Scope of work for electrical work tunstile gate -BALARIYA MINE

S.No Work Details Rate Unit Qty Amount


1 Supply and installation of MDS(Legrand/SCHEINDER) make Distrubution
Board 8way schenider make which includes following items:-
(a)Incomer-40Amp two pole 30ma ELCB - 1 No.
35000 Nos 1 35000
(b)Outgoing- 25Amp Single pole MCB - 03 Nos(for power points,30ma
ELCB-02 FOR AIR CONDITIONER- & room lights).
(c) Outgoing - 16 Amp Single pole MCB- 03 Nos(for light points)
2 Wiring for Light, Ceiling Fan and Plug Point with supply of Single Core PVC
insulated , PVC sheathed 1.5 Sq.mm(multistrand conductor) copper wire
(ISI mark) concealed wiring with all required material such as 6 Amp
switches, 6 Amp sockets, modular switch roma make . 0.75Sqmm copper
earthwire to be laid throughout the wiring . All switches, sockets should be
of modular roma brand anchor make.Circuit wiring is included in this
item.
(a) Light Point with reqd. accessories. 1000 Nos 20 20,000
(b) 6 Amp 5 Pin universal Socket with switch. 1000 Nos 10 10,000
(d) Exhaust Fan point 9" with blowers 7500 Nos 2 15,000
3 Wiring of POWER POINT with supply of Single Core PVC insulated PVC
sheathed 2.5 Sq.mm (Multistrand conductor) copper wire (ISI mark)
conceled wiring all required material such as 16 Amp switches and 16
amp sockets modular switch with roma brand 1.5Sq mm copper 10000 Nos 7 70,000
earthwire to be laid throughout the wiring. All switches, sockets, wire
should be of roma brand anchor make. Circuit wiring is included in this
item.
4 Supply & installation of :-
5KV single phase 230volt AC, 50hrtz UPS with minimum 4hrs battery back
up including all accessories like stand, sixteen battery 100AH make 3E+05 nos 1 320,000
legerand (numiric)

5 Recess mounted direct indirect down light laminar with double portable
louvers with acrylic diffusers with 39 W LEDLIGHTS (600 x 600 mm ) .Wipro 3500 Nos 15 52,500
/ Havells Make

6 Wipro / Havells Down lighter : 2 X 18W CFL /LED lights . 500 Nos 15 7,500
7 Supply and installation of 9 inch exhaust fan ISI mark with bloowers
Make - Khaitan/Crompton/As per Engineer-Incharge Approval. 5000 Nos 2 10,000

8 Supply and installation of 1.5 Ton split Air conditioner, Wall Mounting
with reciprocating compressor with all material including remote control,
32A MCB & MDS make metal clad Socket box. Outer unit to be placed at
roof or MS stand grouted on wall and wiring, copper tubing, water drain
pipe and power lead etc is to be provided accordingly for required 65000 Nos 2 130,000
lenghth. AC should be "5" star rating
Make :- Voltas/LG only.

9 Erection of Earthing pit with brick chamber & MS cover, of 3 Mtr length
40mm Dia GI pipe, putting charcoal and salt into pits as per IS: 3043 with
masonry work. Including Supply of all required material, GI Pipe, MS cover
etc. E/P should be connected through GI strips (40*6mm)/GI WIRE 8NO to 30000 Nos 1 30,000
power panel/ DISTRIBUTION BOARD

Total :- 700,000
Scope of work for electrical work tunstile gate -NORTH BAROI
S.No Work Details Rate Unit
1 Supply and installation of MDS(Legrand/SCHEINDER) make Distrubution Board
8way schenider make which includes following items:-
(a)Incomer-40Amp two pole 30ma ELCB - 1 No.
30000 Nos
(b)Outgoing- 25Amp Single pole MCB - 03 Nos(for power points, 30ma ELCB-01
FOR AIR CONDITIONER & room lights).
(c) Outgoing - 16 Amp Single pole MCB- 03 Nos(for light points)
2 Wiring for Light, Ceiling Fan and Plug Point with supply of Single Core PVC
insulated , PVC sheathed 1.5 Sq.mm(multistrand conductor) copper wire (ISI
mark) concealed wiring with all required material such as 6 Amp switches, 6
Amp sockets, modular switch roma make . 0.75Sqmm copper earthwire to be
laid throughout the wiring . All switches, sockets should be of modular roma
brand anchor make.Circuit wiring is included in this item.

(a) Light Point with reqd. accessories. 1000 Nos


(b) 6 Amp 5 Pin universal Socket with switch. 1000 Nos
(d) Exhaust Fan point 9" with blowers 7500 Nos
3 Wiring of POWER POINT with supply of Single Core PVC insulated PVC
sheathed 2.5 Sq.mm (Multistrand conductor) copper wire (ISI mark) conceled
wiring all required material such as 16 Amp switches and 16 amp sockets
modular switch with roma brand 1.5Sq mm copper earthwire to be laid 10000 Nos
throughout the wiring. All switches, sockets, wire should be of roma brand
anchor make. Circuit wiring is included in this item.

4 Supply & installation of :-


5KV single phase 230volt AC, 50hrtz UPS with minimum 4hrs battery back up
including all accessories like stand, sixteen battery 100AH make legerand 320000 nos
(numiric)

5 Recess mounted direct indirect down light laminar with double portable
louvers with acrylic diffusers with 39 W LEDLIGHTS (600 x 600 mm ) .Wipro / 3500 Nos
Havells Make

6 Wipro / Havells Down lighter : 2 X 18W CFL lamps. 500 Nos


7 Supply and installation of 9 inch exhaust fan ISI mark with bloowers
5000 Nos
Make - Khaitan/Crompton/As per Engineer-Incharge Approval.
8 Supply and installation of 1.5 Ton split Air conditioner, Wall Mounting with
reciprocating compressor with all material including remote control, 32A MCB
& MDS make metal clad Socket box. Outer unit to be placed at roof or MS
stand grouted on wall and wiring, copper tubing, water drain pipe and power 65000 Nos
lead etc is to be provided accordingly for required lenghth. AC should be "5"
star rating
Make :- Voltas/LG only.
9 Erection of Earthing pit with brick chamber & MS cover, of 3 Mtr length 40mm
Dia GI pipe, putting charcoal and salt into pits as per IS: 3043 with masonry
work. Including Supply of all required material, GI Pipe, MS cover etc. E/P
should be connected through GI strips (40*6mm)/GI WIRE 8NO to power 30000 Nos
panel/ DISTRIBUTION BOARD

Total :-
TH BAROI
Qty Amount

1 30000

15 15,000
10 10,000
1 7,500

5 50,000

1 320,000

10 35,000

10 5,000

1 5,000

1 65,000

1 30,000

Total :- 572,500
Scope of work for electrical work tunstile gate -ZAWAR MALA MINE
S.No Work Details Rate Unit
1 Supply and installation of MDS(Legrand/SCHEINDER) make Distrubution Board
8way schenider make which includes following items:-
(a)Incomer-40Amp two pole 30ma ELCB - 1 No.
30000 Nos
(b)Outgoing- 25Amp Single pole MCB - 03 Nos(for power points, 30ma ELCB-02
FOR AIR CONDITIONER & room lights).
(c) Outgoing - 16 Amp Single pole MCB- 03 Nos(for light points)
2 Wiring for Light, Ceiling Fan and Plug Point with supply of Single Core PVC
insulated , PVC sheathed 1.5 Sq.mm(multistrand conductor) copper wire (ISI
mark) concealed wiring with all required material such as 6 Amp switches, 6
Amp sockets, modular switch roma make . 0.75Sqmm copper earthwire to be laid
throughout the wiring . All switches, sockets should be of modular roma brand
anchor make.Circuit wiring is included in this item.

(a) Light Point with reqd. accessories. 1000 Nos


(b) 6 Amp 5 Pin universal Socket with switch. 1000 Nos
(d) Exhaust Fan point 9" with blowers 7500 Nos
3 Wiring of POWER POINT with supply of Single Core PVC insulated PVC sheathed
2.5 Sq.mm (Multistrand conductor) copper wire (ISI mark) conceled wiring all
required material such as 16 Amp switches and 16 amp sockets modular switch
with roma brand 1.5Sq mm copper earthwire to be laid throughout the wiring. All
switches, sockets, wire should be of roma brand anchor make. Circuit wiring is 10000 Nos
included in this item.

4 Supply & installation of :-


5KV single phase 230volt AC, 50hrtz UPS with minimum 4hrs battery back up 320000 nos
including all accessories like stand, sixteen battery 100AH make legerand
(numiric)
5 Recess mounted direct indirect down light laminar with double portable louvers
3500 Nos
with acrylic diffusers with 39 W LEDLIGHTS (600 x 600 mm ) .Wipro / Havells Make
6 Wipro / Havells Down lighter : 2 X 18W CFL /LED lights . 500 Nos
7 Supply and installation of 9 inch exhaust fan ISI mark with bloowers
5000 Nos
Make - Khaitan/Crompton/As per Engineer-Incharge Approval.
8 Supply and installation of 1.5 Ton split Air conditioner, Wall Mounting with
reciprocating compressor with all material including remote control, 32A MCB &
MDS make metal clad Socket box. Outer unit to be placed at roof or MS stand
grouted on wall and wiring, copper tubing, water drain pipe and power lead etc is 65000 Nos
to be provided accordingly for required lenghth. AC should be "5" star rating
Make :- Voltas/LG only.

9 Erection of Earthing pit with brick chamber & MS cover, of 3 Mtr length 40mm Dia
GI pipe, putting charcoal and salt into pits as per IS: 3043 with masonry work.
Including Supply of all required material, GI Pipe, MS cover etc. E/P should be 30000 Nos
connected through GI strips (40*6mm)/GI WIRE 8NO to power panel/
DISTRIBUTION BOARD
Total :-
MALA MINE
Qty Amount

1 30000

20 20,000
10 10,000
2 15,000

7 70,000

1 320,000

15 52,500

15 7,500

2 10,000

2 130,000

1 30,000

Total :- 695,000
Mines TurnStile Gate
Scope of Works
S.NO Description Unit Quantity Rate Amount
1 Zawar Mala mines
Construction of RCC framed structure building construction as per
the scpecification with all fittings and fixtures complete in all
1.1 respect for use of Turnstile Gate Area. Sqm 39 18000 702000
( Layout drawing shall be provided by HZL ) , Detailed drawings
shall be done by the vendor to be verified by HZL

Construction of RCC structure building construction as per the


scpecification with all all fittings and fixtures complete in all
1.2 respect for use of Security cabin , Reception room and toilets area. Sqm 55 18000 990000
( Layout drawing shall be provided by HZL ) Detailed drawings
shall be done by the vendor to be verified by HZL

Dismalting of existing secuity cabin and associated stucture,


boundary wall ect required for construction of turnstile gate
1.3 LS 1 125000 125000
facilities complete as per the direction of engineer incharge.
( all generated scrap to be returned to store )

Removal of existing Parking shed and relocation with in 100 mtr


1.4 including required foundations , RCC Flooring , painting etc Sqm 150 2500 375000
complete as per direction of engineer in charge
2 Balariya Mines
Construction of RCC framed structure building construction as per
the scpecification with all fittings and fixtures complete in all
1.1 respect for use of Turnstile Gate Area. Sqm 55 18000 990000
( Layout drawing shall be provided by HZL ) , Detailed drawings
shall be done by the vendor to be verified by HZL

Construction of RCC structure building construction as per the


scpecification with all all fittings and fixtures complete in all
1.2 respect for use of Security cabin , Reception room and toilets area. Sqm 55 18000 990000
( Layout drawing shall be provided by HZL ) Detailed drawings
shall be done by the vendor to be verified by HZL

Dismalting of existing secuity cabin and associated stucture,


boundary wall ect required for construction of turnstile gate
1.3 LS 1 125000 125000
facilities complete as per the direction of engineer incharge.
( all generated scrap to be returned to store )
3 North Baroi
Construction of RCC framed structure building construction as per
the scpecification with all fittings and fixtures complete in all
1.1 respect for use of Turnstile Gate Area. Sqm 39 18000 702000
( Layout drawing shall be provided by HZL ) , Detailed drawings
shall be done by the vendor to be verified by HZL
Construction of RCC structure building construction as per the
scpecification with all all fittings and fixtures complete in all
1.2 respect for use of Security cabin , Reception room and toilets area. Sqm 17 18000 306000
( Layout drawing shall be provided by HZL ) Detailed drawings
shall be done by the vendor to be verified by HZL

Dismalting of existing secuity cabin and associated stucture,


boundary wall ect required for construction of turnstile gate
1.3 LS 1 125000 125000
facilities complete as per the direction of engineer incharge.
( all generated scrap to be returned to store )
TOTAL 5,430,000
Remarks
SL Location Turnstile Gate Rate Amount
1 North Baroi Network, Printer & Camera 125000 125000
2 Zawarmala Network,& Printer & Camera 125000 125000
3 Balaria Network, Desktop & Printer & Camera 125000 125000
1 V.T.C and Medical to be provided to our employ
2 Work will be executed after issue of gate pass
3 No penalty will be liable in H.R Clearance due to delay payment of our invoice
4 No B.G will be given

Anda mungkin juga menyukai