 s.d 10 bt
3 Bambu Gombong bt
4 Kayu Kamper Singkil / Kapur ( Kayu Samarinda kls II ) m3
5 Kayu Balok Borneo Super m3
6 Kayu Papan Borneo Super m3
7 Kayu Balok Kamper Medan (Kruing ) m3
8 Kayu Papan Kamper Medan (Kruing ) m3
9 Kayu Balok Kamper Banjar m3
10 Kayu Papan Kamper Banjar m3
11 Kayu Balok Kamper Samarinda m3
12 Kayu Papan Kamper Samarinda m3
13 Kayu Balok Rasamala m3
14 Kayu Jati Jatim Tua dia. 40 cm m3
15 Kayu Jati Jateng Tua dia. 40 cm m3
16 Kayu Jati Jabar Tua dia. 40 cm m3
17 Kayu Jati Jabar Tua dia. 40 cm kebawah m3
18 Kayu Hutan Kelas I ( Segeng,Mahoni, Laban ) m3
19 Kayu Balok Albasia m3
20 Kayu Papan Albasia m3
21 Dolken 5 s/d 7 bt
22 Dolken 7 s/d 10 bt
23 List Profil Kamper 1 cm m1
24 List Profil Kamper 2 cm m1
25 List Profil Kamper 4 cm m1
26 List Profil Kamper 5 cm m1
27 List Profil Kamper 10 cm m1
28 Pegangan Tangga Profil Jati m1
29 Pegangan Tangga Profil Kamper m1
30 Kayu Kaso 4/6 m3
31 Kayu Kaso 5/7 Kamper Medan m3
32 Kayu Reng 2/3 Borneo Super m1
33 Kayu Reng 2/3 Kamper Banjar m1
34 Kayu Reng 3/4 Kamper Medan m3
35 Kayu Papan Terentang m3
36 Kayu Balok Terentang m3
37 Batang Kelapa bt
38 Tali Ijuk kg
39 lapisan Ijuk tebal 10 cm m2
40 Venetion Blind m2
41 Vertikal Blind m2

D BAHAN PENUTUP RANGKA PLAFOND


1 Plafond Enternit 4 mm m2
2 Plafond hardpleks 5 mm 120 x 240 lbr
3 Plafond Asbes Semen 5 mm m2
4 Plafond Asbes Semen 3,5 mm m2
5 Gypsum 120 x 240 t= 9 mm ex DN lbr
6 Gypsum 120 x 240 t= 9 mm ex Luar lbr
7 Tepung gypsum kg
8 Acustik Amstrong 60 x 120 lbr
9 Cotton Plester bh
10 GRC (120 x 240) cm, t = 4 mm lbr
11 Cornice Coumpound zak
12 List gypsum m'

E BAHAN KAYU LAPIS


1 Triplek 3 mm 120 x 240 lbr
2 Triplek 4 mm 120 x 240 lbr
3 Triplek 4 mm ukuran Pintu lbr
4 Triplek 6 mm 120 x 240 lbr
5 Triplek 9 mm 120 x 240 lbr
6 Jabar Wood 4 mm lbr
7 Bilik Bambu ( tanpa kulit ) m2
8 Bilik Bambu ( dengan kulit ) m2
9 Bilik Bambu Hitam Variasi m2
10 Wall paper m2
11 MultiPlek 9 mm 120 x 240 lbr
12 MultiPlek 12 mm 120 x 240 lbr
13 MultiPlek 18 mm 120 x 240 lbr
14 Ply Wood 18 mm 120 x 240 lbr
15 Ply Wood 9 mm 120 x 240 lbr
16 Ply Wood 4 mm 120 x 240 lbr
17 Teak Wood 3 mm 120 x 240 lbr
18 Teak Wood 4 mm 120 x 240 lbr
19 Teak Wood 3 mm 120 x 240 ukuran Pintu lbr
20 Teak Wood ukuran Pintu 4 mm lbr
21 Tacon ( Tahan Bakar ) m2
22 Supercon m2
23 Melamin 4 mm 120 x 240 lbr
24 Melamin TOK 4 mm lbr
25 Formika 120 x 240 lbr
26 Formika ukuran Pintu lbr
27 Formika Warna 4" x 8" lbr

F BAHAN LANTAI DAN PELAPIS DINDING


1 Tegel PC 20 x 20 bh
2 Plin Tegel PC 10 x 20 bh
3 Tegel PC 30 x 30 bh
4 Plin Tegel PC 15 x 30 bh
5 Tegel Warna 20 x 20 bh
6 Plin Tegel Warna 10 x 20 bh
7 Tegel Warna 30 x 30 bh
8 Plin Tegel Warna 15 x 30 bh
9 Tegel Wafel PC 20 x 20 bh
10 Tegel Wafel Warna 20 x 20 bh
11 Tegel Badak PC 30 x 30 bh
12 Poslin 11 x 11 Warna Standar DN m2
13 Poslin 11 x 11 Warna khusus DN m2
14 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Mulia m2
15 Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Mulia m2
16 Keramik 20 x 20 (KM) KW I DN Corak/Warna /Anti Slip Mulia m2
17 Keramik 20 x 20 (KM) KW I DN Putih Polos Mulia m2
18 Keramik 20 x 25 Dinding KM KW I DN Corak Mulia m2
19 Keramik 30 x 30 KWI DN Putih Polos Mulia m2
20 Keramik 30 x 30 KWI DN Warna/Corak (ANTI SLIP) Mulia m2
21 Keramik 40 x 40 KWI DN Putih Polos Mulia m2
22 Keramik 40 x 40 KWI DN Warna/Corak (ANTI SLIP) Mulia m2
23 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Roman m2
24 Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Roman m2
25 Keramik 20 x 20 (KM) KW I DN Corak/Warna/Anti Slip Roman m2
26 Keramik 20 x 20 (KM) KW I DN Putih Polos Roman m2
27 Keramik 20 x 25 Dinding KM KW I DN Corak Roman m2
28 Keramik 20 x 25 KW I DN Putih Polos Roman m2
29 Keramik 30 x 30 KW I DN Polos Roman m2
30 Keramik 30 x 30 KW I DN Warna/Corak (ANTI SLIP) Roman m2
31 Keramik 40 x 40 KW I DN Polos Roman m2
32 Keramik 40 x 40 KW I DN Warna/Corak (ANTI SLIP) Roman m2
33 Vinyl Lantai Standar m2
34 Karpet Kelas Baik LN m2
35 Karpet Kelas Sedang LN m2
36 Parquet Jati m2
37 Stairnosing Keramik 10/20 bh
38 Stairnosing Fiber m
39 Taraso Kerang 30 x 30 m2
40 Plin Taraso 10 x 30 bh
41 Granit Alam LN Ukuran Besar m2
42 Granit Alam LN Ukuran Kecil m2
43 Granit Alam DN Ukuran Besar m2
44 Granit Alam DN Ukuran Kecil m2
45 Granito Tile Essenza Ukuran 40 x 40 Polis m2
46 Granito Tile Essenza Ukuran 30 x 30 m2
47 Granito Tile Essenza Ukuran 40 x 40 UnPolis m2
48 Marmer m2
49 Marmer Alam Lampung Ukuran Besar m2
50 Marmer Alam Lampung Ukuran kecil m2
51 Marmer Alam Citatah Ukuran Besar m2
52 Marmer Alam Citatah Ukuran Kecil m2
53 Marmer Sintetis m2
54 Granito Tile Essenza 60 x 60 Polis m2
55 Granito Tile Essenza 60 x 60 UnPolis m2
56 Batu Tempel Hitam m2
57 Bata Karawang bh
58 Campuran untuk Kedap Air ( AM ) ltr
59 Plint keramik 10 x 20 bh
60 Plint keramik 10 x 25 bh
61 Plint keramik 10 x 30 bh
62 Plint keramik 10 x 40 bh
63 Plint keramik 15 x 30 bh
64 Plint keramik 15 x 40 bh
65 Plint granito 10 x 30 bh
66 Plint granito 10 x 40 bh
67 Plint granito 15 x 30 bh
68 Plint granito 15 x 40 bh

G BAHAN SALURAN AIR KOTOR / BERSIH


1 Grafel U 20 cm' m1
2 Grafel U 30 cm' m1
3 Grafel U 40 cm' m1
4 Buis Beton 20 cm ( 1 M' ) m1
5 Buis Beton 30 cm ( 1 M' ) m1
6 Buis Beton 40 cm ( 1 M' ) m1
7 Buis Beton 50 cm ( 1 M' ) stk
8 Buis Beton 60 cm ( 1 M' ) stk
9 Buis Beton 100 cm ( 0.50 M' ) stk
10 Buis Beton 80 cm ( 0.50 M' ) stk
11 BuisTanah 10 cm ( 0.50 M' ) stk
12 BuisTanah 15 cm ( 0.50 M' ) stk
13 BuisTanah 20 cm ( 0.50 M' ) stk
14 BuisTanah 25 cm ( 0.50 M' ) stk
15 Injuk kg

H BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Beton U-24 Rata-rata kg
2 Besi Beton U-39 / U-32 Rata-rata kg
3 Pagar BRC lengkap tiang ( Tanpa Pondasi ) m2
4 Bondek m2
5 Besi WF Ex DN SII kg
6 Besi WF Ex Jepang kg
7 Besi Profil DN SII kg
8 Besi Profil Ex LN kg
9 Besi C Lip Chanel kg
10 Ongkos Galfanis Besi kg
11 Kawat Beton kg
12 Kawat Duri kg
13 Kawat Pengikat m1
14 Kawat Bronjong 4 mm kg
15 Kawat Tembaga kg
16 Ram Nyamuk Hijau m2
17 Ram Kawat 1 x 1 cm m2
18 Ram Ayam m2
19 Kawat Kasa 1 x 1 ( Putih ) m2
20 Kawat Harmonika 4 cm m2
21 Kawat Harmonika 2 cm m2
22 Kawat Las Listrik kg
23 Wiremesh M8 m2
24 Wiremesh M6 m2
25 Timah kg
26 Timah Hitam kg
27 Ram nyamuk Alumunium m2
28 Plat Srip Ø 2 x 30 mm ( 6 m1 ) bt
29 Plat Srip Ø 3 x 30 mm ( 6 m1 ) bt
30 Plat Strip bt
31 Besi Strip kg
32 Plat Alumunium 0.2 mm m2
33 Plat Alumunium 0.3 mm m2
34 Plat Alumunium 0.4 mm m2
35 Plat Alumunium 0.5 mm m2
36 Plat Alumunium 0.6 mm m2
37 Plat Alumunium 0.1 mm m2
38 Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 4 " ) m1
39 Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 4 " ) m1
40 Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 3 " ) m1
41 Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 3 " ) m1
42 Daun Jendela Alumunium Natural ( tanpa kaca dan accessories ) m2
43 Daun Jendela Alumunium Warna ( tanpa kaca dan accessories ) m2
44 Daun Pintu Alumunium Natural ( tanpa kaca dan accessories ) m2
45 Daun Pintu Alumunium Warna ( tanpa kaca dan accessories ) m2
46 Handle Alumunium ( Tarikan Pintu Alumunium ) bh
47 Kait Angin Alumunium ps
48 Karet Asisoris Kusen / Pintu Alumunium m1
49 Jalusi Alluminium m'
50 Sunscreen Almunium m2
51 Seng Plat BJLS 30 60 cm ( 100 m1 ) roll
52 Seng Plat BJLS 30 90 cm ( 100 m1 ) roll
53 Plat Besi Tipis 1 mm kg
54 Plat Besi Tipis 0.5 mm kg
55 Plat Besi 2 mm s/d 5 mm kg
56 Plat Besi 6 mms/d 10 mm kg
57 Plat Besi 10 mm keatas kg
58 Kabel presstressed polos kg
59 Jaring Kawat Baja kg
60 Lem Kuning ( Aibond ) kg
61 Lem Fox kg
62 Lem Vinyl kg
63 Besi Strip Kaca Nako kg
64 Profil alumunium "T" m1
65 Besi Hallow ( 2 x 4 x 4) cm (400cm) btg
66 Besi Hallow ( 4 x 4) cm (400 cm) btg
67 Besi Rail Pengamanan kg
68 Jendela Besi m2
69 Jendela Besi tahan api m2
70 Pintu gulung besi m2
71 Pintu Roliing Door m2
72 Jendela nako kaca ryben + tralis 6 klips set
73 Jendela nako kaca ryben + tralis 7 klips set
74 Jendela nako kaca ryben + tralis 8 klips set
75 Jendela nako kaca ryben + tralis 10 klips set
76 Jendela nako kaca bening + tralis 4 klips set
77 Jendela nako kaca bening + tralis 5 klips set
78 Jendela nako kaca bening + tralis 6 klips set
79 Jendela nako kaca bening + tralis 7 klips set
80 Jendela nako kaca bening + tralis 8 klips set
81 Jendela nako kaca bening + tralis 10 klips set

I BAHAN KACA
1 Kaca Polos 2 mm ( ASAHI ) m2
2 Kaca Polos 3 mm ( ASAHI ) m2
3 Kaca Polos 5 mm ( ASAHI ) m2
4 Kaca Polos 8 mm ( ASAHI ) m2
5 Kaca Rayband 5 mm ( ASAHI ) m2
6 Kaca Rayband 8 mm ( ASAHI ) m2
7 Kaca Rayband 12 mm ( ASAHI ) m2
8 Kaca cermin 5 mm m2
9 Kaca cermin 6 mm m2
10 Kaca cermin 8 mm m2
11 Kaca Patri Lokal Terpasang ( ASAHI ) m2
12 Kaca Patri Ex Luar Negeri Terpasang m2
13 Kaca 6 mm Gravver m2
14 Glass Block DN 20 x 20 ( Kedawung ) bh
15 Glass Block DN 20 x 20 Ex LN bh
16 Sealant kg
17 Jendela Nako bh

J BAHAN PAKU DAN MUR BAUT


1 Paku 1/2" s/d 2" kg
2 Paku 2" s/d 5" kg
3 Paku 8 cm s/d 15 cm kg
4 Paku Beton 2 cm s/d 5 cm bh
5 Paku Kait Lengkap bh
6 Paku Cacing kg
7 Besi Beugel Kuda - Kuda kg
8 Duk Angker bh
9 Angker Mur Baut dia. 19 / Panjang 60 cm bh
10 Mur Baut HTB dia. 19 s/d 16 ( 5 cm ) bh
11 Mur Baut Biasa dia. 19 s/d 16 ( 5 cm ) bh
12 Piser dia.12 s/d 20 cm bh
13 Paku skrup 3" bh
14 Ramset / Dinabolt bh
15 Baut Besar bh
16 Baut Kecil bh
17 Paku GRC kg
18 Paku gypsum kg
19 Sekrup fixer bh

K BAHAN PERPIPAAN
1 Besi Pipa Untuk Hydrant BSP 1" bt
2 Besi Pipa Untuk Hydrant BSP 1.25" bt
3 Besi Pipa Untuk Hydrant BSP 1.5" bt
4 Besi Pipa Untuk Hydrant BSP 2" bt
5 Besi Pipa Untuk Hydrant BSP 2.5" bt
6 Besi Pipa Untuk Hydrant BSP 3" bt
7 Besi Pipa Untuk Hydrant BSP 4" bt
8 Besi Pipa Untuk Hydrant BSP 6" bt
9 Besi Pipa Hitam 1" t = 2 mm bt
10 Besi Pipa Hitam 2" t = 2 mm bt
11 Besi Pipa Hitam 3" t = 2mm bt
12 Besi Pipa Hitam 4" t = 2 mm bt
13 Besi Pipa Hitam 6" t = 2 mm bt
14 Pipa GIP Medium A 1/2" ( 6 m1 ) bt
15 Pipa GIP Medium A 3/4" ( 6 m1 ) bt
16 Pipa GIP Medium A 1" ( 6 m1 ) bt
17 Pipa GIP Medium A 1 1/4" ( 6 m1 ) bt
18 Pipa GIP Medium A 1 1/2" ( 6 m1 ) bt
19 Pipa GIP Medium A 1 3/4" ( 6 m1 ) bt
20 Pipa GIP Medium A 2" ( 6 m1 ) bt
21 Pipa GIP Medium A 2 1/2" ( 6 m1 ) bt
22 Pipa GIP Medium A 3" ( 6 m1 ) bt
23 Pipa GIP Medium A 4" ( 6 m1 ) bt
24 Macam2 Sambungan GIP 1/2" bh
25 Macam2 Sambungan GIP 3/4" bh
26 Macam2 Sambungan GIP 1" bh
27 Macam2 Sambungan GIP 1 1/4" bh
28 Macam2 Sambungan GIP 1 1/2" bh
29 Macam2 Sambungan GIP 1 3/4" bh
30 Macam2 Sambungan GIP 2" bh
31 Macam2 Sambungan GIP 2 1/2" bh
32 Macam2 Sambungan GIP 3" bh
33 Macam2 Sambungan GIP 4" bh
34 Pipa PVC RUCIKA type AW 1/2" bt
35 Pipa PVC RUCIKA type AW 3/4" bt
36 Pipa PVC RUCIKA type AW 1" bt
37 Pipa PVC RUCIKA type AW 1 1/4" bt
38 Pipa PVC RUCIKA type AW 1 1/2" bt
39 Pipa PVC RUCIKA type AW 2" bt
40 Pipa PVC RUCIKA type AW 2 1/2" bt
41 Pipa PVC RUCIKA type AW 3" bt
42 Pipa PVC RUCIKA type AW 4" bt
43 Pipa PVC RUCIKA type AW 6" bt
44 Pipa PVC RUCIKA type AW 8" bt
45 Pipa PVC MASPION ABU ( AW ) 1/2" bt
46 Pipa PVC MASPION ABU ( AW ) 3/4" bt
47 Pipa PVC MASPION ABU ( AW ) 1" bt
48 Pipa PVC MASPION ABU ( AW ) 1 1/4" bt
49 Pipa PVC MASPION ABU ( AW ) 1 1/2" bt
50 Pipa PVC MASPION ABU ( AW ) 2" bt
51 Pipa PVC MASPION ABU ( AW ) 2 1/2" bt
52 Pipa PVC MASPION ABU ( AW ) 3" bt
53 Pipa PVC MASPION ABU ( AW ) 4" bt
54 Macam2 Sambungan Paralon 1/2" bh
55 Macam2 Sambungan Paralon 3/4" bh
56 Macam2 Sambungan Paralon 1" bh
57 Macam2 Sambungan Paralon 1 1/4" bh
58 Macam2 Sambungan Paralon 1 1/2" bh
59 Macam2 Sambungan Paralon 1 3/4" bh
60 Macam2 Sambungan Paralon 2" bh
61 Macam2 Sambungan Paralon 2 1/2" bh
62 Macam2 Sambungan Paralon 3" bh
63 Macam2 Sambungan Paralon 4" bh
64 Sambungan Pipa PVC Jenis AW 4" TY bh
65 Lem Paralon tb
66 Solatip Ledeng gl
67 Pipa PVC 4" Berlobang Jenis AW m1
68 PVC Waterstop lebar 150 m1
69 PVC Waterstop lebar 200 m1
70 PVC Waterstop lebar 230 m1
71 PVC Waterstop lebar 250 m1
72 PVC Waterstop lebar 300 m1
73 PVC Waterstop lebar 320 m1

L BAHAN SANITAIR
1 Stop Kran 3/4" KIT bh
2 Stop Kran 1" KIT bh
3 Stop Kran 1 1/2" KIT bh
4 Stop Kran 2" KIT bh
5 Stop Kran 2 1/2" KIT bh
6 Stop Kran 3" KIT bh
7 Check Valve 1/2" bh
8 Double Neple 1/2" bh
9 Water Mur 1/2" bh
10 Gate walve 1/2" bh
11 Saringan Air Lt. KM Stainless Steel bh
12 Apooer Bath Tube bh
13 Kran Stainless Lokal Kait bh
14 Shower Dengan Tiang bh
15 Shower Tanpa Tiang bh
16 Kran Tembok Sun Eui dia. 1/2" bh
17 Kran Tembok ITAP dia. 1/2" bh
18 Kran Bebek Sun Eui 1/2" bh
19 Kran Bebek ITAP 1/2" bh
20 Kran Panas Dingin San Eui Standard bh
21 Bath Cape Washteren unit
22 Tempat Sabun Poslin bh
23 Wastafel Lengkap TOTO LW 230 unit
24 Wastafel Lengkap INA unit
25 Closet Jongkok Poslin Warna TOTO unit
26 Closet Jongkok Standard Putih Poslin TOTO unit
27 Closet Jongkok Lengkap Sistem Jet TOTO unit
28 Closet Duduk Warna Standard TOTO C 240 Lengkap unit
29 Wastafel Bulat Warna Standard Lengkap unit
30 Closet Duduk Warna Standard INA Lengkap bh
31 Urinoir Lengkap TOTO Warna Standard Lengkap unit
32 Penyekat Poslin Urinoar TOTO lbr
33 Kitchen Zink Stainless Standard Lokal ( 1 Lubang ) bh
34 Kitchen Zink Stainless Non Standard Franke ( 1 Lubang ) bh
35 Kitchen Zink Stainless Non Standard Franke ( 2 Lubang ) bh
36 Talang PVC U - 15 cm btng

M BAHAN PENUTUP ATAP


1 Atap Plastik Gelombang 80 x 180 lbr
2 Atap Fiber Glass Tipis 80 x 180 ( Gelombang ) lbr
3 Atap Fiber Glass Tebal 80 x 180 ( Gelombang ) lbr
4 Atap Alumunium Natural USR 26 ( JAINDO ) m2
5 Atap Alumunium Warna USR 26 ( JAINDO ) m2
6 Atap Asbes Gel. Kecil 80 x 180 x 4 mm lbr
7 Atap Asbes Gel. Besar 80 x 180 x 5 mm lbr
8 Atap Seng Gelombang 80 cm x 180 cm x 3 mm lbr
9 Atap Seng Gelombang 80 cm x 180 cm x 5 mm lbr
10 Atap Seng Gelombang 270 cm x 105 cm x 4mm lbr
11 Atap Seng Gelombang 240 cm x 105 cm x 4mm lbr
12 Atap Seng Gelombang 210 cm x 105 cm x 4mm lbr
13 Atap Seng Gelombang 150 cm x 105 cm x 4mm lbr
14 Atap Seng Gelombang 150 cm x 102 cm x 5mm lbr
15 Atap Seng Gelombang 180 cm x 102 cm x 5mm lbr
16 Atap Asbes Gelombang 300 cm x 105 cm x 4 mm lbr
17 Atap Tegola Kubota, lengkap m2
18 Atap Tegola Kwalitas Sedang m2
19 Alumunium Foile m2
20 Atap Genteng Plentong pres Bakar KW I bh
21 Atap Genteng Plentong pres Molen Oven KW I bh
22 Atap Genteng Flam pres Molen Oven Jatiwangi bh
23 Bubung Genteng pres Bulat Ex Jatiwangi bh
24 Genteng Bubungan Ex Jatiwangi Segi Tiga bh
25 Genteng Bubungan Beton bh
26 Genteng Metal ( Rainbow Roof ) m2
27 Genteng Metal Hana m2
28 Nok Atas Metal ( Rainbow Roof ) lbr
29 Nok Atas Metal Hana lbr
30 Nok Pingir Metal ( Rainbow Roof ) lbr
31 Nok Pingir Metal Hana lbr
32 Wall Flasing ( Rainbow Roof ) lbr
33 Wall Flasing Hana lbr
34 Atap Genteng Beton Warna 14.5/m2 m2
35 Genteng Beton Natural bh
36 Sirap Kelas I ( 80 / m2 ) m2
37 Genteng Keramik Natural Intan 14.5 / m2 m2
38 Genteng Keramik Glasur Standard 14.5 /m2 m2
39 Genteng Keramik Glasur Special 14.5 /m2 m2
40 Genteng Keramik Glasur Premium 14.5 /m2 m2
41 Genteng Murando Natural 1m2 = 18 bh bh
42 Genteng Murando Glasur 1m2 = 18 bh bh
43 Bubung Murando Natural bh
44 Bubung Murando Glasur bh
45 Bubungan Genteng Keramik bh
46 Atap Genteng Kodok bh
47 Bubungan Genteng Kodok bh
48 Bubungan Genteng Plentong bh
49 Bubungan Stel Gelombang bh
50 Nok Stel Gelombang lbr
51 Nok Atap Seng lbr
52 Nok standar 40 cm 18, SWG 22 m2
53 Pelat Asbes tebal 4 mm lbr
54 Pelat Asbes tebal 3.5 mm lbr
55 Trusses ZAM-75 t=0.8 Rangka Utama m1
56 Trusses ZAM-75 t=0.5 Rangka Utama m1
57 Reng 16-DB Roof Battens t=0.48 mm m1
58 Foot Plate t= 1.22 mm m1
59 PLD - Diafragma Plate bh
60 WIND Bracing m1
61 Tensioner ( Pengaku Tali angin ) bh
N BAHAN MEKANIKAL
1 Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW ) unit
2 Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW ) unit
3 Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW ) unit
4 Presure Tank kap. 500 liter lengkap unit
5 Hydran Box dlm Gedung ( Lengkap ) unit
6 Fire House 1.5 x 30 m + nose unit
7 Exhose Fan H 360 W 60 x 60 cm unit
8 Exhose Fan H 380 W CFM 55 x 55 cm unit
9 Exhose Fan H 100 W 40 x 40 cm unit
10 AC Split 3 PK Setara TOSHIBA unit
11 AC Split 2 PK Setara TOSHIBA unit
12 AC Split 1 PK Setara TOSHIBA unit
13 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit ) 1 BTU

O BAHAN ELEKTRIKAL
1 Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' ) ROLL
2 Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' ) ROLL
3 Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' ) m'
4 Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' ) m'
5 Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' ) m'
6 Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' ) m'
7 Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' ) m'
8 Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' ) m'
9 Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' ) m'
10 Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' ) m'
11 Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' ) m'
12 Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' ) m'
13 Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m' ) m'
14 Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' ) m'
15 Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' ) m'
16 Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' ) m'
17 Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' ) m'
18 Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' ) m'
19 Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' ) m'
20 Kabel NYY 4 x 4 Supreme ( 1 rol = 50 m' ) m'
21 Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' ) m'
22 Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' ) m'
23 Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' ) m'
24 Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m' ) m'
25 Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m' ) m'
26 Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m' ) m'
27 Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m' ) m'
28 NSFB FUJI EA - 100 A bh
29 NSFB FUJI EA - 150 A bh
30 Rumah Panel 30 x 60 cm ( Kosong ) unt
31 Skring Kas 2 grop Biasa unt
32 Skring Kas 3 grop Biasa unt
33 Skring Kas 5 grop Biasa unt
34 MCB 1 PAS bh
35 MCB 3 PAS bh
36 Tahanan 50 A Merk Fuji bh
37 Saklar Broko Tunggal Standard ( 1 Phase ) bh
38 Saklar Broko Seri Standard ( 1 Phase ) bh
39 Stop Kontak Broko Standard ( 1 Phase ) bh
40 Stop Kontak Broko 3 Phase (Out Bow) bh
41 Stop Kontak Broko 3 Phase ( In Bow) bh
42 Stop Kontak Handle 3 Phase bh
43 Instalas Titik Lampu / Stop Kontak (Upah dan Alat) ttk
44 Lampu pijar 25 Watt s/d 100 Watt bh
45 Lampu Neon Phillips 20 Watt bh
46 Lampu Neon Phillips 40 Watt bh
47 Trapo TL 20 W (Phillips) bh
48 Trapo TL 40 W (Phillips) bh
49 Trapo TL 20 W (Sinar) bh
50 Trapo TL 40 W (sinar) bh
51 Stater Neon Phillips bh
52 Stater Neon Biasa bh
53 Rumah TL In Bow / Out Bow 2 x 20 W (kosongan) bh
54 Down Light + SL 25 W bh
55 Lampu SL Philip 25 W bh
56 Lampu Sirkel TL 20 W Lengkap bh
57 Lampu Mercuri 80 W bh
58 Lampu Taman + Tiang + Lampu 1 Buah bh
59 Lampu Baret 30 cm + Neon bh
60 Lampu Neon Arcrilik 2 x 40 W Lengkap bh
61 Jarum Penangkal Petir 16 bh
62 Kawat BC ( Tembaga ) kg
63 Pentanahan Penangkal Petir ttk
64 Pentanahan Panel ttk

P BAHAN ALAT PENGANTUNG DAN KUNCI


1 Kunci Silinder ALFA untuk Pintu Alumunium bh
2 Tarikan Pintu Alumunium bh
3 Kunci 2 Slaag ROYAL bh
4 Rel Henderson Lengkap bh
5 Rel maraton I Pintu unt
6 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226 bh
7 Kunci 2 Slaag Ancor Asli bh
8 Kunci 2 Slaag ISO bh
9 Kunci KM Bulat Kualitas Biasa bh
10 Kunci kM Bulat ALFA bh
11 Kunci 2 Slaag Silinder Utama Standard bh
12 Kunci Gembok Besar bh
13 Kunci 2 Slaag Kuda Terbang bh
14 Kunci Lemari bh
15 Espangolet ps
16 Grendel 15 cm bh
17 Grendel 5 cm bh
18 Hak Angin Kait Jendela Biasa ps
19 Hak Angin Jendela Antik ps
20 Hak Angin Sendok Stainless / Kuningan bh
21 Sloot Pintu Berikut Rantai bh
22 Sloot Jendela Tunggal bh
23 Engsel Pintu Unilon Standard ps
24 Engsel Jendela Unilon ps
25 Engsel Patrun ps
26 Engsel Harmonika m1
27 Door Closer Kelas Standard ( Kelas Sedang ) unt
28 Door Closer Kelas Standard ( Kelas Baik ) unt
29 Door Closer Kelas Rendah unt
30 Door Holder unt
31 Door Stoper unt
32 Tarikan Almari Rata-rata bh
33 Seng BJLS 30 Lebar 60 cm ( 1 rol 50 m' ) m1
34 Seng BJLS 30 Lebar 90 cm ( 1 rol 50 m' ) m1
35 Seng BJLS 30 / 3 x 0.3 mm lbr
36 Seng Plat lbr
37 Waterstop Lebar 200 mm m1

Q BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN


1 Aspal Bitumen kg
2 Aspal Emulsi kg
3 Aspal Curah kg
4 Aspal Concrete / Laston( AC -WC) ton
5 Aspal Threated Base ( ATB ) ton
6 Lataston /Hot Rolls Sheet ( HRS ) ton

R BAHAN PENGISAP AIR SUMUR DALAM


1 Pompa Kodok unit
2 Pompa Dragon Tegal unit
3 Pompa Dragon Asli unit
4 Mesin Pompa Air 100 W - Sanyo unit
5 Mesin Pompa Air 150 W - Sanyo unit
6 Pompa Zet Pump 250 W - Sanyo unit
7 Pompa Zet Pump 450 W - Sanyo unit
8 Pompa Submersible kap. 150 liter / menit 3 KW unit
9 Gear Pump Kap. 60 liter / menit unit
10 Deep Well dengan kelengkapannya kap. 150 liter / menit unit
11 Hand Oil Pump unit

S BAHAN PENAMPUNG AIR


1 Tangki Air Fiber Glass 0.5 m3 ( Excel ) bh
2 Tangki Air Fiber Glass 1 m3 ( Excel ) bh
3 Tangki Air Fiber Glass 2 m3 ( Excel ) bh
4 Bak KM Fiber 60 x 60 bh
5 Bak Taraso WC 40 x 40 bh
6 Bak KM Taraso 60 x 60 bh

T ALAT TUKANG
1 Palu 0.5 kg bh
2 Cangkul bh
3 Singkup bh
4 Sekrop bh
5 Pengki bh
6 Linggis bh
7 Rool Meter 30 meter ( Bahan Plastik ) bh
8 Rool Meter 5 meter ( Bahan Besi ) bh
9 Selang Plastik untuk Water Pas dia. 0.5 cm m
10 Water Pas Alumunium 60 cm bh

U BAHAN BAKAR DAN PELUMAS


1 Minyak Tanah lt
2 Kayu Bakar dari Kayu Karet m3
3 Bahan Bakar Residu lt
4 Minyak Solar lt
5 Bensin Premium lt
6 Plus Oil lt
7 Oil Mesran 40 SAE lt
8 Elpiji / botol 15 kg
9 Asitilin / Botol 15.1 kg btl
10 Angin ( O2 ) / botol btl
11 Karbit kg
12 Minyak Bekisting ltr
13 Rapidrant Gln
14 Soda Api kg
15 Sabun kg
16 Arang Kayu kg
17 Kawat Las bh
V BAHAN PAGAR
1 Panel Beton Pracetak lbr
2 Kolom Beton Pracetak btg

B. BIDANG PERTAMANAN
1 Aglonema batang
2 Bambu krisik/jepang batang
3 Furadan kg
4 Kompos/pupuk kandang karung
5 M atoa (2 m) batang
6 Palm (botol, ekor tupai, putri, dll) tinggi 2 m batang
7 Philo batang
8 Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2m batang
9 Pohon perdu (kaca piring, puring, mawar, melati, dll) batang
10 Rumput gajah mini m2

harga sudah termasuk PPN dan keuntungan


HARGA (Rp)

175,300.00
89,200.00
203,500.00
174,200.00
233,400.00
255,400.00
259,000.00
29,600.00
223,600.00
211,100.00
205,000.00
196,000.00
205,500.00
180,800.00
172,600.00
96,600.00
14,100.00
73,700.00
97,800.00
2,000.00
2,400.00
5,400.00
775
675
1,800.00
14,800.00
15,500.00
9,700.00
22,500.00
81,100.00
108,600.00
76,000.00
86,000.00
34,900.00
70,300.00
1,406.00
92,700.00
58,900.00
1,105,000.00
903,500.00
877,500.00
925,000.00
850,000.00
825,000.00
353,300.00
18,300.00
15,700.00
31,300.00
3
2,500.00
5,000.00
4,000.00
3,000.00

25,000.00
120,000.00
75,000.00
25,000.00
75,000.00
20,000.00
30,000.00
40,000.00
90,000.00
185,000.00
70,000.00
62,500.00
32,500.00
8,500.00
10,000.00
25,000.00
29,000.00
382,600.00
370,000.00
16,000.00
22,000.00
5,200.00
5,500.00
15,000.00
110,000.00
34,200.00
37,700.00
37,700.00
35,800.00
48,000.00
112,700.00
19,500.00
23,900.00
21,400.00
30,800.00
52,500.00
39,200.00
35,800.00
5,000.00
24,400.00
30,400.00
40,900.00
41,700.00
44,000.00
76,300.00
67,700.00
3,300.00
38,400.00
50,100.00
8,100.00

17,700.00
25,000.00
37,200.00
7,094,450.00
5,280,000.00
5,595,800.00
5,692,600.00
5,823,400.00
6,363,600.00
6,645,300.00
8,633,700.00
8,724,300.00
2,658,000.00
20,772,000.00
22,188,400.00
13,625,400.00
12,736,100.00
2,069,800.00
1,870,500.00
2,071,700.00
22,600.00
28,000.00
8,900.00
10,000.00
14,300.00
17,200.00
29,400.00
160,100.00
122,500.00
2,772,000.00
3,356,800.00
2,500.00
3,300.00
4,000.00
2,850,000.00
2,640,000.00
139,500.00
23,400.00
22,000.00
537,300.00
351,200.00

17,400.00
62,400.00
22,500.00
19,500.00
79,800.00
83,800.00
12,500.00
132,800.00
15,000.00
67,500.00
75,000.00
8,500.00

61,700.00
64,400.00
56,200.00
92,000.00
166,600.00
119,000.00
19,800.00
22,700.00
34,200.00
55,700.00
151,100.00
195,000.00
255,400.00
323,900.00
235,000.00
140,000.00
129,100.00
131,700.00
127,200.00
114,700.00
128,200.00
57,900.00
89,200.00
133,400.00
170,000.00
132,900.00
238,100.00

3,400.00
2,400.00
3,400.00
2,800.00
3,600.00
3,400.00
5,700.00
6,300.00
3,200.00
2,500.00
4,100.00
63,300.00
67,300.00
54,500.00
56,000.00
62,500.00
54,500.00
62,500.00
53,000.00
58,000.00
56,800.00
65,500.00
64,400.00
72,200.00
75,200.00
72,900.00
75,200.00
72,900.00
68,900.00
76,600.00
72,500.00
77,000.00
56,000.00
1,025,500.00
353,500.00
375,400.00
13,700.00
25,000.00
31,800.00
13,500.00
1,848,400.00
1,612,900.00
1,331,100.00
1,299,400.00
345,000.00
322,800.00
204,900.00
550,000.00
550,200.00
345,700.00
340,800.00
237,600.00
157,900.00
358,100.00
231,800.00
96,500.00
600
37,600.00
3,000.00
3,250.00
3,500.00
4,000.00
4,500.00
5,250.00
25,900.00
27,600.00
31,100.00
41,300.00
44,300.00
56,400.00
74,200.00
49,200.00
61,700.00
80,900.00
94,300.00
130,900.00
299,800.00
298,500.00
9,600.00
12,700.00
16,800.00
22,800.00
17,400.00

16,500.00
20,700.00
171,300.00
185,000.00
24,000.00
23,900.00
18,300.00
21,600.00
19,200.00
10,600.00
27,700.00
63,500.00
1,000.00
28,200.00
41,400.00
13,400.00
15,300.00
14,900.00
32,100.00
35,900.00
28,600.00
23,600.00
51,900.00
38,700.00
46,300.00
43,300.00
32,400.00
33,000.00
33,100.00
18,200.00
26,800.00
89,800.00
110,500.00
141,400.00
143,100.00
171,800.00
56,300.00
151,100.00
163,000.00
81,000.00
102,000.00
98,800.00
148,800.00
211,800.00
207,500.00
345,200.00
104,500.00
7,500.00
35,000.00
380,200.00
1,581,500.00
2,080,100.00
16,800.00
17,700.00
14,100.00
14,100.00
14,700.00
26,700.00
28,900.00
35,700.00
23,900.00
44,000.00
11,000.00
12,200.00
22,600.00
29,200.00
459,300.00
390,200.00
501,700.00
501,700.00
306,600.00
170,000.00
200,000.00
230,000.00
290,000.00
120,000.00
140,000.00
170,000.00
210,000.00
230,000.00
300,000.00

69,000.00
87,400.00
111,000.00
183,100.00
148,700.00
323,400.00
627,000.00
150,500.00
186,400.00
234,300.00
1,621,100.00
3,425,700.00
1,263,900.00
22,000.00
125,700.00
211,800.00
109,200.00

23,800.00
23,400.00
20,000.00
1,600.00
900
57,100.00
21,700.00
7,500.00
71,800.00
15,900.00
9,300.00
5,300.00
800
7,200.00
600
300
35,000.00
17,500.00
250

166,700.00
210,200.00
298,000.00
351,800.00
439,300.00
595,000.00
869,600.00
1,423,400.00
172,300.00
227,900.00
365,800.00
573,100.00
772,400.00
109,100.00
159,400.00
181,500.00
259,300.00
280,500.00
326,400.00
467,400.00
672,100.00
849,900.00
920,300.00
6,300.00
8,600.00
16,700.00
19,800.00
20,700.00
22,700.00
51,200.00
60,400.00
75,900.00
118,600.00
40,100.00
52,200.00
63,200.00
79,900.00
105,900.00
110,700.00
167,100.00
205,100.00
347,900.00
640,000.00
818,300.00
22,500.00
27,800.00
40,500.00
58,500.00
60,200.00
75,800.00
126,300.00
145,700.00
256,800.00
4,400.00
4,700.00
4,900.00
7,200.00
9,500.00
13,500.00
15,800.00
26,400.00
29,700.00
34,000.00
89,900.00
10,100.00
4,200.00
36,700.00
53,500.00
57,900.00
65,700.00
74,700.00
83,600.00
92,500.00

103,900.00
124,200.00
208,000.00
267,900.00
713,200.00
830,300.00
86,400.00
32,400.00
40,200.00
55,500.00
66,600.00
267,800.00
46,100.00
221,000.00
134,800.00
86,900.00
40,900.00
144,600.00
51,500.00
228,400.00
2,098,700.00
46,300.00
1,012,700.00
699,900.00
205,600.00
188,200.00
2,032,900.00
1,724,700.00
910,800.00
1,272,100.00
1,773,400.00
495,900.00
397,800.00
1,272,300.00
1,650,200.00
60,000.00

33,100.00
47,100.00
100,000.00
140,600.00
164,700.00
77,200.00
111,100.00
62,900.00
83,100.00
73,300.00
65,900.00
58,500.00
42,300.00
78,500.00
97,200.00
80,000.00
487,100.00
283,600.00
19,600.00
1,900.00
2,700.00
2,300.00
7,500.00
4,800.00
10,500.00
203,100.00
172,700.00
138,500.00
80,900.00
105,300.00
100,800.00
83,900.00
88,700.00
96,700.00
8,500.00
26,400.00
112,400.00
142,200.00
139,300.00
145,100.00
2,700.00
4,000.00
7,500.00
10,700.00
10,000.00
3,000.00
4,500.00
6,000.00
7,500.00
38,100.00
37,500.00
75,000.00
21,000.00
16,400.00
34,500.00
22,000.00
11,000.00
7,200.00
2,200.00
1,700.00
7,200.00
71,396,400.00
216,358,900.00
591,647,100.00
36,997,300.00
6,854,400.00
4,866,100.00
6,862,900.00
5,491,100.00
1,092,600.00
30,791,800.00
21,926,500.00
5,174,100.00
4,200,000.00

102,700.00
151,700.00
6,600.00
7,600.00
4,900.00
10,900.00
7,600.00
6,300.00
15,400.00
20,700.00
11,800.00
13,700.00
18,600.00
17,600.00
119,700.00
26,500.00
29,700.00
12,000.00
19,300.00
23,800.00
14,500.00
19,200.00
18,500.00
20,400.00
25,800.00
35,500.00
41,900.00
841,900.00
2,182,600.00
153,500.00
204,800.00
222,600.00
468,800.00
55,100.00
106,000.00
521,100.00
23,800.00
26,300.00
23,800.00
87,700.00
144,900.00
87,800.00
179,600.00
61,200.00
29,700.00
35,200.00
41,800.00
37,900.00
40,600.00
41,300.00
8,300.00
6,500.00
144,000.00
306,900.00
306,900.00
67,900.00
147,400.00
307,600.00
221,700.00
738,000.00
101,500.00
65,100.00
423,700.00
296,100.00

410,900.00
408,600.00
126,500.00
864,300.00
193,100.00
335,900.00
165,300.00
207,300.00
54,400.00
102,700.00
586,600.00
85,200.00
94,500.00
46,800.00
51,600.00
49,800.00
5,500.00
7,100.00
29,000.00
32,200.00
31,500.00
33,000.00
21,000.00
15,000.00
13,700.00
9,100.00
420,000.00
597,500.00
200,000.00
205,400.00
255,500.00
19,500.00
43,500.00
53,500.00
86,900.00
50,100.00
57,900.00

12,459.00
12,459.00
10,890.00
1,348,300.00
1,200,200.00
1,666,900.00

172,600.00
243,800.00
718,500.00
1,100,200.00
1,890,700.00
4,961,500.00
7,878,000.00
27,151,200.00
15,702,700.00
172,052,500.00
5,195,300.00

1,172,500.00
1,316,400.00
1,954,200.00
255,300.00
118,500.00
161,100.00

39,300.00
24,500.00
41,400.00
50,100.00
12,300.00
41,700.00
101,000.00
37,800.00
1,600.00
88,200.00

18,000.00
151,100.00
28,435.00
7,150.00
7,800.00
3,300.00
55,000.00
104,600.00
88,900.00
66,400.00
19,400.00
40,500.00
15,700.00
35,600.00
2,400.00
11,100.00
1,400.00
199,200.00
264,000.00

50,000.00
50,000.00
24,000.00
25,000.00
40,000.00
100,000.00
75,000.00
25,000.00
10,000.00
15,000.00
Harga Satuan Upah Kerja Bangunan - AHS 2011

NO URAIAN SATUAN UPAH (Rp.)

1 Mandor Org/hr Rp 80,000.00


2 Kepala Tukang Batu Org/hr Rp 75,000.00
3 Kepala Tukang Kayu Org/hr Rp 75,000.00
4 Kepala Tukang Besi Org/hr Rp 75,000.00
5 Kepala Tukang Cat Org/hr Rp 75,000.00
6 Kepala Tukang Listrik Org/hr Rp 75,000.00
7 Kepala Tukang Org/hr Rp 75,000.00
8 Tukang Batu Org/hr Rp 65,000.00
9 Tukang Kayu Org/hr Rp 65,000.00
10 Tukang Besi/Baja Org/hr Rp 65,000.00
11 Tukang Cat Org/hr Rp 65,000.00
12 Tukang Listrik Org/hr Rp 65,000.00
13 Tukang Pipa Org/hr Rp 65,000.00
14 Tukang Plitur Org/hr Rp 65,000.00
15 Tukang Taman Org/hr Rp 65,000.00
16 Tukang Org/hr Rp 65,000.00
17 Pembantu Tukang Org/hr Rp 42,000.00
18 Pekerja Biasa Org/hr Rp 42,000.00
19 Penjaga Malam Org/hr Rp 42,000.00
20 Sopir Org/hr Rp 65,000.00
21 Operator Org/hr Rp 75,000.00
22 Mekanik Org/hr Rp 65,000.00
23 Pembantu Sopir Org/hr Rp 42,000.00
24 Pembantu Operator Org/hr Rp 50,000.00
25 Pembantu Mekanik Org/hr Rp 42,000.00

harga sudah termasuk PPN dan keuntungan


Format RAB
Inilah Format RAB Rumah yang dihasilkan Software RAB.
Rencana Anggaran Biaya (RAB)
Renovasi Rumah KPR-BTN Type 21/60 (2 Lantai)
Perumahan di Bogor
NO URAIAN PEKERJAAN

A PEKERJAAN PONDASI
1 Galian tanah pondasi
2 Pasangan Pondasi Batu Kosong (aanstamping) tebal 20 cm
3 Pasangan Pondasi Batu adukan 1pc : 5 psr
4 Urugan tanah pondasi
B PEKERJAAN BETON (adukan 1pc:2psr:3krikil)
1 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15
2 Kolom, 15/20 (180 kg besi + bekisting) 4dia.12 , ring 8 -15
3 Ring Balk, sofi-sofi (180 kg besi + bekisting) 4dia. 12mm, ring 8mm -15
4 Tangga Beton (90 kg besi + bekisting), dia 10 & 8 mm
5 Plat Lantai 10 cm ( 90 Kg Besi + Bekisting ) dia 8mm, 2x 15x15
C PEKERJAAN PASANGAN DINDING
1 Pasang bata merah adukan 1 pc : 5 psr
2 Plesteran tebal 2 cm 1 pc : 5 psr
3 Acian semen
4 Pasangan keramik roman dinding km. mandi 20 x 25
5 Pasangan keramik roman dinding dapur 20 x 25
D PEKERJAAN ATAP
1 Rangka atap baja ringan
2 Tutup atap genting plentong
3 Genting bubung plentong
4 Listplang kayu kamper medan 2/20
5 Talang sudut (seng)
E PEKERJAAN LANGIT-LANGIT
1 Langit-langit GRC 120 x 240 + rangka hollow
2 List gypsum
F PEKERJAAN LANTAI
1 Lantai keramik, luar & dalam, 40 x 40 cm
2 Lantai keramik, kamar mandi, 30 x 30
3 Plint Keramik 10 x 40, dalam
G PEKERJAAN KAYU
1 Kusen pintu dan jendela, kayu balok kamper samarinda
2 Daun pintu panel, kayu papan kamper samarinda
3 Daun pintu triplek, rangka kayu papan kamper samarinda
4 Daun jendela ram kaca, kayu papan kamper samarinda
5 Daun pintu triplek lapis formika, rangka papan kamper samarinda
H PEKERJAAN KACA DAN KUNCI
1 Pasang kaca jendela 5 mm
2 Pasang kunci tanam
3 Pasang kunci kamar mandi
4 Pasang engsel pintu
5 Pasang engsel jendela
6 Pasang tulak angin
I PEKERJAAN SANITASI
1 Pasang closet jongkok
2 Pasang washtafel
3 Pasang bak mandi fibergalass
4 Pasang bak cuci piring stainless
5 Septictank uk 2 x 1.5 x 1.5 + rembesan
6 Keran air
7 Pipa pvc 1/2" instalasi air
8 Pipa pvc 4" AW saluran air hujan dan air limbah
J PEKERJAAN PENGECATAN
1 Pengecatan kusen, dengan cat kayu
2 Pengecatan pintu dan jendela, dengan cat kayu
3 Pengecatan Plapond 3x, dengan cat tembok Vinilex
4 Pengecatan tembok 3x dengan Cat Vinilex

<pKeterangan :

FORMAT RAB sudah disetting seperti yang Saudara lihat, URAIAN PEKERJAAN yang dapat d
sejenis dan memiliki ukuran sama. Apabila pengguna software rab selesai mengisi volume
harga satuan bahan material, maka kolom-kolom yang kosong akan otomatis terisi oleh nil
perhitungan Software RAB.
JUDUL TABEL Bisa diubah secara manual oleh pengguna sesuai judul pekerjaan, dengan ca
password yang tercantum dalam sheet tabel tersebut.
Rangka Atap dan rangka plapond dalam software rab ini sudah disetting menggunakan bah
baja ringan dan rangka plapond besi hollow). Bagi yang akan menggunakan kayu, harus m
satuan dengan menggunakan analisa pekerjaan kayu yang disertakan.
Pekerjaan istalasi listrik dan pekerjaan aksesoris seperti pagar dan teralis pengaman tidak
pekerjaan tersebut bukan merupakan pekerjaan standard dan Anda bisa menambahkannya
perhitungan manual sesuai keinginan dan selera.</p
Satuan Volume Satuan Jumlah b Total
(Rp) (Rp) (Rp)
-
m3 - - -
m3 - - -
m3 - - -
m3 - - -
-
m3 - - -
m3 - - -
m3 - - -
m3 - - -
m3 - - -
-
m2 - - -
m2 - - -
m2 - - -
m2 - - -
m2 - - -
-
m2 - - -
m2 - - -
m' - - -
m' - - -
m' - - -
-
m2 - - -
m' - - -
-
m2 - - -
m2 - - -
m' - - -
- -
m3 - - -
m2 - - -
m2 - - -
m2 - - -
m2 - - -
-
m2 - - -
bh - - -
bh - - -
bh - - -
bh - - -
bh - - -
-
bh - - -
bh - - -
bh - - -
bh - - -
unit - - -
bh - - -
m' - - -
m' - - -
-
m2 - - -
m2 - - -
m2 - - -
m2 - - -
TOTAL -
DIBULATKAN -

RJAAN yang dapat diubah hanya material


sai mengisi volume pekerjaan dan meng-edit
matis terisi oleh nilai hasil proses

kerjaan, dengan cara unprotek sheet dengan

g menggunakan bahan metal (rangka atap


akan kayu, harus menghitung sendiri harga

lis pengaman tidak kami seting, sebab


a menambahkannya sendiri dengan
Format Rincian Kebutuhan Bahan Bangunan
Berikut ini adalah contoh output Software RAB yaitu rincian kebutuhan bahan bangunan yang tentunya sangat diper

Jumlah Bahan
No. Satuan Yang
Diperlukan
A. AGREGAT KASAR,BAHAN PEREKAT & BAHAN JADINYA
1 Pasir Urug m3 -
2 Pasir Pasang m3 -
3 Pasir Beton m3 -
4 Split 2/3 m3 -
5 Batu belah m3 -
6 Bata Merah Bakar kelas I bh -
7 Semen PC /50 kg zak -
8 Semen Warna kg -
B LABURAN,PENGISI DAN ALATNYA
1 Plamir kayu kg -
2 Plamir tembok kg -
3 Cat Tembok Vinilex kg -
4 Cat dasar kayu kg -
5 Cat dasar tembok kg -
6 Rool Cat Tembok bh -
7 Ampelas lbr -
8 Meni Kayu / Besi kg -
9 Cat Kayu Glotex lt -
C BAHAN KAYU BERIKUT BAHAN JADINYA
1 Kayu Balok Kamper Samarinda m3 -
2 Kayu Papan Kamper Samarinda m3 -
3 Kayu papan bekisting, terentang m3 -
4 Kayu balok bekisting, terentang m3 -
5 Kayu dolken, tiang bekisting bt -
6 Ijuk kg -
D BAHAN PENUTUP RANGKA PLAFOND
1 Cotton Plester bh -
2 GRC (120 x 240) cm, t = 4 mm lbr -
3 Compound
4 Tepung gypsum kg -
5 List gypsum m' -
E BAHAN KAYU LAPIS
1 Triplek 4 mm 120 x 240 lbr -
2 MultiPlek 9 mm 120 x 240 lbr -
3 Formika ukuran Pintu lbr -
F BAHAN LANTAI DAN PELAPIS DINDING 0
1 Keramik, Roman 20 x 25, untuk kamar mandi & dapur m2 -
2 Keramik, Roman 40 x 40 untuk interior & teras m2 -
3 Keramik, Roman , 30 x 30, untuk lantai k. mandi m2 -
4 Plint keramik 10 x 40 untu interior bh -
G BAHAN LOGAM DAN BAHAN JADI
1 Besi Beton kg -
2 Kawat Beton kg -
3 Seng Plat BJLS 30 60 cm ( 100 m1 ) m' -
4 Lem Kayu Fox kg -
5 Besi Hollow ( 2 x 4 x 4) cm (400cm) btg -
6 Besi Hollow ( 4 x 4) cm (400 cm) btg -
7 Rangka Atap Baja Ringan m2 -
H BAHAN KACA
2 Kaca Polos 5 mm ( ASAHI ) m2 -
I BAHAN PAKU DAN MUR BAUT
1 Paku 1/2" s/d 2" kg -
2 Paku 2" s/d 5" kg -
3 Ramset / Dinabolt bh -
5 Paku GRC kg -
J BAHAN PERPIPAAN
1 Pipa PVC RUCIKA type AW 1/2" bt -
2 Solatip Ledeng gl -
3 Pipa GIP Medium A 1 1/2" ( 6 m1 ) bt -
4 Pipa PVC RUCIKA type AW 4" bt -
5 Pipa PVC 4" Berlobang Jenis AW m1 -
K BAHAN SANITAIR
1 Kran Air Standard 1/2 -3/4" bh -
2 Washtafel Standard unit -
3 Closet Jongkok Standard unit -
4 Closet Duduk Standard unit -
5 Bak Cuci Stainless Standard bh -
L BAHAN PENUTUP ATAP
1 Genteng Plentong pres Bakar KW I bh -
2 Genteng bubung plentong bh -
M BAHAN ALAT PENGANTUNG DAN KUNCI
1 Kunci Pintu 2 Slaag Biasa bh -
2 Kunci Tanam Kamar Mandi bh -
3 Hak Angin Kait Jendela Biasa ps -
4 Engsel Pintu Standard ps -
5 Engsel Jendela Standard ps -
6 Bak Kamar Mandi Fiber 60 x 60 Cm bh -
7 Minyak Bekisting ltr -
JUMLAH
ngunan yang tentunya sangat diperlukan ketika kita sedang melaksanakan pekerjaan bangunan rumah kita.

Harga Satuan Jumlah Uang yang


(Rp) diperlukan (Rp)

- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -

- -
- -

- -
- -

- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -

- -

- -
- -
- -
- -

- -
- -
- -
- -
- -

- -
- -
- -
- -
- -

- -
- -

- -
- -
- -
- -
- -
- -
- -
-
Analisa Harga Satuan Pekerjaan Rangka Atap Baja Ringan
Diposkan : 21 Junii 2014
Oleh : Endang Kusman

No. URAIAN SATUAN VOLUME (Rp)

1 m2 Pek. Pasangan Baja Ringan (Bersertifikat dan bergaransi 10 tahun)


Mobilisasi Ls 1
Main truss C-75-75 m' 2.8
Roof Bottom/Reng R 33-0.45 m' 5.1
Self drilling screw dia 6 x 20 mm (truss Screw) bh 25
Self drilling screw dia 4 x 16 mm (Roof Bottom Screw) bh 35
Dynabol dia 12 x 120 mm bh 1
Tukang oh 0.247
Tukang Besi Profil Oh 0.176
Kepala Tukang Besi Profil Oh 0.117
Alat Bantu (Mesin Bor Listrik)/Genset Ls 1
Gambar Desain m2 1
Total
Keuntungan Max 10%
Total Harga
Dibulatkan
Sumber : http://bit.ly/1rixKVE
Ringan

HARGA SATUAN
HARGA
(Rp)

9,000.00 9,000.00
14,870.00 41,636.00
8,500.00 43,350.00
375 9,375.00
350 12,250.00
1,500.00 1,500.00
45,000.00 11,115.00
50,000.00 8,800.00
52,500.00 6,142.50
4,500.00 4,500.00
2,340.00 2,340.00
150,008.50
15,000.85
165,009.35
165,000.00
PENGERUKAN DREDGING.
Pengerukan adalah pekerjaan penggalian endapan di bawah permukaan air dan dilaksanakan baik dengan tenaga manusia ma
Kecuali pengerukan biasanya dilakukan dengan menggunakan kapal keruk.

Terdapat beberapa tipe kapal keruk antara lain :
•      Tipe pompa
•      Tipe ember (bucket type).
•      Tipe ember cengkeram (grab type).
•  Tipe cengkeram (dipper type).

Penggunaannya tergantung dari :
•      Volume endapan yang dikeruk
•      Lokasi (arealnya)
•      Kedalaman air
•      Karakteristik endapan
•      Tempat pembuangan
•      Sumber tenaga penggerak.

Survey yang perlu dilakukan untuk pengerukan :
•      Pendugaan dan eksplorasi tanah.
•      Survei hidrologi dan meteorology.
•      Survei terhadap hambatan pelaksanaan.
•      Survei tempat pembuangan endapan.

Untuk pemilihan kapal keruk ini sangat dipengaruhi oleh tipe dari kapal keruk itu sendiri, antara lain :

•        Kapal keruk tipe ember cengkeram (grab dredger) :
Penggunaan kapal keruk yang besar tidak terpengaruh oleh kedalaman pengerukan dan sangat cocok untuk pengerukan sedim
Sedangkan penggunaan kapal keruk yang kecil, cocok untuk pengerukan daerah yang sempit, dekat kaki suatu bangunan, kak
•      Kapal keruk tipe ember (bucket dredger) :

Cocok untuk pengerukan baik tanah lunak maupun tanah keras. Effisiensi operasinya tinggi, terutama pada pengerukan lemp
•      Kapal keruk tipe cengkeram (dipper dredger) :
Biasanya dipergunakan untuk pengerukan tanah keras atau hancuran batuan.
•      Kapal keruk pompa yang tidak dapat bergerak sendiri :
Effisiensi operasinya tinggi dan mampu mengeruk sediment dalam jumlah besar. Cocok untuk pekerjaan ringan, reklamasi da

10. 1.     Pengerukan dengan Kapal Keruk tipe Pom
  

a.        Pengerukan lebih (outbreak) :
Volume tanah yang akan dikeruk hendaknya dihitung dengan cara sebagaima na menghitung pekerjaan penggalian biasa.
Hasil yang diperoleh dari cara perhitungan ini dapat digunakan sebagai volu me rencana pekerjaan pengerukan.
Pengerukan lebih ini sangat bervariasi, tergantung dari dimensi pekerjaan, ka rakteristik tanah, cara melaksanakan pengeruk

b.        Volume hasil pengerukan :
Volume hasil pengerukan hendaknya diperhitungkan sebagai berikut :
•      Volume hasil pengerukan supaya ditentukan berdasarkan pengukuran Profil yang sebenarnya.
•     Pengerukan lebih hendaknya tidak dimasukkan ke dalam volume hasil pengerukan.
•     Apabila terjadi pengendapan kembali pada suatu tempat yang sudah dike ruk, hendaknya dikeruk kembali kecuali apabila

c.        Pipa penyemprot dan distribusi hasil penyemprotan :
Apabila pipa penyemprotan lumpur dari kapal keruk tipe pompa yang melin tasi kanal sebagai jalan air, maka pipa penyempr

d.        Lain-lain :
pengerukan dasar sungai hendaknya dimulai dari hulu ke hilir.

11. 2.    Contoh Perhitungan.
  

1.      Sebuah Grab-dredger digunakan untuk pengerukan lumpur sebanyak 800 m³ dimana hasil pengerukan tersebut langsung 
Jika diketahui : kapasitas bucket         = 4,0 m,  kadar lumpur  = 25 %, Waktu kerja per hari = 8 jam,                         job efisi

Waktui siklus              = 1,5 menit.

Pertanyaan : Berapa waktu yang diperlukan untuk menyelesaikan pekerjaan ? Jawab :
Jumlah lumpur = 800 m²  jumlah sediment = 800 /0,25 = 3.200 m³ Banyaknya trip = 60 /1,5 = 40 trip/jam
Produksi teoritis = 40 x 4 =  160 m³/jam
Faktor koreksi : effisiensi waktu = 50 menit/jam = 0,84 Faktor  koreksi total  = 0,84 x 0,70 x 0,85 = 0,50
Produksi = 0,5 x 160 = 80 m³/jam  80 x 8 = 640 m³/hari. Waktu pelaksanaan = 3.200/640 = 5 hari.

2.      Sebuah suction dredger beroperasi dengan data-data sbb : Panjang pipa hisap pada ladder  :  6.00 m


Panjang pipa seluruhnya              :  600 m (minus pipa ladder).
Yang terdiri atas : pipa hisap     :  20 m
 apung    : 300 m pipa darat  :  280 m
diameter seluruh pipa                  : 0,61 m
bj tanah lumpur lunak 20 % (a)  : 1,20 (lumpur 20 % + air 80 %) berat lumpur       : 1,4 kg/m³

Hitunglah total “head loss” dan kapasitas kapal keruk per jam.
Kecepatan (V) dihitung konstan : 3 m/detik dan Grafitasi (g) : 9,8 m/detik. Garis energi dapat dilihat pada gambar.

Jawaban :
Terdapat 10 head loss (kehilangan energi) yaitu :
1.    Head loss di titik masuk :

H 1  = E 1 x V²/2 g = 0,4 x  3²/ 2 x 9,8 = 0,18 m.

2.      Head loss pipa pada ladder :

a  x L x V²
H2     = E2 ----------------- E2 = 0,02 + 0,0005 (1/0,61)  = 0,021
D  x  2 g

=  0,11

3.      Head loss pada pipa lengkung :

H3  = E3 x V²/ 2 g     E3 = sin²(225/2) + 2 sin (225/2) = 2,31

=  1,06 m.

4.      Head loss pada pipa hisap :

a  x L x V²
H4 = E4 -----------------     E4 = 0,02 + 0,0005 (1/0,61) = 0,021
D  x  2 g

= 0,38 m.

5.      Head loss pada pipa buang :

a  x L x V²
H5 = E5 ------------------                 E5 = a + ( b/ V x D)
D  x  2 g

1,2 x  290 x  3²                                  0,0018


= 0,021 x ----------------------              = 0,02 + ------------ 0,61  x  2  x  9,8                                                    3 x 0,16

=  5,5  m                                            =  0,021

6.      Head loss pada pipa lengkung :

H6  =  E6 x ( V² / 2 g)      E6 = sin² (150/2) + 2 sin (150/2)


=  1,23 m                                = 2,67

7.      Head loss pada pipa darat :

a  x L x V²
H7 = E7 ---------------- = 0,021 x 1,2 x (10/0,61) x (3²/2 x9,8)
D  x  2 g
=  0,78 m.

8.      Head loss akibat lengkung : H8 = H6 = 1,23 m.
a  x L x V²
9.  H9 = E7 ---------------- = 0,021 . 1,2 . (280/0,61) . (3²/2 . 9,8)
D  x  2 g

= 5,31 m.

10. Head loss akhir pipa :

H10 = V²/2 . g  = 3² / ( 2 x 9,8)

=  0,5 m.

Total  head loss = H1 + H2 + H3 +………….. + H10

= 0,18 + 0,78 + 1,06 + 0,38 + 5,5 +
1,23 + 0,78 + 1,23 + 5,31 + 0,5

= 16, 95 m.

Q =  A x V    = ¼ π . D² . V

= ¼ . 3,14 . 0,61² . 3

= 0,876 m³/detik.

pompa : P = (1000 . W . Q . H) / ( 75 . n )

= (1000 . 1,4 . 0,876 . 15,68 ) / (75 . n)

= 427 HP.
Kapasitas pengerukan/jam :

Q = 0,876 . 3600 =  3.121,2 m³ sediment

mpur  = 0,2 x 3121,2  =  624,24 m³.
baik dengan tenaga manusia maupun dengan alat berat.

t cocok untuk pengerukan sediment biasa dalam jumlah yang besar.
 dekat kaki suatu bangunan, kaki perkuatan lereng atau pilar jembatan.

erutama pada pengerukan lempung.

 pekerjaan ringan, reklamasi dan pekerjaan penggalian tanah.

eruk tipe Pompa :
pekerjaan penggalian biasa.
erjaan pengerukan.
ah, cara melaksanakan pengerukan dan dapat ditentukan ber- dasarkan pengalaman.

 dikeruk kembali kecuali apabila ditentukan secara khusus.

i jalan air, maka pipa penyemprotan haruslah dipasang sebagaimana pada Gambar dibawah ini.

l pengerukan tersebut langsung dibuang ke tepian sungai untuk reklamasi.
 8 jam,                         job efisiensi = 0,70 Waktu kerja per jam  = 50 menit, carry factor = 0,85

= 40 trip/jam

er  :  6.00 m

t dilihat pada gambar.
                     3 x 0,16

Anda mungkin juga menyukai