COVER
1
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
Contents
1. Tata Tertib Peserta Praktikum.......................................................................................................3
2. Denah Lokasi dan Jalur Evakuasi...................................................................................................4
3. Petunjuk Praktikum.......................................................................................................................5
3.1 Sifat.........................................................................................................................................5
3.2 Tujuan......................................................................................................................................5
3.3 Bahan/Reagen........................................................................................................................5
3.4 Peralatan.................................................................................................................................5
3.5 Keselamatan Kerja...................................................................................................................6
3.6 Dasar Teori..............................................................................................................................6
3.7 Langkah Kerja..........................................................................................................................7
3.8 Perhitungan...........................................................................................................................11
3.9 Tugas......................................................................................................................................11
3.10 Data hasil praktikum............................................................................................................13
3.11 Pembahasan dan Kesimpulan..............................................................................................16
2
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
3
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
4
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
3. Petunjuk Praktikum
3.1 Sifat
Keterampilan Pengenalan
Pembuktian Percobaan
3.2 Tujuan
Setelah mengikuti praktikum ini peserta mampu:
Mensetting Proportional+Derivative Controller terhadap perubahan input
Menjelaskan pengertian derivative action time
3.3 Bahan/Reagen
-
3.4 Peralatan
a) Proportional + Integral + Derivative Controller SLCD
5
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
b) Portable Potensiometer
c) Signal Generator
d) Recorder
e) Varible Resistor
f) Kabel penghubung
6
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
3 4 5
Keterangan :
1 . Variable Resistor
2. Signal generator
3. Portable Potensiometer
4. P + D Controller
5. Recorder
Switch 220 V AC
3. Ubah posisi switch pada aksi (ACTION) controller menjadi direct, TUNING Enable dan
7
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
START HOT.
Switch START
Switch Tuning
Switch Action
4. Tekan tombol M pada bagian depan controller untuk memposisikan Controler pada
posisi manual.
Tombol M
6.
Tentukan Set Point (SP) dengan nilai 50%
sehingga sejajar dengan PV
8
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
8. Tentukan Integral Time (TI) menjadi maksimum (9999) dan Derivative Time (TD) pada
Nilai Minimum (0)
9. Beri bias output sebesar 50 % dengan mengatur secara manual dari tombol atau dari
slider
9
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
10. Tunggu 15 detik dan tekan tombol Auto (A) pada bagian depan controller untuk
membuat controller menjadi bekerja secara Otomatis
Tombol A
11. Secara bertahap, beri signal gigi gergaji dengan frekwensi 0,05 cps (error akan
bergerak sebagai fungsi waktu berbentuk gigi gergaji).
12. Catat waktu Vs Output Controller pada recorder
13. Ulangi langkah 3 sampai 12 untuk PB = 50% dan Td = 10.
14. Ulangi langkah 3 sampai 12 untuk PB = 100% Td = 5
15. Ulangi langkah 3 sampai 13 untuk error dengan frekwensi 0,1 cps
16. Ulangi langkah 3 sampai langkah 13 untuk aksi reverse dari controller
10
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
3.8 Perhitungan
Menghitung Manipulated Variable (MV) dengan rumus
100 de
M e Td b
PB dt
3.9 Tugas
1. Mengisi tabel input Vs Output untuk
a. Bias output 50 % dengan PB 50%, dan 100% untuk Td = 5
kertas yang sama untuk frekwensi 0,05 cps
b. Bias output 50 % dengan PB 50%, dan 100% untuk Td = 10
kertas yang sama untuk frekwensi 0,05 cps
c. Bias output 50 % dengan PB 50%, dan 100% untuk Td = 5
kertas yang sama untuk frekwensi 0,1 cps
d. Bias output 50 % dengan PB 50%, dan 100% untuk Td = 10
kertas yang sama untuk frekwensi 0,1 cps
11
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
3. Bagaimana sifat controller ini bila dipakai dalam system pengaturan otomatis, berikan
alasan yang tepat
4. Beri kesimpulan saudara
12
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
Waktu ke MV Waktu ke MV
Error Max. atau Min Error Max. atau Min
Ukur Hitung Ukur Hitung
10
20
30
40
50
100 50
60
70
80
90
100
10
20
30
40
50
50 50
60
70
80
90
100
13
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
Waktu ke MV Waktu ke MV
Error Max. atau Min Error Max. atau Min
Ukur Hitung Ukur Hitung
10
20
30
40
50
100 50
60
70
80
90
100
10
20
30
40
50
50 50
60
70
80
90
100
14
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
Waktu ke MV Waktu ke MV
Error Max. atau Min Error Max. atau Min
Ukur Hitung Ukur Hitung
10
20
30
40
50
100 50
60
70
80
90
100
10
20
30
40
50
50 50
60
70
80
90
100
15
PPSDM MIGAS GEOTHERMAL OPERATION AND MAINTENANCE
DEVELOPMENT PROGRAM (GEODEP)
PT. SUPREME ENERGY MUARA LABOH
JOB SHEET PROCESS CONTROL SYSTEM
(PROPORTIONAL+DERIVATIVE CONTROL)
16