Anda di halaman 1dari 8

INSTALLATION OF PORTABLE

COMPACTOR

A project report
Submitted in partial fulfillment of the requirements for the award of the Degree
Of

BACHELOR OF ENGINEERING – CIVIL

By,
NIVEDITHA B M
Reg. No. 15GAECV069
VIII Semester

Under the guidance of


Dr. CHETHAN K
Assistant professor
Department of Civil Engineering
UVCE, Bangalore University
Jnanabharathi, Bengaluru- 560 056

Department of Civil Engineering


University Visvesvaraya College of Engineering
Bangalore University, Jnanabharathi
Bengaluru- 560 056
BANGALORE UNIVERSITY
UNIVERSITY VISVESVARAYA COLLEGE OF ENGINEERING
DEPARTMENT OF CIVIL ENGINEERING
JNANA BHARATHI, BENGALURU

This is to certify that the project work entitled “INSATLLATION OF PORTABLE


COMPACTOR” submitted by NISCHITH NIRMAL RAJ GS(15GAECV068), PAVAN
KUMAR KURATTI (15GAECV071), NIVIDITHA B M(15GAECV069) and SUNITHA S
N(15GAECV104) in partial fulfillment of the requirement for the award of degree of Bachelor of
Engineering civil during the academic year 2018-19 is the bonified report of the project of work
carried out by them under my guidance.

Dr. USHA N. MURTY Dr. CHETHAN K.


Professor and Chairperson Assistant Professor and guide
Department of Civil Engineering Department of Civil Engineering
UVCE, Bangalore University UVCE, Bangalore University
Jnanabharathi, Bengaluru-560 056 Jnanabharathi, Bengaluru-560 056

Examiners:

1.

2.
DECLARATION

We solemnly declare that the project work entitled “installation of portable compactor” submitted
to the Department of Civil Engineering, University visvesvaraya college of engineering, Bangalore
University, jnanabharathi , Bengaluru, for the partial fulfillment of degree of Bachelor of
Engineering civil is a bonafide report of the project work carried out by us. The material contained
in this report project has not been submitted to any university Institution / institution as a report for
the award of any degree or diploma. We also state that we have prepared this report under the guidance
of Dr.chethan k, professor, department of civil engineering, UVCE, Bangalore University,
jnanabharathi, Bengaluru.

Place: Bengaluru. NISCHITH NIRMAL RAJ GS

Date: May 2019 (15GAECV068)

PAVAN KUMAR KURATTI

(15GAECV071)

NIVEDITHA BM

(15GAECV069)

SUNITHA S N

(15GAECV104)
ACKNOWLEDGEMENT

We have great pleasure in expressing our deep sense of gratitude and indebtedness to
Dr. CHETHAN K, Professor, Department of Civil Engineering, UVCE, Bangalore University,
Jnanabharathi, Bengaluru for his patient guidance, encouragement, valuable suggestions and technical
pointers that has helped us in understanding and motivated us to probe further into the subject
throughout our course and seminar work. We wish to put on record our deep reverence and esteemed
thanks to him.

We express our sincere thanks to Dr. USHA N. MURTY, Professor and Chairperson, Dept. of Civil
Engineering, UVCE, Bangalore University, Jnanabharathi, Bangalore for her kind support to carry
out the project work.

We also express our deep gratitude to our respective beloved Family, who encouraged us to join the
course and for their constant support during different odds and our Friends for their understanding
and support throughout our course work.

Finally, would like to thank Faculty, Department of Civil Engineering, UVCE, Bangalore
University, Jnanabharathi, and Bengaluru, who have directly or indirectly helped us in successful
completion of project work.

June 2019
ABSTRACT

The general study of the municipal solid waste is required , to know about the waste generation and
source of waste in the city. As the population of a city grows, so does the waste that it generates. Along
with industrial and Commercial Development of a city, waste management system have to be revised
according to the city’s needs. Waste Management is an important aspect because if not done right , it could
lead to contamination and disease. Waste from Commercial establishments such as restaurants and cafes
mainly consist of food waste. Solid waste management is more esstintial for urban socities as they generate
a lot more garbages,; the availability of packaged food and other items leads to the accumulation of more
trash

The present study involve mainly the collection, compaction, transportation and disposal of
municipal solid waste by the installation of portable compactors. And the estimation and costing
,specification. The study area chosen is ward no 18 , south zone ,chickpete division,JC road.
The portable compactors are one which reduce the volume of solid waste. The solid waste is collected in different
methods And these waste is compacted by portable compactors .Once the waste is compacted , it is carried in a
waste transportor to disposal. The disposal is carried by buring ,dumping and landfilling. With the installation of
portable compactor the volume of waste got reduces ,so the space required for the disposal also get reduces.

To install the portable compactors a structure is constructed for the maintainance and process of compaction.
The specification and drawing of the structure is refered for the estimation and costing of the structure.
In this process it is possible to dispose more compacted solid waste in a particular area.Also maintainance
cleanness of the city and avoids diseases in the city.
CONTENTS

CHAPTER 1: INTRODUCTION 1-2

1.1 General 1

1.2 Scope of the study 2

1.3 Objectives 2

CHAPTER 2 LITERATURE REVIEW 3

2.1 General review 3

2.2 Concept 3
2.3 Solid waste manegement 3

CHAPTER 3 SOLID WASTE 7-9

3.1 Solid waste generation 7

3.2 Source of solid waste 7

CHAPTER 4 METHODOLOGY 9-23

4.1 Collection of solid waste 9

4.11 Collection methods 11

4.2 Compaction of solid waste by portable compactor 12

4.3 Portable compactors 16

4.4 Disposal of compacted solid waste 18

4.41 methods of solid waste disposal and management 20

4.5 Transportation 23

4.6 Transfer station 26

CHAPTER 5 RESULTS AND DISCUSSION 26-30

5.1 Estimation and costing 26

5.2 Need for estimation and Costing 26

5.3 Procedure of estimation (or) Method of estimating 26

5.4 Data required to prepare an estimate 26

5.4.1 Drawings 26

5.4.2 Specification 27

5.4.3 Rates 27

5.5 Lumpsum 27

5.6 Work changed establishment 27


5.7 Rules for Measurement 28

5.8 Methods of taking out Quantities 28

5.9 Estimation 30

5.9.1 Detailed Estimation 30

5.9.2 Abstract 34

CHAPTER 6 REFERENCES 35- 36