RENCANA ANGGARAN BIAYA

PEKERJAAN PENYEDIAAN KELAS BARU

TAHUN ANGGARAN 2019


No Uraian Pekerjaan Volume Satuan

(1) (2) (3) (4)


(Nama JENIS PROPOSAL)
I Sentra Bahan Alam

Sub Total
II Sentra Persiapan

Pembuatan direksi keet 20 M2

Pembersihan area 3 Is
Sub Total
III Pekerjaan Tanah dan Urugan

Urugan pedel t = 20 cm 83 M2
Urugan pasir bawah lantai t = 45.5 M2
Sub Total
IV Pekerjaan Beton

Strous 2.16 M3
Poer 100 x 100 x 30 1.53 M3
Sloof 20/40 2.71 M3
Kolom 30/40 3.06 M3
Kolom praktis 15/15 0.082 M3
Balok struktur 20/40 2.71 M3
Plat deck lantai 2 t. 12 cm 6.024 M3
Lantai kerja 0.36 M3
Litsplank 15/80 0.57 M3

IV Pekerjaan Beton

Sub Total
TOTAL
Terbilang : .........................................................................................

Kepala Madrasah……….

....(Nama Jelas)....
A ANGGARAN BIAYA

KELAS BARU

2019
Harga Satuan (Rp.) Jumlah (Rp)

(5) (6)

348,000.00 6,960,000.00

376,000.00 1,128,000.00

8,088,000.00

72.000,00 5,976,000.00

82,000.00 3,751,000.00

9,707,000.00

1,896,500.00 4,096,440.00
2,107,975.00 3,225,101,75
2,682,150.00 7,268,523.50
2,766,400.00 8,465,184.00
2,723,300.00 223,200.60
3,124,300.00 8,466,853.00
2,007,475.00 12,093,027.40
500,750.00 180,270.00
2,940,175.00 1,675,799.75

Rp. ,-
..............
…………, ………………..
2019
Bendahara

....(Nama Jelas)....
No PEKERJAAN VOLUME SATUAN
1 2 3

I PEKERJAAN PERSIAPAN
1 Pembuatan direksi keet 20 M2
2 Pembersihan area 3 Is

II PEKERJAAN TANAH DAN URUGAN


1 Urugan pedel t = 20 cm 83 M2
Urugan pasir bawah lantai t =
2 45.5 M2
10 cm

III PEKERJAAN BETON


1 Strous 2.16 M3
2 Poer 100 x 100 x 30 1.53 M3
3 Sloof 20/40 2.71 M3
4 Kolom 30/40 3.06 M3
5 Kolom praktis 15/15 0.082 M3
6 Balok struktur 20/40 2.71 M3
7 Plat deck lantai 2 t. 12 cm 6.024 M3
8 Lantai kerja 0.36 M3
9 Litsplank 15/80 0.57 M3

IV PEKERJAAN PASANG DAN PLESTERAN


1 Pasang dinding 1 : 3 78 M2
2 Pasang plester 1 : 3 78 M3
3 Plamir tembok 2.052 M2

V PEKERJAAN LANTAI
Keramik lantai30 x 30 ex Asia
1 285 M2
Tile
2 Paving segi enam 17 x 21 m 357 M2
VI PEKERJAAN ATAP OVERSTEK
Konsol 6/12 + 2 ( 3/12 )
1 0.586 M3
kamper
2 Usuk 5/7 + reng 3/5 kamper 23 M2

VII PEKERJAAN PLAFON


1 Enternit 1 x 1 m 324 M2

VIII PEKERJAAN CAT


1 Cat dinding ex. Paragon 2.052 M2
2 Cat plafon ex. Paragon 310 M2
3 Cat kayu emco 210 M2

IX PEKERJAAN LAIN-LAIN
1 Pembersihan akhir 3 Is
HARGA SATUAN JUMLAH HARGA
4 5

348,000.00 6,960,000.00
376,000.00 1,128,000.00
Jumlah I 8,088,000.00

72,000.00 5,976,000.00

82,000.00 3,751,000.00

Jumlah II 9,707,000.00

1,896,500.00 4,096,440.00
2,107,975.00 3,225,101,75
2,682,150.00 7,268,523.50
2,766,400.00 8,465,184.00
2,723,300.00 223,200.60
3,124,300.00 8,466,853.00
2,007,475.00 12,093,027.40
500,750.00 180,270.00
2,940,175.00 1,675,799.75
Jumlah III 45,694,400.00

392,000.00 30,576,000.00
35,000.00 2,730,000.00
3,500.00 7,182,000.00
Jumlah IV 40,488,000.00

82,000.00 23,370,000.00

46,000.00 16,422,000.00
Jumlah V 39,792,000.00
5,400,000.00 1,393,200.00

76,000.00 1,748,000,00
Jumlah VI 3,141,200.00

16,000.00 5,184,000.00
Jumlah VII 5,184,000.00

17,000.00 34,884,000.00
17,000.00 5,270,000.00
33,500.00 7,035,000.00
Jumlah VIII 47,189,000.00

242,000.00 726,000.00
Jumlah IX 648,000.00